Loading...
HomeMy WebLinkAboutRenton Survey Due Diligence_Form2022.11.29V 22.07.28 Project Name: SURVEY & DUE DILIGENCE FORM Project Address: Survey Visit Date:Survey Time: Building Area: As-Builts Received? As-Builts Requested from City if LL did not Provide? Y / N Arch: Y / N Structural: Y / N Mech: Y / N Elect: Y / N Plumbing: Y / N Fire: Y / N Previous Tenant: General Site Description: General Building Description: Urgent Item(s) Description: Location of Site Utilities Description: # of Levels: Architect Contact:MEP Engineer Contact: Landlord Contact:Structural Engineer Contact: Field Survey General Information Climate (Warm/Cold) TRT ID: Name: Name:Name: Developer: Name: Company: Company:Company: Phone:Phone: Phone:Phone: Email:Email: Email:Email: Work Letter Received: Landlord Approval Required: GC & Subs Info Required: 3D Renderings Required: Material Sample Board Req: Digital Material Sample Board Allowed: Yes No Approval Timeline: Approval Letter Required by Jurisdiction? Y / N Additional Notes: Landlord Items V 22.07.28 Zoning Procedures Required: Site Plan Review Triggered by Exterior Improvements? Concurrent Reviews Allowed? Rezoning? CUP? Yes No Applicable Code Sections: Site Plan Process/ Timeline: Additional Notes: Procedure Timeline:Estimated Zoning Fees: Jurisdiction: Zoning Information:Planning Department Contact: Zoning: Zoning District: Zoning Map Link: Zoning Code Link: Name: Phone: Email: Permitted Uses Sales, New Full Body Repair Sales, Used Full Body Paint Service, Major Minor Body Paint Service, Minor Vehicle Storage V 22.07.28 Height/S.F. Limitations: Storage Limitations: Additional Notes: Parts & Storage Shelving/ Racking Outdoor Tire Storage Allowed: Structural Calculations Required: Yes No Seismic Anchoring Required: Deferred Submital Required: Does Outdoor Tire Storage need to be covered per local jursidiction: In-rack Sprinklers Required: Racking Signage Required: Y / N Permitting Timeline, if Deferred: Inspection for Paint Booths/ Curbs: If Deferred, Permitting Timeline: Requirements for Exhaust Ducts: Deferred Submittal for Paint Booth/ Spray Booth Equipment: Paint Booth Permit Requirements: Yes No Signed / Sealed by Engineer Required:Distance from Property Line: Vertical Distance (height) past Roof Line: Air Quality Permit Required? Air Quality Permit Process/Timeline/Fees: Y / N Permitting Timeline: DO NOT LEAVE BLANK Initial Review Second Review Third Review OTC Review Allowed for Plan Check Comments? Permitting Timeline with Expeditor: DO NOT LEAVE BLANK CofO Transfer Timeline: List Permit Submittal Requirements: Names of Expeditors Most Frequently Used in City: Estimated Fees (at time of submittal): Estimated Impact Fees: 3rd Party Review Allowed? Y / N 3rd Party Cost/Timeline: Estimated CofO Transfer Fees: Permit Requirements: Hazmat Documents/ Building Permit Application Forms: Signatures Required: Landlord Tesla Notarized Documents Required: Landlord Tesla Other:Other: Estimated Fees (to pull permit): Expeditor Allowed: Over the Counter Allowed: Landlord Approval Required: Trade Permits Only Allowed: GC & Subs Info Required: Energy Calcs Required: Design-Build Allowed: Fire Protection Engineer Required: Hot Work Operating Permit from local fire authority required? (Collision Only) Sprinkler Drawings Required Impact Fees Required: Special Inspections Required: Existing Active Certificate of Occupancy: Can CofO be transferred to Tesla prior to Construction: Permits Req for Construction: Demo Permit Allowed: Yes NoPermits (at permit submittal): (deferred submittal): Geotech Report Required: Allowed to have two active permits under same address: Yes No Yes No V 22.07.28 Existing Toilets Compliant: Existing Drinking Fountain: Drinking Fountain Req: Office Daylighting Req: Breakroom Daylighting Req: Existing Landscape Compliant: Landscape Well Maintained: Yes No Additional Notes: Maximum # of Employees Allowed for Existing Toilet Compliance: Area per Employee Required for Office Daylight Compliance: Area per Employee Required for Breakroom Daylight Compliance: Code Information Building Official Contact:Fire Department Official Contact: Name: Building: Energy: Accessibility: Fire: EHS: Landscape: Additional Notes: Phone: Structural: Email: Mechanical: Electrical: Plumbing: Name: Year: Year: Year: Year: Year: Year: Phone: Year: Email: Year: Year: Year: Applicable Codes: Environment, Health & Safety Visible Water Damage: Are there any overt environmental or health and safety risks to opening a site in this location? Sufficient space for 30 foot radius for vehicles brought in with known thermal issues? Are there local ordinances that impact intended buisness operations? (e.g. residential areas and noise ordinances) Underground Storage Tank Present? Is there a spark-free area? (no electrical panels/switches, can be used to store hazardous waste) Areas designated for material storage are separated by 5ft from sources of ignition? Above-ground Storage Tank Present? Filled? Filled? Decommissioned Per Code? Decommissioned Per Code? Source of Water Damage: Yes Yes No No Additional Notes: V 22.07.28 Existing Service Equipment: Service Equipment Functional: Public Charging Required: Accessible Charging Required: Existing parking surface in good condition: Change of elevation or grade on same level: All Turns Allow for 50’+ Radius Clearance for Fire/Hauling Trucks: Area on Property for Dedicated Vehicle Staging? Areas of Cross Traffic? (Pedestrians, Vehicles, Trucks) Proper Signage/Demarcation to Direct Drivers and Customers? (If Unable to Separate Service Dropoff from Delivery) Yes Yes Yes Yes No No No No If Existing, Take Photos of Model # and Provide Details: Architectural Site: Building Exterior: Customer Facing Areas: BOH Support Areas: # of Parking: Site Improvement Recommendations: Site Easements: Exterior Building Improvement Recommendations: Building Insulation Type:Upgrade Required? Y / N Customer Facing Area Improvement Recommendations: BOH Support Area Improvement Recommendations: # of Parking Req: Does this facility have enough space? (SF, Parking, RR, Offices, etc) Clearance Height of 14’ - 6” for Truck Route? Grade Changes >5° at Drive Ingress/Egress? Existing Loading Docks Assessed for/Equipped with Dock-Levelers? (from Trees, Powerlines, Bridges, Parking Structures, Building Overhangs)Area on Property (Not Roadway) for Dedicated Truck Unloading/Loading? (110’ Long, 14’ Wide, Supports 80k lbs / Truck) # of Accessible Parking Req: # of Accessible Parking: Vehicle Service Areas: Existing Electrical Drops/ Concrete Slab Undisturbed Area Improvement Recommendations: Manual: Number of Existing Roll Up Doors: Automatic: - Standard Speed - High Speed Roll Up Door Opens: Yes No Roll Up Door Closes: Roll Up Door Recommendations: Trash Enclosure: Existing: Required per local jurisdiction: Yes No Please indicate where in local ordinance the trash enclosure requirement is notated: Local Trash Company Contact Info: How many dumpsters required for our use: V 22.07.28 Existing Steel Fireproofing: Fireproofing Required: Existing Cooling System: Cooling System Code Req: Existing Heating System: Existing Ventilation System: Heating System Code Req: Ventilation System Code Req: Existing Systems Operational: Yes Yes No No Slab Thickness: Floor Load Capacity: Slab Condition: (leveled?) Mezzanine Load Capacity: (if applicable) 2nd Floor Load Capacity: (if applicable) Cooling System Description: Heating System Description: Ventilation System Description: Mechanical Improvement Recommendations: Structural Improvement Recommendations: Structural Mechanical Seismic Zone: Structural Assessment Completed?Limitations to traffic flow/staging?If Yes, outline below: Is structural load capacity sufficient to support all vehicle variants? Roof assessment completed: Soil Type: Existing Stairs: Existing Stairs Compliant: Existing Elevators: Existing Ramps: Existing Elevators Compliant: Existing Ramps Compliant: Yes Yes Yes No No No Vertical Transportation Improvement Recommendations: Vertical Transportation: Existing Ramp* Slopes: *Maximum Vehicle Ramp Slope is 16% or 1:6 V 22.07.28 Existing Electrical Service: Existing Lights in Customer Facing Area Operational: Existing Lights in BOH Area Operational: Existing Lights in Service Area Operational: Existing Site Lighting: Existing Exterior Building Lighting: Sufficient Functional Lighting in Proposed Loading, Unloading, Drop Off, Pickup Zones to Support Nighttime Operations? Existing Electrical Meter: Separate Service Allowed for EV Charging? Existing Equipment Reusable: Existing Telephone Conduit: Existing Fiber Connection: Telephone System Reusable: Fiber Connection Reusable: Yes Yes No No Electrical Improvement Recommendations: Lighting Improvement Recommendations: Electrical Volts: Existing Light Type in Customer Facing Area: Existing Light Type in BOH Area: Existing Light Type in Service Area: Description of Site Lighting: Description of Exterior Building Lighting: Phase:Wire:Amps/kVA: Additional Notes: Utility Company: Max Capacity Allowed by Grid: Power Upgrade Timeline: Estimated Power Upgrade Fees: Lighting: Building Power: Showroom: General Shop/Parts and Storage: Prep Area: Service Work Bays/ Detailing/ Battery Repair/ Wash Bay: Customer Drop Off: Customer Lounge: Office: Existing (FC)Prototype (FC) 100 50 150 100 90-100 30-50 50 Utility Company Scope of Work: V 22.07.29 Existing Water Meter: Existing Domestic Cold/Hot: Water Meter Reusable: Existing Oil/Sand Separator: If Yes, are the wastewater discharge lines from Washbay/Laundry/Floor Drains plumbed into the inlet of Existing Oil/Sand Separator prior to discharging into the sewer lines? Condition of SOI: (If Visible) Compliant for Reuse? Oil/Sand Separator Code Req: SOI Code Size Requirements: Yes No Additional Notes: Plumbing Utility Company:Gas Upgrade Timeline: Estimated Gas Upgrade Fees: Existing Gas Service: Yes No If Existing, Gas Pipe Size: If Existing, Gas Meter Size: If Existing, Gas Pressure: Location of Gas Meter: Additional Notes/ Improvement Recommendations: Plumbing Improvement Recommendations: Gas V 22.07.28 CCTV Installed: Existing Windows Fixed or Have Locks: Existing Windows Tempered: Existing Gates at Ingress/ Egress Points: Roof Accessible from Interior Hatch: Roof Accessible from Exterior Ladder: Access Control Room: Intruder Alarm System: Electronic Key Lock at Entry Points Installed: Area/Locality/Site Reviewed for Public Safety: (e.g. Local Crime Stats) Security Signage: Fenced Parking Area: Free of Graffiti/Vandalism: CCTV Signage Installed: Security Shutters Installed: Yes NoSecurity/IT Additional Notes: AOR Notes: Fence Specs Allowed in Local Jurisdiction: Existing Fence Type: Height: Motorized? Badge Access? Operational? Will New Fence Trigger Additional Reviews With Local Jurisdiction? Y / N Y / N Y / N Y / N Sprinklers Required: Sprinkler Main Size & Flow Rate: Sprinkler Type: Wet / Dry (circle one) Existing Sprinklers: Existing Egress Sufficient: Existing Site in Compliance: Existing Fire Alarms: Fire Alarms Required: Printed MSDS Binder Requried: Existing Smoke Detection: Waterproof Paper Required: Existing Emergency Lighting: Existing Fire Shutter: Existing Hose Reels: Smoke Detection Required: Emergency Lighting Req: Fire Shutter Required: Hose Reels Required: Fire System Upgrades for Battery Storage Required: Sprinkler heads compatible with ceiling type? Yes Yes No No Additional Notes: Should Existing Fire Systems Be Updated Based on New Building Usage and Remodeling? If Yes, Hydraulics/Flow Calcs Needed: If Site is Not in Compliance, Provide Description: Min Sprinkler Radius: Existing Fire Alarm Monitor Company: Max Sprinkler Radius: Fire Systems Existing Fiber: Permitting Timeline: Previous Provider: V 22.07.28 Signage Landlord Approval Required: Variance Required: Illuminated Signs Allowed: Illuminated Signs Required: Monument Sign Allowed: Temporary Signs Allowed: Yes No Permitting Timeline: Additional Notes: Estimated Permitting Fees: Description of Signage Calculation Formula: Description of Signage Restrictions: Existing Monument Sign Height (if applicable):