Loading...
HomeMy WebLinkAboutAdden 3AMENDMENTNO.3TOAGREEMENTCAGͲ17Ͳ011FOR ENGINEERINGSERVICESFOR TRANSPORTATIONBRIDGEPROGRAM THISAMENDMENT,datedforreferencepurposesonlyasDecember21,2022,isbyandbetween theCityofRenton(the“City”),aWashingtonmunicipalcorporation,andSargentEngineers,Inc. (“Consultant”),aWashingtoncorporation.TheCityandtheConsultantarereferredtocollectively inthisAmendmentasthe“Parties.”OncefullyexecutedbytheParties,thisAmendmentis effectiveasofthelastdatesignedbybothparties. Whereas,theCityengagedtheservicesoftheConsultantunderAgreementCAGͲ17Ͳ011,dated 2/13/2017,toprovidenecessaryservicesfortheTransportationBridgeProgram(referredto hereinasthe“Agreement”); Whereas,thePartieswishtoamendtheAgreementtochangethetimeforperformanceand changethecompensationinordertocontinueprovidingnecessaryservicesforthe TransportationBridgeProgram. NOWTHEREFORE,ItismutuallyagreeduponthatCAGͲ17Ͳ011isamendedasfollows: 1. ScopeofWork:Section1,ScopeofWork,isnotchanged. 2.TimeofPerformance:Section3,TimeofPerformance,isamendedpursuanttothe schedule(s)setforthinExhibitBͲ3.AllWorkshallbeperformedbynolaterthan December31,2024. 3. Compensation:Section4,Compensation,isamendedsothatthemaximumamountof compensationpayabletoConsultantisincreasedby$30,000from$210,000to$240,000, plusanyapplicablestateandlocalsalestaxes.Theadditionalcompensationshallbepaid baseduponWorkactuallyperformedaccordingtotherate(s)oramountsspecifiedin ExhibitBͲ3,whichisattachedandincorporatedherein. 4.AlltermsoftheAgreementnotexplicitlymodifiedhereinshallremaininfullforceand effectandsuchtermsshallapplytoWorkperformedaccordingtothisAmendmentasif fullysetforthherein.            CAG-17-011, Adden #3-22 PAGE 2 OF 2 IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Martin Pastucha Public Works Administrator Jessica Soward Principal _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Moloney Renton City Attorney Contract Template Updated 06/17/2021 ______________________________________________________________________ Jeeeeeeeeeeeeeeesssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssica Soward Principal 12/14/2022               N/A Approved by Cheryl Beyer via 12/16/2022 email ExhibitBͲ3 Page1of4 SargentEngineers,Inc. NOTTOEXCEEDRATESCHEDULE EffectiveJanuary1,2023throughDecember31,2024 1. Personnel Classification2023HourlyRate2024HourlyRate Principal$240.70$264.78 SeniorEngineer$211.57$232.73 SeniorProjectEngineer$211.57$232.73 ProjectEngineer$191.64$210.81 DesignEngineer$160.98$177.08 EngineeringIntern$107.32$118.05 DrafterII$125.72$138.29 BusinessManager$177.85$195.63 BusinessAssociate$122.65$134.92 Clerical$104.25$114.68 Overhead:176.63% Profit:30%ofDSC 2. Equipment 2023Rates2024Rates FieldEquipment2023BlueBook2024BlueBook 3. ReimbursableExpenses 2023Rates2024Rates Mileage 2023IRSStandardRate2024IRSStandardRate            June 17, 2022 Sargent Engineers, Inc. 320 Ronlee Lane NW Olympia, WA 98502 Subject: Acceptance FYE 2021 ICR CPA Report Dear Molly Cichosz: We have accepted your firms FYE 2021 Indirect Cost Rate (ICR) of 176.63% of direct labor Shannon & Wilson Associates, LLP. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with the firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah WĂŐĞϮŽĨϰ džŚŝďŝƚͲϯ            ExhibitBͲ3 Page3of4 Subconsultant:WatershedScience&Engineering,Inc. NOTTOEXCEEDRATESCHEDULE EffectiveJanuary1,2023throughDecember31,2024 1. Personnel Classification2023HourlyRate2024HourlyRate SeniorProfessional$227.87$239.27 SeniorEngineerI$201.06$211.12 SeniorEngineerII$181.23$190.29 SeniorGeomorphologist$160.85$168.89 StaffEngineer$140.75$147.78 JuniorEngineerI$120.64$126.67 EngineeringIntern$83.64$87.83 ContractAdministrator$90.61$95.14 Overhead:148.81% Profit:30%ofDSC 2. Equipment 2023Rates2024Rates UAS(drone)andCamera $100/day,$300/week$100/day,$300/week TotalStationSurveyPackage $200/day,$550/week$200/day,$550/week AutoͲLevelSurveyPackage $50/day,$150/week$50/day,$150/week FlowMeter/StreamGagingPackage $100/day,$300/week$100/day,$300/week ReimbursableExpenses 3. 2023Rates2024Rates Travel Mileage2023IRSStandardRate2024IRSStandardRate MealsandLodging2023GSAPerDiemRate2024GSAPerDiemRate ParkingFeesAtCostAtCost            July 7, 2022 Watershed Science and Engineering, Inc. 506 2nd Avenue, Ste 2700 Seattle, WA 98104 Subject: Acceptance FYE 2021 ICR Risk Assessment Review Dear Larry Karpack: Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2021 ICR of 148.81% of direct labor. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah WĂŐĞϰŽĨϰ džŚŝďŝƚͲϯ