HomeMy WebLinkAboutContractSMALL PUBLIC WORKS CONTRACT AGREEMENT
THIS AGREEMENT (“Agreement”) is made as of the _____ day of ________, 2023, (the
“Effective Date”) by and between the City of Renton, a non-charter code city under RCW 35A,
and a Washington municipal corporation (“City”), Facilities Department and Apex Mechanical ,
(“Contractor”), a ___________who are collectively referred to as the “Parties”, to Replacement
of both Centrifugal Pumps and Motors for the Lazy River at the Henry Moses Aquatic Center;
1719 Maple Valley Hwy, Renton WA 98057. City and Contractor agree as set forth below.
1. Scope of Work : Contractor will provide all material and labor necessary to perform all
work described in the Scope of Work which is attached and fully incorporated into this
Agreement by reference as Attachment “A.”
2. Changes in Scope of Work: City, without invalidating this Agreement, may order changes
to the Scope of Work consisting of additions, deletions or modifications, the Agreement
Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work
shall be authorized by written Change Order or Amendment signed by the Parties.
3. Time of Performance: Contractor shall commence performance of the Agreement no later
than 120 days calendar days after the Agreement’s Effective Date.
4. Term of Agreement: The Term of this Agreement shall end at completion of the Scope of
Work, no later than 120 days from the Effective Date or on _December 31
st, 2023. This
Agreement may be extended to accomplish change orders, if required, upon mutual
written agreement of City and Contractor.
5. Agreement Sum: The total amount of this Agreement is the sum of ($54,482.99)which
includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed
amount based on changes to the Scope of Work.
6. Consideration: In exchange for Contractor’s performance of the items and responsibilities
identified in the Scope of Work, City agrees to make payment of the amount identified as
the Agreement Sum.
7. Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the
Work will only be made after the Work has been performed and a voucher or invoice is
submitted in a form acceptable to the City.
CAG-22-411
3rd January
1/3/2023
Approved by Cheryl Beyer via 12/9/2022 email