Loading...
HomeMy WebLinkAboutContractSMALL PUBLIC WORKS CONTRACT AGREEMENT THIS AGREEMENT (“Agreement”) is made as of the _____ day of ________, 2023, (the “Effective Date”) by and between the City of Renton, a non-charter code city under RCW 35A, and a Washington municipal corporation (“City”), Facilities Department and Apex Mechanical , (“Contractor”), a ___________who are collectively referred to as the “Parties”, to Replacement of both Centrifugal Pumps and Motors for the Lazy River at the Henry Moses Aquatic Center; 1719 Maple Valley Hwy, Renton WA 98057. City and Contractor agree as set forth below. 1. Scope of Work : Contractor will provide all material and labor necessary to perform all work described in the Scope of Work which is attached and fully incorporated into this Agreement by reference as Attachment “A.” 2. Changes in Scope of Work: City, without invalidating this Agreement, may order changes to the Scope of Work consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work shall be authorized by written Change Order or Amendment signed by the Parties. 3. Time of Performance: Contractor shall commence performance of the Agreement no later than 120 days calendar days after the Agreement’s Effective Date. 4. Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Work, no later than 120 days from the Effective Date or on _December 31 st, 2023. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of City and Contractor. 5. Agreement Sum: The total amount of this Agreement is the sum of ($54,482.99)which includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Work. 6. Consideration: In exchange for Contractor’s performance of the items and responsibilities identified in the Scope of Work, City agrees to make payment of the amount identified as the Agreement Sum. 7. Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the Work will only be made after the Work has been performed and a voucher or invoice is submitted in a form acceptable to the City.         CAG-22-411 3rd January                                                                         1/3/2023         Approved by Cheryl Beyer via 12/9/2022 email