Loading...
HomeMy WebLinkAboutMFP22006405.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22006405 IVR Number: 22006405 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:12/12/2022Application Date:2023059059Parcel Number: 720 JONES AVE S Permit Type:01/10/2023Issue Date:Franchise Permit Work Class:01/10/2024Expiration Date:Minor Utility Job Number: 101154110Franchise Type:Electric Description: Puget Sound Energy Electric AT P01 CREW TO REMOVE EXISTING CUT OUT AND BRACKET. NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact RENTON CITY OF 1055 S GRADY WAY RENTON, WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101154110 720 JONES AVE S JENNY CHAU 253-208-9480 MFP22006405 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 1/10/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01JONES AVE SS 9TH ST 88 1212 1414STOP FLAGGER STOP FLAGGER STOP FLAGGERW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD WORK AHEAD W20-1W20-7A W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 10/26/2022 512912471 0 720 JONES AVE S, RENTON, WA 98057. JASON BISENIUS 425-424-7316 Jason.bisenius@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor:Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY MFP22006405 805 809 811 1520 1725 1809 1803 833B E A CO N W A Y S 317537-166372 150 kVA 480V (ABC) 317536-166349 JONES AVE S317553-166332 317532-166332 50 kVA (C) R/W 94' R/W 64' 317538-166355 25 kVA 120/240V (A) CUSTOMER OWNED, INSTALLED & MAINTAINED 1-RUN OF #2 SVC CABLE CUSTOMER OWNED, INSTALLED & MAINTAINED 1-RUN OF #3 SVC CABLE G R A 1 6 317520-166308 UNK 317520-166307 SLAG7123 PSE INST.1-2" DB120 CONTINUOUS PVC CONDUIT ±95' IN CUST. PROVIDED TRENCH PSE INST. 1-RUN 1Ø PRI. 12KV1/0 UG JKT CABLE ±115' (AØEJG249) CUST. PROVIDED 6' X 6' WORKPIT CUST. PROVIDED 9' x 11' WORKPIT SITE PLAN N Vicinity Map 47.472378, -122.194618 Owner / Developer Contact Info officeATTN: City of Renton 1055 S Grady Way Renton WA. 98057 Betsy Severtsen 425-757-6657 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE GRA-16 6/2021 144 162 144 0.46 0.13 0.13 144.46 162.13 144.13 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Jenny Chau 253-208-9480 jenny.chau@pse.com SCALE: 1" = 50'101154110THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101154110 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 9/2/2022 Ray Reynolds 253-262-7409 9/2/2022 N/A N/A N/A Ray Reynolds -9/2/2022 RW-_____Renton PHILLIP ARNOLD PARK SITE IMPROVEMENTS SINGLE PHASE L/E, 3PHASE CONNECT, XFMR WRECKOUT 720 JONES AVENUE S. RENTON WA. 98057 N/A N/A N/A 101154110 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM S17-23-5 N/A N/A 2305E077 2305E088 2305E077 GRA-16 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 512912471 CABLE & CONDUIT ONE LINE NOT TO SCALE UNDERGROUND MAP SCALE: 1' = 75' SITE SPECIFIC NOTES P01 EXISTING 317520-166308: -EXISTING 1969 45FT CL-UNK POLE TO REMAIN -OPEN AND REMOVE 200A SINGLE PHASE CUTOUT AND BRACKET J01 EXISTING 317536-166372: -REPLACE VAULT LID HH 4'-8" x 7' x 5' w/2-3' Sq DPC H20 -INSTALL (1) L/B ELBOW 6041.1000(ELB10J) V01 EXISTING 317537-166372: -EXISTING VAULT TO REMAIN -REMOVE 4-4POS SECONDARY CONNECTOR BARS -INSTALL 4-6POS SECONDARY CONNECTOR BARS MID: 7651101 -CONNECT CUSTOMER OWNED INSTALLED AND MAINTAINED 1-RUN OF #2 CABLE V02 EXISTING 317532-166332: -DISCONNECT EXISTING SVC -REMOVE EXISTING 50kVA 120/240V XFMR AND RETURN TO YARD -REMOVE VAULT V03 NEW 317538-166355: -INSTALL 36" X 42" X 38" MINI 21" X 24" HLE UNI 6045.1010(MINU1SR) -SET 25KVA, 120/240V PM XFMR MID:6247000 -INSTALL (1) L/B ELBOW 6041.1000(ELB10J) -INSTALL (1) DUST CAP MID:7630600 -INSTALL GRID# -CONNECT CUSTOMER OWNED INSTALLED & MAINTAINED M01 NEW: -INSTALL NEW 200A UG METER M02 NEW: -INSTALL NEW 200A UG METER M03 EXISTING: -REMOVE EXISTING METER M04 EXISTING: -REMOVE EXISTING METER SPAN SPECIFIC NOTES SEE SITE PLAN, ONE LINES AND TABLES FOR INSTALL AND REMOVALS CABLE INFO. YEAR TYPE CABLE # SCALE: NONE UNISTRUT MP DETAIL TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTCommunications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/240v 6247000 V03 317538-166355 584048742 PSE Locates Req'd Developer Locates Req'd Yes No Yes YesFlagging Req'd Outages Req'd LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 200A N/A 5.5KW 65A 0.4% 1.5% CIRCUIT FEET REMOVED: 170' CIRCUIT FEET ADDED: 115' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 200A N/A 2.2KW 65A 2.1% 1.8% SINGLE PHASE THREE PHASE GUARD POST INSTALLATION GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN MIN WORK SPACE 5' MAX 5' MAX 6" CONCRETE 5' MAX 5' MIN 5' MIN PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. PAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-02 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V02 317532-166332 50kVA CABLE REMOVAL SCHEDULE CABLE NO. LOCATIONS CABLE (LF) EST CABLE TYPE YEAR INST FROM TO CØ10929 P01 V02 170 1/0 AL JKT Total Feet 170 (1/0 AL JKT) ACTUAL________Removed Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.) AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY Check applicable box DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed (Conduit & Cable) J01 V03 2"1 95'X 1 1 0 0 64 64.2 PRI 12KV 1/0 UG 115'EJG249 JOB SITE JOB SITEJOB SITE POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 6' X 6' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V03. -PROVIDE A 9' X 11' WORK PIT AT J01. TRENCHING & CONDUIT. -INSTALL ±95' OF 1-2" DB120 PVC CONDUIT FROM J01 TO V03 . -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Prim / Sec Removal 108141167 TUT Removal Mod Svc 513386018 587035064 Meter Set 1ph 513386086 3002043925 3002043892513386089Meter Set 3ph RESTORATION PER CITY OF RENTON STANDARDS MFP22006405