Loading...
HomeMy WebLinkAboutChange Order - 01CITY OF RENTON Parks and Recreation Departme nt CONTRACT CHANGE ORDER AGREEMENT 1/12/2023 CONTRACT: CAG-22-014 CONTRACTOR: Redside Construction LLC CHANGE ORDER: 1#01 SUMMARY OF PROPOSED CHANGE: Reason/Justification: 1) During construction an open seam was discovered on one piling at Bent 18. Weld repairs were completed to ensure the structural integrity of this component of the Coulon North Water Walk structure. 2) Painting prep scope was modified due to better than expected existing conditions. Painting additional secondary steel/decor items and including anti-graffiti coating was added based on City Staff review/recommendation. 3) During construction misc pile cap spa II/crack and bolt tightening issues were identified and remedied. DESCRIPTION: Item Qty. Description Unit Price Amount No. w/WSST 1 1 Pile Weld Repair $ 34,391.00 $ 37,864.49 2 1 Modifications to Painting Scope ($27,750.00) $ (30,552.75) 3 1 Misc Crack/Spall Repairs and Bolt Tightening $1,953.00 $ 2,150.25 Total this Change Order: $ 9,461.99 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT (W/ WSST) THIS ORDER (W / WSST) TOTAL AFTER CHANGE $ 4,659,432.00 $4,659,432.00 $ 9,461.99 $ 4,668,893.99 Additional Calendar Days: (0)No Extension ofTime. Completion Date is October 1, 2023. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original aereement. All of the other terms of the orieinal aereement remain in effect. SIGNATURES: Contractor: s� 87 ('; L s� Project Manager: � Approved By: Date: 01/12/23 Date 01/12/23 Date: CAG-22-014, CO #1-23 Project Name:COP 3 - T&M - REV 1 Project No.CAG-22-014 1/3/2023 R70-22 Description: a. b.-$ DIRECT LABOR SUBTOTAL -$ d.-$ -$ a.75.00$ 75.00$ a.408.00$ b.-$ 408.00$ 483.00$ a. b. -$ a. $ 29,400.00 b. b. 29,400.00$ 6. OVERHEAD & PROFIT a.57.96$ b.28.98$ c.3,528.00$ 3,614.94$ b.1.70 % of 1-6 508.01$ 508.01$ a.1.10 % of 1-7 368.48$ 368.48$ a.0.048 % of 1-8 16.50$ 16.50$ 34,391.00$ 34,391.00$ 6. SUBTOTAL 5 Subcontractors (12% to $50k, 4% above $50k) SUBTOTAL 1 thru 3 4. SPECIALIZED SERVICES Gene Coulon Beach Memorial Park North Water Walk Improvements 3. EQUIPMENT COSTS 6. SUBTOTAL 4 owned / rented equipment (per spec approved source) small tools (NTE 3% craft labor per WSDOT) 3. EQUIPMENT COSTS Itemize all costs on attached COP Cost Breakdown form. for contracts under $3 million COP General Contractor Breakdown Summary Direct Supervision (NTE 15% Direct Labor) WCD # / COP No. Date: Contractor Ref. No.REDSIDE CONSTRUCTION LLC crew (apprentices, journeymen, & laborers) Source Documents: RFI 11 - Bent 18 Piling Crack Direct Labor Costs: Contractor: 1. CRAFT LABOR COSTS safety (NTE 2% labor, lines 1a, b, & c per WSDOT) Crux Diving Invoice 1601 Attached 1. CRAFT LABOR COSTS 2. MATERIAL COSTS 7. TOTAL OVERHEAD & PROFIT 9. TAX 7. INSURANCE material costs 2. MATERIAL COSTS 8. INSURANCE 5. SUBCONTRACTORS TOTAL (NIC WSST) 6% - Profit Business and Occupational Tax 10. B&O TAX 9. BOND 8. BOND GRAND TOTAL Form Revised 6/1/2004 12% (1st $50k, 4% above $50k) - Overhead bond adjustment payroll & volume driven liability insurance COP 3 - T&M - REV 1 - RFI 11 - Bent 18 Piling Crack Page _______ of _______Issued 1/3/2023 Exhibit A-1 Project Name:COP 3 - T&M - REV 1 Project No.CAG-22-014 10/25/2022 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ Sub Contractor COST BREAKDOWN: -$ -$ -$ -$ LABOR: -$ -$ -$ -$ $7,350.00 per day for 5 days 4 Days $7,350.00 29,400.00$ -$ -$ 29,400.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Materials -$ -$ -$ -$ Welding Wire 1 LS -$ $75.00 75.00$ -$ 75.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ EQUIPMENT -$ -$ -$ -$ Welder Rental from Redside Construction - Invoice Attached 1 LS -$ -$ $408.00 408.00$ 408.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ check 29,400.00$ 75.00$ 408.00$ 29,883.00$ 29,883.00$ COP Cost Breakdown REDSIDE CONSTRUCTION LLC Contractor Ref. No. Date: COP No. Total Cost of Work Form Revised 6/1/2009 Gene Coulon Beach Memorial Park North Water Walk Improvements COP 3 - T&M - REV 1 - RFI 11 - Bent 18 Piling Crack Page _______ of _______Issued 1/3/2023 Exhibit A-1 Invoice Date 12/15/2022 Invoice # 1601 Bill To Redside Construction LLC 600 Winslow Way E., Suite 237 Bainbridge Island, WA 98110 Project / PO R70-22 Terms Net 30 Due Date 1/14/2023 Thank you for your business! We appreciate your prompt payment.Total Balance Due Payments/Credits 6805 NE 175th St. Kenmore, WA 98028-3502 (206) 697-1009 CRUX Diving, Inc. DescriptionQuantity Rate Amount Gene Coulon Beach Memorial Park North Water Walk Improvements Change Order December 13-16, 2022 Days to weld repair to longitudinal crack to bent 18 piling4 7,350.00 29,400.00 $29,400.00 $29,400.00 $0.00 Exhibit A-1 Exhibit A-1 Exhibit A-1 Exhibit A-1 Exhibit A-1 Crux Dinving Inc 6805 NE 175th Street Kenmore, WA 98028 ITEM DESCRIPTION Quantity Price Per Hour Total Billing 12/12/22 to 12/14/22 Welder Rental 24 $17.000 $408.00 Three 8 hour days $408.00 Phone: (360) 297-9557 Fax: (360) 343-0499 Total Due City: Port Gamble, WA 98364 Welder Rental Address: PO Box 267 Name: Redside Construction, LLC Progress Billing #2 Page 1 of 1 Exhibit A-1 CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via X For Your Information For review and comment Approved as Noted Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 11.18.22 N/A N/A PND As Noted NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a.We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b.We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:11.23.22 Bainbridge Island, WA 98110 CAG-20-014 RFI 011 Response 11.23.22 Sam Berry, Colin Kuester, Alan Wyatt Attached RFI 011 Response. Bent 18 Piling Crack Description Deviation Item No. 1 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements 1055 South Grady Way, 6th Floor; Renton, WA 98057 Exhibit A-1 No: 600 Winslow Way E. Suite#237 Ph (206) 317-6400 Bainbridge Island WA 98110 Fax (360) 343-0499 To:Project: Attn:Contract No: Date: Dwg# / Spec. Ref: From:XC: Subject: By: Sam Berry, Project Manager RESPONSE: Signature: Colin Kuester, P.E. Date of Reply: Signature: Sam Berry Sam Berry The divers discovered a longitudinal crack in one of the bent 18 batter piling and we need direction to proceed to repair it. We recommend the divers weld repair the crack which would be a small change order to them for the dive time and welding equipment. Video was taken and transmitted to the City yesterday. Please provide direction at your earliest convenience. File - SB Question - Attach Sketches as Required: REQUEST FOR INFORMATION 11 11/18/2022 CAG-22-014 City of Renton / PND Engineers Coulon North Water Walk Improvements Bent 18 Piling Crack Thank you for bringing this damage to our attention. We agree that it is necessary to repair. Our concern is that by welding over the top that the weld will not penetrate the full depth of the split. Our preference is to gouge out a U-shaped groove along the full length of the split (by air arc or other method), visually verify that the split has been rooted out to full depth, and repair by filling the u-groove with weld metal. If after gouging the split remains deeper, gouge another pass and place additional passes of weld in those areas as required to fill. Remove all marine growth and rust scale within 1 inch of split on both sides before welding. Submit proposed weld metal, methods, and welder qualifications. PND and the City agree that this is extra work not included in the contract. Before proceeding, please provide a cost estimate to perform the work described above over the full length of the split. AWS U-groove weld detail 11/23/22 Exhibit A-1 Project Name:COP 1 A - REV 2 Project No.CAG-22-014 10/25/2022 R70-22 Description: a. b. DIRECT LABOR SUBTOTAL d. -$ a. -$ a.-$ b.-$ -$ -$ a. b. -$ a.(27,750.00)$ b. b. (27,750.00)$ 6. OVERHEAD & PROFIT a.-$ b.-$ c. -$ b.1.70 % of 1-6 -$ a.1.10 % of 1-7 -$ a.0.048 % of 1-8 -$ (27,750.00)$ (27,750.00)$ ADDITIONAL REDSIDE CREDIT TO OWNER FOR ROOF REINSTALLATION (SEE COST BREAKDOWN ATTACHED) GRAND TOTAL Business and Occupational Tax 10. B&O TAX Form Revised 6/1/2004 payroll & volume driven liability insurance 5. SUBCONTRACTORS TOTAL (NIC WSST) 6% - Profit 9. TAX 7. INSURANCE Purcel Detail on Page 2 6. SUBTOTAL 5 Subcontractors (12% to $50k, 4% above $50k) 12% (1st $50k, 4% above $50k) - Overhead bond adjustment 9. BOND 8. BOND crew (apprentices, journeymen, & laborers) 6. SUBTOTAL 4 owned / rented equipment (per spec approved source) 7. TOTAL OVERHEAD & PROFIT material costs 2. MATERIAL COSTS 8. INSURANCE Contractor: 1. CRAFT LABOR COSTS safety (NTE 2% labor, lines 1a, b, & c per WSDOT) 1. CRAFT LABOR COSTS for contracts under $3 million COP General Contractor Breakdown Summary Direct Supervision (NTE 15% Direct Labor) REDSIDE CONSTRUCTION LLC Direct Labor Costs: Itemize all costs on attached COP Cost Breakdown form. 2. MATERIAL COSTS Source Documents: Modification to Pilot House Painting Scope WCD # / COP No. Date: Contractor Ref. No. Gene Coulon Beach Memorial Park North Water Walk Improvements 3. EQUIPMENT COSTS SUBTOTAL 1 thru 3 4. SPECIALIZED SERVICES small tools (NTE 3% craft labor per WSDOT) 3. EQUIPMENT COSTS COP 1 A - REV 2 - Modification to Pilot House Painting Scope Page _______ of _______Issued 11/21/2022 Exhibit A-1 Project Name:COP 1 A - REV 2 Project No.CAG-22-014 10/25/2022 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ COST BREAKDOWN: Purcell Painting & Coatings Detail - See Attached -$ -$ -$ -$ 1 Change from full removal of existing paint on structural steel @ pilot house to spot prep/prime rusted areas and remove loose/flaky paint and overcoat 1 LS -$ -$33,200.00 (33,200.00)$ -$ (33,200.00)$ 2 Change from full removal of existing paint on light poles and bollards to spot prep/prime rusted areas and remove loose/flaky paint and overcoat.1 LS -$9,600.00 (9,600.00)$ -$ (9,600.00)$ 3 Change from full removal of existing paint on bench/table posts/framing to spot prep/prime rusted areas and remove loose/flaky paint and overcoat.1 LS -$3,100.00 (3,100.00)$ -$ (3,100.00)$ 4 Prep and paint louvers and light green secondary steel purlins 1 LS $14,150.00 14,150.00$ -$ 14,150.00$ 5 Apply anti-graffiti to pilot house columns 1 LS $4,000.00 4,000.00$ -$ 4,000.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ check -$ (27,750.00)$ -$ (27,750.00)$ (27,750.00)$ COP Cost Breakdown REDSIDE CONSTRUCTION LLC Contractor Ref. No. Date: COP No. Total Cost of Work Form Revised 6/1/2009 Gene Coulon Beach Memorial Park North Water Walk Improvements COP 1 A - REV 2 - Modification to Pilot House Painting Scope Page _______ of _______Issued 11/21/2022 Exhibit A-1 October 25, 2022 To: Sam Berry Re: Gene Coulon Park Project Additional Costs Scope: Preparation & Installation of Coatings INCLUSIONS: 1.Change from full removal of existing paint on structural steel @ pilot house to spot prep/prime rusted areas and remove loose/flaky paint and overcoat. Deduct $33,200. 2.Change from full removal of existing paint on light poles and bollards to spot prep/prime rusted areas and remove loose/flaky paint and overcoat. Deduct $9,600. 3.Change from full removal of existing paint on bench/table posts/framing to spot prep/prime rusted areas and remove loose/flaky paint and overcoat. Deduct $3,100. 4.Prep and paint louvers and light green secondary steel purlins. Add $14,150. 5.Apply anti-graffiti to pilot house columns. Add $4,000. COST: Base Bid: Total Deduct - $3,100 Alt#1: Total Deduct - $42,800 Added Costs: $18,150 Submitted by; David Purcell Jr Project Manager/Estimator NACE Coatings Inspector Level 2 - Certified No. 30212 Purcell Painting & Coatings www.purcellpainting.com davejr@purcellpainting.com 6456 South 144th Street Tukwila, WA 98168 O (206) 835-6878 C (425) 941-3767 F (206) 835-6979 Exhibit A-1 Project Name:COP 5 REV 1 Project No.CAG-22-014 1/4/2023 R70-22 Description: a.1,196.31$ b.179.45$ DIRECT LABOR SUBTOTAL 1,375.76$ d.27.52$ 1,403.00$ a.182.84$ 183.00$ a.28.00$ b.41.27$ 69.00$ 1,655.00$ a. b. -$ a. b. -$ 6. OVERHEAD & PROFIT a.198.60$ b.99.30$ c.-$ 297.90$ b.1.70 % of 1-6 28.14$ a.1.10 % of 1-7 21.48$ a.0.048 % of 1-8 0.94$ 1,953.00$ 6. SUBTOTAL 5 Subcontractors (12% to $50k, 4% above $50k) SUBTOTAL 1 thru 3 4. SPECIALIZED SERVICES 3. EQUIPMENT COSTS 6. SUBTOTAL 4 owned / rented equipment (per spec approved source) small tools (NTE 3% craft labor per WSDOT) 3. EQUIPMENT COSTS for contracts under $3 million COP General Contractor Breakdown Summary Direct Supervision (NTE 15% Direct Labor) WCD # / COP No. Date: Contractor Ref. No. Gene Coulon Beach Memorial Park North Water Walk Improvements REDSIDE CONSTRUCTION LLC crew (apprentices, journeymen, & laborers) Source Documents: Misc Crack & Spall Repairs and Bolt Tightening Direct Labor Costs: Contractor: Itemize all costs on attached COP Cost Breakdown form. safety (NTE 2% labor, lines 1a, b, & c per WSDOT) 1. CRAFT LABOR COSTS 2. MATERIAL COSTS 7. TOTAL OVERHEAD & PROFIT 9. TAX 7. INSURANCE material costs 2. MATERIAL COSTS 8. INSURANCE 5. SUBCONTRACTORS 1. CRAFT LABOR COSTS 10. B&O TAX 9. BOND 8. BOND Form Revised 6/1/2004 12% (1st $50k, 4% above $50k) - Overhead bond adjustment payroll & volume driven liability insurance TOTAL (NIC WSST) 6% - Profit Business and Occupational Tax COP 5 REV 1 - Misc Crack & Spall Repairs and Bolt Tightening Page _______ of _______Issued 1/4/2023 Exhibit A-1 Project Name:COP 5 Project No.CAG-22-014 1/4/2023 Contractor: Unit Labor Material Equipment Total Description Quantity Type Unit $Cost Unit $Cost Unit $Cost Cost -$ -$ -$ -$ COST BREAKDOWN: -$ -$ -$ -$ -$ -$ -$ -$ LABOR: Field Install Blocks (under pier)-$ -$ -$ -$ 12/16/2022 Jason Mazdzer - Laborer 8 HOURS $74.77 598.15$ -$ -$ 598.15$ 12/19/2022 Jason Mazdzer - Laborer 8 HOURS $74.77 598.15$ -$ -$ 598.15$ -$ -$ -$ -$ MATERIALS -$ -$ -$ -$ 12/15/2022 Atlas Supply 9 Quote Attached 3 Each -$ $44.28 132.84$ -$ 132.84$ Nuts and Bolts 1 LS -$ $25.00 25.00$ -$ 25.00$ Epoxy 1 LS -$ $25.00 25.00$ -$ 25.00$ -$ -$ -$ -$ EQUIPMENT -$ -$ -$ Mics. Small Tools 1 LS -$ -$ $28.00 28.00$ 28.00$ -$ -$ -$ -$ check 1,196.31$ 182.84$ 28.00$ 1,407.15$ 1,407.15$ Total Cost of Work Form Revised 6/1/2009 Gene Coulon Beach Memorial Park North Water Walk Improvements COP Cost Breakdown REDSIDE CONSTRUCTION LLC Contractor Ref. No. Date: COP No. COP 5 REV 1 - Misc Crack & Spall Repairs and Bolt Tightening Page _______ of _______Issued 1/4/2023 Exhibit A-1 Gene Coulon - City of Renton Regular Time Regular Time Regular Time Regular Time Regular Time Regular Time Laborer Tim Carpenter Crane Operator 110 ton Foreman - Robert Superintendent - Jeremy $54.62 $58.62 $68.19 $77.63 $69.19 $73.00 Add Sick Leave Accrual $1.37 $1.47 $1.70 $1.94 $1.73 $1.83 TOTAL WAGE RATE $55.99 $60.09 $69.89 $79.57 $70.92 $74.83 $10.87 $11.67 $13.58 $15.46 $13.78 $0.03 SUTA @ 6.03%$3.29 $3.53 $4.11 $4.68 $4.17 $4.40 FICA @ 7.65%$4.18 $4.48 $5.22 $5.94 $5.29 $5.58 FUTA @ 0.8%$0.44 $0.47 $0.55 $0.62 $0.55 $0.58 TOTAL PER HOUR $74.77 $80.24 $93.35 $106.27 $94.71 $88.42 $3.00 $0.55 $0.59 $0.68 $0.78 $0.69 $10.87 $11.67 $13.58 $15.46 $13.78 L&I Wage Rate USLH Pier/Dock/Wharf Exhibit A-1 Project Name: Project No:CAG-22-014 Source: All Rates per AGC / WSDOT Blue Book for Construction Contractor:The Regional Adjustment used in this form per WSDOT =0.986 176 A B C D E F H J K Model # or Power Mode Blue Book Blue Book Hourly Rate Total Blue Book Total Equipment Description & Specifications Manufacturer Axle Config, Size,Year (Diesel, Gasoline,Monthly Rate = (F + G) / 176 Hourly Rate Standby Rate (incl. Attachment Description, if applicable)Capacity, etc.Hydraulic, etc.)for Equipment x Regional Adj.= H + I (at 50%) M80 Manitowoc 100ton Crawler Crane Manitowoc M80W 1998 Diesel 51,100.00$ 286.28$ 286.28$ 143.14$ Grove 2009 Hydraulic Mobile RT Lift Crane 50t Direct Supervision (NTE 15% Direct Labor)RT-600E 2009 Diesel 40,200.00$ 225.21$ 225.21$ 112.61$ Deck / Ramp Barge 'Whitehorse' (ABS)Custom 34 x 125 rebuilt 2010 n/a 45,000.00$ 252.10$ 252.10$ 126.05$ 33' x 115' Deck Barge 'Western"Custom 33 x 115 2000 n/a 35,000.00$ 196.08$ 196.08$ 98.04$ S5 40'x10'x5' Flexi-Float Barge Flexi Float 40'x10'x5'various n/a 32,500.00$ 182.07$ 182.07$ 91.04$ 1,456.59$ add 2 ea spuds, 2 ea spud wells, winches, power pack Flexi Float --various n/a 7,500.00$ 42.02$ 42.02$ 21.01$ 42' Tug 'Resolute'Custom 500HP Cummins rebuilt 2017 n/a 31,320.00$ 175.46$ 175.46$ 87.73$ 20' Pacific Skiff (incl 90 hp 4-stroke Yamaha)Custom Pacific Skiff 2005 n/a 10,000.00$ 56.02$ 56.02$ 28.01$ floating turbidiy boom / containment boom (per 1000lf per mo)n/a n/a 5,000.00$ 28.01$ 28.01$ 14.01$ Bobcat E-45 Mini-Excavator Bobcat E-45 2013 Diesel 13,500.00$ 75.63$ 75.63$ 37.82$ Ho-Pack / Attachment Hydraulic, etc.)3,800.00$ 21.29$ 21.29$ 10.64$ Telehandler Forklift (11,000#)JLG / Skytrack 10054E 2014 Diesel 15,000.00$ 84.03$ 84.03$ 42.02$ Telehandler Forklift (10,000#)JLG / Skytrack 10054 2012 Diesel 15,000.00$ 84.03$ 84.03$ 42.02$ Bucket / Broom Attachment Custom 2cy bucket or broom n/a 2,500.00$ 14.01$ 14.01$ 7.00$ Crane Mats (per ea)40'x4 40'x4 n/a 800.00$ 4.48$ 4.48$ 2.24$ 16' Isuzu Tilt Bed / Flat Bed Truck Isuzu NPR 16' flatbed 2000 Diesel 5,000.00$ 28.01$ 28.01$ 14.01$ Ford F700 14' Flatbed Truck Ford F700 2000 Diesel 8,500.00$ 47.62$ 47.62$ 23.81$ Ford F650 16' Flatbed Truck Ford F700 2000 Diesel 9,200.00$ 51.54$ 51.54$ 25.77$ 20' Tilt Trailer Lodr Tilt Trailer 2016 n/a 3,200.00$ 17.93$ 17.93$ 8.96$ Laser Level Leica 2017 Electric 750.00$ 4.20$ 4.20$ 2.10$ Magnum Light Tower / Light Tree Magnum 5hp 2010 Gas 2,100.00$ 11.76$ 11.76$ 5.88$ 100 KW Genset PACO Olympian 2008 Diesel 6,500.00$ 36.41$ 36.41$ 18.21$ 150-300 CFM Compressor Various 150-300cfm Gas 3,350.00$ 18.77$ 18.77$ 9.38$ Miler Trailblazer Welder Miller 25hp 2013 Gas 4,000.00$ 22.41$ 22.41$ 11.20$ Miller 400 amp Blue Box welder(s)Miller bobcat-400 amp 2007 Diesel 2,600.00$ 14.57$ 14.57$ 7.28$ Add wire / electrode / gas(per blue book)n/a 2,850.00$ 15.97$ 15.97$ 7.98$ Lincoln LN-25 Lincoln LN-25 Electric 1,500.00$ 8.40$ 8.40$ 4.20$ Torch Set Gas 2,500.00$ 14.01$ 14.01$ 7.00$ Honda 5hp Genset Honda 5hp 2006 Gas 2,500.00$ 14.01$ 14.01$ 7.00$ Mag Drill Magnum 2018 Electric 1,750.00$ 9.80$ 9.80$ 4.90$ 5-8hp Pump, Hose Honda, Goulds 5hp 2008 Gas 3,650.00$ 20.45$ 20.45$ 10.22$ 500 gal fuel tank (incl BFP, Dispenser)Ace Tank New 2010 Diesel #2 1,750.00$ 9.80$ 9.80$ 4.90$ Job Shack Pacific Mobile mobile unit n/a 800.00$ 4.48$ 4.48$ 2.24$ Conex's mobile unit n/a 600.00$ 3.36$ 3.36$ 1.68$ Honey Buckets (per ea, incl service)Honey Bucket New 2010 450.00$ 2.52$ 2.52$ 1.26$ Dodge Ram 1500 Dodge 1500 2020 Diesel 6,000.00$ 33.61$ 33.61$ 16.81$ Dodge Ram 1500 4 X 4 Truck Dodge 1500 2017 Diesel 7,000.00$ 39.22$ 39.22$ 19.61$ Gene Coulon Beach Memorial Park North Water Walk Improvements REDSIDE CONSTRUCTION LLC COP Equipment Rates Exhibit A-1 EXTRA WORK / CHANGE ORDER 12/16/2022 COP # / Title: Added Pile ST OT 8 Regular Standby Project Name: City of Renton - Gene Coulon Memorial Park North Water Walk Improvement Notes / Comments Notes / CommentsDescriptionDescribe Additional Work Performed: Subs / Other / Misc. CostsMaterials Account or Charge?Other / Misc.Notes / Comments Notes / Comments Equipment and ToolsLaborJason - Laborer Labor Hours NOTE: This Extra Work Order is the Field Superintendents best assessment of daily impacts & inefficiencies for tracking purposes and is not intended to be a complete accounting of all project impacts. A final collection of all project impacts will be presented with final pricing by the Project Manager after final review and approval of all EWO's, invoices, & actual impacts are known and available. Fixed the new spalls that the City found, on bent 25 the lower corner and reinforcement and then added the grout Materials Equipment Labor Exhibit A-1 EXTRA WORK / CHANGE ORDER 12/19/2022 COP # / Title: Added Pile ST OT 8 Regular Standby Project Name: City of Renton - Gene Coulon Memorial Park North Water Walk Improvement Notes / Comments Notes / CommentsDescriptionDescribe Additional Work Performed: Subs / Other / Misc. CostsMaterials Account or Charge?Other / Misc.Notes / Comments Notes / Comments Equipment and ToolsLaborJason - Laborer Labor Hours NOTE: This Extra Work Order is the Field Superintendents best assessment of daily impacts & inefficiencies for tracking purposes and is not intended to be a complete accounting of all project impacts. A final collection of all project impacts will be presented with final pricing by the Project Manager after final review and approval of all EWO's, invoices, & actual impacts are known and available. Fixed the new spalls that the City found, on bent 25 the lower corner and reinforcement and then added the grout Materials Equipment Labor Exhibit A-1 12/15/22 Atlas Supply – Seattle – 206-623-4697 3 sacks of SIKA VOH $44.28 ea $132.84 No WSST Exhibit A-1 From:Sam Berry To:Jan Ybarra Subject:FW: Coulon Pile Caps - Additional Repairs Date:Friday, December 16, 2022 2:55:22 PM This can be pulled together into a change order early next week, you’ll just need to get with David. Sam Berry President / Owner Redside Construction LLC O 206-317-6400 C 206-940-0564 sam@redside.biz www.redside.biz 600 Winslow Way E, Suite 237 Bainbridge Island, WA 98110 From: David Berry <david@redside.biz> Sent: Friday, December 16, 2022 1:47 PM To: Betsy Severtsen <BSevertsen@Rentonwa.gov>; Sam Berry <sam@redside.biz> Cc: Jeremy Helser <jeremy@redside.biz>; ckuester@pndengineers.com; Alan Wyatt <AWyatt@Rentonwa.gov>; Erica Schmitz <ESchmitz@Rentonwa.gov> Subject: Re: Coulon Pile Caps - Additional Repairs Hi Betsy, All of the additional grout repairs are complete and Jason added nuts and tightened the transient float brackets...except one of the embedded bolts is loose in the hole so we will need to get some Hilty 500 epoxy and another bolt and install it on Monday... David David From: Betsy Severtsen <BSevertsen@Rentonwa.gov> Sent: Thursday, December 15, 2022 11:33:15 AM To: Sam Berry <sam@redside.biz> Cc: David Berry <david@redside.biz>; Jeremy Helser <jeremy@redside.biz>; ckuester@pndengineers.com <ckuester@pndengineers.com>; Alan Wyatt <AWyatt@Rentonwa.gov>; Erica Schmitz <ESchmitz@Rentonwa.gov> Subject: FW: Coulon Pile Caps - Additional Repairs Hi Sam and David, Exhibit A-1 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Nice talking with you this morning. PND found that all of the cap repairs/pile wrapping within your scope were in conformance from their inspection yesterday – thank you! Please see the attached description of additional spall repair and connection tightening items (day moorage) that were found. Could you have Jazon look into these while he is on-site and provide a cost for the addition? Thank you, Betsy From: Colin Kuester <ckuester@pndengineers.com> Sent: Thursday, December 15, 2022 11:23 AM To: Betsy Severtsen <BSevertsen@Rentonwa.gov>; Alan Wyatt <AWyatt@Rentonwa.gov> Cc: Kristinn Bjarnason <kbjarnason@pndengineers.com> Subject: Coulon Pile Caps - Additional Repairs Hi Betsy, Kristinn’s observation yesterday was that Redside’s completed work is all good. We did, however, find a few additional spalls and repairs that were not identified by Global that should be repaired while we have the crew mobilized. These could be considered outside of the contract scope. 1. Spall repairs: Cap 31 side, Cap 24 corner, Cap 32 edge, and 3 repairs on the underside of the panels/closure pour near Cap 32. Photos of all are attached. If Redside has identified any others that we have missed that are greater than 1” deep, or have exposed repair, those should be repaired, too. 2. At Caps 2, 4, and 5, it appears that some of the nuts that secure the transient float moorage are working loose. I hope that the threaded inserts aren’t pulling out, but that is a possibility they may be able to verify; please let me know if they are. If the nuts are the only thing loose, please tighten and add double nuts or thin nuts to prevent backing off. Unfortunately, some appear galvanized and some appear stainless, and we should match like metals. Thanks! Colin Kuester, P.E. | Senior Engineer P|N|D Engineers, Inc. 3240 Eastlake Ave E, Seattle, WA 98102 p. 206.624.1387 c. +1.206.484.3893 ckuester@pndengineers.com | www.pndengineers.com If you are not the intended recipient, please notify the sender immediately and delete this e-mail from your system. Exhibit A-1 From:David Berry To:Jan Ybarra; Sam Berry; Karen McCarthy Subject:Gene Coulon Extra Work Date:Monday, December 19, 2022 1:24:27 PM Hi Jan, The latest extra work doing some grouting and bolt repairs had the following costs: Labor. 1 man. 16 hours 3 sacks of Sika VOH Nuts + Bolts. $25 Epoxy. $25 Small Tools. $28 David Exhibit A-1