Loading...
HomeMy WebLinkAboutPRE_StaffComments_230119_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 |www.rentonwa.gov PREAPPLICATION MEETING FOR VMC Haz-Mat Storage Building 400 S 43rd St PRE 22-000411 January 19, 2023 Contact Information: Planner: Andrew Van Gordon, 425.430.7286, avangordon@rentonwa.gov Public Works Plan Reviewer: Scott Warlick, 425.430.7216, swarlick@rentonwa.gov Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org Please retain this packet throughout the course of your project as a reference. Consider giving copies of it to any engineers, architects, and contractors who work on the project. You will need to submit a copy of this packet when you apply for land use and/or environmental permits. Pre-screening: When you have the project application ready for submittal, call and schedule an appointment with the project manager to have it pre-screened before making all of the required copies. The pre-application meeting is informal and non-binding. The comments provided on the proposal are based on the codes and policies in effect at the time of review. The applicant is cautioned that the development regulations are regularly amended and the proposal will be formally reviewed under the regulations in effect at the time of project submittal. The information contained in this summary is subject to modification and/or concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services Director, Development Engineering Director, Department of Community & Economic Development Administrator, Public Works Administrator and City Council). M E M O R A N D U M DATE: December 23, 2022 TO: Andrew Van Gordon, Senior Planner FROM: Corey Thomas, Lead Plans Review Inspector SUBJECT: VMC Hazardous Waste Building 1. The preliminary fire flow is 1,500 gpm. A minimum of two fire hydrants are required. One within 150-feet and one within 300-feet of the building. It appears that there are sufficient existing fire hydrants to meet these requirements. 2. Fire impact fees are applicable at the rate of $0.15 per square foot of storage space. This fee is paid at time of building permit issuance. 3. Approved fire sprinkler and fire alarm systems are required throughout the building. Direct outside access is required to the fire sprinkler riser room. Fire alarm system is required to be fully addressable and full detection is required. Separate plans and permits required by the fire department. 4. Fire department apparatus access roadways are adequate as they exist and shall be maintained. 5. A Hazardous Material Inventory Statement shall be submitted and approved prior to building permit issuance. DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: January 17th, 2023 TO: Andrew Van Gordon, Planner FROM: Scott Warlick, Engineering Specialist III, Plan Review SUBJECT: Tenant Improvement 400 S 43rd St PRE22-000411 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non- binding and may be subject to modification and/or concurrence by official City decision-makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal located at parcel(s) 8857670010. The following comments are based on the pre-application submittal made to the City of Renton by the applicant. WATER COMMENTS 1. The proposed project is within the City of Renton’s water service area and in the Talbot Hill 350 pressure zone. 2. There is a looped water main located on the property: • 12-inch water main – refer to City water project plan no. W-14280B and W-337901 • The static water pressure is approximately 122 psi at ground elevation of 66 feet. 3. There are existing water services in the area of the new building: • 3/4-inch domestic water meter - Facility ID No. MTR-002437. • 1-1/2-inch domestic water meter - Facility ID No. MTR-002107 4. There are 3 existing fire hydrants within 300 feet of the building. • Hydrant ID No. HYD-S-00287 • Hydrant ID No. HYD-S-00739 • Hydrant ID No. HYD-S-00484 5. Based on the application materials, the buildings will be used for storage of hazardous and biomedical wastes. It does not appear that the building will contain a domestic service, however, if there are any domestic fixtures proposed (like emergency showers or chemical washout areas) a new ¾” domestic meter with a reduced pressure backflow assembly will be required. Due to the high static water pressure, a pressure reducing valve will also be required. 400 S 43rd St – PRE22-000411 Page 2 of 4 January 17th, 2023 6. Renton Regional Fire Authority notes that an approved fire sprinkler is required within the building. The applicant will need to provide a dedicated fire service line extending from the existing 12” water main west of the building and provided a double detector check valve along with associated post indicator valve and FDC connections. 7. The existing water main may need to be extended depending on the location of the fire sprinkler supply line and DDCVA. See picture provided by the water department at end of report. SEWER COMMENTS 1. Sewer service is provided by the City of Renton. 2. There is an existing 8-inch wastewater main located in the vicinity of the proposed building. (Record dwg: S-032506). 3. There is an existing private 8-inch wastewater main that is located under the new proposed building. (Record dwg: S-203103). 4. Based on the review of project information submitted for the pre-application meeting, the applicant is not planning on adding any additional sewer service to the property. However, any service lines that are currently running under the proposed building footprint will need to be re- routed around the new building foundation. STORM DRAINAGE COMMENTS 1. The site contains a collection of private surface water pipes and catch basins in the vicinity of the proposed building (Record Dwg: R-203101) 2. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water Design Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface Water Design Manual (RSWDM) to determine what type of drainage review is required for this site. The site falls within the City’s flow control duration standard area matching forested site conditions. The site falls within the Black River drainage basin. 3. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current City of Renton Standard Details are available online in the City of Renton website https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton 4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will be required to provide enhanced basic water quality treatment. Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. Separate structural plans will be required to be submitted for review and approval under a separate building permit for the detention and/or water quality vault. 5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the application of on-site BMPs, shall be included with the land use application, as applicable to the project. The final drainage plan and drainage report must be submitted with the utility construction permit application. 6. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design Manual Section C.1.3. Information on the water table and soil permeability (measured infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be included in the report. The report should also include information concerning the soils, geology, drainage patterns and vegetation present shall be presented in order to 400 S 43rd St – PRE22-000411 Page 3 of 4 January 17th, 2023 evaluate the drainage, erosion control and slope stability for site development of the proposed plat. The applicant must demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage, or excess surface water runoff. 7. Erosion control measures to meet the City requirements shall be provided. 8. The development is subject to a surface water system development charge (SDC) fees. Fees will be charged based on the rate at the time of construction permit issuance. 9. The current SDC fee for the new Townhomes is charged per square foot of new impervious surface at $0.84 per square foot, but not less than $2,100. 10. The full fee schedule can be found at: https://rentonwa.gov/city_hall/finance/budget 11. Based on the review of project information submitted for the pre-application meeting, the applicant is not planning on adding any additional storm service to the property. However, any service lines that are currently running under the proposed building footprint will need to be re- routed around the new building foundation. TRANSPORTATION/STREET COMMENTS 1. The project currently does not propose to construct more than $1750,000 worth of improvements based on the RMC 4-6-060, therefore frontage improvements are not required. If, however, the proposal was to change, frontage improvements may be required. GENERAL COMMENTS 1. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements. a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 2. All construction permits for utility and street improvements will require separate plan submittals. All plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 3. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets. 4. All utility lines (i.e. electrical, phone, and cable services, etc.) serving the proposed development must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 5. Fees quoted in this document reflect the fees applicable in the year 2023 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current development fee schedule. 400 S 43rd St – PRE22-000411 Page 4 of 4 January 17th, 2023 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: January 19, 2023 TO: Pre-Application File No. 22-000411 FROM: Andrew Van Gordon, Associate Planner SUBJECT: VMC Haz-Mat Storage Building – 400 S 43rd St (Parcel number 8857670010) General: We have completed a preliminary review of the pre-application for the above- referenced development proposal. The following comments on development and permitting issues are based on the pre-application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision- makers (e.g., Hearing Examiner, Community & Economic Development Administrator, Public Works Administrator, Planning Director, and City Council). Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available online at https://www.codepublishing.com/WA/Renton/. Project Proposal: The project area is located at 400 S 43rd St (Parcel number 8857670010). The applicant proposes to construct a single story, 500 square foot storage building. The building would be split into two (2) separate rooms with no interior connection: one (1) room for hazardous material (Group H-3 for flammable liquids; Group H-4 or toxic materials) and one (1) room for biomedical waste storage (Group S-1). The building would be accessory to the existing Valley Medical Center facility. The City of Renton’s (COR) mapping system indicates that portions of Valley Medical Center campus is mapped within a Moderate Landslide Hazard area and has regulated slopes however, critical areas are not mapped in the proposed area of development for this project. Current Use: The project site is currently the Valley Medical Center campus. The specific proposed site for the accessory building includes vegetation (English ivy, rhododendron and a significant tree), a stepped concrete pathway with metal handrailing between buildings, and a metal canopy above the pathway with supports for electrical conduit services. The pathway, canopy and conduit services are proposed for retention if feasible. Zoning/Land Use: The subject property is located within the Commercial Office (CO) zoning classification. The purpose of the CO zone is established to provide areas appropriate for professional, administrative, and business offices and related uses, offering high-quality and amenity work environments. In addition, a mix of limited retail and service uses may be allowed to primarily support other uses within the zone, subject to special conditions. Limited light VMC Haz-Mat Storage Building Page 2 of 6 January 19, 2023 industrial activities, which can effectively blend in with an office environment, are allowed, as are medical institutions and related uses. Uses customarily incidental and subordinate to a principal use and located within the same structure as the principal use or otherwise upon the same site occupied by a principal use. The proposal is an accessory storage use for materials associated with Valley Medical Center, a medical institutions use. The project is located on the same site as Valley Medical Center and will be incidental and subordinate to the medical center. Development Standards: The project would be subject to RMC 4-2-120B, “Commercial Development Standards” effective at the time of complete application (noted as “CO standards” herein). Building Standards – The CO standards permit a maximum lot coverage for buildings to be 65% of the total lot area or 75% if parking is provided within the building or within an on-site parking garage unless modified through an approved Master Plan. The allowed height is 250 feet (250’). In no case shall building height exceed the maximum allowed by the Airport Related Height and Use Restrictions for uses located within the Airport Influence area and Safety Compatibility Zones. Building standards would be reviewed for compliance at the time of application. Setbacks – Setbacks are the minimum required distance between the building footprint and the property line. The required setbacks for the CO zone are: minimum front yard and secondary front yard: 15 feet (15’) for buildings less than 25 feet (25’) in height; maximum front yard and secondary front yard: none; minimum side yard and rear yard: none, except 15 feet (15’) if lot abuts a lot zoned residential; minimum rear yard: none; minimum freeway frontage setback: 10 feet (10’) landscaped setback from the property line. In no case shall a structure over 42 inches (42”) in height intrude into the 20-foot (20’) clear vision area defined in RMC 4-11-030. The proposed location would meet setback requirements. Setback standards would be reviewed for compliance at the time of application. Access/Parking: Access to the proposed building is via existing internal parking lot drive aisles. Access to the Valley Medical Center campus is from S 43rd St and Talbot Rd S. The medical institution use requires a minimum and maximum of one (1) stall for every three (3) beds, plus one (1) stall per staff doctor plus one (1) stall for every three (3) employees. Driveway width shall not exceed an aggregate of 40 percent (40%) of the street frontage. There shall be a minimum of 18 feet (18’) between driveway curb returns where there is more than one (1) driveway on property under single ownership or control and used as one premises. The width of any driveway shall not exceed 30 feet (30’). There shall be no more than one (1) driveway for each 165 feet (165’) of street frontage serving any one property. For each 165 feet (165’) of additional street frontage another driveway may be permitted. Maximum driveway slope shall not exceed eight percent (8%). The Administrator may allow a driveway to exceed eight percent (8%) slope but not more than fifteen percent (15%) slope, upon proper application in writing and for good cause shown, which shall include, but not be limited to, the absence of any reasonable alternative. To exceed fifteen percent (15%), a variance from the Administrator is required. Bicycle Parking –The number of bicycle parking spaces shall be equal to 10 percent (10%) of the number of required off-street vehicle parking spaces for all uses except attached dwellings. VMC Haz-Mat Storage Building Page 3 of 6 January 19, 2023 Outside of the Center Downtown Zone new buildings trigger parking, loading and driveway regulations. The proposal would not increase the number of beds, doctor’s or employees as it supports existing operations. A modification is required to deviate from standards. Please see RMC 4-4-080, Parking, Loading and Driveway Regulations for full requirements. Landscaping: With the exception of critical areas, all portions of the development area not covered by structures, required parking, access, circulation or service areas, must be landscaped with native, drought-resistant vegetative cover. The minimum on-site landscape width required along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in the ROW planter will also be required. Landscaping may include hardscape such as decorative paving, rock outcroppings, fountains, plant containers, etc. Minimum planting strip widths between the curb and sidewalk are established according to the street development standards of RMC 4-6-060, Street Standards. Street trees and, at a minimum, groundcover are to be located in this area when present. Street trees shall be planted in the center of the planting strip between the curb and the sidewalk at the following intervals; provided, that, where right-of-way is constrained, irregular intervals and slight increases or decreases may be permitted or required. Additionally, trees shall be planted in locations that meet required spacing distances from facilities located in the right-of-way including, but not limited to, underground utilities, streetlights, utility poles, traffic signs, fire hydrants, and driveways; such spacing standards are identified in the City’s Approved Tree List. Generally, the following spacing is required: i. Small- sized maturing trees: thirty feet (30') on center; ii. Medium-sized maturing trees: forty feet (40') on center; and iii. Large-sized maturing trees: fifty feet (50') on center. Those small additions determined by the Community and Economic Development Administrator not to warrant improvements to the entire site are exempt from all but the maintenance and street tree requirements. All landscaping shall meet the requirements of RMC 4-4-070, Landscaping. Significant Tree Retention: A review of COR Maps shows that there are mature trees on the site. When significant trees (greater than 6-inch caliper or 8-caliper inches for alders and cottonwoods) are proposed to be removed, a tree inventory and a tree retention plan along with an arborist report, tree retention plan and tree retention worksheet shall be provided with the formal land use application as defined in RMC 4-8-120. The tree retention plan must show preservation of at least 30% of significant trees. Please refer to RMC 4-4-130, Tree Retention and Land Clearing Regulations for further general and specific tree retention and land clearing requirements. In addition to retaining a minimum of 30% of existing significant trees, properties subject to an active land development permit shall comply with minimum tree credit retention requirements of a minimum of 30 credits per net acre. Tree credits encourage retention of existing significant trees with larger trees being worth more tree credits. TREE SIZE TREE CREDITS New small species tree 0.25 New medium species tree 1 New large species tree 2 VMC Haz-Mat Storage Building Page 4 of 6 January 19, 2023 TREE SIZE TREE CREDITS Preserved tree 6 – 9 caliper inches 4 Preserved tree 10 – 12 caliper inches 5 Preserved tree 12 – 15 caliper inches 6 Preserved tree 16 – 18 caliper inches 7 Preserved tree 19 – 21 caliper inches 8 Preserved tree 22 – 24 caliper inches 9 Preserved tree 25 – 28 caliper inches 10 Preserved tree 29 – 32 caliper inches 11 Preserved tree 33 – 36 caliper inches 12 Preserved tree 37 caliper inches and greater 13 Significant trees shall be retained in the following priority order: Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; significant trees over sixty feet (60') in height or greater than eighteen inches (18") caliper; and trees that shelter interior trees or trees on abutting properties from strong winds, which could otherwise allow such sheltered trees to be blown down if removed. Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native evergreen or deciduous trees; and other significant non-native trees. Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention and are not able to be retained unless the alders and/ or cottonwoods are used as part of an approved enhancement project within a critical area or its buffer. The Administrator may require independent review of any land use application that involves tree removal and land clearing at the City's discretion. The Administrator may authorize the planting of replacement trees on the site if it can be demonstrated to the Administrator's satisfaction that replacement requirements in RMC 4-4- 130H1e can be met. Tree retention standards shall be applied to the developable area, as defined in RMC 4-11-040, Definitions D, of a property. Fences/Walls: Within commercial zones the maximum height of any fence, hedge, or retaining wall within the front yard and secondary front yard shall not exceed 48 inches (48”) in height within 15 feet (15’) of the front yard property line or within any part of the clear vision area. Chain VMC Haz-Mat Storage Building Page 5 of 6 January 19, 2023 link fencing shall be coated with black, brown, gray or green bonded vinyl. Fences, hedges and retaining walls shall not stand in or in front of any required landscaping. If a new or replacement fence is proposed within 15 feet (15’) of a public street on a site that is nonconforming to street frontage landscape requirements per RMC 4-4-070F1, the site shall be brought into conformance. Critical Areas: According to COR Maps the Valley Medical Center facility is within a Moderate Landslide Hazard area and has regulated slopes however, critical areas are not present in the proposed area of development for this project. Environmental Review: The proposal would require environmental review pursuant to the State Environmental Policy Act (SEPA) as the gross square floor area of the use exceeds 4,000 square feet of floor area. Site Plan Review: The purpose of the site plan review process is to analyze the detailed arrangement of project elements to mitigate negative impacts where necessary to ensure project compatibility with the physical characteristics of a site and with the surrounding area. Site plan review ensures quality development consistent with City goals and policies. Site plan review analyzes elements including, but not limited to, site layout, building orientation and design, pedestrian and vehicular environment, landscaping, natural features of the site, screening and buffering, parking and loading facilities, and illumination to ensure compatibility with potential future development. Site plan review is required for all development in the CO zone. Please review RMC 4-9-200, Master Plan and Site Plan Review for full site plan review requirements. Permit Requirements: The proposal requires Environmental Review and Administrative Site Plan Review. The 2023 fees would total $5,701.50 ($3,030.00 Administrative Site Plan Review + $1,800.00 Environmental Review + $241.50 Technology Fee (5%) = $5,701.50). Each modification request is $290.00. A 5% technology fee added to the total cost of the reviews would also be assessed at the time of land use application. All fees are subject to change. Other informational applications and handouts can be found on the City’s Digital Records Library. The City requires electronic plan submittal for all applications. Please refer to the City’s Electronic File Standards. Fees: In addition to the applicable building and construction fees, impact fees would be required. The fee in effect at the time of building permit issuance will apply. For informational purposes, the 2023 impact fees are as follows: • A Fire Impact Fee assessed at $0.15 per square foot of storage space. A handout listing Renton’s development-related fees is available on the City of Renton website for your review. Next Steps: When the formal land use application materials are complete, the applicant shall have the application materials pre-screened prior to submitting the complete application package. Please contact Andrew Van Gordon, Associate Planner at avangordon@rentonwa.gov or (425) 430-7286 for an appointment. Expiration: Upon approval, the site plan shall expire within two (2) years. A single two (2) year extension may be granted for good cause by the Administrator. The Administrator may determine at their discretion that a public hearing before the Hearing Examiner is required for such extension. It is the responsibility of the owner to monitor the expiration date. VMC Haz-Mat Storage Building Page 6 of 6 January 19, 2023