HomeMy WebLinkAboutMFP23000117.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23000117
IVR Number: 23000117
Permit Information
Permit Name: P.063985
Address/Location:01/06/2023Application Date:1723059013Parcel Number: 1715 MAPLE VALLEY HWY
Permit Type:01/19/2023Issue Date:Franchise
Permit Work Class:01/19/2024Expiration Date:Minor Utility
Job Number: P.063985Franchise Type:Telephone
Description: Lumen to access MH294 and MH96 for fiber installation.
Contacts
Name Address PhoneTypeBilling
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549ApplicantX
Austin Sweeney
Century Link
23315 66th Ave S
Kent, WA 98032
C: (253) 766-7549Contact
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Jesse Patjens
CenturyLink / Lumen
23315 66th Ave S
Kent, WA 98032
Contact
Michael Smith
North Sky Communications
21320 84th Ave S
Kent, WA 98032
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Northsky Communications
Tawnya Longfellow
22517 88th ave S Kent/WA 98031
P.063985
1715 Maple Valley Hwy
2/6/23 3/6/23
425 615 7121
Lumen to access MH294 and MH96 for fiber installation.
MFP23000117
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 1/19/2023
Additional approval from WSDOT will
be required for work in their ROW.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Austin Sweeney
Austin Sweeney 1/6/2023
ON RAMP I 405OFF RAMP I-405O
N
R
A
M
P
I
-
4
0
5
BRONSON WAY
N SUNSET BLVD NROADWORKAHEAD
W20-1
RIGHT LANECLOSEDAHEAD
W20-5
Comments:
ACCESS MH 294 LOCATED IN THE EB CURB LANE OF MAPLE VALLEY HWY,
EAST OF SUNSET BLVD N.THIS IS A RIGHT LANE CLOSURE.
CONTACT WSDOT NW REGION RADIO (206)440-4490 5 MIN PRIORTO START OF CLOSURES AND AGAIN
AFTER REOPENING.CONTACT JUAN REYES (WSDOT)
(206)440-4457 FIVE DAYS PRIOR TO WORK TO COORDINATE.NO CLOSURES ALLOWED FROM NOON
THE DAY PRIOR TO A HOLIDAY THROUGH NOON THE DAY FOLLOWING
A HOLIDAY.
MAPLE VALLEY HWY
TRAFFIC CONTROL PLAN
JOB # P.063985 C.45
PERMIT #
Date:12/16/2022 Author:Sharon Martos, Traffic Control Supervisor Project:P.063985 C.45
CERT:TCS # 010745 Designed for CenturyLink:By Sharon Martos
Comments:
General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTON/WSDOT
requirements.
2. Channelizing devices are Traffic Drums with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be determined by City of Renton/WSDOT.
MAPLE VALLEY HWY @ SUNSET BLVD N
MH 294
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON/WSDOT TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 012843 sharon.martos@gmail.com
200'
200
200
200
R
I
G
H
T
L
A
N
E
C
L
O
S
E
D
A
H
E
A
D
W
2
0
-5
W
4
-2
R
O
A
D
W
O
R
K
A
H
E
A
D
W
2
0
-1
W4-2
350'
350'
350'
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
LENGTH (FT)
25 30 35 40 45 50 55 60 65 70
155 200 250 305 360 425 495 570 645 730
PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE
TYPICAL PROTECTIVEVEHICLE TYPEWITH TMA
TYPICAL PROTECTIVE VEHICLE(WITH TMA) LOADED WEIGHT(LBS)
STATIONARYOPERATION(feet)
YARD DUMP TRUCK.SERVICE TRUCK.FLAT BED. ETC.
MINIMUM WEIGHT 15,000 LBS.(MAXIMUM WEIGHT SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDATION)
30 MIN.
100 MAX.
ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT
1 A PROTECTIVE VEHICLE IS RECOMMENDED REGARDLESS IFA TMA IS AVAILABLE. IF NO TMA IS USED, THE PROTECTIVE VEHICLE SHALL BE STRATEGICALLY LOCATED IN THE FIELD TOSHIELD WORKERS AND NO ROLL AHEAD DISTANCE IS SPECIFIED.REFER TO CHAPTER 1.5.5 FOR ADDITIONAL INFORMATION
(1) All spacing may be adjusted to accommodate interchange ramps,at-grade intersections, and driveways.(2) The spacing may be reduced in urban areas to fit roadway conditions
RURAL HIGHWAYS
RURAL ROADS
ALL SIGNS ARE 48'' X 48'' BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.
RURAL ROADS & URBAN ARTERIALS
60/65 MPH
45/55 MPH
35/40 MPH
800'
SIGN SPACING=X (FEET) (1)
500'
350'
FREEWAYS & EXPRESSWAYS 55/70 MPH 1500 (OR ASPER MUTCD)
RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTS 25/30 MPH 200'
URBAN STREETS 25 MPH OR LESS 100'
(2)
(2)
MINIMUM TAPER LENGTH (L) IN FEET
LaneWidth
Feet
Posted Speed (mph)
10
11
12
25 30 35 40 45 50 55 60 65 70
105
115
125
150
165
180
205
225
245
265
295
320
450
495
540
500
550
600
550
605
660
660
720 780 840
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
250'100'
115'115'ROADWORKAHEADW20-1Legend
Arrowboard (Chevron)
Work Area
truck
Cone
Traffic Drums w/ Type C lights
Sharon Martos
Project # P.063985 C.45Designed for LUMENSharon MartosApproved 12/16/2022Traffic Control SupervisorTCS # 012843Expires 5/31/2025Phone 253-737-5198
sharon.martos@gmail.com NMH 294
WORK AREA10 X 465
NOT TO SCALE
www.invarion.com
MFP23000117
Additional approval from WSDOT will
be required for work in their ROW.
NTRAFFIC CONTROL PLAN
JOB # P. 063985. C. 45
PERMIT #
MAPLE VALLEY HWY @ 1850 MAPLE VALLEY HWY
MH-96 ACCESS (SHEET 1 OF 2)
RIGHT-TWO-LANES CLOSURE & LANE-SHIFT
LEGEND
ARROW BOARD CONES
CROSSWALK TRAFFIC LIGHT
WORK AREA WORK TRUCK
Jeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT25 / 30 20' 40'
35 / 45 30' 60'
ONE-LANE TWO-WAY TAPER 50' TO 100'
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 5401/3 L 50 500 550 600
Designed For: LUMEN
Project # P. 063985. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Draw Date: 12/16/2022
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
Date:12/16/2022 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:P. 063985. C. 45CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 36" x 36" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be determined by City of RENTON.
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
Comments:
ACCESS MH-96 LOCATED IN ROADWAY.
RIGHT-TWO-LANES CLOSED SE-BOUND
MAPLE VALLEY HWY W/ ARROW BOARDS.
INCLUDES LANE-SHIFT SE-BOUND.
CENTER-LANE CLOSED NW-BOUND.
MAINTAIN 11' MINIMUM LANE WIDTHS.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
NOTIFY TRANSIT. BUS-STOP RELOCATED.
PEDESTRIANS ARE NOT IMPACTED.
Comments:
SIGN SPACINGMPH "X"
20-25 100'
30 200'
35-40 350'45+ 500'
SPEED
LIMIT25
SEE SHEET 2DRIVEWAYTRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
100' +-100' +-ROADWORKAHEADW20-1W4-2100' +-
ISLAND
1111111211111111SUNSET BLVD N
MAPLE VALLEY HWY
ARROWBOARD
ARROWBOARD
MERGING
TAPER11' X ~115'
MERGINGTAPER
11' X ~115'
MH-96
ACCESSWORK ZONE
~1200' TOTAL
SIDEWALK
SIDEWALK
MAPLE VALLEY HWY
1850
MAPLE VALLEY HWY
11' MIN
CLOSEDLANESCLOSED LANE
RIGHT TWO LANESCLOSEDAHEADW20-5awww.invarion.com
MFP23000117
NTRAFFIC CONTROL PLAN
JOB # P. 063985. C. 45
PERMIT #
MAPLE VALLEY HWY @ 2003 MAPLE VALLEY HWY
MH-96 ACCESS (SHEET 2 OF 2)
RIGHT-TWO-LANES CLOSURE & LANE-SHIFT
LEGEND
CONES CROSSWALK TRAFFIC LIGHT
WORK AREA WORK TRUCK
Jeffrey Hubbard
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT25 / 30 20' 40'
35 / 45 30' 60'
ONE-LANE TWO-WAY TAPER 50' TO 100'
NOT TO
SCALE Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 5401/3 L 50 500 550 600
Designed For: LUMEN
Project # P. 063985. C. 45
Jeffrey D. Hubbard
Traffic Control Supervisor
WA TCS # 011989
Draw Date: 12/16/2022
Phone 253-737-5198
jhubbard.tcp@gmail.com
_______________________
Date:12/16/2022 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:P. 063985. C. 45CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 36" x 36" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be determined by City of RENTON.
UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM
Comments:
SIGN SPACINGMPH "X"
20-25 100'
30 200'
35-40 350'45+ 500'
SPEED
LIMIT25
SUNSET BLVD N
MH-96
ACCESS 2003
MAPLE VALLEY HWYBUSSTOPR3-2SEE SHEET 1Comments:
ACCESS MH-96 LOCATED IN ROADWAY.
RIGHT-TWO-LANES CLOSED SE-BOUND
MAPLE VALLEY HWY W/ ARROW BOARDS.
INCLUDES LANE-SHIFT SE-BOUND.
CENTER-LANE CLOSED NW-BOUND.
MAINTAIN 11' MINIMUM LANE WIDTHS.
DRIVEWAYS REMAIN OPEN/ACCESSIBLE.
NOTIFY TRANSIT. BUS-STOP RELOCATED.
PEDESTRIANS ARE NOT IMPACTED.
350' +-350' +-ROADWORKAHEADW20-1CENTERLANECLOSEDAHEADW9-3SPEEDLIMIT40
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW
TRAFFIC FLOW KEEPRIGHTR4-7bW1-41111111111111111W1-411' MIN
CLOSED
LANES CLOSEDLANES
CLOSEDLANES
ACCESSRD1719
MAPLE VALLEY HWY
SHIFTING
TAPER8' X ~60'DRIVEWAY111117
MAPLE VALLEY HWY
MAPLE VALLEY HWY
ROADWORKAHEAD
W20-1
SIDEWALK
SIDEWALK
WORK ZONE
~1200' TOTAL
SIDEWALK
SIDEWALK
ISLAND
www.invarion.com
MFP23000117
MH294
N
Lumen to access MH294 for splicing without surface disturbance.
1715 Maple Valley Hwy Parcel# 1723059013
MFP23000117
Additional approval from WSDOT will
be required for work in their ROW.
MH294
MH294
N N
Access road
MFP23000117
MH96
N
Lumen to access MH96 for splicing without surface disturbance.
No address Parcel# 1723059026
MFP23000117
N
MH96
MH96
N
MFP23000117