Loading...
HomeMy WebLinkAboutContract onlyArmando Pavone Mayor AGREEMENT CONTRACT NO. CAG-22-343 THIS AGREEMENT, made and entered into this day of , 2023 by and between the CITY OF RENTON, Washington, a municipal corporation of the State of Washington, hereinafter referred to as "City” and HCON INCORPORATED, hereinafter referred to as "Contractor." Now, therefore the parties agree as follows: 1.Agreement. This agreement incorporates the following documents as if fully set forth herein: the 2022 Standard Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of Transportation and the Washington State Chapter of the American Public Works Association, including all published amendments issued by those organizations (“Standard Specifications”); the City’s Contract Bid Documents for the Project, including but not limited to Addenda, Proposal Form, Special Provisions, Contract Plans, and Amendments to the Standard Specifications; Contractor’s Proposal and all documents submitted therewith in response to the City’s Call for Bids Documents; and any additional documents referenced as comprising the Contract and Contract Documents in Section 1-04.2 of the Standard Specifications, as revised by the Amendments and Special Provisions included with the City’s Call for Bids and Contract Documents. 2.Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project entitled Sunset Gardens Off-Site Water Main Improvements Project, WTR-27-4199, including all changes to the Work and force account work, in accordance with the Contract Documents, as described in Section 1-04.2 of the Special Provisions. 3.Payments. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Proposal according to the Contract Documents as to time, manner, and condition of payment in a contract amount not to exceed $879,533.85, unless modified by an approved change order or addendum. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 4.Completion Date. Contract time shall commence upon City's Notice to Proceed to Contractor. The Work under this Agreement shall be completed within the time specified in the Contract Bid Documents. Substantial Completion for this project must occur by June 30, 2023. If the Physical Work under this Agreement is not completed within the time specified, Contractor shall pay liquidated damages and all engineering inspection and supervision costs to City as specified in the Contract Bid Documents. 5.Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be entitled to recover its costs, including reasonable attorney's and expert witness fees. 6.Grant Compliance. The Contractor, and any subcontractors on the Project, shall follow all applicable terms of the Grant Contract included in the Contract Documents (under #25 of Table of Contents). 7.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this Agreement, except as expressly provided in this Agreement. The Department of Commerce and the State of Washington are not liable for claims or damages arising from the Contractor’s performance of the Work or any subcontractor’s performance of the Work. 30th January 1/30/2023