HomeMy WebLinkAboutChange Order - 01SUMMAllf OJ ,110,0510 CHAtlGI
ll&!nor,/Ju1tilic:'1;on
CITY OF RENTON
Parks and Recreation Department
CONTRACT CHANGE ORDER AGREEMENT
Coulon Park Trestle Bridge Replacement
CAG-22-012
American Construction Company
No. One (1)
Date:
lB·Jan-23
Gr;ting substructure modification to grating supports (Channel Diaphragms) per RFI No 31 for Coulon Park Trestle Bridae.
DUClll,nQN;
lt•m .... D.wt•"-" uflh,Na ....... .. •/•WSST w/oWSST
I Grating Substructure Modification s 92,970.31 s 92,970 31 ' • .
s •
Tataldlbeha"&•Drdtr: $ 92,970.31
w/oWS>f
DAIGINAl CONnACf CUlllllNT COHTIIACT NITCHANGl IUl/1:S[D CONTMCT
AMOUNT AMOUNT TitlSDIDUI TOTAL AFTH CHMlit:
$1,625,000.00 $1,625,000.00 $92,970.31 $1,717,970.31
w/oWSST w/oWSST w/oWS>f w/oWSST
89 calendar days calendar d•ys -extension of Time. Completion Date Is May 31, 2023.
The 111\'ff'ICIII :icp.e1f.,a 111d llrttd u, m 1h11 tr.i111t 0ti:ter hC:\/dn Wt!"f d1,m l:y th■ ta�tl'a:"o• klr ""'W Kl� HV!Tltltt WAh r�pcct 1;11h wo1). damHd ,n thi:I ,hanct otdtt The wo,, tovu..i Ir, �!'Ill tlU"J'I
order mom bt' p■rkl'"CG ui,dlf ttw u,... 1•rmt •ltd mndll.Klr,f •f lh•I ,ni:luc!f'd tr., 1119 ..,t,"-'l .1&rtt11'0■1'1l Al of1h■ cnh■r terms ol 1h1 or,&il":al acr"'"1-.1 n111Ji,, 111 •rf■a
. .,.
1/18/2023
CAG-22-012, CO #1-23
Armondo Pavone
1/30/2023
Attest:___________________
Jason Seth, City Clerk
EXHIBIT A-1
CHANGE ORDER PROPOSAL
Date: 01-17-2023
Project:
COP#:
City of Renton Gene Coulon Memorial Bridge Replacement
01 Rev 2
Contractor: American Construction Company, Inc.
Description: Grating Substructure Modification Rev 2
Amount of Proposed Change:
10.1% tax
Total:
Change in Contract Days:
Clarifications/ Assumptions:
$92,970.31
$9390.00
$102,360.32
95 Calendar Days
1.Contract days is based on having direction forward on RFI 31 on 01-24-2023.
2.Pricing Based on Grating Support Modifications drawings dated 12-28-2022 and
as revised in RFI 3 7.
3.Revised Schedule is per the attached updated schedule and will be updated when
change order is executed.
4.Excludes any unforeseen modifications to Water or Electrical.
5.Any nonstandard or additional fasteners the revised grating design due to the
grating overhang.
6.Excludes any additional TESC permit expenses.
Attachments: (Spreadsheet, quotes, invoices)
APPROVALS:
John Blair, PE
Project Manager
Title
Date
Title
Date
City of Renton
Project Manager ___ _Title
Date
GENE COULON MEMORIAL BRIDGE BEACH PARK TRESTLE REPLACEMENT-CITY OF RENTON
Grating Support Modifications
LABOR
DAYS
EQUIPMENT
DAYS
MATERIALS AND SUPPLIES
RENTALS
SUBS AND SERVICES
FOREMAN
ST I OT
0.0 0.0
0.0 0.0
0.00 0.0
0.0 0.0
0.0 0.0 o.oo o:oo
FOREMAN
ST
OT
PILEDRIVERS
ST
OT
OPERATOR
ST
OT
DECK ENGINEER
ST
OT
Palouse
0.00
Palouse
Barge
Ice Hammer
Skiff
Welder
Air Compressior
Pickup Truck
.\lEtillQB
Barge
0,00
PILEDRTVER
ST I 0.0 o.o
0.0
0.0
0,0
0.00
Ice Hammer
0.00
DESCRIPTION
OPERAlOR DECKENGR o, ST I 01 s, I OT
00 Ou u,o u,u o.u
0,0 0,0 0.0 0.0 o.o
0.0 0.0 0.0 o.o 00
00 0.0 o.o o.o 0.0
0.0 0.0 0.0 0.0 0.0
0.00 0.00 0.00 0.00 0.00
0,00 HOURS @ $92.05
0.00 HOURS @ $127.32
0.00 HOURS @ $88.49
0.00 HOURS @ $122.01
0.00 HOURS @ $96,96
0.00 HOURS @ $132.51
0.00 HOURS @ $93.98
0.00 HOURS @ $128.07
LABOR COST
00 72 00 7.2,B.7.f.(1)(a) .ALLOWABLE MARK UP OVERHEAD, 16%
TOTAL LABOR WI MARK UP
Air
Skiff Welder Compress Pickup Truck
0.00 0,00 0.00 0.00 0.00
0 00 HOURS @ s 500 OD
0 00 HOURS @ s 80.00
0 00 HOURS @ s 85 00
0.00 HOURS @ s 15.00
0.00 HOURS @ s 15,00
0,00 HOURS @ s 15.00 o.oo HOURS @ s 15.00
EQUIPMENT COST
00 72 OD 7.2.B.7.f.(1)(a) ,ALLOWABLE MARK UP OVERHEAD, 16%
TOTAL EQUIP WI MARK UP
Rainer Welding Rainer Welding Per Attached Proposa
VENDOR
United Renlals
United Sile Services
DESCRIPTION
Office Container
Rental Fencing
� DESC8IPDQN
3 Month
3 Month
MATERIALS, SUPPLIES COST
ALLOWABLE MARK UP 6% and 4%
TOTAL MATERIALS & RENTALS WI MARK UP
@ $ 531 56
@ $ 393,85
MATERIALS, SERVICES & RENTALS COST
Tax, 10.1%
00 72 00 7 2.B 7.f.(1)(a) ALLOWABLE MARK UP OVERHEAD, 16%
TOTAL MATERIALS & RENTALS WI MARK UP
SUBCONTRACTOR COST
ALLOWABLE MARK UP
TOTAL SUBCONTRACTOR WI MARK UP
SUB TOTAL AMOUNT
00 72 00 7.2.B.7.g. ALLOWABLE MARK UP PROFIT, 4%
00 72 DO 7.2.B.7. H BOND AND INSURANCE 2%
TOTAL AMOUNT WITH OVERHEAD AND PROFIT
Tax, 10.1%
TOTAL AMOUNT
$0.00
$0.00
$0.00
$0.00
$0,00
$0 ,00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$79,900.00
$79,900.00
$4,196.00
$84,096.00
$1,594.68
$1 ,181.56
$2,776.24
$280.40
$489.06
S3,545,70
$0.00
$0.00
$0.00
$0.00
$87,641.70
$3,505.67
$1,822.95
$92,970.31
$9,390.00
$102,360.32
: RAINIER • WELDING
January 3, 2023
To: American Construction Company
Attn: Aaron McMahill
Re: Gene Coulon Memorial Park Bridge Change Order 3409-01
Aaron,
19020 N. E. 84th Street
Redmond WA 98053
( 425)868-1300
www.RainierWelding.com
After review of the Gene Coulon Memorial Park Bridge Proposed Grating Support Design
Revision Drawing created by WSP for the City of Renton, we have come up with following price
adjustment and updated delivery date. Rainier Welding (RW) has received material quotes with
material lead times and a quote from our detailer with lead time. Please note that procuring domestic
material has been currently difficult due to the supply chain, current lead time is mid-February. The
following is taking in consideration of a two-week turnaround on drawing review and a total of two
weeks of detailing. This is a generous amount of time and should be easily accomplished. RW is also
including the previously discussed plan of assembly in the delivery date, 2 weeks.
New deliver date is April 14'h, 2023. This date is contingent on the drawing review process
including any RFI's issued by our detailer and a response on direction from the City of Renton to
proceed or not by 1/13/2023.
Please note that fabrication will be at a stand still at RW starting 1/13/2023 if we have not received
a decision to move forward or to revise the design as proposed.
Cost adjustment is outlined on the attached change order.
Sincerely,
Joe Gilden
Project Manager
AISC CERTIFIED FABRICATOR SINCE 1975 !;((ERTi Fl ED < FABRICATOR
Rainier Welding
19020 NE 84th St. Change Order Request
: RAINIER : • WELDING
Redmond Wa. 98052
425.868.1300
www.RalnierWelding.com
RW Pro·e,ct Number Pro· ect Information 3409
Pr0ject Name Area I Building
Gene Coulon Memorial Park Brid e Gratin Span
Descripti0n of W0r:k Cost Breakdown Reference
Request o.
1
Owner Proposed Design Change to the Grating Supports
Channel Diaphragms
Cost Breakdown and Quotes from Vendors with
Lead Times
Item Quantity Unit Rate Cost
Detailing Production
Detailin Lot $ 3,640.00
En $
In-$
Material
C8x18.75 and 1/2" Plate -8,000 Pounds $ 11,998.00
Bolts and Hardware 1.00 Lot $ 5,184.00
Weldin Supplies and other Misc. Sup lies 1.00 Lot $ 3,883.00
$
$
$
Shop Labor
Regular Time 521.00 Hours 90.00 $ 46,890.00
Overtime $
Double Time $
Coatings
Galvanizin 1.00 Lot $ 5,705.00
Paint $
Shipping
Contract Carrier 1.00 Load $ 2,600.00
Other
$
Sub -Total 79,900.00
Total 79,900.00
New Proposed Delivery Date 4/14/2023 Prepared By
Joe Gilden
Date: 1/3/2023
This Change Order is good only for the direct cost of the Proposed change. RW reserves the right to seek
compensation for any additional costs or damages arising from said change.
OUnited Rentals· II II Ill I lll�llllmtlllllll lllllllllll llllll Ill 4 WEEK BILLING INVOICE
QI .µ ·rf ti)
BRANCH AK4 1701 PORT OF TACOMA RD TACOMA WA 98421-3714 253-886-5627 253-275-0534 FAX
GENE COULON 1201 LAKE WASHINGTON RENTON WA 98056-2567 BLVD N
# 212558013-003
Customer# Invoice Date Date Out Billed Through UR Job Loe UR Job# Customer Job ID:
9766936 12/27/22 10/31/22 01/23/23 1201 LAKE 5
05:30 PM 00:00 WASHINGTON
.Q 0 � Office: 253-254-0118 Cell: 253-350-1670
P.O. # Ordered By Reserved By Salesperson
MC 08-22 93-02 AARON MCMAHILL DEVIN WHEELER BRIAN BURNETTE
AMERICAN CONSTRUCTION CO INC 1501 TAYLOR WAY Invoice Amount: $584.59
Terms: Due Upon Receipt TACOMA WA 98421 Payment options: Contact our credit office 888-481-2660
RENTAL ITEMS: � Equipment Description
1 PV2812015 GLD/OFFICE CONTAINER 8X20X8'6" Make: TRANSOCEAN Model: 20' OC A/O Serial: 2812015
SALES/MISCELLANEOUS ITEMS: --�Q�t�y I tern
1 WA HEAVY EQUIP. RENTAL TAX
COMMENTS/NOTES:
CONTACT: AARON MCMAHILL CELL#: 253-350-1670
Minimum
Price
[ DRSURWA/MCI]
Billing period: 28 Days From 12/26/22 05:30 PM Thru 1/23/23 05:30 PM
ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING ?
CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDRENTALS.COM/TRAINING
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. P.O. BOX 051122 LOS ANGELES CA 9007 4-1122
Day Week 4 Week
525.00
Rental Subtotal:
Unit of Measure
6.563 EACH
Sales/Misc Subtotal:
Agreement Subtotal: Tax: Total:
Amount
525.00
525.00
Extended Amt.
6.56
6.56
531.56 53,03 584 59
Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. Page:
United Site Services of Nevada, Inc.
1 054 S Elmgrove St
SEATTLE, WA 98108 United�
SITE SERVICES
Salesperson Contact
Daniel Linnan
Mobile:
Office: + 1 208-362-3000 x72306
Fax:
Daniel.Linnan@unitedsiteservices.com
Site Service Quotation
Quote No.: 414-2399831 Quote Date: 09/27/22 Quote Expires: 1 0/27 /22
Sell To: American Construction Company
Inc.
Aaron McMahill
1501 TAYLOR WAY
TACOMA, WA 98421
Cust. #: USS-1421301
Phone: 253-350-1670
Ship To: American Construction Company
Inc.
1201 Lake Washington Blvd N
RENTON, WA 98056
Terms: Due Upon Receipt
!Comments & Specfal lnstructions1-l ----------------------------------
18% FENCE RENTAL-(4) 28 DAY BILLING CYCLE TERM
$4.06/ FT ON 6 FT PANEL FENCE
$7.97 EA SANDBAG
$450.00 Delivery/Install/Pickup per 1,000 LF
Temporary fence pricing for long-term projects is based on the initial term listed on the agreement which will be billed on a 28 day
billing cycle. All new fence orders are subject to a minimum install fee and will be listed on the corresponding agreement. If the
fence is needed beyond the initial term listed on this agreement, a residual (rental) fee will apply to all fence and related products
on site. This residual percentage amount will appear on your agreement and will be invoiced each billing cycle until the fence is
removed. Price includes initial delivery, installation and removal. Any additional deliveries, moves or removals will be charged
based on the pricing in this agreement and the schedule below. All partial deliveries and removals are subject to a minimum trip
charge as outlined in the agreement.
Miscellaneous Charges:
Add $1.00 per ft for moves (subject to $250.00 minimum fee)
Add $1.00 per ft for rocky ground, hillside or hand carry.
Hole patching (cold patch) available in designated areas, will be $8 per hole in asphalt and $1 O per hole in concrete (subject to $250
minimum fee)
Add $225.00 per hour based on two-person crew for waiting time related to site delays, safety classes, site orientations or any other
reason for delay, etc.
lt is the customer's responsibility to keep fence line free of vegetation and snow. All growth and or snow must be cleared prior to
delivery or removal.
If damaged fence has to be removed and reinstalled, customer will be billed for damaged fence and for additional installa tion
charges.
50% deposit for fencing may apply
Damaged or missing fence will be billed per the schedule below:
Chain Link: $6.00 per foot
Panel Fence: $12.25 per foot
Gates: 2x standard per foot charge for item. I.E. 1 O' gate for panel fence will be charged at $24.50 per foot.
USS DOES NOT ENGAGE IN OR SIGN PROJECT LABOR AGREEMENTS (PLA). USS WILL, HOWEVER,
Continued ..
United Site Services of Nevada, Inc.
1054 S Elmgrove St
SEATTLE, WA 98108
Salesperson Contact
Daniel Linnan
Mobile:
Office: + 1 208-362-3000 x72306
Fax: United·
SITE SERVICES Daniel.Linnan@unitedsiteservices.com
Site Service Quotation
Quote No.: 414-2399831 Quote Date: 09/27/22 Quote Expires: 10/27/22
Sell To: American Construction Company
Inc.
Ship To: American Construction Company
Inc.
Aaron McMahill
1501 TAYLOR WAY
TACOMA, WA 98421
1201 Lake Washington Blvd N
RENTON, WA 98056
Cust. #: USS-1421301
Phone: 253-350-1670
Terms: Due Upon Receipti Comments & Special lnstructionsfl----------------------------------
PROVIDE FENCE TO OUR CUSTOMERS FOR SELF-INSTALLATION IN THESE INSTANCES.
IF THIS IS A PREVAILING WAGE PROJECT, DAVIS BACON RATES WILL BE USED TO ESTIMATE PREVAILING WAGE.
RATE WILL BE CHARGED AS SITE MANDATES. CUSTOMER IS RESPONSIBLE TO PROVIDE USS WITH DIR OR CPR
FORM PRIOR TO INSTALL.
ALL INSTALLS, PICKUPS, MOVES, OR REPAIRS ACCRUE AT CURRENT DAVIS BACON WAGE ACT WAGES IF THE
PROJECT IS PREVAILING WAGE.
SHOULD YOUR FENCE REQUIRE DRIVEN POST, CUSTOMER WILL NEED TO MARK THE FENCE LINE FOR
UNDERGROUND UTILITIES LOCATE COMPANY (I.E.: DIG ALERT) AND LET USS KNOW ONCE COMPLETED.USS WILL
CALL TO SCHEDULE THE UNDERGROUND ASSESSMENT. IN SOME STATES THE LOCATE APPOINTMENT CAN BE
SCHEDULED BY THE CUSTOMER, HOWEVER USS MUST BE LISTED ON THE PAPERWORK. PLEASE NOTE THIS WILL
TAKE 3-5 BUSINESS DAYS TO CLEAR BASED ON LOCAL UTILITY LOCATE AVAILABILITY.
Item
Fence 18% After (4) 28 Day Billing Cycles
Fuel & Inflation Surcharge
Unit
EA
Quanlll From
1 02/20/23
Thru
lndef
Fence 18% After (4) 28 Day Billing Cycles Subtotal: .......•...........
Fence -6x12 T-Stand Panel
Fuel & Inflation Surcharge
FT 300 10/31/22 02/19/23
Fence -6x12 T-Stand Panel Subtotal: .....
Fence -6x4 T-Stand Panel FT 4 10/31/22 02/19/23
Fuel & Inflation Surcharge
Fence -6x4 T-Stand Panel Subtotal:
Fence -T-Stand -No Charge EA 25 10/31/22
Fuel & Inflation Surcharge
Fence -T-Stand -No Charge Subtotal: .................... .
02/19/23
Fence -Sandbags EA 25 10/31/22 02/19/23
Unit Price
0.00
4.06
4.06
0.00
7.97
Total Price
0.00 per billing cycle
0.00 per billing cycle
0.00
1,218.00 one time
120.58 one lime
1,338.58
16.24 one time
1.61 one time
17.85
0.00 one time
0.00 one time
0.00
199.25 one time
Continued ..
United Site Services of Nevada, Inc. 1054 S Elmgrove St SEATTLE, WA 98108 United'
SITE SERVICES
Salesperson Contact Daniel Linnan Mobile: Office: + 1 208-362-3000 x72306 Fax: Daniel.Linnan@unitedsiteservices.com
Site Service Quotation
Quote No.: 414-2399831 Quote Date: 09/27 /22 Quote Expires: 10/27 /22
Sell To: American Construction Company Inc. Aaron McMahill 1501 TAYLOR WAY TACOMA, WA 98421
Cust. #: USS-1421301
Phone: 253-350-1670
Ship To: American Construction Company Inc. 1201 Lake Washington Blvd N RENTON, WA 98056
Terms: Due Upon Receipt
l1tem Unit Quantity From Thru Unit Price Total Price Fuel & Inflation Surcharge
Fence -Sandbags Subtotal:. . .
Fence • 6x12 Gate -Will use Panel Fuel & Inflation Surcharge
Fence• 6x12 Gate -Will use Panel Subtotal:.
Delivery Only -No SetupFuel & Inflation Surcharge
Delivery Only -No Setup Subtotal:
EA
EA
Accepted:£'."'°�� :::::Jc----
Remit To: United Site Services, PO Box 660475, Dallas, TX 75266-0475
1 09/27/22 02/19/23
1 09/27/22 02/19/23
Date:�Zv
NOTE: Total prices have been calculated tor 1 billing period only. Damage Waiver is optional. Please read \he
\erms and conditions on the last page of this document tor more information.
0.00
450.00
Subtotal:
Tax:
Total:
19. 73 one time
218.98
0.00 one time 0.00 one time
0.00
450.00 one time 44.55 one time
494.55
2,069.96
143.35
2,213.31
TERMS AND CONDITIONS Rev 5 6 09
1. Acceptance Customer shall be deemed to have accepted these terms and
conditions upon the earliest to occur of. (i) two business days after receipt of an
invoice From Company; (ii) delivery of items of equipment ("Equipment") identified in
the invoice to the site designated in the invoice (the 'Site") and use or acceptance
thereof; or (iit) acknowledgment or other conduct of Customer indicating acceptance.
These terms and cond�ians shall supersede any inconsistent terms of any purchase
order or other documenls of Customer
2. Payment Terms All agreements are subject to approval by Company Customer
shall pay all charges by Company during the term (the "Period") shown tn t11e invoice
All Company invoices are due and payable upon Customer's receipt of the
invoice. Customer shall be liable to Company for interest at the rate of 1 5% per
month, or such lesser rate as may be the maximum lawful rate from time to time,
on all overdue accounts. Customer shall pay all additional charges for services
separately requested by Customer or made necessary by Custom er's breach of
these Terms and Conditions. including but not limited to. moving/relocation charges,
special service charges, and special delivery and removal charges In the event
Customer's account becomes delinquent, Customer agrees to pay Company all
collection e,penses. including reasonable attorney's fees
3. Service The Company offers servicing as an option on all portable rest
rooms
4. Damage Waiver The Company offers a damage waiver program on certain
Equipment Customer may decline the damage waiver by completing and
executing the appropriate section at the end of these terms and conditions.
Unless Customer has declined the Damage Waiver in writing before the com
mencement of the Period or within five business days aflhe date of the first Invoice
lo Customer for any Equipment identified with a Damage Waiver on the invoice,
whichever is later. Campariy shall impose. and Customer shall pay, any Damage
Waiver fees indicated on the invoice and (provided Customer has not breached any
of these terms and condrtions) Customer shall have no responsibility far accidental
structural damage to the Equipment, EXCEPT (i) Customer shall be liable for theft
of any Equipment and for any losses resulting from any willful or grossly negligent
acts or omissions of Customer or any of its agents, servants and employees. and
(ii) tf Customer has other insurance covering such loss or damage, Customer shall
exercise all rights available to it under such insurance, take all actions necessary to
process such c:aim and assign sucl1 claim and pay any and all proceeds from such
insurance ta Company. If Customer declines the Damage Waiver, Customer shall be
liable for any loss or damage to the Equipment, regardless or cause or lault, except
for reasonable wear and tear, and Customer shall pay Company the actual cast
al repair or replacement cost thereof, and in addition thereto. for Company's loss
of use of the Equipment In the event oi any loss of or damage to the Equipment.
Customer shall promptly notify Campany of such loss or damage and shall provide
Company with copies of all reports relating to such loss or damage including police
repons. informal investigation reports and insurance reports. The damage waiver
describe<! In this section does not apply to portable toilets and containers
which become contaminated with hazardous materials or contaminants de
scribed in Paragraph 7 while in the Customer's control and possession.
5. Equipment Location Customer warrants and represents that it has exercised
due diligence and care in the selection of the location 1t has designated far the
placing of pornible toilets, temporary fencing, portable storage containers and any
other Equipment provided by Company, and fur1her agrees to give directions and
supervise the placement of such temporary fencing, storage containers, portable
toilets and other Equipment
6. Equipment Responsibility Company will deliver the Equipment ta the Site
at tne commencement of the Period and will remove the Equipment at the end
of the Period. If servicing has been ordered by Customer. Company will remove
any domestic septic waste ('DSW") from portable restrooms. if applicable. on the
service day(s) scheduled by Company. In the event Campany is unable ta service
the Equipment an the service day due to a holiday, inclement weather, or other
interfering circumstances, Campany shall service lhe Equipment on the earliest
bu siness day. excluding Sundays, available in accordance with Company's other
serv,ce commitments Company shall be granted access to the Equipment at any
time ror any servicing. maintenance or removal of Equipment. Customer shall
not remove the Equipment from the Site, and Shall not move the Equipment on
the Site without •1111tten permission from Campany Customer shall not modify the
equipmant. Customer shall not sell. rent. lease or otherNise lose possession of
the Equipment, nor shall Customer permit any lien to be placed on the Equipment
Customer aeknowledges that Company has no control over the use or the Equip
ment by Customer, and Customer agrees to comply. at Customer's sole expense,
with any and all applicable municipal, county. state. federal or quasi-governmental
laws, ordinances, regulations and guidelines. including ANSI Standard Z4.3 and
the requirements of the 'Guide for Clean Portable Sanitation· published by PSAI.
if applicable
7, Equipment Contamination While portable restroom units are in Customer's
possession, Customer shall prevent any contamination of such un�s with or from
radioactive volatile, flammable, explosive, toxic or hazardous materials iincluding
oils. paints, adhes,,es and solvents) Company will not remove any waste other
than DSW from portable restrooms and storage containers ("Other Waste") In the
event Other Waste is found in the Equipment, Customer shall arrange and pay
far separate removal of such Other Waste Until such Other Waste is removed.
Customer may not terminate the Period and Customer is liable far all charges ac
crued during such period.
8. Liability Except to the extent Customer is not liable far damage to Equipment
under the Damage Waiver program described in Section 5, Customer agrees ta
defend, indemnify and hold Company harmless to the maximum extent permitted
by law from and for all claims, lav,"Suits. damages. expenses and other losses
arising out of the rental or use of Equipment deli vered to or rented by Customer
Customer's obligation will apply ta the extent permitted by law ta all accidents or
incidents regardless of whether same occur as a result of Customer's or third party's
negligence, fault or other legal liability Customer will have no obligation to defend.
indemnify or hold harmless Campany if the accident or incident arises out of !he
sale negligence or v�llful misconduct of Campany Campany, its officers, directors,
employees and agents shall not, under any circumstances. be liable ta Customer
for consequential, incidental. special, exemplary or punitive damages arising out of
or relating to the Equipment Customer's sole and exclusive remedy far any claims
or causes of action arising out of or related ta the Equipment shall be to recover
from Company direct damages in an amount not to exceed the amount pa:d by
Customer far use of the Equipment
9. No Prorating Agreed upon rates are the complete billing periods and are not
to be prorated
10. Termination Campany may terminate this agreement and remove the Equirr
ment immediately in the event (i) Customer fails to pay any amount wtien due to
Campany, (11) Customer otherwise breaches or rejects any of these Terms and
Conditions, (iii) there is any loss of or damage to the Equipment, (iv) any lien is
placed, or Is proposed to be placed. on any of the Equipment. or (v) a proceeding
in bankruptcy or for other protection from creditors is commenced by or against
Customer Campany shall not be responsible for lass of any personal property on
the Site, which may be caused by removal al any of Company's Equipment pursu
ant to this paragraph
11. Governance This agreement shall be governed by and construed in accor
dance with the laws of the state. shown on the invoice, in which the Compants
place of business is located, without giving effect to any choice or conflict of law
provision or rule that would cause the appl1cat1on of the law; of any 1unsdiction
other than such state. Each of the parties submits ta the Jurisdiction of any slate
or federal court s,tting ,n such state, in any action or proceeding arising out of or
relating to this agreement All claims in respect of !he action or proceeding may
be heard and determined in any such court. No failure by Company to exercise
any right hereunder shall operate as a waiver of any other right hereunder. and a
waiver of any right on one occasion shall not constitute a bar to or a waiver of any
such right on any future occasion. All modifications to these Terms and Conditions
shall be in v,riting
12. Taxes & Fees Customer shall pay any and all taxes. license fees or permit
fees arising out of use of the Equipment Customer shall pay such taxes whether
such taxes are shown on the invoice or whether such taxes are later claimed by
a governmental authority In the event of a claim by a governmental authority for
taxes related ta the Equipment. Customer shall pay to Company such taxes on
demand
13. Additional Terms Additional Terms and Conditions apply ta rental and service
of Storage Containers(' Sheds") and Temporary Power equipment These Terms I'.
Conditions are shown on the back of your contract far these items
14. Errors & Omissions Company reser,es IM right to correct any erroneous
inlorma�on that may appear In the invoice or may have appeared in a prior invoice
including. without limitation, Customer's name or address. or billing amounts
15. Conditional Payments Any payment check. or other form of payment that you
send us for less than the full balance due that is marked 'paid in full" or contains
a similar notation, or that you otherwise tender in full satisfaction of a disputed
amount, must be sent to United Site Services Inc., ;o Washington Street, Suite
1000, Westborough, MA 01581 We reserve all our rights regarding these payments
( e g., if it is determined there is no valid dispute, or if any such check is received at
any other address, we may accept the check and you v�II still owe any remaining
balance). We ma1· refuse to accept any such payment by returning it to you. not
cashing 1t or destroying ti. All other payments that you make shall be sent to the
address on the invoice