Loading...
HomeMy WebLinkAboutMFP22006512DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22006512 IVR Number: 22006512 Permit Information Permit Name: P.062388 Address/Location:12/16/2022Application Date:3343901680Parcel Number: 1400 ABERDEEN AVE NE Permit Type:02/02/2023Issue Date:Franchise Permit Work Class:02/02/2024Expiration Date:Major Utility Job Number: P.062388Franchise Type:Telephone Description: Lumen to place 2 new HHs in place of P1 and P2. Aerial facilities will be undergrounded between P4 and P5. Contacts Name Address PhoneTypeBilling Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549ApplicantX Jesse Patjens CenturyLink / Lumen 23315 66th Ave S Kent, WA 98032 Contact Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Contact Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 23315 66th Ave S Kent, WA 98032 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Northsky Communications Tawnya Longfellow 22517 88th ave S Kent/WA 98031 P.062388 1400 Aberdeen Ave NE 1/16/23 2/16/23 Lumen to place 2 new HHs in place of P1 and P2. Aerial facilities will be undergrounded between P4 and P5. 425 615 7121 8 am 3 pm 2-1-2023 MFP22006512 CEDKip Braaten Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment.MFP22006512 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Austin Sweeney Austin Sweeney 12/16/2022 MFP22006512 DWYDWYDWYNE 15TH STABERDEEN AVE NE NE 16TH STNE 12TH STDWYDWYDWYDWYTRAFFIC CONTROL PLAN JOB # P.062388.C.45 PERMIT # Date:12/5/2022 Author:JORGIA DURR Project:P.062388.C.45 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City, County, and/or WSDOT Legend X POLE Work Area WORK TRUCK POLE TRAILER CONES FLAGGER NOT TO SCALE Approved 12/5/2022 Darlene Durr TCS # 011915 Phone 253-737-5198 darlene.durr@hotmail.com _______________________Darlene Durr NSPEEDLIMIT 25 CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 ONE LANE TWO WAY TAPER 50' MIN/100' MAX Comments: THIS IS TO REMOVE P.A1613894, PLACE NEW HH, AND RESTORE AS REQUIRED THIS IS A ONE LANE TWO WAY WITH FLAGGERS FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA DRIVEWAYS WILL REMAIN ACCESSIBLE AT WORK AREA PARKING RESTRICTED AT WORK AREA X P.A1613894 REMOVAL / NEW HH PLACEMENT ROADWORKAHEAD BE PREPAREDTO STOP BE PREPAREDTO STOP ROADWORKAHEAD ROADWORKAHEAD ROADWORKAHEAD 200' 200'200'200' 200' 200'200'200' ABERNEEN AVE NE @ NE 15TH ST P.A1613894 REMOVAL / NEW HH PLACEMENT / RESTORE ONE LANE TWO WAY WITH FLAGGERS WORK AREA 11' X 180' NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com www.invarion.com MFP22006512 DWYDWYNE 15TH STABERDEEN AVE NE NE 16TH STNE 12TH STDWYDWYDWYDWYTRAFFIC CONTROL PLAN JOB # P.062388.C.45 PERMIT # Date:12/5/2022 Author:JORGIA DURR Project:P.062388.C.45 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City, County, and/or WSDOT Legend X POLE Work Area WORK TRUCK POLE TRAILER CONES FLAGGER NOT TO SCALE Approved 12/5/2022 Darlene Durr TCS # 011915 Phone 253-737-5198 darlene.durr@hotmail.com _______________________Darlene Durr UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:DARLENE DURR, TCS #011915, darlene.durr@hotmail.com NSPEEDLIMIT 25 CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 ONE LANE TWO WAY TAPER 50' MIN/100' MAX Comments: THIS IS TO REMOVE P.A0505604, PLACE NEW HH, AND RESTORE AS REQUIRED THIS IS A ONE LANE TWO WAY WITH FLAGGERS FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA DRIVEWAYS WILL REMAIN ACCESSIBLE AT WORK AREA PARKING RESTRICTED AT WORK AREA X P.A0505604 REMOVAL / NEW HH PLACEMENT ROADWORKAHEAD BE PREPAREDTO STOP BE PREPAREDTO STOP ROADWORKAHEAD ROADWORKAHEAD ROADWORKAHEAD ROADWORKAHEAD ROADWORKAHEAD 200' 200'200'200' 200' 200'200'200' ABERNEEN AVE NE @ NE 15TH ST P.A0505604 REMOVAL / NEW HH PLACEMENT / RESTORE ONE LANE TWO WAY WITH FLAGGERS WORK AREA 11' X 160' NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 www.invarion.com MFP22006512 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.5500000000”NVICINITY MAP5%12'1(914-18'4*'#&6170&'4)4170&%108'45+1021.'52#0&261$'4'/18'&$;25'2.#%'8#7.65+06*'+42.#%'#55*1906*'02.#%':%122'4%#$.'+0%10&7+62.#%'&$;&'8'.12'4+0,1+0664'0%*#55*1908#7.6561+0%.7&'52.+%+0)%.1574'#0&$74+'&6'4/+0#.5(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.4+%-('4&+0#0&1".7/'0%1/(+$'4'0)+0''42#7.'.5#''&2*10'01  ÄDRAFTED BY: MOUNTAIN LTD/DL - 11/14/2223N5E5P.062388W26226RNTNWA011400 ABERDEEN AVE NERENTON, WA 9805613MFP22006512 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R /W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.4+%-('4&+0#0&1".7/'0%1/(+$'4'0)+0''42#7.'.5#''&2*10'01  ÄDRAFTED BY: MOUNTAIN LTD/DL - 11/14/2223N5E5P.062388W26226RNTNWA011400 ABERDEEN AVE NERENTON, WA 9805623MFP22006512 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.4+%-('4&+0#0&1".7/'0%1/SPEEDLIMIT(+$'4'0)+0''42#7.'.5#''&2*10'01  ÄDRAFTED BY: MOUNTAIN LTD/DL - 11/14/2223N5E5P.062388W26226RNTNWA011400 ABERDEEN AVE NERENTON, WA 9805633 EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W 32'28'32'12541500#33439016811400#33439016801330#33439017301324#33439017281333#33439018011325#33439018011401#33439018011409#33439018011417#33439018012025#33439018161501#33439018061413#3343901800016'ž0'9:+0':7)016'ž0'9:+0':7)016'ž0'9:+0':7)016'ž0'9:+0':7)T016'4'/18' 4'2.#%'9Ä6#**016'4'/18' 4'2.#%'9Ä6#**ITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1PSEN/A318720-166480 | A1613894NEUTRAL = 27'-03"004 = 22'-02"005 = 22'-01"POLE REMOVAL. ALL LINES WILL BE CUT AND NEW 200X FROM POLE 4 TO POLE 5.EXISTING ATTACHMENTSITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER2PSEN/A318705-166479 | A0505604STREETLIGHT = 27'-02"NEUTRAL = 26'-04"004 = 22'-01"005 = 21'POLE REMOVAL. ALL LINES WILL BE CUT AND NEW 200X FROM POLE 4 TO POLE 5.EXISTING ATTACHMENTSITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER4PSE24'318734-166480 | A0505934NEUTRAL = 26'-05"STREETLIGHT = 24'-01"004 = 22'-04"005 = 21'-03"005 = 20'-03"RISER DOWN POLE TO NEW 4" CONDUIT SOUTH TO NEW HH ATPOLE 1 & 2 REMOVAL, THEN RISER UP & POLE 5.EXISTING ATTACHMENTSITEM #STATIONSCLPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER5PSEN/A318690-166479 | A0505306NEUTRAL = 28'-02"004 = 22'-09"005 = 21'-08"RISER UP POLE TO NEW 4" CONDUIT NORTH TO NEW HH REPLACING POLE 2.EXISTING ATTACHMENTSMFP22006512