HomeMy WebLinkAboutSR_ERC Report_Towns on 12th_230126_v4_FINALDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL REVIEW COMMITTEE REPORT ERC Meeting Date: February 6, 2023 Project File Number: PR22-000160 Project Name: Towns on 12th Land Use File Number: LUA22-000180, ECF, PP, SA-H Project Manager: Alex Morganroth, Senior Planner Owner/Applicant: Ben Paulus, Blue Fern, 18300 Redmond Way #120, Redmond, WA 98052 Contact: Anna Drumheller, Blue Fern, 18300 Redmond Way #120, Redmond, WA 98052 Project Location: 3924 NE 12th St (APN 0423059099, 0423059140, 0423059100, 0423059067, 0423059063) Project Summary: The applicant is requesting preliminary subdivision approval, Hearing Examiner site plan approval, and a street modification for a unit-lot subdivision residential development consisting of 90 fee-simple townhouse dwelling units ranging in size from 700 to 1,000 sq. ft. The subject site is comprised of seven (7) parcels located on south side of NE Sunset Blvd and west of Union Ave NE (APNs 0423059063, 0423059067, 0423059099, 0423059140, 0423059101, 0423059247 and 0423059100). Four (4) of the parcels have frontage along NE 12th St and are in the Residential - 10 (R-10) zone. The portion of the site in the R-10 zone would have a net density of 9.9 dwelling units per acre. The other three (3) parcels are located to the north, one with frontage along NE Sunset Blvd, and are in the Residential Multi-Family (RMF) zone with an Urban Design District B overlay. The portion of the site in the RMF zone would have a net density of 18.41 dwelling units per acre. The subject property is 285,453 sq. ft. (6.55 acres) in size and contains three single-family homes with associated accessory structures. All lots would gain access via a new public residential access street off of NE 12th St with internal public alleys extending off of the public road to provide vehicular access to the majority of the units. Frontage improvements are proposed within the NE 12th St and NE Sunset Blvd ROWs. The proposal also includes five open space tracts, a storm drainage tract, and two critical areas tracts. Critical areas mapped on the site include sensitive (25-40%) and protected (>40%) slopes, a moderate landslide hazard and a Category III wetlands. The applicant is requesting a 25% wetlands buffer reduction as part of the application. The applicant submitted an Environmental Checklist, a Traffic Impact Study, Drainage Report, Arborist Report, Critical Areas Report, and Geotechnical Report with the application. Exist. Bldg. Area SF: 0 Proposed New Bldg. Area (footprint): Proposed New Bldg. Area (gross): N/A N/A Site Area: 6.55 acres Total Building Area GSF: 3,520 STAFF RECOMMENDATION: Staff Recommends that the Environmental Review Committee issue a Determination of Non-Significance-Mitigated (DNS-M). Project Location Map DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 2 of 11 SR_ERC Report_Towns on 12th_230131_v1 ENVIRONMENTAL REVIEW In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project impacts that are not adequately addressed under existing development standards and environmental regulations. A. Environmental Threshold Recommendation Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials: Issue a DNS-M with a 14-day appeal period B. Mitigation Measures 1. The applicant shall adhere to the recommendations in the geotechnical report, prepared by Terra Associates, Inc and dated August 5, 2021 (Revised February 15, 2022), or future addenda. 2. The geotechnical engineer shall submit a sealed letter stating that he/she has reviewed the construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). 3. The applicant shall submit a revised geotechnical report prepared by a licensed geotechnical engineer that analyzes the protected slope on the northern portion of the site and makes a specific finding regarding the feasibility of locating structures within the 50-foot setback identified in the original geotechnical report. The updated report shall be submitted with the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. 4. The applicant shall coordinate with King County Metro prior to submitting construction permits to identify any needed accommodations for the abutting transit stop on NE 12th St that need to occur during construction of the site. Evidence of the coordination with King County Metro and the accommodation(s) shall be shown on the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. 5. The applicant shall submit an archeological survey prepared by a qualified professional prior to the start of any construction and provide notification of the survey to Tribes’ cultural committee and the Washington State Department of Archeology and Historic Preservation. DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 3 of 11 SR_ERC Report_Towns on 12th_230131_v1 C. Exhibits Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site Plan Exhibit 3: Landscape Plan Exhibit 4: Grading and Drainage Plan Exhibit 5: Utilities Plan Exhibit 6: Tree Retention Plan Exhibit 7: Floor Plans Exhibit 8: Architectural Renderings Exhibit 9: Topography Survey Exhibit 10: Geotechnical Engineering Report, prepared by Terra Associates dated August 5, 2021 (Revised February 15, 2022) Exhibit 11: Technical Information Report (TIR), prepared by CORE Design dated February 18, 2022 Exhibit 12: Arborist Report, prepared by Greenforest Incorporated dated January 28, 2022 Exhibit 13: Critical Areas Study, prepared by Altmann Oliver Associates, LLC dated February 21, 2022 Exhibit 14: Traffic Impact Analysis, prepared by TENW dated February 21, 2022 Exhibit 15: Transportation Concurrency Memo prepared by Brianne Bannwarth dated June 10, 2022 Exhibit 16: Hazardous Materials Statement prepared by Bluefern (applicant) dated March 3, 2022 Exhibit 17: Duwamish Tribe Comment dated June 4, 2022 Exhibit 18: King County Metro Comment dated June 8, 2022 Exhibit 19: Advisory Notes D. Environmental Impacts The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have identified that the proposal is likely to have the following probable impacts: 1. Earth Impacts: According to COR Maps, portions of the property are located within a moderate landslide hazard area. Both sensitive (15-40%) and protected (>40%) slopes are also mapped on the site. The steepest slopes are primarily located on the north side of parcel #0423059063 where the site slopes downwards towards NE Sunset Blvd. Similarly, the moderate landslide hazard is concentrated along the northern border of the site adjacent to the NE Sunset Blvd ROW. As such, the applicant submitted a Geotechnical Report prepared by Terra Associates (Exhibit 10). The site has a high point in the middle with slopes ranging from 5 to 20% extending away for an overall average relief of approximately 25 feet. Closer to the north properly line, the slope transitions from moderate to steep and descends to NE Sunset Boulevard with an overall vertical change of approximately 30 feet. The consultant investigated subsurface conditions by observing nine (9) test pits using a mini -excavator to dig nine (9) test pits to maximum depths of 6.5 to 11.5 feet below the existing surface grade. According to the report, the soil conditions at DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 4 of 11 SR_ERC Report_Towns on 12th_230131_v1 the site consist of approximately 6 to 12 inches of topsoil overlying approximately three (3’) to eight (8’) feet of medium dense silty sand over medium dense to very dense sand with silt and gravel and silty sand with gravel. However, in Test Pits TP-6 and TP-7, loose, fill material overlying the native soils was found between two (2’) and five (5’) feet below grade. The fill material consisted of sand and silty sand with varying amounts of debris and organic material. Groundwater seepage was observed in Test Pit TP -2 at approximately eight (8’) feet below current site grades but was not observed in any other subsurface exploration. According to the report, the soils observed on-site are predominately classified as Alderwood gravelly sandy loam with 8 to 15 percent slopes (AgC) and Arents, Alderwood material with 6 to 15 percent slopes (AmC) by the United States Department of Agriculture Natural Resources Conservation Service (NRCS). Due to the type of soils observed on the site, onsite infiltration was determined not to be feasible and therefore a conventional storm detention facility is proposed (Exhibit 5). Based on the existing slope gradients onsite, the soils near the developable area will have a slight to moderate potential for erosion when exposed and therefore do not create a significant erosion hazard. However, the report did note that the steep slope portion of the site near the northwest corner has a severe to very severe potential for erosion when exposed and may be considered an erosion hazard area as defined the code. The report notes that although typically a 50-foot building setback would be required for the subject slope due to the soil characteristics, a 15-foot building setback may be possible if additional geotechnical analysis is completed. Proposed units 39, 40, 41, and 42 are located within the potential 50-foot slope setback and therefore may not be able to be constructed depen ding on the results of the additional geotechnical analysis. As such, staff recommends as a mitigation measure, the applicant shall submit a revised geotechnical report prepared by a licensed geotechnical engineers that analyzes the protected slope on the northern portion of the site and makes a specific finding regarding the feasibility of locating structures within the 50-foot setback identified in the original geotechnical report. The updated report shall be submitted with the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. The report recommends the use of erosion and sediment control Best Management Practices (BMPs) site- wide for preventing and controlling erosion, especially on the eastern and northern sides of the site near the protected slopes. BMPs recommended include but are not limited to, limiting site clearing and grading to drier months, providing temporary cover for slope cuts and soil stockpiles, and installing silt fence before clearing and grading begins. The report also makes a variety of recommendations related to site preparation and grading, specifically for the area near Test Pits TP-6 and TP-7 where the loose, organic material found would not be suitable for support a new building. The report recommends over-excavation of the area near the two (2) test pits in order remove the loose material and replace with new structural fill. Across the rest of the site, the report recommends a minimum of 18 inches of clean, granular structural fill compacted over geotextile fabric that will establish a stable surface for the new foundations and roadway infrastructure. The report concludes that all structures can be supported on conventional spread footings bearing on competent inorganic native soils or on structural fill placed and compacted above the native soils if specific recommendations are followed. No structures would be located within the 15 feet from the top of protected slopes. Due to the presence of significant geologic hazards and potential requirement for a larger building setback from the protected slope on the north side of the site, staff recommends, as a mitigation measure, the applicant shall adhere to the recommendations in the geotechnical report, prepared by Terra Associates, Inc and dated August 5, 2021 and revised February 15, 2022, or future addenda. In addition, staff recommends, as a condition of approval, the geotechnical engineer shall submit a sealed letter stating that he/she has reviewed the construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). Mitigation Measures: DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 5 of 11 SR_ERC Report_Towns on 12th_230131_v1 1. The applicant shall adhere to the recommendations in the geotechnical report, prepared by Terra Associates, Inc and dated August 5, 2021 and revised February 15, 2022, or future addenda. 2. The geotechnical engineer shall submit a sealed letter stating that he/she has reviewed the construction and building permit plans and in their opinion the plans and specifications meet the intent of the report(s). 3. The applicant shall submit a revised geotechnical report prepared by a licensed geotechnical engineers that analyzes the protected slope on the northern portion of the site and makes a specific finding regarding the feasibility of locating structures within the 50-foot setback identified in the original geotechnical report. The updated report shall be submitted with the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. Nexus: City of Renton Comprehensive Plan Policy L-36; State Environmental Policy Act (SEPA) Environmental Review; RMC 4-3-050 Critical Areas Regulations; RMC 4-4-060 Grading, Excavation and Mining Regulations. 2. Air Impacts: It is anticipated that some short-term air quality impacts could be associated with the mitigation work proposed on the site. Project development impacts during construction may include periods of increased dust generated as a result of grading and exhaust from vehicles and equipment. Dust control would be mitigated through the use of temporary erosion control measures, watering or other measures to remediate impacts as needed. No further site-specific mitigation for the identified impacts from typical vehicle and construction exhaust is required. Any further analysis of air quality impacts would occur during site plan review. Mitigation Measures: No further mitigation recommended. Nexus: Not applicable. 3. Water a. Stormwater Impacts: The applicant submitted a Technical Information Report (TIR), prepared by CORE Design, dated February 18, 2022 (Exhibit 11). The report analyzes existing conditions and proposed surface water collection and distribution. The site has a high point in the middle of the site and slopes down in all directions ranging from 5-20%. The proposal includes approximately 160,000 sq. ft. of new impervious surface. Based on the City’s flow control map, the site falls within the Flow Control Duration Standard area matching Forested Site Conditions and is within the May Creek Drainage Basin. The report notes that due to the soils found on the site, infiltration via full dispersion is not possible. As such, a vault flow control facility is proposed on the northern portion of the site between future Road A and existing NE Sunset Blvd. The vault appears to be located fully below grade, but will confirmed as such during the site plan review. The project is required to meet the City’s Flow Control Duration Standard. As of the date of the report, the most current manual was the 2017 Renton Surface Water Design Manual (RSWDM). However, the 2022 Renton Surface Water Design Manual is currently in effect and therefore applicant shall be required to demonstrate compliance with the new manual prior to issuance of the construction permit. Based on the proposal, staff does not anticipate updating for compliance with the new manual will result in major changes to the stormwater design. The report is based on a full drainage review as required in the 2022 Renton Surface Water Design Manual. Core requirements one through nine, as well as the six special requirements, have been discussed in the DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 6 of 11 SR_ERC Report_Towns on 12th_230131_v1 Technical Information Report. As noted in the ‘Advisory Notes’ (Exhibit 19), some required information was not included in the report or utilities plan including but limited to, a conveyance system analysis, discussion of the provision of flow control credits for BMPs (not allowed per 2022 RSWDM), and a maintenance and operations manual. All requirements would be addressed in the final TIR submitted and reviewed with the civil construction permit application. A Construction Stormwater General Permit from Department of Ecology is required since grading and clearing of the site exceeds one (1) acre. A Stormwater Pollution Prevention Plan (SWPPP) is also required for this site. The development would be subject to stormwater system development charges. The 2023 SDC fee is $0.92 per square foot of new impervious surface but not less than $2,300. It is anticipated that the requirements set forth by the 2022 RSWDM, or a future stormwater manual adopted by the City of Renton, would be sufficient to mitigate stormwater impacts generated by the proposed development. Mitigation Measures: No further mitigation is required. Nexus: Not applicable. b. Wetlands, Streams, Lakes Impacts: During environmental reconnaissance, the applicant discovered a potential offsite wetland on the west of the site (Exhibit 2). As such, the applicant submitted a Critical Areas Study prepared by Altmann Oliver Associates, LLC, dated February 21, 2022 (Exhibit 13). The report identified the presence of a wetlands on the site directly adjacent the western property line (parcel # 0423059046), identified in the report as Wetland A. According to the consultant, Wetland A consists of an isolated Depressional Hydrogeomorphic (HGM) class wetland located immediately off-site to the southwest. During a site visit on February 10, 2021, the consultant found that vegetation within Wetland A consisted of a Palustrine Forested plant community including western red cedar (Thuja plicata), salmonberry (Rubus spectabilis), red osier dogwood (Cornus sericea), reed canarygrass (Phalaris arundinacea) and English ivy (Hedera helix) with small patches of willow (Salix sp.). In addition, they found that much of the wetland appeared to be seasonally ponded. The buffer was observed and found to be degraded with invasive species such as Himalayan blackberry and Japanese knotwood. Based on the results of the wetland determination data form, the wetland meets the criteria for a Category III wetland with 4 habitat points. Per RMC 4-3050.G.2, non-low impact land development is required to maintain a 75-foot buffer from the wetland. As part of the application, the applicant has requested a 25% buffer reduction as outlined in RMC 4- 3-050I.3.a, in conjunction with buffer enhancement. If approved, the proposed reduced buffer would be approximately 56.25 feet in width. Wetland buffer enhancement proposed includes the removal of invasive species and planting a variety of native trees, shrubs, and groundcovers to increase the value of the buffer. The plantings would provide wildlife habitat value while also providing a physical and visual screen to the wetland from the proposed development. In addition, a split rail fence with the required signage would be installed around the portion of the buffer on the project site, protecting it from future impacts or disturbance. According to the consultant, restoration of the reduced buffer would significantly increase the plant species and structural diversity of the buffer, resulting in increases of the habitat and protective functions of the buffer over current conditions. A mitigation plan prepared by Altman Oliver Associates, LLC was submitted with the application (Exhibit 13, pg 10) and includes a restoration proposal for the buffer around Wetland A. Native plantings proposed for the buffer would include Vine maple, Douglas fir trees, in addition to a variety of native shrubs and grasses, including but not limited to Snowberry, Red currant, Nootka rose, Swordfern, and Oregon grape. A Native Growth Protection Easement is required to be established around the entire buffer area per RMC 4-3-050.G.3. The applicant will also be required to install a DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 7 of 11 SR_ERC Report_Towns on 12th_230131_v1 standard split rail fence with wetlands signage along the boundary of the Wetlands A buffer, whose location would be reviewed and approved by the Currently Planning Project Manager prior to installation. After completion of the mitigation plan, compliance with the requirements for long-term (5 years) maintenance and monitoring of the mitigation area plantings would be required per the process outlined in RMC 4-3-050.L.3. The report concludes that after restoration and enhancement of the Wetland A buffer, there would be no net loss of ecological function. Staff concurs with the reports conclusion and therefore no site-specific mitigation is recommended. Mitigation Measures: No further mitigation is required. Nexus: Not applicable. 4. Environmental Health a. Noise Impacts: Short-term construction activity-related noise impacts would primarily result from the preparation of the building site and improvements proposed of the project. Construction activity hours are restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. Haul hours shall be restricted to the hours between eight-thirty (8:30) a.m. and three-thirty (3:30) p.m., Monday through Friday unless otherwise approved in advance by the Development Services Division. All noise levels would be required to comply with City of Renton code (Chapter 7 Noise Level Regulations) and Washington State code (WAC 173-60-040). The anticipated temporary noise impacts would be those commonly associated with mixed-use construction. No further site-specific mitigation is proposed. Mitigation Measures: No further mitigation is required. Nexus: Not applicable. 5. Vegetation Impacts: The subject property contains some existing paved and gravel areas, unmaintained ground cover including Himalayan blackberry and various grasses, as well as a significant number of native trees. As such, the applicant submitted an Arborist Report prepared by Greenforest Incorporated and dated January 28, 2022 with the application (Exhibit 12). The report identified a total of 390 trees on the site including 53 landmark trees, 337 significant trees, and 53 dangerous trees on the project site. The report identified a total of 34 trees within proposed right-of-way, 37 tree within proposed private access easement, and 35 trees in critical areas on the site, leaving a total number of 231 viable trees available for retention. Pursuant to the tree regulations in RMC 4-4-130.H effect at the time of a complete application, tree retention standards in other residential zones require a minimum of 20 percent (20%) of the site’s significant trees to be retained during and post development. Of the 231 significant trees in the developable area, the applicant is proposing to retain 46 trees, or 20% of the total. Of the 46 trees proposed for retention, the applicant is proposing to retain two (2) landmark trees including 36-inch and 45 inch DBH Western red cedars. The other 44 trees proposed for retention include a mix of Western red cedar, Maple, Douglas fir, and Madrona species. The majority of the trees propose for retention are located within two (2) tree tracts (Tracts I and H) near the northeast corner of the site (Exhibit 6). A cluster of trees near the wetlands on the west side of the site are also proposed for retention. New tree planting would occur as part of the proposal along the street frontages, within the open spaces, and around the new buildings. The landscape plan calls for trees in excess of the three (3) required replacement trees and includes 12 vine maple and nine (9) round-lobed sweet gum species. Additional analysis of the tree DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 8 of 11 SR_ERC Report_Towns on 12th_230131_v1 retention plan, including analysis of the location, species, and size of retained trees, would occur during review of the site plan, therefore no site-specific mitigation is recommended. Mitigation Measures: No further site-specific mitigation recommended. Nexus: N/A 6. Aesthetics Impacts: The 2, 3, and 4-unit buildings would be setback from the existing public rights-of-way approximately 15 feet (NE Sunset Blvd) to 20 feet (NE 12th St) (Exhibit 3). The development would include three-story townhome structures that would blend in such a way to ensure that the project adequately transitions between the existing single-family neighborhoods to the south and west through design, maximum building heights and landscape buffering (Exhibit 7). According to the applicant, the tuck-under design of the units would allow the applicant to consolidate the many of the retaining walls into the buildings themselves and reduce the duration of project construction. The layout of the site would include several open and green spaces situated along the frontages of NE 12th St, Sunset Blvd NE, as well as undeveloped critical areas along portions of the northern and western boundaries that will provide privacy for both the existing neighborhood and the new residents. Many of the front doors open to green courts with sidewalks throughout the site to connect gathering spaces to help promote a sense of community. A proposed pathway would connect the open space on the north side of the development with the sidewalk along NE Sunset Blvd. The building design would contain modulation, both along the façade as well as the roofline, to help reduce the building mass to a more pedestrian feel. Other methods proposed to enhance the aesthetics of the project include, but are not limited to, diverse, earthy building colors, varying siding materials (vinyl siding, wood siding, fiber-cement siding, and stucco) and reveal dimensions, inset balconies, and abundant glazing. Site infrastructure, such as storm drainage, would be underground and designed in accordance with Low Impact Development principles to allow for increased common open space and decreased impervious surface on the subject property. Mitigation Measures: No further site-specific mitigation recommended. Nexus: N/A 7. Transportation Impacts: The proposed project is anticipated to generate more than 20 new PM peak hour trips and therefore, the applicant submitted a Traffic Impact Analysis prepared by TENW and dated February 23, 2022 (Exhibit 4) with the application. Primary access to the site would be provided a new 53-foot wide residential access street off of NE 12th St. Secondary access would be provided via a 20-foot wide alley connecting NE 12th St with the new internal residential access street. The secondary access alley provides vehicular access to units 24 to 30 and 46 to 52, as well as emergency vehicles entering and exiting the site. According to the submitted TIA, the project is anticipated to generate 500 net new average weekday trips with 31 net new trips (8 in/23 out) occurring during the AM peak hour and 39 net new trips (25 in/14 out) occurring during the PM peak hour. The TIA studied five (5) off-site intersections including NE Sunset Blvd (SR 900)/NE 10th St, NE Sunset Blvd (SR 900)/NE 12th St, Union Ave NE/NE Sunset Blvd (SR 900), Duvall Ave NE/NE Sunset Blvd (SR 900), and Union Ave NE/NE 12th St. A level of service (LOS) analysis was conducted at each intersection and found that LOS was within City standards (A, B, C, and D) at the horizon year, 2023. The analysis assumes an annual background growth rate of 1% and included future pipeline projects in the immediate area such as Solera Mixed Use, Sunset Oaks, Sunset Gardens, Sunset Mixed Use, and DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 9 of 11 SR_ERC Report_Towns on 12th_230131_v1 Kiddie Research Daycare. The report concludes that additional mitigation measures beyond payment of transportation impact fees are not required to retain the LOS. City staff concurs with the trip generation and trip assignment outlined in the report. Vehicular access to the site is proposed via NE 12th St. Street Improvements are regulated by RMC 4-6-060 – Street Standards. See below: NE 12th St – NE 12th St is classified as a Collector Arterial street. To meet the City’s complete street standards for Collector Arterial streets with 2 lanes a minimum ROW width of 83 feet is required. Per RMC 4-6-060 half of street improvements as taken from the ROW centerline shall be required and include a minimum 46-foot paved road (23 feet each side), a 0.5 foot curb, an 8 foot planting strip, an 8 foot sidewalk, 2 foot clear space at back of walk and storm drainage improvements. Per COR Maps, dedication of approximately 11.5 feet will be required pending final survey. NE Sunset Blvd (SR 900) – NE Sunset Blvd (SR 900) is classified as a Principal Arterial street. To meet the City’s complete street standards for Principal Arterial streets with 5 lanes a minimum ROW width of 103 feet is required. Per RMC 4-6-060 half of street improvements as taken from the ROW centerline shall be required and include a minimum 66-foot paved road (33 feet each side), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, 2-foot clear space at back of walk and storm drainage improvements. Dedication, as needed for frontage improvements, will be required pending final survey. Due to the steep on-site grades along NE Sunset Blvd, The City’s Transportation Department has determined a modified Principal Arterial street section to reduce the sidewalk and planter strip width to five feet each is appropriate. Reducing the sidewalk and planter strip width would result in a reduction of retaining wall heights and reduce the overall number of trees requiring removal. The modified section would result in the curb line remaining in the existing location and a five-foot (5’) planter strip and five-foot (5’) sidewalk would be required. New Internal Roadway (Road A) – A dead-end Residential Access road (Road A) is proposed to serve the site. The proposed road includes a cul-de-sac and hammerhead turn around in order to meet Renton Regional Fire Authority access requirements. Residential Access roads shall have a minimum 53-foot right- of-way that includes a 26 foot paved road with, on either side, a 0.5-foot curb, an 8-foot planting strip, a 5-foot sidewalk and street trees. Street lighting is not shown on the plans but will be required.. Alleys – Alleys shall have a minimum 16-foot right-of-way that includes a 16-foot paved road and two feet of clear space on either side. New 20-foot wide public alley ROWs are proposed for access to the units. One alley, identified as ROW 4, would provide secondary fire access to NE 12th St. Access to the alleys would be provide via future Road A. Pedestrian Improvements: As part of the proposed project, sidewalks would be constructed along both frontages of the site and would connect to the existing sidewalk system. Sidewalks are also proposed along both sides of the future Road A and would connect to the next sidewalk on NE 12 th St. While not required by code, the applicant has shown a pathway connection between the future sidewalk along Road A and NE Sunset Blvd. The pathway connects near the proposed cul-de-sac and meanders down the slopes to the new sidewalk proposed along NE Sunset Blvd. Future residents, as well as residents in the existing surrounding neighborhoods, are highly likely to walk down the slope in order to access retail services on the along NE Sunset Blvd to the east and west of the project site. Concurrency – A concurrency recommendation will be provided in the staff report to Hearing Examiner based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS‐tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation. The development will have to meet the City of Renton concurrency requirements. Transit – A King County Metro bus stop is located directly in front of the project site on the north side of NE 12th St. The bus stop serves both the 105 and 240 bus routes, both of which serve the greater Renton DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 10 of 11 SR_ERC Report_Towns on 12th_230131_v1 Highlands Area. King County Metro submitted a public comment requesting coordination between the applicant and King County Metro during construction to avoid impacts to service (Exhibit 18). As such, staff recommends as a mitigation measure, the applicant shall coordinate with King County Metro prior to submitting construction permits to identify any needed accommodations for the abutting transit stop on NE 12th St that need to occur during construction of the site. Evidence of the coordination with King County Metro and the accommodation(s) shall be shown on the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. Increased traffic created by the development would be mitigated by payment of transportation impact fees and compliance with the required mitigation measures. The transportation impact fee that is current at the time of building permit application will be levied. Mitigation Measures: The applicant shall coordinate with King County Metro prior to submitting construction permits to identify any needed accommodations for the abutting transit stop on NE 12th St that need to occur during construction of the site. Evidence of the coordination with King County Metro and the accommodation(s) shall be shown on the civil construction permit plans to be reviewed and approved by the Current Planning Project Manager prior to permit issuance. Nexus: Renton Comprehensive Plan Policy T-24; State Environmental Policy Act (SEPA) Environmental Review, King County Metro Comment (Exhibit 18). 8. Historic and Cultural Preservation Impacts: A representative of the Duwamish Tribe submitted a comment (Exhibit 17) to City staff on June 4, 2022 indicating the project site is an area the tribe considers significant due to it being located in an area the Tribe considers culturally significant. The comment identifies the high potential for discovery of unknown archeological deposits and requests notification of any archeological work performed. In addition, the Washington Department of Archaeology and Historic Preservation mapping tool indicates the potential for a historic Native trail in the area. As such, staff recommends as a mitigation measure the applicant shall submit an archeological survey prepared by a qualified professional prior to the start of any construction and provide notification to Tribes’ cultural committee and the Washington State Department of Archeology and Historic Preservation. Mitigation Measure: The applicant shall submit an archeological survey prepared by a qualified professional prior to the start of any construction and provide notification of the survey to Tribes’ cultural committee and the Washington State Department of Archeology and Historic Preservation. Nexus: SEPA Environmental Review, RCW 27.53 Archaeological Site and Resources, and RCW 27.44 Indian Graves and Records 9. Fire & Police Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to the proposed development; provided the applicant constructs Code required improvements and pays associated impact fees (Exhibit 19). Mitigation Measures: No further mitigation recommended. Nexus: Not applicable E. Comments of Reviewing Departments The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments have been incorporated into the text of this report and/or “Advisory Notes to Applicant.” ✓ Copies of all Review Comments are contained in the Official File and may be attached to this report. DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E City of Renton Department of Community & Economic Development Towns on 12th Staff Report to the Environmental Review Committee LUA22-000180, ECF, PP, SA-H Report of February 6, 2023 Page 11 of 11 SR_ERC Report_Towns on 12th_230131_v1 The Environmental Determination decision will become final if the decision is not appealed within the 14 -day appeal period (RCW 43.21.C.075(3); WAC 197-11-680). Environmental Determination Appeal Process: Appeals of the environmental determination must b e filed in writing on or before 5:00 p.m. on February 20, 2023. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: Towns on 12th Land Use File Number: LUA22-000180, ECF, PP, SA-H Date of Meeting February 6, 2023 Staff Contact Alex Morganroth Senior Planner Project Contact/Applicant Anna Drumheller Blue Fern 18300 Redmond Way #120, Redmond, WA 98052 Project Location 3924 NE 12th St (APN 0423059099, 0423059140, 0423059100, 0423059067, 0423059063) The following exhibits are included with the ERC Report: Exhibit 1: Environmental Review Committee (ERC) Report Exhibit 2: Site Plan Exhibit 3: Landscape Plan Exhibit 4: Grading and Drainage Plan Exhibit 5: Utilities Plan Exhibit 6: Tree Retention Plan Exhibit 7: Floor Plans Exhibit 8: Architectural Renderings Exhibit 9: Topography Survey Exhibit 10: Geotechnical Engineering Report, prepared by Terra Associates dated August 5, 2021 (Revised February 15, 2022) Exhibit 11: Technical Information Report (TIR), prepared by CORE Design dated February 18, 2022 Exhibit 12: Arborist Report, prepared by Greenforest Incorporated dated January 28, 2022 Exhibit 13: Critical Areas Study, prepared by Altmann Oliver Associates LLC dated February 21, 2022 Exhibit 14: Traffic Impact Analysis, prepared by TENW dated February 23, 2022 Exhibit 15: Transportation Concurrency Memo prepared by Brianne Bannwarth dated June 10, 2022 Exhibit 16: Hazardous Materials Statement prepared by Bluefern (applicant) dated March 3, 2022 Exhibit 17: Duwamish Tribe Comment dated June 4, 2022 Exhibit 18: King County Metro Comment dated June 8, 2022 Exhibit 19: Advisory Notes DocuSign Envelope ID: CB3FEE37-E3FD-4E9A-BBDA-38822A5CC20E