HomeMy WebLinkAboutChange Order - 02CONTRACT: CONTRACTOR: CHANGE ORDER: SUMMARY OF PROPOSED CHANGE: Roason/Justlflc.atlon: CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT Kiwanis Park Improvements CAG-22-013 Terra Dynamics, Inc. No. Two(2) Date: Hob-23 Additional scope of work required for unforseen conditions -thinge CBM206 and assoicated pipe, change storm outfall pipe to ductile Iron per city requirement and adjusting berm locaton to protect tree roots, and deloto drainage pipe. DESCRIPTION: ltomNo. Qty. Description Unit Price Amount w/o WSST 1 1 BOA CPR-06 / COP-07 • CB#206 and Now Pipe $ 8.773.34 $ 8,773.34 2 1 BOA CPR-12 / COP·6 -Change Storom Dutt.II Pipe to DI Pipe $ 9,729.61 $ 9,729.61 3 1 BOA CPR-13 / COP-12 -Field Adjustment per ASl-005 $ (1.235.15) $ (1,235.15) I I Total this Change Order. w/o WSST $ 17,267.80 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT TOTAL AMOUNT w/o WSST AMOUNT w/o WSST THIS ORDER w/o WSST AFTER CHANGE w/o WSST $ 4,780,000.00 $ 4,763,744.47 $ 17,267.80 $ 4,781,012.27 Additional calendar Days: Eighty-one (Bl) calendar days added to Contract Time• Extension ofTime. Date Is March 31, 2023, The payment specified and agreed to in this change order indudes every claim bv the contractor for any extra payment with re.spect to the work described In thls change order. The work covered by this change order must be performed under the same terms and conditions as that Included m the orlglnal agreement. All of the other terms of the original agreement remain In effect. Dato: }_-C.-.,102.) Dato 2/6/2023 CAG-22-013, CO #2-23 -��&•Ci!Y of Renton -Kiwanis Park ASSOCIATES CHANGE PROPOSAL REQUEST JOB NO: 175-01-06 DATE: January 18, 2023 TO: Terra Dynamics, Inc CHANGE PROPOSAL REQUEST NO: 06 In connection with your Contract with the City of Renton, please furnish, your proposal for performing the changes described: Please provide a detailed cost proposal to provide work associated with the new drain basins and revised pipe locations as described in ASl-002. Reason: Per RFl-07 the 48" catch basin cannot allow for five (5) penetrations and upsizing the basin would create a conflict with the 8" curb wall. Bruce Dees & Associates TECHNICAL REPRESENTATIVE BY: �� .,,, • _4' �-----DATE: 1/18/23 The above request for a tota�DEDUCTION to the contract sum of: $8,773.34 Eight Thousand Seven Hundred Seventy-Three Dollars and 34/100 Cents (Washington State Sales Tax not included) We have attached hereto Cost Estimate Detail Nos. COP-7 The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on the remainder of the project. All other provisions remain in full force and effect. We request the completion date be extended ____ O ___ calendar days because of this work. rJ}BTERRA liili1 DYNAMICS IN<- PO Box 2479 • Auburn, WA 98071 253-880-3100 • Fax: 253-880-3109 Kiwanis Park Renton -COP 114.:i:..nnls..Cou,t.l!esu<fadng COP#? New Pipe Locations per ASl-002 Labor Rate/MH Power Equipment Operator Foreman $ 83.2S General Labor $ 60.14 Equipment Rate/MH Articulated Wheel Loader $ 26.10 Crawler Mounted Compact Excavators $ 43.37 Materials Qty 5/8" RAC Sub Base -6" 2.00 Subgrade Disposal 3.00 CB 102 Material Adjustments 1.00 Yard Drain Materials 1.00 Subcontractors Qty C&C Development Asst. Project Manager No. 1 2 No. 1 1 Unit Tons Tons LS LS Hours 8 Hours 4 8 Cost/Unit $ 9.00 $ 28.00 $ 729.71 $ 542.18 Unit Cost/Unit $ $ $ $ $ $ $ $ $ $ $ $ LS $ 4,142.06 $ Subtotal 666.00 962.24 Subtotal 104.40 346.96 Subtotal 18.00 84.00 729.71 542.18 Subtotal 4,142.06 Labor Subtotal $ Small Tools @3% $ Health and Safety @2% $ Supervision @5% $ Labor Total $ Equipment $ Equipment Total Materials Materials Total Subtotal of Contractor Work $ Overhead< $50,000 @12% $ Overhead > $50,000 @4% $ Profit of Contractor Work @6% $ Loaded Subtotal $ Subcontractors $ Subcontractor Sub Total $ Overhead < $50,000 @4% $ Overhead > $50,000 @2% $ Profit on Subcontractors @4% $ Loaded Subtotal $ GRAND TOTAL $ 7/28/2022 1,628.24 48.85 32.56 81.41 1,791.06 4Sl.36 451.36 1,373.89 1,373.89 3,616.31 433.96 243.02 4,293.29 4,142.06 4,142.06 165.68 172.31 4,480.05 8,773.34 Bid No: E492157 Page 1 of 1 [SH.D. FOWLERCOMPANY Customer: TERRA DYNAMICS Estimate: E492157 Estimator: Ivan Ramsey Bid Date: 8/29/2022 Job Name: CPR-06 (ASl-002) CB206 KIWANIS PARK Location: RENTON Line Qty UoM Description Unit Price Extended Price CB #102 1 1 EA TYPE 1 CONCRETE CATCH BASIN 34" X 30" X 44" 184.53 184.53 2 2 EA 12" CATCH BASIN RISER FOR TYPE 1 32" X 36" X 12" 80.09 160.18 3 1 EA 2" CATCH BASIN RISER FOR TYPE 132" X 36" X 2" 51.67 51.67 4 1 EA EJ 20 X 24 FRAME & VANED GRATE, LOCKING #00775045B01 333.33 333.33 YARD DRAIN #1 5 TYPE OF YARD DRAIN NOT GIVEN. QUOTING A TYPE 40 CATCH BASIN DUE TO Note 8" PIPE SHOWN GOING INTO IT. CONTRACTOR TO VERIFY WHAT IS REQUIRED. 6 1 EA TYPE 40 CONCRETE CATCH BASIN 20" X 26" X 30" 137.25 137.25 7 1 EA 12" EXTENSION FOR TYPE 40 CATCH BASIN 20" X 26" X 12" 87.34 87.34 8 1 EA 6" EXTENTION FOR TYPE 40 CATCH BASIN 20" X 26" X 6" 52.41 52.41 9 1 EA 12" X 18" Cl FRAME AND GRATE FOR TYPE 40 CB 265.18 265.18 Approximate Total 1,271.89 PROJECT: TASK: 99002-CB#206 and New Pipe DATE: I 9.2.22 22025 Kiwanis Park Locations 0 Labor Labor Equipment Item Description QTY Unit Material U.P. Material Hours Rates Labor Subcontractor Rate Equipment Other Subtotal Total 1 YPD dba C&I: O1}Velepment, bLc.W@rk Foreman 1 HR s s 7 $ 92.75 s 649.25 $ $ $ $ $ 649.25 $ 649.25 Operator 1 HR $ $ 7 $ 87.99 $ 615.93 $ $ $ $ $ 615.93 $ 615.93 PipeLayer 1 HR $ $ 8 $ 67.31 $ 538.48 $ -$ -$ -$ $ 538.48 $ 538.48 General Laborer 1 HR $ $ -8 $ 66.04 $ 528.32 $ -$ -$ -$ $ 528.32 $ 528.32 Tool Truck 6 HR $ -$ $ $ -$ $ 27.00 $ 162.00 $ $ 162.00 $ 162.00 220 Excavator 6 HR $ $ $ $ $ $ 78.00 $ 468.00 $ $ 468.00 $ 468.00 Backhoe W /Hoepack 6 HR $ $ $ $ $ -$ 47.90 $ 287.40 $ $ 287.40 $ 287.40 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ -$ $ $ $ $ $ $ $ $ -$ $ $ $ -$ $ $ $ -$ -$ $ $ 2 �•11ntr�rt00Werk $ $ $ $ $ $ $ $ $ -$ $ $ -$ $ $ -$ -$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 30 $ 2,331.98 $ -$ 917.40 $ - SUBTDTALl $ 3,249.38 I 5.00% Safety & Small Tools $ 116.60 I 16.00% ADMIN. OVERHEAD $ 519.90 6.00% Markup $ 194.96 SUBTOTAL 2 $ 4,080.84 0.00% Bond $ 1.500% Insurance s 61.21 SUBTOTAL3 $ 4,142.06 I 0.00% B&OTaxes $ GRAND TOTAL $ 4,142.06 Accepted For: Accepted For: C&C Development By: By: Signature Date Signature Date Name &lltte Name&Title Job No. 175-01-06 ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS (ASI) Project: Kiwanis Park Improvements ASINo.: Two (2) Owner: City of Renton Date Issued: 08/23/22 Contractor: Terra Dynamics Inc. Contract No: CAG-22-013 34721 W. Valley HWY S Algona, WA 98001 Contract Dated: 4/18/22 If the following described work affects the Contract sum or Contract time, the Contractor shall submit a proposal for review and approval by the Architect prior to proceeding with the work. Description: ASI indicates re-routing the (NE) 8" HOPE storm drain line to reduce the amount of knockouts at CB #206. The change will add two (2) PVC drain basins at the storm drain line and perforated pipe intersections. The change eliminates one (1) 12" knockout, one (1) Kor-N-Seal boot, and 9.8 lineal feet of storm drain line. Orientation of the (N) 8" HOPE storm drain line will be slightly adjusted to allow for the required 8" separation between knockouts (See RFI 07 -Control Structure Adjustment - BDA Response (Rev.1 08-22-22)). Reason: Cost: Per RFl-07 the 48" catch basin cannot allow for five (5) penetrations and upsizing the basin would create a conflict with the 8" curb wall. Provide cost per CPR-06 CB #206 and New Pipe Locations Attachments: ASI SKETCH 002.1 Issued by: Michael-Paul Faulkner, PLA Project Manager l ; I I \ \ Re-route the {NE) 8" HDPE storm drain line to reduce the amount of knockouts at CB #206. This will add two (2) PVC drain basins at the storm drain line and perforated pipe intersections. The change eliminates one (1) 12" knockout, (1) Kor-N-Seal boot, and 9.8 lineal feet of storm drain line. Orientation of the {N) 8" HDPE storm drain line will be adjusted to allow for the required 8" separation between knockouts. BRUCE .DEES& ASSOCIATES Landsc.:ipe Archilectur1, � Urban Desigri Site Planning• Recreallon foci!itles Design 222 t, 26th St., No 202, To�, 'II� Mnl (l&J)627-7917 Kiwanis Park Improvements City of Renton, WA CAOD fi1oname: R:\DRAWINGS\17501 -RrNTON KIWANIS PARK 1MPR0\,£M[Nr5\14 -Rtv. CONST. SET\17501-C2.1-C2,J.DWG /I Pfotlod: 8.23.22-10;17 By.(rvissia) ca.a -AGO UNITS K1-0103 ···i�;;�;g.11.�;11,}i: :,1 -, (19.6911)1 K1-1111 THRU MM,,11m K1-18 (8x39.37 ), 1•·,,,,110 '" ,11, AND INLINE C.B, UNIT ,;,,,,,o 19, s . K900 (19.69"), TOT. 8"H·c ,w LEN. = 29.5275L.F. 42 NEW ADA RAMP AND PAVING ADJUSTMENT AT EAST SIDE OF UNION AVE NE PARK ENTRY AREA & CONG. SCORE PATTERN PLAN ENLARGEMENT RIM(EX.)=412.91 +lk\\,'>l'1i:frl'f:::-::--, .. ,;;;;-J(,-;:;;Nl);,I, IE N�EX.12")=408.49± • . IE W 15')=410.46IE S EX.15" )=408,34± 0 NCH & OVERLAY RESTORATION CITY STD. DETAIL 220.20 UTION: EXISTING 36'' SPU NSMISSION WATER PIPELINE, NTACT spu BEFORE ANY VATION WORK NEAR THE INE = 11. 2 12")=410,71 ')=411.14 B') 111.0£ ")=410.71 8x4 ,87 DPE-14L.F.@8.8% LYETHYLENE (PP) E AT PLANTER Em) � 10 20 .3o±) % GRAPHIC SCALE 40 DRAWING NO/SHEET: 1 of 1 / C2.3 ASI SKETCH DRAWING TITLE: CB #206 ASl-002.1 AND PVC DRAIN BASINS DATE: 08.23.22 C C BRUCE.A._ .. City of Renton -Kiwanis Park DEES&mw ASSOCIATES JOB NO: 175-01-06 TO: Terra Dynamics, Inc CHANGE PROPOSAL REQUEST DATE: January 18, 2023 CHANGE PROPOSAL REQUEST NO: 12 In connection with your Contract with the City of Renton, please furnish, your proposal for performing the changes described: Please provide a detailed cost proposal to provide work associated to change storm outfall to DI pipe. Reason: Unforseen condition in the field. Bruce Dees & Associates TECHNICAL REPRESENTATIVE BY: �·��6 ,,,, ·--,,_ ...DATE: 1/18/23 The above request for a tota�DEDUCTION to the contract sum of: $9,729.61 Nine Thousand Seven Hundred Twenty-Nine Dollars and 61/100 Cents (Washington State Sales Tax not included) We have attached hereto Cost Estimate Detail Nos. COP-6 The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on the remainder of the project. All other provisions remain in full force and effect. We request the completion date be extended ____ 5 ___ calendar days because of this work. --TERRA DYNAMICS INC. PO Box 2.479 • Auburn, WA 98071 253-880-3100 • fax: 253 .. 880•3 I 09 Kiwanis Park Renton -COP #6 -Change Storm Outfall Pipe to DI Pipe 8/25/2022 Labor Rate/MH No. Hours Subtotal Power Equipment Operator Foreman $ 83.25 1 2 $ 166.50 General Labor $ 60.14 1 $ 120.28 Dump Truck Driver $ 83.51 $ 501.06 $ $ $ $ Labor Subtotal $ 787,84 Small Tools 3% $ 23.64 Health and Safety 2% $ 15.76 Supervision 5% $ 39.39 Labor Total $ 866.62 Equipment Rate/MH No, Hours Subtotal Crawler Mounted Compact Excavators $ 43.37 1 2 $ 86.74 Hydraulic bucket thumb $ 6.80 1 2 $ 13.60 On-Highway Rear Dump Truck $ 77.16 1 6 $ 462.96 25 Ton 3 axle Trailer $ 11.05 1 $ 66.30 Equipment $ 629,60 Equipment Total $ 629.60 Materials Qty Unit Cost/Unit Subtotal 16" DI Pipe 18.25 ft lengths 73.00 LF $ 90,93 $ 6,637,89 15" ADS N-12 pipe 13ft legths -52.00 LF $ 19,95 $ (1,037.40) Restock Fee 15" ADS pipe 25% 25% LS $ 1,037.40 $ 259,35 Steel Sheet Rentals week rate 7.00 EA $ 61.58 $ 431.06 Materials $ 6,290.90 Materials Total $ 6,290.90 Subtotal of Contractor Work $ 7,787.12 Overhead< $50,000 12% $ 934.45 Overhead > $50,000 4% Profit of Contractor Work 6% $ 467.23 Contractor Subtotal $ 9,188,81 Subcontractors Qty Unit Cost/Unit Subtotal Traffic Management Shoulder closure 1 LS $ 500.00 $ 500.00 $ $ $ $ Subcontractors $ 500.00 Subcontractor Sub Total $ 500,00 Overhead < $50,000 4% $ 20.00 Overhead > $50,000 2% $ Profit on Subcontractors 4% $ 20.80 Subcontractor Subtotal $ 540,80 GRAND TOTAL $ 9,729.61 Contract Days Required 5 VeVv\.01/L, Orr Vern Orr Project Manager �l H.D. FOWLER� COMPANY Customer: Estimator: Job Name: Location: Line 1 2 3 4 12 TERRA DYNAMICS Ombe Bedaso KIWANIS PARK IMPROVEMENTS CITY OF RENTON RENTON,WA Qty UoM Description PLANS DATED 02/04/22 Section Subtotal: PLAN DATES GENERAL QUOTE NOTES DUE TO GLOBAL CONDITIONS BEYOND OUR CONTROL, OUR INDUSTRY IS EXPERIENCING UNPRECEDENTED SUPPLY CHAIN DISRUPTIONS RESULTING IN VOLATILITY OF PRICING, LIMITED AVAILABILITY, AND A GENERAL LACK OF CONTROL. THEREFORE, THE PROJECTS WE ARE CURRENTLY BIDDING MAY BE SUBJECT TO PRICE ESCALATIONS AS WELL AS MATERIAL AVAILABILITY DELAYS OUTSIDE THE PARAMETERS OF OUR MANUFACTURER_S PRODUCTION CAPABILITIES OR YOUR PROJECT SCHEDULES. PLEASE TAKE NOTE OF THE ESTIMATED DELIVERY AND TERMS FOR YOUR PROJECT AND REQUEST UPDATES AS THEY ARE FLUID AND SUBJECT TO CHANGE WITHOUT NOTICE. AS DIFFICULT AS THESE CONDITIONS APPEAR, WE ARE WORKING TO MITIGATE THESE ISSUES TO THE BEST OF OUR ABILITY. WE SHARE YOUR FRUSTRATIONS AND SINCERELY APOLOGIZE FOR ANY INCONVENIENCE. THANK YOU FOR YOUR PATIENCE AND UNDERSTANDING. PIPE SOLD IN FULL LENGTHS ONLY. 52 FT 15" X 13' ADS HP STORM PIPE, GRAY POLYPROPYLENE CORRUGATED, TESTABLE, ASTM F2881, DUAL WALL, 156500131BPL2 Approximate Total Bid No: Q472091 Page 1 of 2 Quote#: Bid Date: Unit Price 19.95 Q472091 3/8/2022 Extended Price 0.00 Note Note 1,037.40 1,037.40 Bid No: Q472091 Page 2 of 2 �l H.D. FOWLER � COMPANY Customer: Estimator: Job Name: Location: Line 1 TERRA DYNAMICS Ivan Ramsey KIWANIS PARK 16" DI STORM PIPE RENTON Qty UoM Description 73 FT 16" CL 52 DI PIPE TJ 18.25' LENGTH ASPHALTIC COATED ANSI/AWWA C151/A21.51 AND CEMENT LINED ANSI/AWWA C104/A21.4 WITH SBR GASKET Approximate Total Bid No: E490710 Page 1 of 1 Estimate: Bid Date: Unit Price 90.93 E490710 8/15/2022 Extended Price 6,637.89 6,637.89 3700 6th Ave S Seattle WA 98134 Phone: 866-695-5008 www.dpnicoli.com Customer No. TERR0002 BILL TO: Terra Dynamics Inc PO Box 2479 Auburn WA 98071 GUST. JOB NO.: JOBSITE CONTACT: Chris OFFICE CONTAC : PROJECTcKiwanis Park SALESPERSON: John Winters Items Rented Qty Part Description Date Out P.O.# 7 Steel Plate 8 x 10 x 1 5/16/2022 EACH 1 Quick Pick 5/16/2022 EACH Items Sold Qty Part Description lpll���jN',�C�J-� ' . ,\i , I I \ , i . BY: ,. Contract#Bill From Del# /Rel# Bill To 123137 6/13/2022 284281/ 7/10/2022 N/A 123137 6/13/2022 284281/ 7/10/2022 N/A Date P.O.# JOBtl ). \ 5: Min Contract# Del# I Rel# PHASi: INVOICE NO.: 340634 DATE 6/29/2022 BILLING TYPE: CYCLE Page: 1 SHIP TO: Terra Dynamics Inc 815 Union Ave NE Renton WA 98056 JOBSITE PHONE NO.: 206-919-5665 OFFICE PHONE NO.: ORDER DATE: 5/16/2022 DPN ORDER #: 83543 TERMS: NET 30 Day Week 4 Week Total $20.53 $61.58 $184.75 $1,293.23 $25.84 $77.52 Price $232.56 $232.56 Ext Price EQUIP# ______ G/t ______ _ No additional equipment/service outstanding for this rental order. Please remit to: D.P. NICOLI, INC. PO BOX 31001-3165 PASADENA CA 9111 0-3165 Sub total: Environmental Fee: WA State Heavy Rental Equipment Tax: Tax: Total Invoice: $1,525.79 $15.26 $19.27 $155.65 $1,715.97 BRUCE At .. DEES&� ASSOCIATES City of Renton -Kiwanis Park CHANGE PROPOSAL REQUEST JOB NO: 175-01-06 DATE: January 18, 2023 TO: Terra Dynamics, Inc CHANGE PROPOSAL REQUEST NO: 13 In connection with your Contract with the City of Renton, please furnish, your proposal for performing the changes described: Please provide a detailed cost proposal to provide work associated with ASl-005 to shift the field to potentially reduce impacts to tree roots. Reason: To reduce impacts to potential significant tree roots at existing tree to be preserved just north of the field. Bruce Dees & Associates TECHNICAL REPRESENTATIVE BY: �,Iii J ,,_.....,. DATE: 1/18/23 The above request for a total ADDITIO� the contract sum of: -$1,235.15 One Thousand Two Hundred Thirty-Five Dollars and 15/100 Cents (Washington State Sales Tax not included) We have attached hereto Cost Estimate Detail Nos. COP-12 The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on the remainder of the project. All other provisions remain in full force and effect. We request the completion date be extended ____ O ____ calendar days because of this work. .TERRA · · DYNAMICS me. PO Box 2479 • Auburn,WA 98071 253-880-3100 • Fax: 253 ·880·3 I 09 Kiwanis Park Renton • COP #12 Field Adjustment Per ASI 005 10/17/2022 Labor Rate/MH No. Hours Subtotal Landscape Operator $ 75.50 l ·2 $ (151.00) Landscape Labor $ 42.08 l ·2 $ (84.16) $ $ $ $ $ Labor Subtotal $ (235.16) Small Tools 0% $ Health and Safety 0% $ Supervision 0% $ Labor Total $ (235.16) Equipment Rate/MH No. Hours Subtotal Crawler Mounted Compact Excavators $ 43.37 1 ·2 $ (86.74) Equipment $ (86.74) EqulpmentTotal $ (86.74) Materials Qty Unit Cost/Unit Subtotal Infield Mix Sand -45.00 TONS $ 27.00 $ (1,215.00) Drain Pipe ·25.00 LF $ 0.83 $ (20.75) Top Soil 15.00 CY $ 21.50 $ 322.50 Materials $ (913.25) Materials Total $ (913.25) Subtotal of Contractor Work $ (1,235.15) Overhead< $50,000 0% $ Overhead> $50,000 4% Profit of Contractor Work 0% $ Contractor Subtotal $ (1,235.15) Subcontractors Qty Unit Cost/Unit Subtotal $ $ $ $ $ $ Subcontractors $ Subcontractor Sub Total $ Overhead< $50,000 4% $ Overhead > $50,000 2% $ Profit on Subcontractors 4% $ Subcontractor Subtotal $ GRAND TOTAL $ (1,235.15) Contract Days Required 0 ven11 .. o�ovr Vern Orr Project Manager Job No. 175-01-06 ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS (ASI} Project: Kiwanis Park Improvements ASINo.: Five (5) Owner: City of Renton Date Issued: 10/14/22 Contractor: Terra Dynamics Inc. Contract No: CAG-22-013 34721 W. Valley HWY S Algona, WA 98001 Contract Dated: 4/18/22 If the following described work affects the Contract sum or Contract time, the Contractor shall submit a proposal for review and approval by the Architect prior to proceeding with the work. Description: TOI has requested if the north edge of the sand field area can be shifted south slightly to reduce potential tree root impacts. This change is acceptable provided that the field edge retains a smooth curve as shown in the attached sketch which shifts the field's north edge approximately 5 feet south. Reason: Cost: To reduce impacts to potential significant tree roots at existing tree to be preserved just north of the field. Provide cost adjustments for the reduction in 1 O" depth sand volume required at the field and replacement with 6" depth topsoil along with reduced lengths of field underdrain lines. Attachments: ASI SKETCH 005.1 Issued by: Michael-Paul Faulkner, PLA Project Manager ) ) r \ I I BRUCE.DEES& ASSOCIATES Landscape Architecture • Urban 0(1Bign Site Plonnlng t Recreation Focilitles Design 27.2E.26thSt .. 11,.io2,1-0eoroo,'IIA93n1 {,SJ)62H947 Kiwanis Park Improvements City of Renton, WA CADD fr1onamo: R: \ORAW/NGS\17501 -R[NTON KIWN/1S PARK IMPROl;EMENTS\14 -RCV. CONST. 5U\17501-C2.1-C2.J,OWG If Plotled: IQ,13.22-16:JF By:{sjonsrn) 0 10 20 gl(, I I / .\ \ \ \ \ \ \ \ \ \ \ \ \ I I I I I !. / T I ! I t I ! I I I 1 .1 i . I IE/ / 40 GRAPHIC SCALE DRAWING NO/SHEET: 1 of 1 / C2.2 DRAWING TITLE: GRADING & DRAINAGE PLAN -GRID '2' ASI SKETCH ASl-005.1 DATE: 10.13.22 C C