Loading...
HomeMy WebLinkAboutLUA74-781 - Large Format hibeoslieh PUGET oe POWER = fcr lee es SY |ICOMMON UAwWEe | BOTANICAL HUaAMe- ees WD. REMAR<S w | D0UGLAS = | EeUROTUGA Menmesi! |} 45° | 30 A | 20G.35 FIZ | Gb MENFIES!| | oa | Ss + A | FLDWERG 2 | ALG 4-5 | jo ae xX | COTON FASTER | C.HOR/IZONTAL / I S 52 ee (0) \zvgorean m7 ASH | SORBUS Aver ARIA |G-8!| 14 [STRAW B E R R Y TREE| A.UNEDO) ARBUTUS - 10 , : O'GRMEL 20ND LANDSCAVE 7LAN | es Ai - NEL ets CHhPLE | ~ GENERAL ENGINEERING DEPARTMENT a 8 Ta PUGET POWER op scat: Tato" DSGN | DRWN | CHKD | APPRD 7 APPRD REV NO| DATE DESCRIPTION ~~‘ DATE: {-\\-19 inc x TABLE OF REVISIONS ae Z63& D 2017 Z PUGET === POWER " - Kee] KEUFFEL & ESSER CO. PSs if id rei i i {3 t Poses TEE we ees : — ay foes Sa SEC | 4 ba bat eden Se os peo SERS & | ~+444->4 \ 1.2 eae bre: &.. i a5d ‘* fis a To. : rs } ’ +++ es to phil aases 7 ee on eee a ae 45 € CESS Pex rs oe ae es wtb : i oe Sins AN Bees weegs oS coe aes web s+ + ops ELOCTR 4018 JITIT DMINATMIDNS JARINID a PRINTED JUN 28 1974 PUGET, POWER a ee batt. WORK SKETCH 2031 .2121 SA _78l- PUGET SOUND POWER & LIGHT COMPANY RESP. AREA 2. J W.S. NO. AGP4A BIA SHEET 3C OF 3 JOINT FACILITIES ARRANGEMENTS-OTHER UTIL. LABOR ACCOUNTS INSTALL REARRANGE | TRANSFER FLN. NO POLES. GUYS & FIXTURES TRANSM. DIST. CONDUCTORS, GROUNDS & RODS TRANSM. (~ OST. OTHER UTIL. ENG SERVICES DISTRIBUTION TRANSFOR MERS OISTRIBUTION VNDERGROVUYD CONDYUIT-TRANSMISSION 225 = fr fol ploy und LOCATION NELSEN CABL EGR OL CaEBLE =<TRAAMS«IISS 22 COUNTY OIVISION STA.TOW VALLEY HWY] KING | SCENM NATURE OF WORK WAGOAGIA| EXPERIMENTAL USkKV UG. CABLE INSTALLATION THRU. TUkIWILA : SO iy ay EASEMENT [PERM.AFRAN] DATE COMP. FOREMAN'S SIGNATURE ed ‘ REQD] RE QD ENG. BY CHECKED BY APRONS MAPPED RETIREMENT POLE CARO! BILLING Me EREMOVE® CONSTRUCTION NOTES AND APPROXIMATE LOCATIONS OF UNDEROROUND UTILITIES GR STRUCTURES d N GN THESE WORK SKETCHES WERE DETERMINED FROM UTILITY RECORDS AND DRAWINGS. ; THE LOCATIONS ARE APPROXIMATE AND SINCE ACTUAL LOCATIGH MAY BE DIFFERENT FROM _ THAT SHOWN, THE CONTRACTOR SHALL TAKE THF NECESSARY PRECAUTIONS TO PROTECT THE “eELITIxs OR STRUCTURES SHOWN AND ANY OTHER UTILITIES OR STRUCTURES ON THE SITE, iy LL. BE THE CONTRACTOR'S RESPONSIBILITY T aie TY OR STRUCTURE OWNERS CONCERNED A MINIMUM OF 2 DAYS BEFORE STAR s THE VICIN- ITY & ANY UTILITY, WATER - TUKWILA ENGRG. OFFICE CH.2-2177 SEWER - w " TELEPHONE - PACIFIC NORTHWEST BELL 611 “ELECTRIC POWER - PUGET SOUND POWER & LIGHT AL.5-2464 CT “GAS - WASHINGTON NATURAL GAS CO, MA.2-6767 Ext. 249 PROJE PETROLEUM - OLYMPIC PIPELINE BA.6-8880 Mr. DAVE SMITH AREA 2. INSTALL 22 IN, STEEL CASING, MINIMUM SHELL THICKNESS 0.375 IN. PER ASA SPEC. £35.19-1959 PR UHER CM .SEP G2 .A.R, LETEN S78. 3476 20D $18. 4465. MIND PEPTH OF CASING Te Sensor laag 22> 54, Th. INSTALL SOVEN <= C* AND GME © 24 PVG CONDUITS 13. STESL bid “SING. JOS CF FC CoNCIz SHALL £5 SCLTENT MELDED, TRY, BLGHN SAND MULL BE PLACED te i CASING, ARGCXD ove COOUIT, SEC SECTIGN B-B. SFAL ENDS CP CASING ARCUND 6" PVC DUCTS KITH CONCRE - ) 3. INSTALL 6" P.V.C. CONIUIT, TYPE pe, PYCET COLE 735] EETSEEN NELSEN TERMINATION STATICS POTIEARS fr ate ae ha Sch CASING LISSA TEE SSST.VALUEY EY - AT STA. 84241. Pe Ke cox are Fe Ce eee ee ieee ae Se CES BEL TRSTALL GROy. 270 COPPER. SEDI S-CaCcR PISS my ‘ se MURES Ce AO UN, SPACIND AD THE EITIO OF TEE TRETE! 25D CoveR WItM 6 IN. OF €3ND BASe fox WAS. Coetvat, GATIEM ANSTALLATION, COvaa & IM. CONDUIT WITH 6.2K, OF SaxD < bigs ‘ ANG a iM. APXER BF KOR COATS. PREGR. TO: Ba “CRF ILL OF TRENTH. SEE SECTIGN A-A, CITY Lnats INSTALL 22 IN. STEEL CASING, MINIMUM SHELL THICKNESS 0.375 IN. PER ASA SPEC. B36.10-1959 UNDER WEST VALLEY HWY BETWEEN STA. 8 + 11 AND STA. 8 + 90. MINIMUM DEPTH OF CASING TOP - BELOW ROAD TO BE 42 IN. INSTALL SEVEN - 6” PVC CONDUITS IN STEEL CASING. JOINTS OF PVC | CONDUIT SHALL BE SOLVENT WELDED. DRY, BLOWN SAND WILL BE PLACED IN CASING, AROUND PVC CON- INTERSTATE FREEWAY NO. 5 DUIT. SEE SECTIONB-8. SEAL ENDS OF CASING AROUND 6" PYC DUCTS WITH CONCRETE. : 5. pINSTALL 4-6 IN, PVC COMDUITS, TYPE DB, POGET CODE 76351 BETWEENIO' x@0* x 6° Ey PRECAST CONCRETE VAULT LOCATED 5 FT. RIGHT OF STA. 8490.35 AND EAST CONCRETE BRIDGE ABUTMENT AYSTA, 15+14.6 CONDUITS TO BE TRENCHED TO A DEPTH OF 5 FT, 3 INSTALL TWO, 4/0 COPPER BONDING-GROUNDING WIRES ON A 9 IN. SPACING AT THE BOTTOM ra OF THE TRENCH AND COVER WITH 6 IN. OF SAND BASE FOR 6 IN. CONDUITS. AFTER IN- STALLATLON, COVER DUCTS WITH 6 IM. OF SAND, ALL PVC DUCTS SHALL BE INSTALLED IN SAND BEDDING EYCEPT ON BENDS AMD CURVES, WHERE THE DUCTS SHALL BE IMBEDDED IN 2 CONCRETE. DUCTS WILL BE SPACED 9 IN. BETWEEN CENTERS IW LAYERS AND VERTICAL PAIRS, Bs BUNDLED WITH LUMBER SPACERS AND FIRMLY. TIED TO RETAIN POSITION DURING & AFTER | : oe BACKFILLING, SAND FILL OVER DUCTS WILL BE COVERED WITH 3 IN. CONCRETE CAP PRIOR | } TO BACKFILL OF REMAINDER OF TRENCH. SEE SECTION C-C. 1 set ee il ae ae ate 6. CONCRETE 3 IN. CAP OVER DUCT WORK, DIRECT BURIED CABLE AND ON CURVES SHALL BE ate Oe bee Oe ay ge SS aes | : CLASS 5 (34%) CONCRETE. 7, ‘TRENCH BACKFILL SHALL BE COMPACTED TO 90% MAXIMUM DRY DERSTTY ‘PER MODIFIED AASHD SPECIFICA- TIONS, EXCESS EXCAVATED MATERIALS WILL BE DISPOSED OF AS DIRECTED BY THE CITY ENGINEER, AND IM ACCORDANCE WITH FLOOD CONTROL DISTRICT REQUIREMENTS . 8. THE 4/0 COPPER GROUNDING-BONDING WIRE SHALL BE TIED TO TERMINATION STATION GROUND SSamsom BLN RA. “e dts ? MAT PER STD, 360%Pbbh AND-VAULT GROUNMENG PER STD. 2003.2211. « 9. MARK DIRECT BURIED CABLE RUNS AT 100 FT. INTERVALS , SO FT. INTERVALS ON CURVES AND AT TURIG OR ANGLES WITH THREE FOOT LENGTHS OF SCRAP PVC CONDUIT LABELED WITH “CAUTION, BURIED V i arg DECALS APPLIED TO OPPOSITE SIDES OF THE CONDUIT AT THE UPPER AND EXPOSED END. NSTALL A 5/8" X 14 Be seg ORE EMD AMD PERT THE MARKERS UPRIGHT AROVE THE CARES WITH TUE DECAL EWD ABOUT i) FT. EXPOSED, Ee PRINTED eS ae PUGET SOUND POWER & LIGHT COMPANY RESP. AREA. LE = W.S. NO.A S246 JUN 28 1974 re 8 WORK SKETCH 4 ATE Cae SHEET 1A OF 3 PUGET. POWER o. 1 FMV JOINT FACILITIES ARRANGEMENTS-OTHER UTIL. LABOR AGCODATS INSTALL | REARRANGE | TRANSFER | REMOVE POLES. GUYS & FIXTURES TRANSM. DIST. ; CONDUCTORS, GROUNDS & RODS TRANSM. [~~ DIST. STS ARO SAREE “Sk Ss SERVICES DISTRIBUTION J ENG TRANSFOR MERS DISTRIBUTION i VUDERGROUND CONDUIT -TRANSM:SS!ON 2256 < UNDERGROUN CARLE -— TFRANSMISS 1 Tey u - ears . 26h 5 ~ BAEADL & pucTt AaCcess RD. iL T agg R. i COUNTY DIVISION ae = Eyl © “Sera TX Ad} Liv ¥ ma | E By | 4 [RUA Stet Der ps NELSEN CABLE STa TOWVALLEY HWY] KING S.CEN |N: AGI 46 | = APD Acce SS RPe NATURE OF WORK ss St. PZ > ‘ . EXPE RIM ENTAL US kVULG CABLE INSTALLATION THRU TURWILA : SF 444 2 S-<73 ee MESES) CAD Lc SADA — — EASEMENT |PERM.€FRAN] DATE COMP. FOREMAN'S SIGNATURE | Sf o4 | [See Rey eo Boe 234-28 REO'D| REQ'D 3 APPRD REV NO DATE DESCRIPTION ENG. BY OR AWN By CHECKED By ARIPROVED MAPPED RETIREMENT POLE CAROS BILLING MEMO . TABLE OF REVISIONS jue : ae UY pow\ Ne ; a | PUGET amleme POWER - i aaa us 2 } | a e | | i Ot gn sd lnc: = tet aetaercat er 2% om oe tags i tia age | bef | SPECIFICATIONS tat of a fee cae bed | ee ee ea ED _ROCK SURFACING: pat cP as ee | | e station shall be surfaced with 3-inch yard course, the drive- oe 4300 ars’ | | i) } | Se y shall be 4-inch base course covered with a 2-inch top course. Paar Py Pee oadway gravel shall be compacted, unless otherwise noted. Lean R4E W.M. | pds ET dae. Baa crushed surfacing shall be made in accordance with the State 3 23 24 I} L baer | 2 | Washington Standard Specification For Road And Bridge Con- eT eet: = D tec hye ae oe rhapey aie , struction, 1963 Section 24-201, Crushed Surfacing. Ae Pap Ads ote Ww ay iN | | u oo ae ae \ Se es - zc BT et BOW UE SNE 120.25, a oe a —— The material shall be graded as follows: i 2g Bos ie ageged - 21,1 43 Meoaee | ‘N x 87.39 Fa | FH F eS FOF CORSE EROS] : et % Beals a, 2 ee 5 i} | an : ee or tor ms uk ia 4 PVE deta | + 2 > » 3 [passing 1 1/4" Square Sieve BB ta Ne ES 4 a. be wt, “ ' j \ Pat : % “| Pett 5/8" " u to ae 2 4 | ‘ * | ~ = | a | = | 3 = a Sie 1/4" . " 30 to 50% |50 to 65% 10% es Bs es ae wee ae eel * x x he m: us #40—" 3 to 18% | 5 to 23% - Ae P ae as ata. eae. ee ‘ ie : se . i " * i " US #200" a 7.5 Max. |10.0 Max. - i ne b Ow \ ee ae a No Sat che ae 5 be L* Bes -: I HS By Sd ode oe | t ve : ! 2 Ww a Oo { f } j 4'f o — x & BACKFILLING: cD '¥ i Xx { ; es x p>-- ‘ | ‘Remove all top soil and other organic material from area to be q 3| graded. Save top soil and cover graded area with approximately is | 3 4-inch layer outside graveled areas. his Fill material shall not exceed 6 inches in depth before compac- * O bo tion. ’ 2 Si ‘ Fy ” Fill material shall be free from all organic material. : cus > Oe i11 material shall be compacted to 90% maximum dry density B cag ge : sais" BASE cept the top 6 inches of cut and fill shall be compacted to N ' FINISHED STATION GRADE 3 % ee re Density shall] be as per ASTM D 698 + cr ‘ ; } ~ z 5 d . x \ EL. 24.00 a ; Beh Je mechanical means shall be used for compaction as ban ] 3 fest . roved by P.S.P.&L. engineers. Special care must be taken “ cae , ba | 7 compact all trenches by mechanical means. | <4 | GE: | 3 | ae , A io | pee Drainage ditches shall be constructed with a minimum 1% slope. ae we Galvanized corrugated metal pipe shall be placed on grade line ¥ oi bed Shed of ditches where indicated on plans. Concrete pipe shall be | 16.007 DRIVE WAY _ | used under station. : : ae nS r v z : om see pin he bef } i i ot | ee ae aes ise Se | ON CONTROL AND SITE IMPROVEMENT: } : ae | ' i r Seed graded and filled area (except area to be graveled) with \ a mixture of rye grass and red clover. Use organic fertilizer ESN Ge id: [- in sufficient quantity to establish seeded area. Water the | | area as necessary to establish growth. ‘Treat station yard to prevent growth of weeds inside fenced POWER | POLE NO. * algsag ca annie CF | 25/245 NG: él eta Hr As per P.S.P.& L. Standard Spec. 3113.0211, Woven Wire Fence Lait " With Treated Wood Curb. : gs 427 5) * a | | ‘ natin | { bet \ | “ SPE aemnanemsaterasantent’ amperes ities ith sctenee RE eer esc, WS ena eed ent bn pea i 87.39° # | I SOUTH LINE D.CL.*46 of re Poke | } oe eaieg’ auatay a a Re ae ie J a eet ul i i i i i } \ % ‘e { i : } rf ‘ : > Ing fas ain 1s aD ana ae spemunneeenmammemenetind SE RAD OS NSEER SCR ENON rq iin” SRT oantl Wee a | He n ea oe Se uu l2. GAS LINE ° k i) ¢ : oO Mer ee \ Ke) “cs te { { ea H ' 2 Oo mr } | 3 : : ee E | ce | | ©: ALL BEARINGSS DISTANCES ARE © op 4 Po Spee ane. i. pis FCS a ats ee ee ae y US 0,& 2S. (N.O.S) MERIDIAN ~ ~. Peeler t | 14" GAS LINE > * : : | ; 3 | El yap as | | TOUR. INTERVAL =} 5 Cen ces b a | Lo oa ye | TUM. USC.4& GS. (NOS) RAILROAD SPIKE IN x gue ee ok ae ; SOUTH FACE OF POWER POLE NO CF 25/245. lanl NOTE: S Ty N DAR CROSSING PLANKS 16 LONG, eae a G > rO BE FURNISHED BY CM.S.P&PRR. CO | | | j | Z WHEN HEIGHT OF FILL EXCEEDS 2FT. } le ee, | | GY PROVIDE 3: WIDE SHOULDE RS -WITHOUT if, wf { } GRAVEL SURFACE. i | ha oom ek | in AP. Bee i és &: : Xe bit eis Re eh ae aie: SO A a Bains” Seer RES Rem eam TNN co a ae 4 METRO TRUNK 36° R.CP. Ati rts ; | | | ‘ | | | REFERENCE DRAWINGS NG¢ FENCE BiLL OF MATERIAL ~ ‘| Caled i ; D-1934 PLOT PLAN AND GROUND BUS es ae: ee | CONS PRUCTION D-1752 ELECTRICAL ASSEMBLY AND BILL OF MATERIAL DESCRIPTION | aes eee ACCESS ROAD ! D-2023 STATION SERVICE. CABINET AND LIGHTING» LAYOUT Shine shinee | xe D-1909 .SHEET |- ASSEMBLY DETAILS - TERMINATION, LA, COMPACT FILL SUBSTATION YARD AND SWITCH STAND YARD COARSE : ~~ —_—_—_———|_ eo - 19.08 S ET 2-FABRICATION: DETAILS - TERMINATION, LA, AN SWITCH STAND COMPACT FILL ACCESS ROAD BASE COARSE | es 71 TOP COARSE Te it oty an’ -GALY, CORR, I2GA. le"x 60" Shee‘ pipe 12” 30 " a W 7 Fence Were | * D-1029. .26' DE TOWER * H-2942 26 DE TOWER FOUNDATION * H-3055 SINGLE PEDESTAL FOUNDATION 0-1436- GND. BUS BILL OF MATERIAL * H-2906 FON DFT 11SkvV SW A&A FUSE STAND * D-1912 TYPE £-O l15kvy BUS PEDESTAL & —\ CM ST P&P RR. eames SEMI - TANGENT ponies. + adhe onli iia” meaiee. dpman. seme eae Sia aia il geome pit” itty it, | tay ipo ses. Sian 0 mee : - Meme na gape ets tiilhamete: dies Eikenentiioe siti ie a ee ee 7.00° SOUTH O01. 4 FINAL SITE. yee | | > ONRUSEN: CARER’ SUMTION |... - ee Se oe N. 86°11 06" W 10.0°'GRAVEL ROAD 10 arrange nandetn pm tt —~ ~ oe — — vi mene ne ee Pa gs x ghee 3 | Ha ee ee ee Ea ash oe HCI Pa Sak oe el oe pe the he ae Ae oe ar a tia A ee GENERAL ENGINEERING DEPARTMENT , , <7 F CO Day pe | ; : BELLEVUE merge PUGET POWER | PRINTED A SCALE: |"=|Q | DESIGNED. DRAWN |CHECKED|APPROVEp’ "DRAWING NO. | REV. JUN 28 1974 L | fare 27-7 [as | DB Cs Se ee ; |__| **§ 36.34 or | PUGET POWER REV.NO.) DESCRIPTION | REV.BY | DATE —_| APPRO, COUNTY SEQ.NO. FILE NO. . i TABLE OF REVISIONS ERD | MN, nace oe 4) D-1988 — 314° S. OF DUCT io | ReUrAe, @ Esser co. Lee ets \ PUGET POWER * Ly &S KV CABLE ac &- SGte PED 4 26" | TERM LA€SW DE TWR z eet | ge +D-1912 TYPE 8-0 D-1912, TYPE 8-0 ee INE 7) TOWER FODN. \ \ PEDESTAL FDN. H-3055 H-2942 ii a eee se - * ; #8 4 me, : ‘ : # Bt ee ab ia sei Sina ita Sy NK AONE ; : : : ‘ {STATION BASE LINE! t REFERENCE DRAWINGS D-1933 SITE PLAN AND COMPLETE LIST OF REFERENCE DRAWINGS NOTE THIS DRAWING IS FOR DESIGN GO ORDINATION ONLY. DO NOT USE FOR CONSTRUCTION PURPOSES, . A Gee | STRUCTURAL ASSEMBLY NELSEN CABLE STATION | . RAL ENGINEERING DEPARTMENT = PRIN} &'2 JUN 22 1974 REV.NO| DESCRIPTION. __—*| REV. BY Ae TABLE OF REVISIONS 1 Xx GO COLVEAYTS WEST RAIL — ws ASS a )\WELEAN j WEED KILL NORMT HH, SOLTH, EAST + WEST TO PROP LNs AS Cc i) a FIED W piv, | Go) 4-8 iNncENGE CE DAS (0) 6-6 EDROPEAN y “MODRIPAINT Ati Ne ae 1 ee " ig Wh by ae 2 7 rr Aa his fost bane : tee ' » a +: ' e - \. ery rte Le en SS * ca ey eran i ae 72h. Ror SS & > (0) 2'-4' spTeaweenny i " sis b . at fe Sac arom : Gee et ea, bee Cong Pe : ‘ Cn dae ” “* i: Cae Saki Bey ‘ peal ae * et 7 Me “ ar POS Spears 5 Met ee a8 . . Be! Pai om re ‘. *, 7 , « es. cre ag 19) B54 | site pl a —~ RYE? CLOVER, NereTe . 2OUTH , SAS ‘ WEST. SIDES OF STA, Af ~ a See Ree Mert ‘ Cod Ls i SEAM ck sai anu A Sy oe POP POWER ROLE - od Rk DD ox > a NES ip alae ee AORS EK; ; —~ ‘ : ; as 5; DH LS io a ie) @ GS rs (5) Ge. INCE OE | 2" GAS UNE RN, CEDAR \ | Hh laren abating 22 a re é i ‘ \ i” ( ) PE6AL Seo ssn | y | err WU eCOMP&S AS j IWIDICANT i. < en. G .—. G i G G | — C G G G G x 6—— ae | | Bi ore, mn 4" GS Link 7 es S S G ND] ZLensep LAWS CAPE ~ il 8 : : w STRANDER WwW. SNCOVER PARK _ Noes VICINITY MAP NO SCALE. et one CTY LIMITS. FEB IN ae +3. 5 -SPREAD-FOPSOIL- ——— FERED TN -BHEV4 By INSTALL FRM BE PLANTING OF TREES AND SHR AS SPECIFIED IN DIVISION $5 BARK-MULEH--SHALE ——-ON-BRAWINGS- -AND-AS- WEED KILL AND CLEAN AR SPECIFIED IN DIVISION PROVIDE EROSION CONTRO SPECIFIED IN DIVISION INSTALL WATER LINE FROM METER TO HOSE BIDS AS INDICATED, HT SHALL FURNISH WATER_METER, SOUND POWER AND LIG SYSTEM SHALL BE AS SPECIFIED IN DIVISION 12, SCOPE OF WORK —INDIGATER—-ON DRAWINGS AND AS SPECT—_ LANDSCAPE CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL NECESSARY TO FULLY COMPLETE THE PROJECT IN ACCORDANCE WITH PLANS AND SPECIFICATIONS, CONTRACTOR SHALL GUARANTEE TO REPAIR. REPLACE AND CORRECT — DEFECTS IN WORKMANSHIPS AND MATERTALS WHICH OCCUR OR BECOME EVIDENT WITHIN ONE YEAR OF JOB ACCEPTANCE. ALL WORK UNDER THIS CONTRACT SHALL BE AS INDICATED EXCEPT INSIDE OF STATION, GRAVEL DRIVEWAY AND CYCLONE FENCE. i) GRADE SITE AS INDICATED AND AS SPECIFIED IN DIVISION 02, BEST GNAFER-PLAN FING -AREAS-AND-AS--SPECT > INDICATED ON-BRAWINGS ANB-AS SPECT | HES SHALL BE AS INDICATED ON DRAWINGS “ bo, . bY ? t AOS WHERE INDICATED ON DRAWING AND AS WHERE INDICATED ON DRAWINGS AND AS DECARTMENT IRRIGATION t planning dept. PUGET RPEereRsciice. Dawe, projec S25 SSS ee = SSI egteser fe COMMONS NAME BOTANICAL NAME. - SIZ NO, REMARAD INCENSE CEDAR | CALOLEDRDS DECORRENS 4-5’ 2 SS CALOCED RUS DECURABHE eB’ = = aT Se pecceetee eae ee ae % ‘ Ll l= AL REE: Sse | Fd ae i — Ke JEDRBOPEAN MT. ASH | SORBLS ALCLPARIA é-3' = Wiisiaeiicngis eidecedecdapaiaianel —7FK STRAWBERRY TREES ARBLUTOS ONES a4? a + 7 "ay int me (ENGINEERING NoO_) LAND SCARE FLARE NELSEN CABLE SOSSTATION SOLTH CENITRAL DIVIGION PUGET POWER D-2017 PROJECT PLANTING KO REVISED DRIVE ts ost ee ee Sint ESE oy SCALE : Z = DSGN |DRAWN] CHKD TAT TS DATE JOLY 14 | Sale. -S.c = pa : q REVISIONS ) OR S624 aie em Lad POWER CABLES PUGET 70-0" ns — en en + se vo oe nt cee nt pa EZ hgh 35-0" . nl. 15°0 20-0 as - 7 - id - « vm "eee y& 5 KV CABLE L & SGL PED é 26) | | | TERM LA# SW DE TWR FDNS Es xk STD FDN r | AF * ' ro) 3 e1 || STATION GROUND BUS *, D4 aan sai ae % ° | S@ } (@)- | | | | | A The Sel ae ‘| | | | o| | %© € | DRIVEWAY _ : y awa = se Si: fon ars. ka me Pass os Y j \ E DET. sal ohio TA ‘ SECURE (6) COPPER STRANDS ———, a Tae ea TO FENCE AS SHOWN USING "C" CONNEC TORS, CODE #21616 2" CHAINa—+< LINK FENCE S'EATE POST ——-— > 2"% 8" TREATED FIR) PLANK~ S72 WE | Boe ae STR ~~ - © » BARE COPPER V (FRONT View ae ‘PERIMETER s a GROUND Sir «FENCE FINISHED die ne STA. GRADE | | ani _ FINAL STATION GRADE FT ES 2 CBS QS WER EN Vie File PoP cee “al WIE TF SECURE (7 TH) COPPER a pk STRAND TO PERIMETER DETAIL. D i. Sen et be GROUND USING "C" CONNECTORS NO SCALE ' na MHD? cope. #21616 ‘3 BARE SOLID COPPER PERIMETER GROUND i (SIDE VIEW) . eeurven oe ar ae PUGET ccm POWER ~{STATION BASE LINE| PUGET i‘ + w u PRINTED JUN 2.6 1974 PUGET. POWER POWER 9. 10. REFERENCE + 1833 | FRAMES OF ALL EQUIPMENT, : pals FOR LIGHTNING. ARRE! AND: SHALL BE CONNECTED AS SHOWN IN| ‘cinta (4/0 BARE STRANDED C : ‘PANELS. AND LIGHTNING Leche’ LAY RISER UNDERGROUND an Soca FROM GA WELD CONNECTI BUS TO POINT DIRECTLY BENEATH EDGE OF FOUNDATICN THEN OF SLAB, ACROSS TOP OF SLAB, Lins uP TO CRONE LOG: £9 svar ek! INSTALL ‘PERIMETER GROUND CONDUCTOR. a MED pre sour “OPI STATION GRADE & 1'-6" OUTSIDE STATION » FENCE & 1 BE BONDED TO STATION GROUND MAT AT ‘MIND OF ON, SOR WATER LINES: oR CONDULTS PASSING BENEATH aoe JAC ¥ DGNSIST OF pg on (OR Oraiee, ee ING RODS & DRIVING wen 20 wea SY aun mn) cc mE Ams pa CONTACT quash. FA NOTE: FOR SPECIAL LIGHTNING ARRESTER GROUNDING, SEE DWG D-1752 os LEGEND : . *——F—S CADWELD CONNECTION : | $-¥——-4CLAMPED CONNECTION _DRAWINGS O- 1436 ye ee BITE PLAN: AND COMPLE TE: -fIStT OF REFERENCE DRAWINGS GND BUS BILL OF MATERIAL D-!752 ELECTRICAL ASSM. & BILL OF MAT. PLOT PLAN & GROUND BUS NELSEN CABLE STATION GENERAL ENGINEERING DEPARTMENT 3D f ya] BELLEVUE WASHINGTON a iM beeen I” =6' DESIGNED) DRAWN | CHECKED APPROVED DRAWING NO. — [ DATE: & DB DESCRIPTION REY. BY TABLE OF REVISIONS ¥ 3 rete : ae ig “ y i aad % ; ta Sciighie eae eae ome ; é et ; ee , : bere ene a ; j fe x Seat —— Go.% iol mone een Sie Sees RR oe ei ea Fe ‘ '5'15.760" W874 SSay nt STA. B+: BEcaiN £22 ib. Noxd / STEEL CASING UNDOEY 0? , : WVALLEY LV, SEE SEC. B-E 2? ae : F he : ” TEL. CABLES STO" waTeg LINE (2 181) TEL. CABLE® ASING ee? 4 eee «S, +20 BS be es | B+oo “s J 4 y f Ste° >¢P RP L “Ek \ . . aiid ta bd Sis d h 9) j if 7 : ; ‘ fs soe coe Se Ne ‘eat age ke sat é INSTALL | v : “g ‘$, ee ea GEE Las O20 = 9 oz fat Se tee Ey ee aS lpi erie ean Seat. PRECAST ¢ ri 9° Uv ¢ ee SE Aw ee ee Ke ye, Pe Be es “4 ea © ” : ¢ ria < eo eee CR 2 he cCONCHETE | [4.118 = =| a Pg om yi Paes Pe 5 | peer age oP rare ae BLEC, VAYLT I] + Nee - ; #063 . wT Ma, - 1 8) 7 ae i> ” x Ste ORR STR eR RR omy Nn oH i rt / | Oo i) *O0 R, SAL [E> 1-2"Pve 8 £ASING g/w TAPE B'INSO—|| = be wearea ee beh ST PAA Gro eve . 0 asteve ee haa RT \ ENS ey -7 es 9+52 58 3 Ti aeoie Bi Res eee a Bue Tis 20" Casing ROB, Biv" NM, 1£42! * | ») ’ | { *% ” if a ees Sis ‘ft oJ “ : 9 j j ta Cnn ee parecer 2. ae a ao ie ne Mos ee Pe te - QUET IM TRE tes SECTION | SEC. B-& , | 3 ee ig oe BoA yee 1o+00 | 4 | 2 Ps Gan.Mi. SES LT ALLY TEND OF EXISTING DUCTS aire STA \0+GB wae | ah _ 109.59’ j { H Ow HIGHWAY ST. LT ICT, BOK <1} . BACKFILL . | |: mY 0 7 o | | | f : » +f 38 | L- 2 aoe ™ | ~ % ovr | ELS ae Sar | = 9 q72- | Neeser 264g ~ 9 o @ i are A i, ee ~~. 4 ie! Leer ae oe ee he as es ee a 0 ae. oi Ese peo v Coie pe oo OP meee md in ” lee es, i a 4 QO ut 7 1 Nees : eee ee 2 fy ' , , Hes He Ae ¢ eo = ELEC.COND FOR po lee —— O | ~f i. 8) Pe ks | ©T. LTS. at Qt. | i : | © | | | | : 9 @TQAN OE _ BLV®. sit” che capes ra 33 ‘ CE ee eee. . 2 o i o \ 5 ane ; D 62. w vam = 2 "eae ’ < erie 2 SELECT BACKFILL fy 4 ty @ 4 | 5'O” F—~ &" CONC RETE w, r ’ be ~ 4-G" PVC. CONDUIT 4.9 . PREFORMED OR oe T> 2'x 4° PINE SPACEUS = Rane —@" CONCRETE | ox s 2-4/0 Cw. Go €4N. MH. 40° Lt : "GAO Be es eee CUUVE ala, 4 Shy IN COMCRLTE SECTION 7 aio cue 5 44 Ec. (9+ OQUCT IN TAENICH SECTION i. &* CONCGETE Pe aromwed oR ; PR ‘ 2 A"K Any > ACERS 4- @* pvc ¥ - tee A WEST ag yA | j - e epee SIGNAL” BS/S pitta cs 3 312.7' S/o POWER CaBLe I72.7' Sf ExisT RO, + ; * % x ~ 3 Zs ‘ poets 5s Be pA re 7 ae pr oe 3 rte i " . . ‘ cg et Pee ¢ * . F A tee: ! % . * % gtk sie * ue! cee RE Foose av x P Fae n ee Pally a 4 Sid Fs OE: ine Pos P FSS 2: RAS * s peuniig P i v ase i : < ae ts =" > . x Oe st CS oe gi a a ap : : ae ar ie i : : e on gee 5 x " ‘ es ee c 3 “S, ‘ + ai tf ? ~ * + ae Fen? _ ‘ » eee 2 <5 : $ ; . : Ms HHS gee : Br ictien, So ORE oar Saar i ay : "i id te: Me Ki t ® ac 2 ; 3 Rot vikeed we a crea é i : A Wh ite Sas g BS as . i ae at ee + 2 ye x GO oes 8 dh Be i Satay cae : “5 PP ae S ahs Sie 2 RS sect ay ‘ f ; 4 ‘ st 3 3 oy iat Hs ‘ Ma Bua wg Neg: a ‘ A , : wes 4 : pe Se aN Ail ec te BE ge DE gees CA Nn at SPR CE Ty Rat oh i io lle angie cae se kid “ b wid Si i a 2 2 pine a2 gf Saas Fa te a Ske A he : : t Te ‘ ia wi ft Ret LEAs i 3 eae ee a site NE PS at SPOR as ce ei i a *® act * ° s é #790.70 6-66 a 2031 .2121 PUGET SOUND POWER & LIGHT COMPANY RESP. AREA i L A N ERINTE? ca \- 9-73 WORK SKETCH et Sa JUN 28 1974 thie SHEET 2Bor 3S JOINT FACILITIES PUGET. POWER ARRANGEMENTS-OTHER UTIL. LABOR ACCOUNTS INSTALL | REARRANGE | TRANSFER | REMOVE ¥: fe# POLES, GUYS & FIXTURES TRANSM. DIST. CONDUCTORS, GROUNDS & ROOS _TRANSM. ~~ _pist. F N¢ SERVICES ' DISTRIBUTION 2 ER a ENG TRANSFOR MERS DISTRIBUTION 2 UNDERGROUND CONDUIT = TRANSMISSION 2256 . B VUMNSER GROUND CABLE. - TRANSMissio 225% , a — m 3 Pad) ow 4 - ) N Vv a a a Be be- SMALE iy UTE ACCESS RDC «OS *. GERI CRRI F OTA TAWMY inte 4 POR BOS ae or oat ae = W.S-AC DAG )/ NELSGEN CABLE STA /VALLEMW MWY KIMEG > CER] [nd. Avie 24a// a * {7-302 ADD 2” Erol Ducr, Set = Bh NA RE F WOR = 5.307 >» MOCESS RPS 27 ‘ er e ( me "J ie » & = wwe PPO Mt AAAI! ok ; t Ac} as vn, : A men, ‘ a oad — me 2 ad i PER YM tA] PA , be he CALE. TN DIAL LRAT Sri { HIS i J AVILA At ay pe 2. 2 or Fnenneeisinnppmenne st 2 Cod Fl Gt SCATE MELSON CAGLS STA D 3 ae 86 EASEMENT |PERM.&FRAN] OATE COMP. FOREMAN'S SIGNATURE yo a a geteiy Beis. SY s iy PR hewueQ 2a anita: Sena Sa m : £ } a 4 } ~ , TE vy / r | oreely sy Le Sius oS x a7 Mo EQD) REQD bs | APPRD |REV NO} DATE DESCRIPTION ENG. BY OR AWN BY CHECKED @Y APPROVED MAPPED RETIREMENT POLE CARDS BILLING MEMO Lae & wei pe y f TABLE OF REVISIONS