HomeMy WebLinkAboutP_Truss Layout_171012_V2Mechanical area
RELOCATE
SCUTTLE
HERE
SUPER ANCHOR
SUPER ANCHOR
(2)
HUS26
(2)
LUS24
Garage
2x4 Vent Block
Blocking List
120
12
Product
2x8 Solid Block
Qty
QUANTITY HANGER CARRIED
MEMBER
HANGER SCHEDULE
CARRYING
MEMBER
USE 10DX1 1/2" NAILS @ SINGLE PLY CARRYING MEMBER
OR CLINCH 3" NAILS ON BACKSIDE OF GIRDER
HUS262 14-16D 6-16D
2 2-10DLUS244-10D
= Truss left end indicator.
SUPER ANCHOR2 4/124/124/124/124/12
4/12 4/12HRCHRCJ10
J11
J12
J10
J11
J12
S04S05S06S04S05S06HRDHRDJ14J15J14J15S01
S02
S01
S02
E01
J09(6)E0
2
(
3
)
J16(6)J13(4)
14-04-00
7-00-00
21-00-006-00-0012-00-009-06-00
A01
A02
A03
A04SA
A05 HRAHRAJ01J02J03J01J02J03J04J05J06J07J04J05J06J07S01
S02
S03
S01
S02
S03
B01 HRBHRBJ01J02J03J01J02J03J04J04S01
S02
S03
S01A
S02A
S03A
A01B
A02B
A03
A04SA
A05HRA
J01J02J03J04J05S01
S02
S03
J0GA06
J05(2)J08(2)37-00-002-00-0035-00-0037-00-0021-06-00
11-06-00
33-00-00
8-00-008-00-008-00-0011-06-00
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.
These trusses are designed as individual building
components to be incorporated into the building design
at the specification of the building designer. See the
individual design sheets for each truss design identified
on the placement drawing. The building designer is
responsible for temporary and permanent bracing of the
roof and floor system and for the overall structure. The
design of the truss support structure including headers,
beams, walls, and columns is the responsibility of the
building designer. For general guidance regarding
bracing, consult "Bracing of wood trusses" available
from the Truss Plate Institute, 583 D'Onifrio Drive;
Madison, WI 53179
BUILDER :
PROJECT :
SUBDIV :
MODEL :
LOT :
20815 67th Ave NE
Arlington, WA 98223
Phone: 1-360-925-4155
JOB #:
ADDRESS :
Harbour Homes North
Wildwood view ll lot 20
Wildwood view ll
B1704742
# 20
2217 B
PR13000026
B17005356
V1
REVISION
Received: 01/25/2018 / aalexander
BUILDING DIVISION
APPROVED
BUILDING DIVISION
THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY.
APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY.
DATE: 02/14/2018