HomeMy WebLinkAboutFR - 052.pdfCity of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
Field Report No. FR-052
CAG-22-013 Site Date/Time:2.21.2023 8:00 AM
Kiwanis Park Improvements Project Location:Kiwanis Park
To:Vern Orr, TDI Copy To:File
Chris Polk, TDI M. Faulkner, BDA
BDA Sherryl Sales, BDA
Pat Decaro, COR
Weather/Temperature:Mostly Cloudy 380
Alan J. Wyatt, COR PPNR
Meeting:TDI Site Conditions:Workable Areas,
Kevin Kern, TDI
Contractor:Terra Dynamics, Inc.
Item:Observations/Remarks:Action/Status:
1 TDI erecting Poligon structure at Parent Plaza. Adjustment to structural connections TDI
per Poligon. COR Bldg. Inspector due on site later today for inspection of structure. COR Bldg. Inspector
2 Gravel aggregate base placed at north walkways between Tennis Court and Playground.TDI
3 Tree roots exposed in excavation of trenching along south walk, south of ballfield. TDI
Tree roots are to be treated as required by Tree Protection Requirements.
4 Concrete cold weather placement requirements - concrete to be placed in cold weather TDI
per Cold Weather requirements per Contract Documents. Caliber Concrete
We believe the above record to be an accurate summary of decisions and related discussions. We would appreciate notification of exceptions
to this record within ten (10) days of receipt. Failing such notification, we will consider this a statement of fact with which you concur.
Alan J. Wyatt 2/21/2023
Submitted by:Date:
Present at Site/
February 21, 2023Date:
Contract No.
Project Name:
City of Renton
1055 S. Grady Way
Renton, WA 98057 1
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
1 PARENT PLAZA
2.21.2023
Erection of Poligon
pavilion at Parent
Plaza. Structural
alignment issues
resolved with
Poligon.
COR Bld. Inspector
due on site today for
inspection.
2 PARENT PLAZA
2.21.2023
Erection of Poligon
pavilion at Parent
Plaza. Structural
alignment issues
resolved with
Poligon.
COR Bld. Inspector
due on site today for
inspection.
City of Renton
1055 S. Grady Way
Renton, WA 98057 2
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
3 SITE
2.21.2023
Gravel base placed
in walkway, between
Tennis Court and
Playground areas.
Photo looking east.
SITE
2.21.2023
Gravel base placed
in walkway, between
Tennis Court and
Playground areas.
Photo looking west.
City of Renton
1055 S. Grady Way
Renton, WA 98057 3
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
5 PARENT PLAZA
2.21.2023
Concrete poured
for connection
between playground/
parent plaza and
picnic area and
connecting walk to
south walk.
Photo looks south
from playground
area.
6 SITE
2.21.2023
Excavation for
irrigation lines
along south walk,
south of ballfield
area show exposed
tree roots.
Tree roots to be
treated as required
by Tree Protection
Requirements.