HomeMy WebLinkAboutFR - 052.pdfCity of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT Field Report No. FR-052 CAG-22-013 Site Date/Time:2.21.2023 8:00 AM Kiwanis Park Improvements Project Location:Kiwanis Park To:Vern Orr, TDI Copy To:File Chris Polk, TDI M. Faulkner, BDA BDA Sherryl Sales, BDA Pat Decaro, COR Weather/Temperature:Mostly Cloudy 380 Alan J. Wyatt, COR PPNR Meeting:TDI Site Conditions:Workable Areas, Kevin Kern, TDI Contractor:Terra Dynamics, Inc. Item:Observations/Remarks:Action/Status: 1 TDI erecting Poligon structure at Parent Plaza. Adjustment to structural connections TDI per Poligon. COR Bldg. Inspector due on site later today for inspection of structure. COR Bldg. Inspector 2 Gravel aggregate base placed at north walkways between Tennis Court and Playground.TDI 3 Tree roots exposed in excavation of trenching along south walk, south of ballfield. TDI Tree roots are to be treated as required by Tree Protection Requirements. 4 Concrete cold weather placement requirements - concrete to be placed in cold weather TDI per Cold Weather requirements per Contract Documents. Caliber Concrete We believe the above record to be an accurate summary of decisions and related discussions. We would appreciate notification of exceptions to this record within ten (10) days of receipt. Failing such notification, we will consider this a statement of fact with which you concur. Alan J. Wyatt 2/21/2023 Submitted by:Date: Present at Site/ February 21, 2023Date: Contract No. Project Name: City of Renton 1055 S. Grady Way Renton, WA 98057 1 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 1 PARENT PLAZA 2.21.2023 Erection of Poligon pavilion at Parent Plaza. Structural alignment issues resolved with Poligon. COR Bld. Inspector due on site today for inspection. 2 PARENT PLAZA 2.21.2023 Erection of Poligon pavilion at Parent Plaza. Structural alignment issues resolved with Poligon. COR Bld. Inspector due on site today for inspection. City of Renton 1055 S. Grady Way Renton, WA 98057 2 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 3 SITE 2.21.2023 Gravel base placed in walkway, between Tennis Court and Playground areas. Photo looking east. SITE 2.21.2023 Gravel base placed in walkway, between Tennis Court and Playground areas. Photo looking west. City of Renton 1055 S. Grady Way Renton, WA 98057 3 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 5 PARENT PLAZA 2.21.2023 Concrete poured for connection between playground/ parent plaza and picnic area and connecting walk to south walk. Photo looks south from playground area. 6 SITE 2.21.2023 Excavation for irrigation lines along south walk, south of ballfield area show exposed tree roots. Tree roots to be treated as required by Tree Protection Requirements. City of Renton 1055 S. Grady Way Renton, WA 98057 4