Loading...
HomeMy WebLinkAboutCA_BeamCalculations_190430_V12015 IRC/2015 NDS BEAM CALCULATIONS FOR TO BE BUILT IN WASHINGTON FOR Roof Roof w/ tile LOADING 15 PSF Dead Load + 25 PSF Live Load = 40 PSF 25 PSF Dead Load + 25 PSF Live Load = 50 PSF Floor 10 PSF Dead Load + 40 PSF Live Load = 50 PSF Floor w/ Gypcrete 24 PSF Dead Load + 40 PSF Live Load = 64 PSF Ceiling 5 PSF Dead Load + 10 PSF Live Load = 15 PSF Deck 5 PSF Dead Load + 40 PSF Live Load = 45 PSF Exterior Cantilevered 10 PSF Dead Load + 60 PSF Live Load = 70 PSF Balcony Interior Partition = 07 PSF Exterior Partition = 10 PSF DEFLECTION Roof = 1/360 Live Load, 1/360 Total Load Floor = 1/480 Live Load, 1/360 Total Load NOTE: This stamp applies to the members and assemblies described in these calculations, and are only valid if they have been wet stamped. Architects Northwest Job No ARCHITECTS NORTHWEST, Inc. 18915 142nd Avenue NE Suite 100 Woodinville, WA 98072 (425) 485-4900 FAX (425) 487-6585 www.ArchitectsNW.com 03/13/19 PR13000037 B19003029 V1 RECEIVED 06/06/2019 aalexander BUILDING DIVISION APPROVEDBUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALLTIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BEOCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTONBUILDING DIVISION AND RECEIPT OF CERTIFICATE OFOCCUPANCY. APPROVAL SHALL NOT BE CONSTRUED AS THE AUTHORITY TOVIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES,OR OTHER REGULATIONS ENFORCED BY THIS CITY. DATE: 07/16/2019