Minor Franchise Permit: MFP23000557
IVR Number: 23000557
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:02/01/2023Application Date:1437650040Parcel Number: 857 FIELD AVE NE
Permit Type:02/24/2023Issue Date:Franchise
Permit Work Class:02/26/2024Expiration Date:Minor Utility
Job Number: 105096918Franchise Type:Electric
Description: Install underground services to two new homes. CREW TO PARK IN ROW. NO HS CUTS
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Test UserContact
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
ANDREW MICHAEL CONSTRUCTION 857 FIELD AVE NE
RENTON , WA 98059
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105096918
857 FIELD AVE NE
JESSE DOUCET 206-573-3576
MFP23000557
Monday Friday 8:00am 3:00pm
CED 2/24/2023Joel McCann
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
V01
HH
PLACE 72HRS IN ADVANCE
NO PARKINGFROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
SHOULDER
WORK
W21-5
UTILITYWORK
AHEAD
W21-7
UTILITYWORKAHEAD
W21-7
UTILITYWORK
AHEAD
W21-7
UTILITY
WORKAHEAD
W21-7
FIELD AVE NE FIELD AVE NE NE 9TH ST NE 9TH ST
857
NOTES:
1. MAINTAIN PED. ACCESS TO
AND THROUGH CROSSWALKS
2.MAINTAIN MIN 11' LANES
3.MAINTAIN LOCAL ACCESS
4.NOTIFY TRANSIT AUTHORITY
AT LEAST 48HRS. IN ADVANCE
OF BUS STOP CLOUSRE
5.TRAFFIC CONTROL PLAN AND
DEVICES SHALL COMPLY WITH MUTCD,
PROWAG &WSDOT
6.DEVICE SPACING
FLAGGER TAPER 20'
SIGNS PER WSDOT
TAPERS PER WSDOT
7.28" CONES
36" BARRELS
48" SIGNS
24" PADDLE
8.ADJUST TO FIELD CONDITIONS
PLEASE SCHEDULE
WITH DISPATCH
@800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
NOTIFY EMS, FIRE
AND POLICE
72 HOURS IN ADVANCE
NOT TO SCALE
K&D SERVICES , AS THE PREPARER OF THIS TRAFFIC
CONTROL PLAN MAKES NO REPRESENTATION AS TO ITS'
GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM TRAFFIC ENGINEER OR OTHER
PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY
IN THE JURISDICTION. UTILIZATION & IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THAT APPROVAL.
REF. MUTCD 2009 6A-O1(10)
Legend
cone
NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 No Parking R7-T39
SHOULDERWORK W21-5 shoulder work
UTILITYWORKAHEAD W21-7 utility work ahead
Work Truck
OFFICE: 800-343-4049
CELL: 425-530-9162
WATCP@KNDSERVICES.NET
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
PSE
JESSE DOUCET
206-573-3576
857 FIELD AVE NE
RENTON, WA
05/03/21
DESIGNED BY: ISAIAH MARTINEZ
WSTCS#011748
105096918
Manifest
15 x cone
9 x Sign Stand
4 x W21-7 utility work ahead
2 x truck
1 x No Parking R7-T39
1 x W21-5 shoulder work
www.invarion.com
MFP23000557
906907482286385849044905860854848852851NE 9TH STFIELD AVE NEROW60'ROW56'LOT 2TRACT ALOT 1318430-167385318405-16738550 kVA 120/240V (B)318416-16739215 kVA 120/240V (B)318430-167392SLAH3571318431-167387UNK (ERROR-SET FUSE)PRE14J780774768762756318405-16738550 kVA 120/240V (B)CUSTOMER SUPPLIED5'6" X 4'5" WORK PITPSE INST. 1-RUN 350 UG TPX ± 110'PSE INSTALLED1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 95'PSE INST. 1-RUN 4/0 UG TPX ± 85'PSE INSTALLED1-3" DB-120 CONTINUOUS PVC CONDUIT ± 80'CUSTOMER SUPPLIED4' X 4' WORK PITCUSTOMER SUPPLIED4' X 4' WORK PITPSE INST. 1-RUN 4/0 UG TPX ± 15'CUSTOMER SUPPLIED1-3" DB-120 DISCONTINUOUS PVC CONDUIT ± 10'CUSTOMER SUPPLIED4' X 4' WORK PITFIELD AVE NEWALKROW60'36'6'TRACT A18'6'318405-16738550 kVA 120/240V (B)SITE PLANSCALE: 1" = 50'JOB SITEPOWER GENERAL NOTES - RESIDENTIAL PROJECT7.6.5.4.3.2.1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, oras required by your local municipality.All work is to be done in accordance with local municipal and county permit requirements as applicable.Inclement weather conditions may cause delays in construction times and dates.8.9.CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT V01-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT M01-REQUIRED TO PROVIDE 5'6" X 4'5" WORK PIT AT HH1TRENCHING & CONDUIT.-INSTALL ± 35' OF 1-3" DB-120 GREY PVC CONDUIT FROM HH1 TO M01.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .NVicinity Map47.497074, -122.154615ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.JOB SITEASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYERPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)NEW CABLE & CONDUIT DIAGRAMNOT TO SCALE10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.001"2"0050'100'SITE SPECIFIC NOTESAT V01: 318405-167385-EXISTING VAULT & TRF TO REMAIN-CONNECT NEW #350 UG TPLX SECAT HH1:-INSTALL (1) 17"x30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350)-INSTALL (3) 6-POS FARGO BARSM01 AT "LOT 1": NEW METER BASE-INSTALL 200A METER___SPAN SPECIFIC NOTESV01 TO HH1:-INSTALL 1-3" DB-120 GREY PVC 95' ___' ACTUAL-INSTALL 1-RUN 350MCM UG TPX, ± 110' ___' ACTUALHH1 TO LOT 1 (M01):-INSTALL 1-RUN 4/0 UG TPX, ± 50' ___' ACTUALHH1 TO LOT 2:-INSTALL 1-3" DB-120 GREY PVC 80' ___' ACTUAL-INSTALL 1-RUN 4/0 UG TPX, ± 85' ___' ACTUALCIRCUIT FEET ADDED: 0'AT LOT 1SQ. FOOTAGE: 3,000 SQ FTPANEL SIZE: 200AHEAT TYPE: GASEST. DEMAND: 9.8kWLRC: 140A% V. DROP: 1.4%% FLICKER: 2.4%AT LOT 2SQ. FOOTAGE: 3,000 SQ FTPANEL SIZE: 200AHEAT TYPE: GASEST. DEMAND: 9.8kWLRC: 140A% V. DROP: 1.5%% FLICKER: 3.3%PARTIAL PLAN DETAILSCALE: 1" = 20'NOT TO SCALECROSS SECTION - FIELD AVE NELOOKING NORTHE60' ROWCLWOwner / Developer Contact InfoofficeATTN:TUSCANY CONSTRUCTION LLCPO BOX 6127 BELLEVUE, WA 98008BOB WENZL206-714-6707105096918GASPHONECABLE TV594141831PROJECT PHASEPWRNOTIF#ORDER#SuperiorSec SpliceE-Mail:Cell Phone:Project Manager Contact Information:Manager:JESSE DOUCET206-573-3576JESSE.DOUCET@PSE.COMUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJ. DOUCET206-573-35764/2/21Z. VAN SANTFORD206-512-94084/2/21S. FOX714-893-24054/2/21N/ARENTONHARDY SHORT PLATSEC L/E, INSTALL HH857 FIELD AVE NE, RENTON, WA 98059N/AN/AN/A105096918AS NOTED1 OF 2KINGN/AN/ACSPSKEPMNW 10-23N-05EN/AN/A2305E0382305E0402305E038PRE-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A105096918510698630___OVERHEAD CIRCUIT MAP 2305E040SCALE: 6" = 1 MILECIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEPRE-1406/2020391.33442.50417.000.001.180.00391.33443.68417.00Bryce Potter253-320-16519/20/21MFP23000557Pothole all existing utilities andrestoration per City of Renton standards
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)105096918UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJ. DOUCET206-573-35764/2/21Z. VAN SANTFORD206-512-94084/2/21S. FOX714-893-24054/2/21N/ARENTONHARDY SHORT PLATSEC L/E, INSTALL HH857 FIELD AVE NE, RENTON, WA 98059N/AN/AN/A105096918AS NOTED2 OF 2KINGN/AN/ACSPSKEPMNW 10-23N-05EN/AN/A2305E0382305E0402305E038PRE-14N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APSE 1730 POLYETHELYNE HANDHOLEPLAN VIEW2"APPROX30"APPROX17"ELECTRIC4' - 5"PENTABOLTLOCK COVER5' - 6"18"SIDE VIEW4" X 4"KNOCKOUT(2 PLACES)APPROX 27"APPROX 40"20"CONDUITS ENTER FROM BENEATHAT ONE END OF HANDHOLESINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAILNot to scaleFLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS.6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200TV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverBackfill for ConduitFree of rockslarger than 8"in diameterSeparation12" Minin ConduitSchedule 40 Yellow PVCGas Service Line32" Typical(Power, Gas,Phone & Cable)Separation12" Min12" MinSeparation36" MINIMUM COVERIN RIGHT OF WAY JOINT TRENCH DETAILJoint Service Line in Conduit (NTS)To Excavated Dirt PileBackfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.CUSTOMER POST, METERBASE, AND PANEL6' MAX5' PREFERRED4' MINPSE STUBOUTSTUBOUT CONDUITCOVERING THETEMPORARYCONNECTION26"CUSTOMER OWNEDTEMPORARY SERVICECONDUCTORS4'PSE CONDUCTOR4'METER DETAIL @ M01SCALE: NONE32"Typical24"Min24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulatorGas MeterAssembly48"4'8"Service (Permanent Detail:)Not to ScaleConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line Conduit3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. Mtr VentUtility ProvidedSeal24"-36"TEMPORARY METER DETAIL @ M01SCALE: NONE9/20/21253-320-1651Bryce Potter