HomeMy WebLinkAboutFR - 054.pdfCity of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
Field Report No. FR-054
CAG-22-013 Site Date/Time:3.01.2023 8:00 AM
Kiwanis Park Improvements Project Location:Kiwanis Park
To:Vern Orr, TDI Copy To:File
Chris Polk, TDI Jonathan Chavez, COR
Michael Faulkner, BDA Sherryl Sales, BDA
Jarod Emerson, TDI Pat Decaro, COR
Weather/Temperature:Mostly Cloudy 320
Alan J. Wyatt, COR PPNR
Meeting:TDI Site Conditions:Workable Areas,
Caliber Concrete
Chris Polk, TDI Contractor:Terra Dynamics, Inc.
Item:Observations/Remarks:Action/Status:
1 TDI erecting Poligon structure at Parent Plaza. Placing wood decking for roof.TDI
2 Caliber Concrete forming wall curb at front planter. Adding forming for reveal in wall Caliber
face per ASI No.10. Concrete pouring to start after forming.
3 TDI starting to plant in Union Avenue front planter - locating and planting trees. TDI
4 TDI provided grade at pinch point between tennis court and north walk to determine if TDI
rough grade is acceptable for mowing operations. Grade of area to be furnished to PPNR/Parks Maint.
Parks Maintenance for verification of acceptable grade.
Existing grade is 26.95%.
5 TDI requested irrigation pressure test for Friday, March 3, 2021. TDI, BDA, PPNR
We believe the above record to be an accurate summary of decisions and related discussions. We would appreciate notification of exceptions
to this record within ten (10) days of receipt. Failing such notification, we will consider this a statement of fact with which you concur.
Alan J. Wyatt 3/1/2023
Submitted by:Date:
Present at Site/
March 1, 2023Date:
Contract No.
Project Name:
City of Renton
1055 S. Grady Way
Renton, WA 98057 1
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
1 UNION AVENUE
ENTRANCE
Planter wall/curb -
Caliber Concrete
adding reveal detail
to wall. ASI #10.
Concrete curb wall
to be poured today.
Photo taken from
south walk looking
north to entrance.
2 UNION AVENUE
ENTRANCE
Photo of planter wall
curb forming with
decorative fence and
now strip intersecting
walkway.
Photo from south
planter looking north
towards entrance.
City of Renton
1055 S. Grady Way
Renton, WA 98057 2
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
3 UNION AVENUE
STREETSCAPE
Photo of Caliber
Concrete placing
reveal forming detail
at curb wall in
preparation of
placing concrete
later today.
Photo looks southeast
towards entrance,
from south walkway.
4 UNION AVENUE
STREETSCAPE
Photo of Caliber
Concrete placing
reveal forming detail
at curb wall in
preparation of
placing concrete
later today.
Photo looks southeast
towards entrance,
from south planter.
City of Renton
1055 S. Grady Way
Renton, WA 98057 3
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
5 UNION AVENUE
ENTRANCE
Landscape planting
starting in planter
along Union Avenue.
Placing of street trees.
6 PARENT PLAZA
PAVILION
Contractor placing
decking on roof
structure of
pavilion.
City of Renton
1055 S. Grady Way
Renton, WA 98057 4
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
7 PARENT PLAZA
PAVILION
Contractor placing
decking on roof
structure of
pavilion.
8 PARENT PLAZA
PAVILION
Contractor placing
decking on roof
structure of
pavilion.
City of Renton
1055 S. Grady Way
Renton, WA 98057 5
City of Renton Parks and Recreation
Parks Planning and Natural Resources FIELD REPORT
9 SITE
NORTH WALKWAY
Photo shows the
rough grading
between the tennis
court and south
walkway. Slope
condition 26.95%
to be verified with
Parks Maintenance
for acceptance of
mowing.
Photo looks east
along north walk at
tennis court.
10 SITE
NORTH WALKWAY
Photo shows the
rough grading
between the tennis
court and south
walkway. Slope
condition 26.95%
to be verified with
Parks Maintenance
for acceptance of
mowing.
Photo looks west
along north walk at
tennis court.
City of Renton
1055 S. Grady Way
Renton, WA 98057 6