HomeMy WebLinkAboutFR - 054.pdfCity of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT Field Report No. FR-054 CAG-22-013 Site Date/Time:3.01.2023 8:00 AM Kiwanis Park Improvements Project Location:Kiwanis Park To:Vern Orr, TDI Copy To:File Chris Polk, TDI Jonathan Chavez, COR Michael Faulkner, BDA Sherryl Sales, BDA Jarod Emerson, TDI Pat Decaro, COR Weather/Temperature:Mostly Cloudy 320 Alan J. Wyatt, COR PPNR Meeting:TDI Site Conditions:Workable Areas, Caliber Concrete Chris Polk, TDI Contractor:Terra Dynamics, Inc. Item:Observations/Remarks:Action/Status: 1 TDI erecting Poligon structure at Parent Plaza. Placing wood decking for roof.TDI 2 Caliber Concrete forming wall curb at front planter. Adding forming for reveal in wall Caliber face per ASI No.10. Concrete pouring to start after forming. 3 TDI starting to plant in Union Avenue front planter - locating and planting trees. TDI 4 TDI provided grade at pinch point between tennis court and north walk to determine if TDI rough grade is acceptable for mowing operations. Grade of area to be furnished to PPNR/Parks Maint. Parks Maintenance for verification of acceptable grade. Existing grade is 26.95%. 5 TDI requested irrigation pressure test for Friday, March 3, 2021. TDI, BDA, PPNR We believe the above record to be an accurate summary of decisions and related discussions. We would appreciate notification of exceptions to this record within ten (10) days of receipt. Failing such notification, we will consider this a statement of fact with which you concur. Alan J. Wyatt 3/1/2023 Submitted by:Date: Present at Site/ March 1, 2023Date: Contract No. Project Name: City of Renton 1055 S. Grady Way Renton, WA 98057 1 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 1 UNION AVENUE ENTRANCE Planter wall/curb - Caliber Concrete adding reveal detail to wall. ASI #10. Concrete curb wall to be poured today. Photo taken from south walk looking north to entrance. 2 UNION AVENUE ENTRANCE Photo of planter wall curb forming with decorative fence and now strip intersecting walkway. Photo from south planter looking north towards entrance. City of Renton 1055 S. Grady Way Renton, WA 98057 2 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 3 UNION AVENUE STREETSCAPE Photo of Caliber Concrete placing reveal forming detail at curb wall in preparation of placing concrete later today. Photo looks southeast towards entrance, from south walkway. 4 UNION AVENUE STREETSCAPE Photo of Caliber Concrete placing reveal forming detail at curb wall in preparation of placing concrete later today. Photo looks southeast towards entrance, from south planter. City of Renton 1055 S. Grady Way Renton, WA 98057 3 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 5 UNION AVENUE ENTRANCE Landscape planting starting in planter along Union Avenue. Placing of street trees. 6 PARENT PLAZA PAVILION Contractor placing decking on roof structure of pavilion. City of Renton 1055 S. Grady Way Renton, WA 98057 4 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 7 PARENT PLAZA PAVILION Contractor placing decking on roof structure of pavilion. 8 PARENT PLAZA PAVILION Contractor placing decking on roof structure of pavilion. City of Renton 1055 S. Grady Way Renton, WA 98057 5 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 9 SITE NORTH WALKWAY Photo shows the rough grading between the tennis court and south walkway. Slope condition 26.95% to be verified with Parks Maintenance for acceptance of mowing. Photo looks east along north walk at tennis court. 10 SITE NORTH WALKWAY Photo shows the rough grading between the tennis court and south walkway. Slope condition 26.95% to be verified with Parks Maintenance for acceptance of mowing. Photo looks west along north walk at tennis court. City of Renton 1055 S. Grady Way Renton, WA 98057 6