HomeMy WebLinkAboutEx 27_Final Hearing Presentation_20230321Towns on 12th Preliminary Plat LUA22 -000180 Applicant Presentation Towns on 12th Preliminary Plat •Applicant –Madrona Place, LLC •Project Numbers a PR22-000160, LUA22-000180, ECF, PP, SA-H •Professional Team •Project Overview •Areas of Consideration in Design •Neighborhood Overview / Vicinity •Safe walk to Schools •Application History •Project Infrastructure •Summary / Applicant’s Burden of Proof Our Team of Professional Experts •Holli Heavrin –Professional Engineer with over 16 years experience in Civil Engineering and Land Development, Principal at Core Design, Inc. •Lindsey Solorio –Professional Landscape Architect with over 10 years of experience, Associate at Core Design, Inc. •Alex Clohesey –Project Architect 1 with over 8 years of experience with Milbrandt Architects. •Carolyn Decker –Professional Engineer and President of Terra Associates, Inc. •Chris Bicket -Professional Engineer and President of TENW Project Overview •6.55 total acres •Retains 1.82 acres of open space •Creates multiple areas of active, passive, and common open space •Protection of onsite and adjacent critical areas •90 townhome sites Areas of Consideration •Code Requirements •Neighborhood Compatibility •Density •Environment –wetlands, slopes, streams •Pedestrian Safety •Stormwater •Traffic •Water Supply, Fire Flow, and Sewer Neighborhood Overview / Vicinity •Project Site is located between NE Sunset Blvd and NE 12th St. •7 parcels totaling 6.55 acres •Zoned RMF and R-10 •Primary Access off NE 12th St •Secondary Access off NE 12th St Safe Walk to Schools •Students within the development will attend Honey Dew Elementary and Hazen High School, both within walking distance. •Sidewalks will be added along the project frontage of NE 12th St. •Existing sidewalks exist between the site and Honey Dew Elementary •A full safe walk exhibit has been prepared and included in the submittal documents. Application History •Neighborhood Meeting: 01/21/2022 •Public Information and Outreach signage posted: 02/23/2022 •Application Submitted: 03/03/2022 •Application Accepted by City: 05/18/2022 •Determined Complete: 05/25/2022 •Notice of Application Sent: 05/25/2022 •SEPA Proposed Determination of Non-Significance –Mitigated (DNS-M) sent:02/06/2023 •Public Hearing 03/21/2023 Project Infrastructure Public Streets: All roads and alleys on site will be public ROW. Sewer: Public Sewer will connect to the existing infrastructure located within NE Sunset Blvd. Stormwater: All stormwater generated on the site will be collected, detained, and treated on-site in a stormwater vault. Flow Control Duration Standard and enhanced water quality are consistent with the 2017 City of Renton Surface Water Design Manual. Water: Water will be provided by the City of Renton and connected to the existing infrastructure located within NE Sunset Blvd and NE 12th Street. Fire: Fire protection will be provided by Renton Regional Fire Authority Burden of Proof In Summary: The Applicant has met its burden of proof. The Preliminary plat makes appropriate provisions for public health, safety, and general welfare by providing: •Housing consistent with the City’s Comprehensive Plan and current zoning regulations. •A proposal that is consistent with the applicable codes & policies; •All necessary infrastructure. The applicant generally concurs with the Staff Report but does have proposed revisions to some Conditions of Approval. The applicant team feels this is necessary to provide clarity. Thank you. Thank You