Loading...
HomeMy WebLinkAboutMFP23001210.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23001210 IVR Number: 23001210 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:03/06/2023Application Date:1457500025Parcel Number: 16210 SE 134TH ST Permit Type:03/21/2023Issue Date:Franchise Permit Work Class:03/20/2024Expiration Date:Minor Utility Job Number: 107061099Franchise Type:Natural Gas Description: PSE Gas INSTALL 2" SHORTSTOP TIE IN ON EXISTING MAIN 69E385 70'N OF SE 134TH ST & 14'W OF 162ND AVE SE. Install 2" MPE main via open trench approx. 169' to property line. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering INFRASOURCE, INC 6905 S 228TH ST KENT, WA 98032 PLEASE SEE ATTACHED 107061099 16210 SE 134TH ST Randy Blackie 425-457-2614 MFP23001210 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 3/21/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1010SE 134TH STSE 134TH ST77 162ND AVE SE66 #16210RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREUTILITYWORKAHEADW21-7 100'100'SHOULDERWORKW21-5 UTILITYWORKAHEADW21-7100'FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK 101077 TEMPORARY TRAFFIC CONTROL PLANNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV11/22/2022 5117088470-107061099 16210 SE 134TH ST Renton.PRACHI JOSHI425-424-7808Prachi.joshi@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 70' NCL SE 134th St & 14'WCL 162nd Ave SE.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001210 1 2 3 4 5 6 7 8 9101112 TRACT B TRACT A13 2" STW IP 14'W69E38516206 160491/2" STW-U19682" STW IP 14'S N PL 67E022 120'W52'N 55'N 1/2" STW-U 1969 15'S N PLFLOW SE 134TH ST 162ND AVE SEROAD A 164TH AVE SEELECONLY30'W30'60' 60'55'53'35'ELECONLYSEE CONST.DETAIL (THIS PAGE) N Vicinity Map 47.4826, -122.1245 Owner / Developer Contact Info officeATTN: DR HORTON 11421 SLATER AVE NE, SUITE 200 KIRKLAND, WA 98033 WES MACKIE 253.606.0654 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105098533107061099Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 253.395.6850 . A. VASQUEZ .11.02.22 A. VASQUEZ .11.02.22 REDT # ( RW-124481 )RENTON MAPLE HIGHLANDS 2" MPE-___ GAS MAIN EXTENSION - 13 S/F LOTS 16210 SE 134TH STREET, RENTON, WA 98059 PUGET SOUND ENERGY 107061099 105098533 1" = 50'1 OF 2 KING 088A CIKNC 14NE-T12N-R05E 208.086 208.089 COMCAST TODD ZIMNY 360.357.1234 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY STACY MELDRUM STACEY.MELDRUM@PSE.COM . . . B. JOHNSON 206.571.8519 N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 511708848 107061099 N/A 106380646 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2"MPE-___169 FT JOINT 2"MPE-___693 FT .... .... .... .... Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:RANDY BLACKIE 253.395.6850 randy.blackie@pse.com 60 IP 088-60 B. JOHNSON 206.571.8519 SITE PLAN xx INSTALL 2" = 169 FT JOINT 2" = 693 FT ... ... ... overlapping existing coating 3". Tape wrap weld joint Wrapped Steel Gas MainSteelPEPE Main Transition Fitting Test Lead Wires Tracer Wire CP Test Box TYPICAL TEST LEAD CONNECTION FOR PE MAIN NOT TO SCALE CONNECTED TO WRAPPED STEEL MAIN CP NOTES: INSTALL PER PSE STANDARDS (4510.1020 - FIG. 4) IF LOW PSP READ. INSTALL 9LB ANODE AND BRING WIRE UP IN BOX WITH TEST LEAD OFF MAIN. NOTIFY CORROSION TECH. @206.571.8519 B. JOHNSON WESLIEMACKIE@GMAIL.COM IP 088-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE CFH / HOME = 180 SITE CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 1 'A'ELEC ONLY 2 SCH80 1 215 ( )' ECL PRIMARY X01 LOT 1 'B'ELEC ONLY 3 SCH80 1 70 ( )' ECL SECONDARY X02 LOT 1 'C'4 40 1 S 2 SCH80 1 70 ( )' NCL GAS MAIN, PRIMARY X03 LOT 2 LOT 13 2 40 1 E 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY X04 LOT 3 LOT 12 2 40 1 W 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY X05 LOT 4 LOT 11 2 40 1 W 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY X06 LOT 5 LOT 10 2 40 1 E 3 SCH80 1 65 ( )' WCL GAS SVC, SECONDARY X07 LOT 6 LOT 9 2 40 1 E 3 SCH80 1 65 ( )' WCL GAS SVC, SECONDARY X08 LOT 8 TR. A ELEC ONLY 2 SCH80 1 75 ( )' WCL PRIMARY 2" PVC PLUG /CAPS = 10 2" YELLOW SCH 40 PVC = 325 FT 2" SCH80 GREY PVC = 360 FT 2" PVC PLUG /CAPS = 6 4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 70 FT 3" SCH80 GREY PVC = 395 FT 3" PVC PLUG /CAPS = 12 2" SHORTSTOP TIE-IN 70'N C/L & 14'W C/L ______'N C/L & _____'W C/L 2" T.L. & T.F. 71'N C/L & 14'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 115' @ 14'W C/L (______)' @ _____'W C/L 2" INLINE TEE 185'N C/L & 14'W C/L ______'N C/L & _____'W C/L 2" CAP EOM/WIREBOX 195'N C/L & 14'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 44' @ 185'N C/L (______)' @ _____'N C/L BEGIN JOINT MAIN 29'N C/L & 30'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 7' @ 29'N C/L (______)' @ _____'N C/L JOINT 2" MPE-___ 686' @ 29'N C/L TO 29'W C/L (______)' @ _____'N C/L TO _____'W C/L 2" CAP EOM/WIREBOX 148'N C/L & 29'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 10' @ 14'W C/L (______)' @ _____'W C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 29'N C/L & 27'E C/L ______'N C/L & _____'E C/LPROPERTY LINEPROP. 2"PROP. 2" T01 CONSTRUCTION DETAIL N.T.S. MFP23001210 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL R. BLACKIE 253.395.6850 . A. VASQUEZ .11.02.22 A. VASQUEZ .11.02.22 REDT # ( RW-124481 )RENTON MAPLE HIGHLANDS 2" MPE-___ GAS MAIN EXTENSION - 13 S/F LOTS 16210 SE 134TH STREET, RENTON, WA 98059 PUGET SOUND ENERGY 107061099 105098533 N/A 2 OF 2 KING 088A CIKNC 14NE-T12N-R05E 208.086 208.089 COMCAST TODD ZIMNY 360.357.1234 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY STACY MELDRUM STACEY.MELDRUM@PSE.COM . . . B. JOHNSON 206.571.8519 N/A ... ... ... ... EX PLAT MAP 208.089 NOT TO SCALE Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 SITE GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 2" MAIN 1 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 2 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 3 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 4 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 5 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 6 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( )' WCL 2600 LS SINGLE 2" MAIN 9 1 1/8 MPE-___65 ( )' WCL 2600 LS SINGLE 2" MAIN 10 1 1/8 MPE-___65 ( )' WCL 2600 LS SINGLE 2" MAIN 11 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 12 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 13 1 1/8 MPE-___65 ( )' ECL 2600 SS SINGLES =8 405 FT 1 1/8" PE PIPE LS SINGLES =5 NOT TO SCALE CROSS SECTION - 162ND AVE SE LOOKING NORTH E 60'ROW W PROP. 2" MPE IP - 14'WCLG G EX.2" STW IP - 14'WCL 69E385 NOT TO SCALE CROSS SECTION - ROAD A LOOKING EAST S (WIDTH VARIES FROM STA. 20+60 TO 21+82) N PROP. 2" MPE IP - 29'NCLG 53' ROW NOT TO SCALE CROSS SECTION - 164TH AVE SE LOOKING NORTH W 35'ROW PROP. 2" MPE IP - 29'WCLGnote that future build out of 162nd ave se will most likely result in a curbline set 13 feet from the centerline. with a main 14 feet it will be very close to the edge of curbline. consider adjusting. MFP23001210