Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:03/06/2023Application Date:1457500025Parcel Number: 16210 SE 134TH ST
Permit Type:03/21/2023Issue Date:Franchise
Permit Work Class:03/20/2024Expiration Date:Minor Utility
Job Number: 107061099Franchise Type:Natural Gas
Description: PSE Gas INSTALL 2" SHORTSTOP TIE IN ON EXISTING MAIN 69E385 70'N OF SE 134TH ST & 14'W OF 162ND
AVE SE. Install 2" MPE main via open trench approx. 169' to property line. POTHOLE ALL EXISTING UTILITIES.
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
INFRASOURCE, INC
6905 S 228TH ST KENT, WA 98032
PLEASE SEE ATTACHED
107061099
16210 SE 134TH ST
Randy Blackie 425-457-2614
MFP23001210
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 3/21/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
1010SE 134TH STSE 134TH ST77
162ND AVE SE66 #16210RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREUTILITYWORKAHEADW21-7 100'100'SHOULDERWORKW21-5 UTILITYWORKAHEADW21-7100'FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
101077 TEMPORARY TRAFFIC CONTROL PLANNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV11/22/2022 5117088470-107061099 16210 SE 134TH ST Renton.PRACHI JOSHI425-424-7808Prachi.joshi@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 70' NCL SE 134th St & 14'WCL 162nd Ave SE.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001210
1 2 3 4 5 6 7 8
9101112
TRACT B
TRACT A13
2" STW IP 14'W69E38516206
160491/2" STW-U19682" STW IP 14'S N PL
67E022
120'W52'N
55'N 1/2" STW-U
1969
15'S N PLFLOW
SE 134TH ST 162ND AVE SEROAD A
164TH AVE SEELECONLY30'W30'60'
60'55'53'35'ELECONLYSEE CONST.DETAIL
(THIS PAGE)
N
Vicinity Map
47.4826, -122.1245
Owner / Developer Contact Info
officeATTN:
DR HORTON
11421 SLATER AVE NE, SUITE 200
KIRKLAND, WA 98033
WES MACKIE 253.606.0654
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
GENERAL NOTES - GAS (JOINT TRENCH):
1" = 50'105098533107061099Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two
working days prior to construction. 1-800-424-5555
Notify appropriate permitting agency prior to job start (see permit requirements).
Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion
and Sediment Control and any additional local jurisdiction requirements.
Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the
appropriate Engineer/Project Manager.
Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.
Check box on report for wire box (Test Lead) installation.
Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating
Standard 2525.2500.
To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on
this design, unless approved by the appropriate Engineer/Project Manager.
System MAOP denoted by System MAOP = 60 PSIG
Install Main Valves out of traffic where possible.
Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.
Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas
Operating Standards 2525.1200 and 2525.2300.
If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .
Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas
Field Procedures Manual 0812 and 0813.
Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.
Unless otherwise noted:
All pipes installed in plat to be 2" MPE-___.
All crossings to be Yellow 4" PVC.
All Services to be 1-1/8" PE.
/ denotes service stub location.
(________') denotes footage between fittings.
Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas
Operating Standards 2525.1500, 2525.1600 and 2525.1700.
Note all recordable footages, locations and material changes on the as-built in red.
Upon completion of the project send the print copy, along with the completed work order, listing crew & actual
materials used to the appropriate design group.
On site pre-con required before start of job.
At symbol: install natural gas main piping and fixtures. Size as indicated on tables and
work sketch (gas main is to parallel power system unless otherwise shown on work sketch).
Inclement weather conditions may cause delays in construction times and dates.
19.
20.
18.
16.
17.
15.
14.
13.
6.
9.
11.
12.
10.
8.
7.
3.
5.
4.
2.
1.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELEC Order Number
SAP Sup Order Nbr
PC APPROVAL
R. BLACKIE 253.395.6850 .
A. VASQUEZ .11.02.22
A. VASQUEZ .11.02.22
REDT # ( RW-124481 )RENTON
MAPLE HIGHLANDS
2" MPE-___ GAS MAIN EXTENSION - 13 S/F LOTS
16210 SE 134TH STREET, RENTON, WA 98059
PUGET SOUND ENERGY
107061099
105098533
1" = 50'1 OF 2
KING 088A CIKNC
14NE-T12N-R05E 208.086 208.089
COMCAST
TODD ZIMNY
360.357.1234
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
STACY MELDRUM
STACEY.MELDRUM@PSE.COM
.
.
.
B. JOHNSON 206.571.8519 N/A
...
21.
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
511708848 107061099
N/A 106380646
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service Stubs
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Service/Meter
4680 06/11
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 02/18
TEST RESULTS
/ /
/ /
/ /
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
INSTALL 2"MPE-___169 FT
JOINT 2"MPE-___693 FT
....
....
....
....
Cell Phone:
Project Manager Contact Information:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:RANDY BLACKIE
253.395.6850
randy.blackie@pse.com
60 IP 088-60
B. JOHNSON 206.571.8519
SITE PLAN
xx
INSTALL 2" = 169 FT
JOINT 2" = 693 FT
...
...
...
overlapping existing coating 3".
Tape wrap weld joint
Wrapped Steel Gas MainSteelPEPE Main
Transition Fitting
Test Lead Wires
Tracer Wire
CP Test Box
TYPICAL TEST LEAD CONNECTION FOR PE MAIN
NOT TO SCALE
CONNECTED TO WRAPPED STEEL MAIN
CP NOTES:
INSTALL PER PSE STANDARDS
(4510.1020 - FIG. 4) IF LOW
PSP READ. INSTALL 9LB ANODE
AND BRING WIRE UP IN BOX
WITH TEST LEAD OFF MAIN.
NOTIFY
CORROSION TECH. @206.571.8519
B. JOHNSON
WESLIEMACKIE@GMAIL.COM
IP 088-60
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
STOP TIME
START TIME TESTED BY
SOAP AIR NITROGEN WATER
P F
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
TEST RESULTS
/ /
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
60
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
4'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
CFH / HOME = 180
SITE
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 LOT 1 'A'ELEC ONLY 2 SCH80 1 215 ( )' ECL PRIMARY
X01 LOT 1 'B'ELEC ONLY 3 SCH80 1 70 ( )' ECL SECONDARY
X02 LOT 1 'C'4 40 1 S 2 SCH80 1 70 ( )' NCL GAS MAIN, PRIMARY
X03 LOT 2 LOT 13 2 40 1 E 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY
X04 LOT 3 LOT 12 2 40 1 W 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY
X05 LOT 4 LOT 11 2 40 1 W 3 SCH80 1 65 ( )' ECL GAS SVC, SECONDARY
X06 LOT 5 LOT 10 2 40 1 E 3 SCH80 1 65 ( )' WCL GAS SVC, SECONDARY
X07 LOT 6 LOT 9 2 40 1 E 3 SCH80 1 65 ( )' WCL GAS SVC, SECONDARY
X08 LOT 8 TR. A ELEC ONLY 2 SCH80 1 75 ( )' WCL PRIMARY
2" PVC PLUG /CAPS = 10 2" YELLOW SCH 40 PVC = 325 FT 2" SCH80 GREY PVC = 360 FT 2" PVC PLUG /CAPS = 6
4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 70 FT 3" SCH80 GREY PVC = 395 FT 3" PVC PLUG /CAPS = 12
2" SHORTSTOP TIE-IN
70'N C/L & 14'W C/L
______'N C/L & _____'W C/L
2" T.L. & T.F.
71'N C/L & 14'W C/L
______'N C/L & _____'W C/L
INSTALL 2" MPE-___
115' @ 14'W C/L
(______)' @ _____'W C/L
2" INLINE TEE
185'N C/L & 14'W C/L
______'N C/L & _____'W C/L
2" CAP EOM/WIREBOX
195'N C/L & 14'W C/L
______'N C/L & _____'W C/L
INSTALL 2" MPE-___
44' @ 185'N C/L
(______)' @ _____'N C/L
BEGIN JOINT MAIN
29'N C/L & 30'E C/L
______'N C/L & _____'E C/L
JOINT 2" MPE-___
7' @ 29'N C/L
(______)' @ _____'N C/L
JOINT 2" MPE-___
686' @ 29'N C/L TO 29'W C/L
(______)' @ _____'N C/L TO _____'W C/L
2" CAP EOM/WIREBOX
148'N C/L & 29'W C/L
______'N C/L & _____'W C/L
INSTALL 2" MPE-___
10' @ 14'W C/L
(______)' @ _____'W C/L
2" POLYVALVE/OPEN
W/ BOX & SUPPORT
29'N C/L & 27'E C/L
______'N C/L & _____'E C/LPROPERTY LINEPROP. 2"PROP. 2"
T01
CONSTRUCTION DETAIL
N.T.S.
MFP23001210
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
ELEC Order Number
SAP Sup Order Nbr
PC APPROVAL
R. BLACKIE 253.395.6850 .
A. VASQUEZ .11.02.22
A. VASQUEZ .11.02.22
REDT # ( RW-124481 )RENTON
MAPLE HIGHLANDS
2" MPE-___ GAS MAIN EXTENSION - 13 S/F LOTS
16210 SE 134TH STREET, RENTON, WA 98059
PUGET SOUND ENERGY
107061099
105098533
N/A 2 OF 2
KING 088A CIKNC
14NE-T12N-R05E 208.086 208.089
COMCAST
TODD ZIMNY
360.357.1234
LUMEN
AMY ALLISTON
206.794.8534
RIGHT OF WAY
STACY MELDRUM
STACEY.MELDRUM@PSE.COM
.
.
.
B. JOHNSON 206.571.8519 N/A
...
...
...
...
EX PLAT MAP 208.089
NOT TO SCALE
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
SITE
GAS SERVICE PIPE TABLE
DESCRIPTION
OF
ACTIVITIES
LOCATION PIPE DESIGN AS-BUILT
FROM TO LOT
SIZE
(IN)TYPE
LENGTH
(FT)LOCATION
LENGTH
(FT)
EFV
SIZE LOCATION REMARKS
SS SINGLE 2" MAIN 1 1 1/8 MPE-___10 ( )' ECL 2600
SS SINGLE 2" MAIN 2 1 1/8 MPE-___10 ( )' ECL 2600
SS SINGLE 2" MAIN 3 1 1/8 MPE-___10 ( )' ECL 2600
SS SINGLE 2" MAIN 4 1 1/8 MPE-___10 ( )' ECL 2600
SS SINGLE 2" MAIN 5 1 1/8 MPE-___10 ( )' WCL 2600
SS SINGLE 2" MAIN 6 1 1/8 MPE-___10 ( )' WCL 2600
SS SINGLE 2" MAIN 7 1 1/8 MPE-___10 ( )' WCL 2600
SS SINGLE 2" MAIN 8 1 1/8 MPE-___10 ( )' WCL 2600
LS SINGLE 2" MAIN 9 1 1/8 MPE-___65 ( )' WCL 2600
LS SINGLE 2" MAIN 10 1 1/8 MPE-___65 ( )' WCL 2600
LS SINGLE 2" MAIN 11 1 1/8 MPE-___65 ( )' ECL 2600
LS SINGLE 2" MAIN 12 1 1/8 MPE-___65 ( )' ECL 2600
LS SINGLE 2" MAIN 13 1 1/8 MPE-___65 ( )' ECL 2600
SS SINGLES =8 405 FT 1 1/8" PE PIPE
LS SINGLES =5
NOT TO SCALE
CROSS SECTION - 162ND AVE SE
LOOKING NORTH
E
60'ROW
W
PROP. 2" MPE IP - 14'WCLG
G EX.2" STW IP - 14'WCL
69E385
NOT TO SCALE
CROSS SECTION - ROAD A
LOOKING EAST
S
(WIDTH VARIES FROM STA. 20+60 TO 21+82)
N
PROP. 2" MPE IP - 29'NCLG
53' ROW
NOT TO SCALE
CROSS SECTION - 164TH AVE SE
LOOKING NORTH
W
35'ROW
PROP. 2" MPE IP - 29'WCLGnote that future build out of 162nd
ave se will most likely result in a
curbline set 13 feet from the
centerline. with a main 14 feet it will
be very close to the edge of curbline.
consider adjusting.
MFP23001210