Loading...
HomeMy WebLinkAboutChange Order - 03CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT 3/13/2023 CONTRACT:CAG-22-014 CONTRACTOR:Redside Construction LLC CHANGE ORDER:#03 SUMMARY OF PROPOSED CHANGE: Reason/Justification: During construction a number of issues were identified that led to additional design/ detailing and fabrication scope for structural steel infill panels. These included skewed Pile Caps discovered during the Contractor's surveying (RFI #9), Utility lines not fitting within area shown in design drawings (RFI #16 and 17), and changes identified during shop drawing submittal review by Engineer (Submittals 24.1, 24.3). DESCRIPTION: Item Qty. Description Unit Price Amount No.w/ WSST 1 1 Structual Steel Detailing - COP15 34,327.00$ 37,794.03$ 2 1 Structual Steel Fabrication - COP2 30,889.00$ 34,008.79$ Total this Change Order:71,802.82$ ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST)AMOUNT (W/ WSST)THIS ORDER (W/ WSST)TOTAL AFTER CHANGE Additional Calendar Days: (0) No Extension of Time. Completion Date is October 1, 2023. SIGNATURES: Contractor:Date: Project Manager:Date Approved By:Date: (Mayor) The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. 4,659,432.00$ 4,678,983.55$ 71,802.82$ 4,750,786.37$ 03/17/23 03/17/23 CAG-22-014, CO #3-23 03/22/23 Attest:______________________ Jason Seth, City Clerk Project Name:COP 15 Project No.CAG-22-014 3/7/2023 R70-22 Description: a. b.-$ DIRECT LABOR SUBTOTAL -$ d.-$ -$ a. -$ a. b.-$ -$ -$ a. b. -$ a.8,154.00$ b.21,699.00$ 29,853.00$ 6. OVERHEAD & PROFIT a.-$ b.-$ c.3,582.36$ 3,582.36$ b.1.70 % of 1-6 507.50$ 507.50$ a.1.10 % of 1-7 367.79$ 367.79$ a.0.048 % of 1-8 16.47$ 16.47$ 34,327.00$ 6. SUBTOTAL 5 Subcontractors (12% to $50k, 4% above $50k) SUBTOTAL 1 thru 3 4. SPECIALIZED SERVICES Jesse Quote for Detailing on West Walkway 3. EQUIPMENT COSTS 6. SUBTOTAL 4 owned / rented equipment (per spec approved source) small tools (NTE 3% craft labor per WSDOT) 3. EQUIPMENT COSTS for contracts under $3 million COP General Contractor Breakdown Summary Direct Supervision (NTE 15% Direct Labor) WCD # / COP No. Date: Contractor Ref. No. Gene Coulon Beach Memorial Park North Water Walk Improvements REDSIDE CONSTRUCTION LLC crew (apprentices, journeymen, & laborers) Source Documents: Unforeseen Site Conditions - Jesse Engineering Cost Proposal for West and South Detailing Direct Labor Costs: Contractor: Itemize all costs on attached COP Cost Breakdown form. safety (NTE 2% labor, lines 1a, b, & c per WSDOT) Jesse Quote for Detailing on South Walkway 1. CRAFT LABOR COSTS 2. MATERIAL COSTS 7. TOTAL OVERHEAD & PROFIT 9. TAX 7. INSURANCE material costs 2. MATERIAL COSTS 8. INSURANCE 5. SUBCONTRACTORS 1. CRAFT LABOR COSTS 10. B&O TAX 9. BOND 8. BOND Form Revised 6/1/2004 12% (1st $50k, 4% above $50k) - Overhead bond adjustment payroll & volume driven liability insurance TOTAL (NIC WSST) 6% - Profit Business and Occupational Tax COP 15 - West and South Detailing Page _______ of _______Issued 3/7/2023 Feb. 2 2023 Updated March 1 2023 Redside Construction Bainbridge Island, WA Attn: Sam Berry Re: City of Renton, Gene Coulon Beach Memorial Park North Water Walk Improvements #CAG-22-014 Jesse Job File No. 144286 Change Order #2 Extra Detailing Expenses Sam, Jesse Company’s bid proposal for the City of Renton Gene Coulon Memorial Beach Park North Water Walk Improvements drawing package dated July 18 2022 was based upon the development of common South and West Leg walkways as depicted with typical Pile cap spacings in straight and perpendicular alignments. Since the award of contract for fabrication, extensive field survey’s (7 to date) provided by Redside Construction of the existing pile caps, pilot house and abutment conditions along both South and West Legs have generated extensive Detailing reviews and changes requiring multiple: plan overlays, pile cap dimensional and alignment reviews, pre-existing handrailing and bollard positionings, all having generated excessive subcontracted Detailing expense to Jesse Company far exceeding our project bid allowance. In an effort to best suit the project efficiency and fabrication/delivery schedules Jesse Company has absorbed these Extra expenses to date but must now submit this Change Order #2 for the extenuating cost of Detailing services further defined below. South Walkway: 1) Multiple surveys located the South pile caps via. nail holes, centerline and face of concrete, all provided dimensional variances in pile cap spacings. These subsequent surveys also proved the existing pile caps to be out of common spacing, out of longitudinal alignment and slightly skewed. There was a consensus during a project teleconference to develop common frame sizes between Bents 2 thru 7 with the intent of the Contractor field cutting the Pile Cap shelfs perpendicular to a longitudinal centerline. The two outermost frames between Bents 1-2 & 7-8 would be unique in size and conditions. $3,055.00 2)Received survey of random Handrail post locations along the South Leg walkway confirmed there is no common base plate spacing between Pile Cap Bents thus requiring all seven South Leg frames to be uniquely Detailed for handrail mount positions resulting in additional drawings, for each frame structure. $1,778.00 3)Changes of 2 7/8”dia. Handrail base plate hole pattern previously defined by Redside now confirmed at 3 ¼” center spacing required prior drawing plan views and plate detail corrections at all frames. $525.00 4)Add two hole patterns at South Stringer webs for P2542 and P2945 UNISTRUT bracket attachments to aid utility run supports. $590.00 5) Revise Transition plates to a Tee shape to support thermal spray metallizing distortion for flatness. $639.00 6) Revise all South leg shops to adopt 3” dia. hole thru webs and end plates for Electrical conduit penetrations per RFI 16. $393.00 7)Revise #108A and 110A Frames for 4” hole penetrations at W10 stringer webs for fire line routing to Fire Boxes via U1.01 and U1.02. $2,164.00 8)Light Pole supports moved off pile caps and shifted onto frames 113 and 116 per Dec. 9 2022 review. $463.00 9)Bollard base added to frame 110 to suit bolt pattern $325.00 Net South walkway Detailing Cost Impacts: $8,154.00 West Walkway: 10)Multiple surveys located the West pile caps via. nail holes, centerline and face of concrete, all provided dimensional variances in pile cap spacings. These subsequent surveys also proved the existing Bent 11-23 pile caps and abutments to be out of common spacing, out of longitudinal alignment and significantly skewed. After repeated attempts by the Detailer to develop common West structural frames it was decided via. City of Renton teleconference to efficiently proceed with drawing submissions and maintain production schedule that all West frames shall be Detailed to the shape and conditions of the existing pile caps. This would generate 13 unique frames with skewed ends and require all W10 stringers(68) be assigned a separate piece mark and detailed individually thus vastly increasing the drawing quantity yet this would simplify field cutting requirements at existing skewed cap conditions. $16,555.00 11) Received survey of random Handrail post locations along the South Leg walkway confirmed there is no common base plate spacing between Pile Cap Bents thus requiring all 13 West Leg frames to be uniquely Detailed for handrail mount positions resulting in additional drawings, for each frame structure. $1,778.00 12)Changes of 2 7/8”dia. Handrail base plate hole pattern previously defined by Redside now confirmed at 3 ¼” center spacing required prior drawing plan views and plate detail corrections at all frames. $525.00 13) Add two hole patterns at West Stringer webs for P2542 and P2945 UNISTRUT bracket attachments to aid utility run supports. $591.00 14)Revise #120A Frame for 4” hole penetrations at W10 stringer webs for fire line routing to Fire Boxes via U1.01 and U1.02. $315.00 15) Add developed Grating/Waler support angle ledger weldment at Abutment 23 per PND redline comment at submission 24.3, not in design plan. $758.00 16)Update #124 & 125 Picnic float struts to suit RFI 12 and Marine Floats Corp. submittal #2.$315.00 17) Update #123,131,132,133,134,135 perimeter channels at swim step to suit Dec. 1 survey. Increased complexity to suit varying pile cap spacings. $473.00 18) Revise all West leg shops to add 3” and 4”dia. hole penetrations and UNISTRUT channels at W10 stringers for conduit/fire line passage and J-Box support. $2,167.00 Net West walkway Detailing Cost Impacts: $21,699.00 Respectfully, Dave Easterly Project Manager / Estimator Jesse Company 253-552-1520 office, 253-377-2954 cell Project Name:COP 2 Project No.CAG-22-014 3/7/2023 R70-22 Description: a. b.-$ DIRECT LABOR SUBTOTAL -$ d.-$ -$ a. -$ a. b.-$ -$ -$ a. b. -$ a.2,826.00$ b.24,037.00$ 26,863.00$ 6. OVERHEAD & PROFIT a.-$ b.-$ c.3,223.56$ 3,223.56$ b.1.70 % of 1-6 456.67$ 456.67$ a.1.10 % of 1-7 330.95$ 330.95$ a.0.048 % of 1-8 14.82$ 14.82$ 30,889.00$ Form Revised 6/1/2004 12% (1st $50k, 4% above $50k) - Overhead bond adjustment payroll & volume driven liability insurance TOTAL (NIC WSST) 6% - Profit Business and Occupational Tax 10. B&O TAX 9. BOND 8. BOND 7. TOTAL OVERHEAD & PROFIT 9. TAX 7. INSURANCE material costs 2. MATERIAL COSTS 8. INSURANCE 5. SUBCONTRACTORS 1. CRAFT LABOR COSTS safety (NTE 2% labor, lines 1a, b, & c per WSDOT) Jesse Quote for Fabrication on South Walkway 1. CRAFT LABOR COSTS 2. MATERIAL COSTS REDSIDE CONSTRUCTION LLC crew (apprentices, journeymen, & laborers) Source Documents: Unforeseen Site Conditions - Jesse Engingeering Cost Proposal West and South Fabrication Direct Labor Costs: Contractor: Itemize all costs on attached COP Cost Breakdown form. for contracts under $3 million COP General Contractor Breakdown Summary Direct Supervision (NTE 15% Direct Labor) WCD # / COP No. Date: Contractor Ref. No. Gene Coulon Beach Memorial Park North Water Walk Improvements 3. EQUIPMENT COSTS 6. SUBTOTAL 4 owned / rented equipment (per spec approved source) small tools (NTE 3% craft labor per WSDOT) 3. EQUIPMENT COSTS 6. SUBTOTAL 5 Subcontractors (12% to $50k, 4% above $50k) SUBTOTAL 1 thru 3 4. SPECIALIZED SERVICES Jesse Quote for Fabrication on West Walkway COP 2 - West and South Fabrication Page _______ of _______Issued 3/7/2023 Feb. 2 2023 Redside Construction Bainbridge Island, WA Attn: Sam Berry Re: City of Renton, Gene Coulon Beach Memorial Park North Water Walk Improvements #CAG-22-014 Jesse Bid File No. 2022-075 Rev.A Change Order #3 Extra Fabrication Cost Impacts Sam, Jesse Co. submits this Change Order #3 including Material, Galvanizing and Shop Labor additions for the following Coulon Park South and West Walkway Project Impacts as further defined below. South Walkway: 1) Shop cut and grind 3”dia. holes(29) thru 1” end plates and C10 diaphragms for electrical conduit run between W10 stringers. 2) Fabrication of abutment Transition plates(2) from single flat to welded Tee shape. Required to aid distortion control from HDG and Thermal Spray heat applications. Mat’l: $313.00 + HDG $143.00 + Labor: $2,370.00 Net Total Impact: $2,826.00 Lot West Walkway: 3) Hand miter cut each end of all W10 stringers(126) to random 1/10th degree angles to accommodate existing skewed pile cap conditions creating 13 unique skewed frame weldments. (Bid square) 4) Shop cut and grind 3” and 4”dia. holes(37) thru W10 stringer webs for electrical conduit/fire line penetrations at J-Box and Fire Box locations. 5) Material and Fabrication addition of welded P1000 Unistrut channels(24) for electrical conduit support near J-Boxes. 6) Material and Fabrication of abutment Transition plates(2) from single flat to welded Tee shape. Required to aid distortion control from HDG and Thermal Spray heat applications. 7) Material and Fabrication addition of Grating/Waler support ledger at Bent 23 per PND redline. Mat’l: $911.00 + HDG: $376.00 + Labor: $22,750.00 Net Total Impact: $ 24,037.00 Lot If you have any questions, please feel free to contact me at any time via telephone or e-mail. Respectfully, Dave Easterly Project Manager / Estimator Jesse Company 253-552-1520 office, 253-377-2954cell CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via X For Your Information For review and comment Approved as Noted Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 11.15.22 Multi dwgs N/A PND As Noted NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a. We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b. We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:11.15.22 Deviation Item No. 1 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements Attached RFI 009 Response. Skewed Pile Caps Description Bainbridge Island, WA 98110 CAG-20-014 RFI 009 Response 11.15.22 Sam Berry, Colin Kuester, Alan Wyatt 1055 South Grady Way, 6th Floor; Renton, WA 98057 CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via X For Your Information For review and comment Approved as Noted Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 12.22.22 E Series N/A PND As Noted NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a. We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b. We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:12.28.22 Deviation Item No. 1 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements Attached RFI 016 Response. Conduit Sizes Description Bainbridge Island, WA 98110 CAG-20-014 RFI 016 Response 12.28.22 Sam Berry, Colin Kuester, Alan Wyatt 1055 South Grady Way, 6th Floor; Renton, WA 98057 No: 600 Winslow Way E. Suite#237 Ph (206) 317-6400 Bainbridge Island WA 98110 Fax (360) 343-0499 To:Project: Attn:Contract No: Date: Dwg# / Spec. Ref: From:XC: Subject: By: David Berry, Senior Superintendent RESPONSE: Signature: Schedule Impact: No Colin Kuester, P.E. Date of Reply: Signature: David Berry David Berry / Dalton Electric Attached please find a drawing of the conduit sizes from the Dalton Electric. They won’t fit in the voids shown in the infill panels and combined with junction boxes and pile caps being out of line Dalton is suggesting that all conduit and junction boxes be installed in the void between the outside W beam and the adjoining beam. In addition they are requesting a 6 inch core through the closure pour section of the pile cap so all the conduit runs are straight and the end for end location of the caps is not an issue. Is this concept acceptable? File - SB Cost Impact: Yes Question - Attach Sketches as Required: REQUEST FOR INFORMATION 16 12/22/2022 CAG-22-014 City of Renton / PND Engineers Coulon North Water Walk Improvements Conduit Sizes After further discussion, it is understood that there is inadequate space for the 4 conduits and the junction box for the lighting conduit in the space provided. The following changes are acceptable: 1. The light pole conduit may be moved on the South Walk to the next bay north, between two girders. 2. This move will require new mountings on the bottom flanges of the girders, 1/2" thick tab plates with 1/2" holes for Dalton to provide unistrut or other secure mount for conduit. Tabs shall be welded before galvanizing. Penetrations will also be required in the end plates and diaphragms. See attached sketches and submit changes to shop drawings for review. 3. The light pole conduit move will also require coring through the pile cap at each bent on the South Walk. Provide a 2 1/2" or 3" hole as required, at the elevation of conduit mounting to allow for straight runs as possible. See figure attached. 4. The three remaining conduits on the South Walk shall be routed through the design space. Adding bends and routing around any conflicting pile caps is acceptable. See figure attached. 5. All mountings shall remain 6 ft max spacing per design. 6. West Walk shall only have 2 conduits, and there is more space between the waler and outermost girder. It is also known that some pile caps on the West Walk are further out of design location. Modifications may be required, to be assessed at a later date. Unistrut supports for transverse conduit routings between Bents 19 and 20 (shown on 3/U1.02) may be replaced with tabs similar to #2 above, or with girder web penetrations, provided support every 6 ft max. 12/28/22 0'-2 3/8" 0'-6" 0'-2" 0'-1 7/8" 0'-2" 0'-2" 0'-1 7/8" 0'-2 3/8" Verify hole size with electrical 0'-10" 18" SHALLOW STRUT (7/8") PLACED STARTING 18" FROM CONCRETE CAP ON EACH SIDE, 18" EACH SIDE OF ELECTRICAL FIXTURE, AND MAXIMUM OF EVERY 10' SEPARATION ON INSIDE OF STRINGER BASE. DALTON WILL PROVIDE CROSS BRACE CONDUIT AND JUNCTION BOX SUPPORT. MAX 10' MAX 6 FT LIGHT POLE CONDUIT PENETRATION NO LONGER REQUIRED MOUNT TAB PLATES LEVEL WITH OR ATOP BOTTOM FLANGES No: 600 Winslow Way E. Suite#237 Ph (206) 317-6400 Bainbridge Island WA 98110 Fax (360) 343-0499 To:Project: Attn:Contract No: Date: Dwg# / Spec. Ref: From:XC: Subject: By: David Berry, Senior Superintendent RESPONSE: Signature: Question - Attach Sketches as Required: REQUEST FOR INFORMATION 09 11/15/2022 CAG-22-014 City of Renton / PND Engineers Coulon North Water Walk Improvements Skewed Pile Caps Colin Kuester, P.E. Date of Reply: Signature: David Berry David Berry A number of the pile caps are skewed up to 9 inches out of square with the water walk. We can square the cuts on the caps but that may result in the cut on one side being only 2 inches into the cap and the other side being as much as 11 inches. Is that acceptable? If the panels are fabricated to the skew the connecting holes will have to be enlarged to accommodate the bolts through the caps being at an angle. Please provide direction regarding how best to deal with the skewed caps. File - SB Some extent of skew cutting is permissible, but not to the extent that stringers would only have 2" of bearing on the cap. 6" of bearing is ideal, as reflected on the drawings, but 4-5" would be acceptable if necessary. It is expected that some of the steel frame fabrications would be made to fit such caps to ensure stringer bearing on the caps. Also note that the rebar within the top of the cap must be preserved. So it is expected that cuts may be squared a bit, but not to the extent noted here for worst case. The survey did not indicate caps out of square to this extent. Please submit as-built geometry for review. 11/15/22 CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via X For Your Information For review and comment Approved as Noted Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 01.04.23 U1.02 dwg N/A PND As Noted NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a. We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b. We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:01.04.23 Bainbridge Island, WA 98110 CAG-20-014 RFI 017 Response 01.04.23 Sam Berry, Colin Kuester, Alan Wyatt Attached RFI 017 Response. Unistrut Detail Description Deviation Item No. 1 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements 1055 South Grady Way, 6th Floor; Renton, WA 98057 No: 600 Winslow Way E. Suite#237 Ph (206) 317-6400 Bainbridge Island WA 98110 Fax (360) 343-0499 To:Project: Attn:Contract No: Date: Dwg# / Spec. Ref: From:XC: Subject: By: David Berry, Senior Superintendent RESPONSE: Signature: Unistrut Detail 3, U1.02 Cost Impact: No Question - Attach Sketches as Required: REQUEST FOR INFORMATION 17 1/4/2023 CAG-22-014 City of Renton / PND Engineers Coulon North Water Walk Improvements Colin Kuester, P.E. Date of Reply: Signature: David Berry David Berry / Dalton Electric Sheet U1.02 detail 3 calls for welding a 1 5/8 in Unistrut to the bottom flange of the H beams where conduits cross the stringers. I assume this is intended for bents 19/20 where the electrical is crossing from the west side of the walk to the east side to serve the light poles on the north end of the west walk. In a recent project meeting reference was made to avoid mounting electrical below the H beams. Is it permissible to eliminate the Unistrut shown for conduit cross over in detail 3 and substitute 3 inch holes in the web of the H beams? File - SB Sheet U1.02 detail 3 Proposed change is acceptable provided that 3-inch holes are centered on the webs. Show on review shop drawings. Note that conduit must still be supported/affixed every 6 ft max. 1/4/22 CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via For Your Information For review and comment Approved as Noted X Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 11.30.22 05 50 00 MCN PND NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a.We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b.We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:12.09.22 Deviation Item No. 1 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements Attached Sub. 024.1_r1 - Structural Steel Drawings: Make Corrections Noted (no resubmittal required). See attached for notes. Structural Steel Drawings-South Leg Description Bainbridge Island, WA 98110 CAG-20-014 Sub. #024.1 Revised 12.09.22 Sam Berry, Colin Kuester, Alan Wyatt 1055 South Grady Way, 6th Floor; Renton, WA 98057 600 Winslow Way E. Suite#237 Bainbridge Island WA 98110 Phone 206.317.6400 Fax 360.343.0499 www.redside.biz 1 of 1 S UBMITTAL R EVIEW T RANSMITTAL CONTRACTOR INFORMATION: PROJECT INFORMATION: NAME: Redside Construction PROJECT NAME: Gene Coulon Beach Memorial Park North Water Walk Improvements ADDRESS: 600 Winslow Way E. #237 SUBMITTAL NO.: #24.1 Bainbridge Island WA 98110 DATE: 11/30/22 Subcontractor/Supplier: Jesse Co. Check: ☐ Original Submittal ☒ Re-submittal ☐ Other Item No. Specification Reference Description Other 1 05 50 00 South Walkway Shop Drawings_Rev1 Contractor certifies to Review of Submittal, Verification of Field Measurements and Compliance with Contract Documents unless noted otherwise in the Submittal. Review action: ☐ No Exceptions Taken ☐ Rejected ☐ Submit Specified Item ☐ Revise and Re-Submit ☐ Make Corrections Noted (Resubmittal not required) Comments: By: Date: Cc: X See comments on attached sheets. Verify dimensions per survey. Redside to verify dimensions for all handrails and light pole bases. 12/8/22 JESSE COMPANY 1840 Marine View Drive TACOMA, WA 98422 (253) 922-74533 Letter Of Transmittal [Page 1 ] Date: 11/30/2022 To: Redside Construction Attn: David Berry Ph. Re: Gene Coulon Memorial Park South Walkway Framing Rev.B approvals Fx. Item Qty Dwg/Doc No. Description 1 2pg.s E1, E2 Rev.A South Walkway Plans and Details 2 19pg.s 101-1&2Rev.B, 106-1Rev.B, 107-1Rev.A 108-1&2Rev.B, 110-1&2Rev.B, 111-1Rev.B, 113-1&2Rev.B, 114-1&2Rev.B, 115-1&2Rev.B, 116-1&2Rev.B, 1001Rev.B, 1002Rev.B South Walk welded Frame 101A South Walk MC Ledger 106A South Walk Transition plates and Rubber pad South Walk welded Frame 108A South Walk welded Frame 110A South Walk welded abutment Frame 111A South Walk welded Frame 113A South Walk welded Frame 114A South Walk welded Frame 115A South Walk welded Frame 116A South Walkway Cut Sheets 3 THESE ARE TRANSMITTED as checked below: [X] Submitted For Approval [] For Your Use / File [] As Requested [] For Review & Comment [] Other/Remarks: BY: Dave Easterly cc File JESSE COMPANY Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly IT REMAINS UNCLEAR WHY THESE VARY, BUT PND CONFIRMS THAT THESE AVERAGE A 3/16" EXTRA GAP PER BENT. NO EXCEPTION. EXISTING IS NOT CONCRETE AT IVAR'S, BUT TRANSITION PLATE ATTACHMENT IS NOT BY JESSE. OK. VERIFY PER SURVEY. SURVEY IS UNCLEAR WHETHER LINE LABELED "EXPANSION JOINT" IS POINTING AT NWW OR IVAR'S DECK. SHOULD BE APPROXIMATELY 1'-4.5" OR 1'-2.5" DEPENDING. IT IS UNKNOWN IF LIGHT POLES LAND ON BENTS 4 AND 7, AND IT IS UNKNOWN IF THEY CAN BE REINSTALLED ON THE CAPS. CONSIDER MOVING ~2FT TO ADJACENT FRAME TO STANDARDIZE DETAIL. PND CONFIRMS THAT EACH OF THESE VALUES IS THE SURVEYED CLEAR SPAN PLUS 3 FT. OK TO USE HDG PLATE, 1/4" X 8" WITH FULL-LENGTH STIFFENER 1/4" X 3" TO PREVENT WARPING DURING SPRAY METALIZING OF TOP SURFACE. ATTACH WITH SELF-TAPPING SCREWS OR THRU-BOLTS TO STUB STRINGER FLANGES. GRATING OVERHANG NOT REQUIRED. HDG WITH SPRAY- METALIZED NON-SKID SURFACE OK. INCLUDE 1/4" X 3" STIFFENER TO PREVENT WARPING. 1/2" TO PROVIDE SPACE FOR TRANSITION PLATE STIFFENER JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify VERIFY ALIGNED IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly OK NO CONCRETE AT IVAR'S. MUST ATTACH TO W10 SPACER BEAMS THROUGH GRATING. ADJUST HOLES TO MATCH BEAMS, TWO CONNECTIONS PER BEAM. PROVIDE WITH NON-SLIP SURFACE PER DWG G1.03 PROVIDE WITH NON-SLIP SURFACE PER DWG G1.03 NO CONCRETE. FASTEN TO STEEL BEAMS AND PROVIDE TEFLON SLIDE STRIP ON IVAR'S SIDE. TYPE 316 JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. VERIFY ATYPICAL HANDRAIL SPACING. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly VERIFY. APPROXIMATELY 1'-4.5" FROM EDGE OF CAP TO "EXPANSION JOINT" ON SURVEY. NOT CLEAR IF THIS IS ON WATER WALK OR EDGE OF IVAR'S. OK. MAINTAIN APPROX. 2" CLEAR, BUT VERIFY OVERALL LENGTH OF W10'S PER SURVEY. VERIFY PER ABOVE VERIFY PER ABOVE VERIFY PER ABOVE JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly Verify Verify Verify IT APPEARS THAT THE HANDRAIL SPACING IS INTENDED TO BE 7'-6". REDSIDE TO VERIFY THAT DISASSEMBLED HANDRAIL PIECES WILL FIT WITH FABRICATED PIECES WHERE MULTIPLE HANDRAIL POSTS LAND ON SINGLE FABRICATED FRAME PIECE. SOME TOLERANCE IS ACCEPTABLE WHERE HANDRAIL PIECES HAVE SLIDING JOINTS. THIS NOTE APPLIES FOR ALL FRAMES. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly FABRICATOR TO HOLD PIECES AS NEEDED ON THIS SHEET FOR WEST WALK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK Issued for Approval JESSE COMPANY 11/30/2022 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 12/08/22 As Noted 204013 4 CK CITY OF RENTON Parks and Recreation Department Parks Planning and Natural Resources TRANSMITTAL LETTER To Transmittal No. Address Date Copy to Contract #Routing Sent Received Project Title Contractor X Owner X X Contractor Consultant X X Owner X X Contractor X X Attached Under separate cover via For Your Information For review and comment Approved as Noted X Returned for corrections Request for Information Remarks: Date Spec. Section Rev. Action Reviewer Comments 01.06.23 05 50 00 A&R PND 01.06.23 05 50 00 SI PND 01.06.23 05 50 00 SI PND 01.06.23 05 50 00 MCN PND NET - No Exceptions Taken; MCN - Make Corrections Noted; A & R - Amend and Resubmit; R - Rejected; RA - Receipt Acknowledged ; SI - Submit Specified Item a. We have verified that the material or equipment contained in this submittal meets all the requirements, including coordination with all related Work , as specified, no exceptions. b. We have verified that the material or equipment contained in this submittal meets all the requirements specified, except the attached deviations. Submitted by:Betsy Severtsen Date:01.20.23 Deviation Item No. 1 2 4 3 No. Redside Construction LLC Karen McCarthy Redside Construction LLC 600 Winslow Way E. Suite #237 Coulon North Water Walk Improvements Attached Sub. 024.3 - Structural Steel Drawings - West Leg: Make Corrections Noted (no resubmittal required), for majority of submittal. Also Submit Items, and Revise and Resubmit. See attached for detailed notes. Float Brace Drawings Step Supports - Bent 23 All other Structural Steel Drawing Components-West Leg Bollard Connections - Bent 19 & 20 Description Bainbridge Island, WA 98110 CAG-20-014 Sub. #024.3 01.20.23 Sam Berry, Colin Kuester, Alan Wyatt 1055 South Grady Way, 6th Floor; Renton, WA 98057 600 Winslow Way E. Suite#237 Bainbridge Island WA 98110 Phone 206.317.6400 Fax 360.343.0499 www.redside.biz 1 of 1 S UBMITTAL R EVIEW T RANSMITTAL CONTRACTOR INFORMATION: PROJECT INFORMATION: NAME: Redside Construction PROJECT NAME: Gene Coulon Beach Memorial Park North Water Walk Improvements ADDRESS: 600 Winslow Way E. #237 SUBMITTAL NO.: #24.3 West Walkway Shop Drwgs, Bainbridge Island WA 98110 DATE: 1/6/2023 Subcontractor/Supplier: Jesse Co. Check: ☒Original Submittal ☐Re-submittal ☐Other Item No. Specification Reference Description Other 1 05 50 00 West Walkway Shop Drawings Contractor certifies to Review of Submittal, Verification of Field Measurements and Compliance with Contract Documents unless noted otherwise in the Submittal. Review action: ☐No Exceptions Taken ☐Rejected ☐Submit Specified Item ☐Revise and Re-Submit ☐Make Corrections Noted (Resubmittal not required) Comments: By: Date: Cc: X Resubmit float brace drawings. Submit drawings for step support at Bent 23 and bollard connections at Bents 19 and 20, when available. Remainder of components may proceed with marks noted on individual sheets. Reference review stamps on individual sheets. 1/20/23 From:Dave Easterly To:Sam Berry; David Berry Cc:Karen McCarthy Subject:West Walkway Frame submission Date:Friday, January 6, 2023 3:49:08 PM Attachments:West Walkway approvals Rev.A.pdf West Walkway approval drawings.pdf Sam, David Attached are the West Walkway Frame approvals. Please review the Redside clouded notations and response, issue to PND for approval. As you will see, every W10 stringer has a piece mark of its own because of the existing Pile Cap conditions being skewed. This required about double drawing quantity than would have been required if the Pile Caps were square and equal in spacings such the Plan drawings indicate. Thus every W10 has its own miter end cuts and variation in length which I hope you can understand will require additional labor to process and fabricate verses square cut ends. I continue to receive extra Detailing expenses for the development of each complex frame and will track the extra labor time for W10 stringer processing caused by the existing site conditions. I would hope PND and the City of Renton would be accepting of these additional requirements and accept our future proposal for unforeseen project expenses. Dave Easterly Project Manager Cell: (253) 377-2954 Please provide an accounting when possible. The drawings look excellent and demonstrate how short the as-built conditions came from uniform construction. It's better to sort the dimensioning now that it would be to try to field-fit. JESSE COMPANY 1840 Marine View Drive TACOMA, WA 98422 (253) 922-74533 Letter Of Transmittal [Page 1 ] Date: 1/6/2023 To: Redside Construction Attn: David Berry Ph. Re: Gene Coulon Memorial Park West Walkway Framing Rev.A approvals Fx. Item Qty Dwg/Doc No. Description 1 2pg.s E3-1Rev.A, E3-2Rev.A, E3-3Rev.A West Walkway Plans, Sections and Details 2 57pg.s 102-1 thru 3 Rev.B 103-1 thru 3 Rev.B 104-1 thru 3 Rev.B 105-1 thru 3 Rev.B 109-1 thru 3 Rev.B 112 Rev.B 117-1 thru 3 Rev.B 118-1 thru 3 Rev.B 119-1 thru 3 Rev.B 120-1 thru 3 Rev.B 121-1 thru 3 Rev.A 122 Rev.B, 123 Rev.B, 124 Rev.A 125Rev.A, 126 Rev.B, 127 Rev.A 128-1 thru 3 Rev.A, 129-1 thru 3 Rev.A 130-1 thru 3 Rev.A 131 Rev.A, 132 Rev.A, 133 Rev.A 134 Rev.A, 135 Rev.A 136-1&2 Rev.A 137-1&2 Rev.A 138 Rev.A West Walk Frame 102A Plan & Sections West Walk Frame 103A Plan & Sections West Walk Frame 104A Plan & Sections West Walk Frame 105A Plan & Sections West Walk Frame 109A Plan & Sections West Walk Rubber Pads West Walk Frame 117A Plan & Sections West Walk Frame 118A Plan & Sections West Walk Frame 119A Plan & Sections West Walk Frame 120A Plan & Sections West Walk Frame 121A Plan & Sections West Walk Ledgers & Waler Supports West & North Picnic Struts, WT Struts, Trans.Plates West Walk frame 128A Plan & Sections West Walk Frame 129A Plan & Sections West Walk Frame 130A Plan & Sections West Walk Waler Channels West Walk Waler Channels West Walk Gangway Bumpout Frame 136A West Walk Triangular Frame 137A West Walk Frame 138A at Pilot House 3 1001 Rev.2, 1002 rev.1, 1003 Rev.A 1004 Rev.A Cut Sheets THESE ARE TRANSMITTED as checked below: [X] Submitted For Approval [] For Your Use / File [] As Requested [] For Review & Comment [] Other/Remarks: BY: Dave Easterly cc File JESSE COMPANY Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly 25' - 4 7/8"25' - 4 5/8"30' - 1" PND NOTED MINIMAL DIFFERENCES IN THE CENTERLINE SPAN LENGTHS ON 3 SPANS. THEY ARE NOTED HERE. 8'-0" spacing acceptable to avoid concrete panels and maintain existing number of connection points. OK PILE CAP FACE? LOOKS OK. REDSIDE TO VERIFY THAT THE GANGWAY LANDING REMAINS IN EXISTING LOCATION. RECALL: SOME WELDS CALLED OUT AS FIELD WELDS ON DESIGN DRAWINGS TO ALLOW FOR INSTALLATION FLEXIBILITY OF RIGID TRIANGULAR FRAME ATTACHED TO TWO SEPARATE FRAMES. MAY PROVIDE ADDITIONAL WELDS AS FIELD WELDS IF REQUIRED, WITH PND APPROVAL. WE WILL HAVE TO FIELD DESIGN A CONNECTION TO THE CONCRETE PILE CAP USING THREADED INSERTS, OR REUSE EXISTING INSERTS IF PRESENT AND PRESERVED AFTER SAW CUTS. OK PILE CAP FACE? PROVIDE SIM. WT CANTILEVER BEAM WITH SIM. END PL TO SUPPORT END OF STEP AND WALER. CJP WELD TO CONNECTING WT. SUBMIT DETAIL FOR REVIEW JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK OK. PROVIDE SEPARATE SUBMITTAL LATER. Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK OK OK OK, ONLY 6" REQUIRED JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK CUT INCREASED APPROX. 1/2? OK. OK FIELD CUT OK, REPAIR COATING END TRANSITION PLATE HERE, AT EDGE OF INFILL TRIANGLE GRATING. END TRANSITION PLATE AT EDGE OF GRATING REF END CUT CONDITIONS SHOWN BOLTED CONNECTIONS OK INSTEAD OF WELDS OK. REDSIDE: NOTCH RPL TO ACCOMMODATE GRATING BELOW AT BEARING PL 5'-3" PER DESIGN. OK IF ALTERED TO FIT EXISTING CAP LOCATION JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK TO HAVE 3 SPACES AT 8'-0" JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK OK OK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly YES, ELEC CONDUITS WILL RUN BETWEEN OUTSIDE STRINGER AND WALER JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK OK OK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly YES, CONDUIT WILL CONTINUE NORTHBOUND OUTSIDE PILE CAPS JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly 3 SPACES AT 8'-0" OK PROVIDE HOLES THROUGH CENTER OF STRINGERS. REDSIDE TO PROVIDE LOCATIONS. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly NO, BUT 1/2" CLEARANCE TO HANDRAIL CONNECTION MAY BE INCREASED TO ALLOW FOR MORE TOLERANCE. PURPOSE OF ANGLE IS GRATING SUPPORT. 8", TYP. OK 8", TYP. OK OK PND AGREES. FIELD WELDING ACCEPTABLE DUE TO SKEW OF CAPS AND DIFFICULTY SHOP FABRICATING TO FIT. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly YES. EXTEND TO COVER VOID FROM SAW CUT. JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly ORIENT ANGLE WITH CORNER UP SIM TO EXISTINGMORE WELD BETWEEN GUSSET AND BRACE IS REQUIRED. PROVIDE GUSSET AS SHOWN IN DRAWINGS, OR OPTIONALLY EXTEND BRACE TO END PL SEE DETAILS PROVIDED IN RFI 12 TO REDSIDE BOLT OK, PROVIDE QTY FOR FLOAT ATTACHMENTS, TOO A53-B REQUIRED, A500-B OK BUT MAY REQUIRE HSS 5.563X0.375 OR X0.5 SPEC INSTEAD OF PIPE 5XS JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly ORIENT ANGLE WITH CORNER UP SIM TO EXISTING SEE SIM COMMENT SHT 124 SEE DETAILS PROVIDED IN RFI 12 TO REDSIDE OK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly OK JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly REDSIDE TO NOTCH WALER SO GRATING CAN REST ON SUPPORT PLATE. OK OK BOLTED CONNECTIONS OK OK SUPPORT PLATE EXTENT OKYES, WALERS TO BE TRIMMED AT SUPPORT PLATE LOCATIONS PROVIDE ~1/2" SHORTER TO ALLOW FOR SEAL WELDED END PLATES EACH END PER B/S1.09 OK OK OKJOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK Issued for Approval JESSE ENGINEERING CO. 1/6/2023 Dave Easterly JOB NO. DATE ______REVIEWED ______RESUBMIT ______REFERENCED CHECKED BY PND ENGINEERS, INC. Checking is only for general conformance with the design concept of the project and compliance with the information given in the contract documents. Contractor is responsible for dimensions and quantities to be confirmed and correlated at the job site, for information that pertains solely to the fabrication processes or to the techniques of construction, and for the coordination of the work of all trades. 01/20/23 As Noted 204013 4 CK