HomeMy WebLinkAboutMFP23001696.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP23001696
IVR Number: 23001696
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/02/2023Application Date:1023059124Parcel Number: 1075 DUVALL AVE NE
Permit Type:04/03/2023Issue Date:Franchise
Permit Work Class:04/02/2024Expiration Date:Major Utility
Job Number: 101158468Franchise Type:Electric
Description: Puget Sound Energy Electric CRFEW TO REPLACE FUSES AT 10 POLES. CREW TO SWAP CIRCUITS ON 318109
167464. CREW TO REPLACE EXISTING #6 COPPER WITH #2 ACSR FROM 318502 167128 TO 318502 167191 TO
TOTAL APPROX 650'. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
RENTON SCHOOL DISTRICT NO 4 300 SW 7TH ST
RENTON , WA 98057
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101158468
1075 DUVALL AVE NE
KEVIN CHUNG 206-383-9700
MFP23001696
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 4/3/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
318502-167128318503-167140318502-167163UNION AVE NETACOMA AVE NENE 10TH STVASHON AVE NE
STO
P
FLAGGER STOP
FLAGGER
15 15 1818W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD
WORK
AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4 200'200'200'ROADWORKAHEADW20-1 W20-7ABEPREPAREDTOSTOPW3-4200'200'200'ROADWORKAHEADW20-1ROADWORKAHEADW20-1161611111111STOPFLAGGER STOPFLAGGER PLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
RESIDENT(S) WILL BE INFORMEDOF TEMPORARY DRIVEWAYCLOSURETEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com1 OF 21075 Duvell Ave NE, Renton, WA0 1192302503/17/2023Puget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001696
318502-167163318502-167191318500-167202NE 10TH STANACORTES
CT NE
VASHON AVE NE
161618 18 W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROAD
WORK
AHEAD W20-1ROADWORKAHEADW20-1 STOP
FLAGGER
1818W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1STOPFLAGGER
STO
P
FLAGGER 1420PLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
RESIDENT(S) WILL BE INFORMEDOF TEMPORARY DRIVEWAYCLOSUREProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVKali-Jamal Collins424-425-6425Kali-jamal.collins@pse.com2 OF 21075 Duvell Ave NE, Renton, WA0 1192302503/17/2023Puget Sound EnergyTraffic Control Supervisor:Jamal I. CollinsCard No. 013375Card Exp. 10/2026Kali-Jamal.Collins@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001696
4107
4108
970
960
4212
42064120
4100
4102
4229
4217
4221
4115 4213
4225
4123
4117
4116
41084100
4123
4124
4130
4202
4201
907
913
4225
4224
4219
4218
919
4217
4216
4208
4225
4224
4313
961
955 950
4124
4132
4125
4233 4307
4316
4308
4232
973
967
4300
4306
4312
4318
4209
4112
4104
4107
950UNION AVE NENE 9TH PL
VASHON PL NEVASHON AVE NENE 10TH ST
NE 10TH STNE 9TH CT
CØAGF816
CØAFY813
AØEHW312BØEHW313CØEHW314
CØAFY810
CØAFY811
AØ25756
AØACT591 J(105020822)
(101059667)
(593147015)
SLAH3606
SLAH3607
40TCK00366
??UNK
100TX11307
15TT80707
25TX12082
100TX766
40TUNK
0
318495-167212
318478-167205
318502-167120
318457-167158
318500-167202
318460-167181
37.5kVA 120/240V
37.5kVA 120/240V
37.5kVA 120/240V
37.5kVA 120/240V
75kVA 120/240V
45kVA 120/208V
15kVA 120/240V
15kVA 120/240V
50kVA 120/240V
15kVA 120/240V
50kVA 120/240V
25kVA 120/240V15kVA 120/240V
318453-167199 D
D
D
318509-167123
318486-167123
318464-167124
318502-167163
318502-167177
318518-167171
318502-167191
318503-167140
318471-167142
318502-16712817\4
318458-167130
318472-16712817/5
318519-167129
318502-167191
D2305E040, R2305E038, A2305E038No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
02-22-2023
Scale 1:1012
Lat\Long=47.4989, -122.1629
318502-167191
ADDRESS: 1075
DUVALL AVE NE,
RENTON WA, 98059
CREW TO REPLACE
FUSES AT
MULTIPLE
LOCATIONS AND
REPLACE OH
CABLE RUN
NOTIFICATION
11923025
WORK ORDERS
101158468
108144661
593250141
FUSES:
1) UPGRADE X7542 40TS @ GRID 318543-167456 TO A 65TS (3) CA AFF855-56-57
2) UPGRADE X11856 65T @ GRID 318503-167316 TO A 40T CA AFE368
3) UPGRADE X12082 25T @ GRID 318502-167191 TO A 40T CA AFY810
4) UPGRADE UNK 25T @ GRID 318501-167438 TO A 40T CA ACG524
5) UPGRADE UNK 25T @ GRID 318569-167455 TO A 40T CA ADG127
6) UPGRADE UNK 40TS @ GRID 318442-167457 TO 65T’S
7) UPGRADE X9687 40T’S @ GRID 318421-167456 TO SOLID BLADES AND CHANGE SW TO T9687 CA
AEH022-23
8) UPGRADE UNK 65TS @ GRID 318500-167267 TO SOLID BLADES CA 53460-53456-53455
9) UPGRADE X11307 100TS @ GRID 318502-167191 TO SOLID BLADES CA AFY807-08-09
10) UPGRADE X9688 40T @ GRID 318335-167450 TO 100T CA AEH030
ALSO:
- SWAP ABM743 UNK65T (318109-167464) FROM B=0 TO C=0 (NOT PART OF THE OUTAGE ABOVE -
SCH OUTAGE)
- REPLACE THE #6 COPPER FROM 318502-167128 TO 318502-167191 OVER TO #2 ACSR. 4 SPANS,
ROUGHLY 650 FT.
MFP23001696
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
5100
5116
5110 5122 51285104
51171050
5123
5135
5118
51125106HOQUIAM AVE NENE 11TH ST
AØAFF855BØAFF856CØAFF857
BØADD797
(105026183)
SLAK1875 SLAK1876
#2ACSRABCN #2ACSRABCN
40TX7542
318551-167471
2
25kVA 120/240V
25kVA 120/240V
D D
318543-167456
318524-167456
318543-167456
D2305E040, R2305E037, A2305E037No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.5007, -122.151
318543-167456
FUSE 1)
UPGRADE X7542
40TS @ GRID
318543-167456 TO A
65TS (3) CA
AFF855-56-57
MFP23001696
1014
1008
1017
982
1001
4650
CHELAN CT NECØAFE368
(104248697)
(104248700)(104248699)
#2ACSR #2ACSR
CBAN65TX11856
318510-167305
318495-167301
2
2
3
25kVA 120/240V
37.5kVA 120/240V
10kVA 120/240V318503-167316318503-167316
D2305E040, R2305E038, A2305E038No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4994, -122.1567
318503-167316
FUSE 2) UPGRADE
X11856 65T @ GRID
318503-167316 TO A
40T CA AFE368
MFP23001696
4213
4229
4208
4216
42324224
967
973
43134217
4308
4209
NE 10TH STCØAGF816
CØAFY810
CØAFY811J
(101059667)CBA#6CU
25TX12082
100TX11307
318500-167202
318495-167212
37.5kVA 120/240V
37.5kVA 120/240V
50kVA 120/240V
25kVA 120/240V318502-167163
318502-167177 318502-167191318502-167191
D2305E040, R2305E038, A2305E038No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4993, -122.1621
318502-167191
FUSE 3) UPGRADE
X12082 25T @ GRID
318502-167191 TO A
40T CA AFY810
AND
9) UPGRADE
X11307 100TS @
GRID 318502-167191
TO SOLID BLADES
CA AFY807-08-09
MFP23001696
978
965
971972
973
977
966 HOQUIAM AVE NENE 10TH ST
GRAHAM AVE NE#2ACSR
#2ACSRCBAN #2ACSR25TUNK
318501-167438318501-167438
D2305E040, R2305E037, A2305E037No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4992, -122.152
318501-167438
FUSE 4) UPGRADE
UNK 25T @ GRID
318501-167438 TO A
40T CA ACG524
MFP23001696
5103
5109 5115 5121
5108 5126 5132
5116
5110 5122 51285104
5127
5102
HOQUIAM AVE NECØAGH124
CØADG127
#2ACSRABCN#2ACSR25TUNK
40TUNK
318571-167469
318566-167477
25kVA 120/240V
37.5kVA 120/240V
37.5kVA 120/240V
318569-167455
318557-167455
318569-167455
D2305E040, R2305E037, A2305E037No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.5014, -122.151
318569-167455
FUSE 5) UPGRADE
UNK 25T @ GRID
318569-167455 TO A
40T CA ADG127
MFP23001696
904
920
901
5020
5019 5025
UNK
#2ACSRCBAN40TUNK
37.5kVA 120/240V
25kVA 120/240V
D
318441-167447
318442-167457
318459-167456
318442-167457
D2305E040, R2305E037, A2305E037No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.498, -122.151
318442-167457
FUSE 6) UPGRADE
UNK 40TS @ GRID
318442-167457 TO
65T’S
MFP23001696
861
867
876
5119
51135107
5101
51245118
NE 8TH CT
(101033564)
CO23576.00 kW
G#2ACSRCBA40TX9687
318418-167475
318405-167457
2
37.5kVA 120/240V
50kVA 120/240V
318404-167452
318421-167456
318425-167457
318421-167456
D2305E040, R2305E037, A2305E037No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4972, -122.1509
318421-167456
FUSE 7) UPGRADE
X9687 40T’S @
GRID 318421-167456
TO SOLID BLADES
AND CHANGE SW
TO T9687 CA
AEH022-23
MFP23001696
966
4420
4526
4531
4532
CHELAN AVE NEAØ53460BØ53453CØ53455
(104252338)CBAN#2ACSR
C#6CU#6CUC
25TUNK
40TX12181
65TUNK318500-167267
318504-167290
318479-167290
318500-167267
D2305E040, R2305E038, A2305E038No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4992, -122.1586
318500-167267
FUSE 8) UPGRADE
UNK 65TS @ GRID
318500-167267 TO
SOLID BLADES CA
53460-53456-53455
MFP23001696
5023
753 763
769
5010
5105
757
5017
5009
NE 7TH PL
BØADJ799
BØAEH031
BØAEH030
AØAEH025BØAEH026CØAEH027
J J
(104255899)
(101033563)
#2ACSR
BN40TX9688
NO318338-167458
318344-167467
15kVA 120/240V
37.5kVA 120/240V
318335-167450
318337-167438
318335-167450
D2305E040, R2305E040, A2305E040No gas grid information available
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
03-31-2023
Scale 1:450
Lat\Long=47.4948, -122.1515
318335-167450
FUSE 10) UPGRADE
X9688 40T @ GRID
318335-167450 TO
100T CA AEH030
MFP23001696