Loading...
HomeMy WebLinkAboutMFP23001717.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23001717 IVR Number: 23001717 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/03/2023Application Date:3211100740Parcel Number: 4307 SE 4TH PL Permit Type:04/06/2023Issue Date:Franchise Permit Work Class:04/05/2024Expiration Date:Minor Utility Job Number: 101149709Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REPLACE POLE AT P01. NO HS CUTS. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact GINCHAK SVETLANA 4307 SE 4TH PL RENTON , WA 98059 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101149709 4307 SE 4TH PL KELLY ULICNY 425-429-0949 MFP23001717 Scott Warlick CED 4/6/2023 Monday - Friday 8:00AM - 3:00PM Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 4307 SE 4th Pl Renton WA 98059 USAP0116161616STOP FLAGGERSTOPFLAGGERFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AW A Y A R E A PHONE 8 8 8 - 9 9 9 9 INFRASO U R C E L L C 0 0 0 0 0 0 0 0 0 0 NO PARK I N G NO-PARKW20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4100'100'ROADWORKAHEADW20-11313100'W20-4ONE LAN E ROAD AHEAD ROAD WORK AHEAD W20-1100'100'SE 4TH PLSE 4TH PLSE 4TH PLCHELAN AVE SEANACORTES AVE SESE 4TH STSE 4TH PLTEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVQyumin Parungao425-424-6658qyumin.parungao@pse.com1 OF 14307 SE 4th Pl, Renton, WA, 980590 11637013 02/27/2023Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYMFP23001717 Owner / Developer Contact InfoofficeATTN:PSE--KELLY ULICNY425-429-0949THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PHONECABLE TV11637013 101149709N/A 593244923N/A 594153704N/A N/AN/A N/AN/A 108137700PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 2/7/23A. HANCOCK 703-623-8120 2/7/23...H. MORENO 619-869-3711 2/7/23N/A RENTONPRE-13 REPL 1 POLEDISTRIBUTION POLE REPLACEMENT4307 SE 4TH PL, RENTON, WA 98059ASPLUNDH CONSTRUCTIONN/A N/AN/A 101149709AS NOTED 1 OF 1KING N/A N/A QCNOKESW15-T23N-R05E N/A N/A2305E059 2305E088 2305E059 PRE-13COMCAST...........E-Mail:Cell Phone:Project Manager Contact Information:Manager:KELLY ULICNY425-429-0949KELLY.ULICNY@PSE.COM......101149709 PRE-13 REPL 1 POLEDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILESITE PLAN1" = 50' POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 317719-167194 40 3 1967POLE TABLE (NEW)Site#Pole DataGrid #HeightClass Year Remarks / Location Ref.P01 317719-167194 45 3LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONGeneral- Return removed materials to the local storeroom or PSE storeroom.OVERHEAD CONSTRUCTIONPoles & Structures- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers.UNDERGROUND CONSTRUCTIONExcavation-Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of 36” of cover forprimary conductors and 24” of cover for secondary conductors.-Road crossings and all trenches within the Right-of-way shall be of sufficient depth to provide a minimumof 36” of cover for all conductors or as required by the permitting Agency.-All conductors/conduits shall have a minimum of 3” of bed and 3” of clean sand cover.-No rocks larger than 6” shall be included in backfill.-Backfill in road crossings and within the Right-of-way shall be compacted to 95% density or as requiredby the permitting Agency.-Restore all excavated areas to original condition.P01: 317719-167194(Avg. Span = 122', Angle = 11°)GRID # INCORRECT IN FIELD-EX 40' CL 3, 1967 POLE TO BE REPLACED-INST 45' CL 3 (PD453) 6010.1000-INST 1Ø DBL PTP #2ACSR (ANG112) 6031.1020-TRANSFER 1Ø #2ACSR PRI & NEUT (E/W)-RM EX RISER-INST 3" RISER (RIS3CSS) 6042.1000-TRANSFER OH TPX SEC-TRANSFER 4/0 UG TPX SVC (SW); EXTEND AS REQ'D-ACTUAL 4/0 UG TPX ADDED L=_________ BATCH YEAR_________-ACTUAL TRENCH L=_________-RM EX DG (S)-INST 3/8" PRI & NEUT DG (GYD3SA)(GYD3SAN) 6013.0100 TO EX ANC-INST ANC ROD EXTENSION (9997938)-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERREDNVicinity MapN.T.S.CLCONDUIT RISER PLACEMENT DETAILTOP VIEWNOT TO SCALE. MOREN2/15/232/15/232-812-1292-24XXRESTORATION PER CITY OF RENTON STANDARDSMFP23001717