HomeMy WebLinkAboutFR - 061.pdfCity of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT Field Report No. FR-061 CAG-22-013 Site Date/Time:4/12/2023 10:00 Kiwanis Park Improvements Project Location:Kiwanis Park To:Vern Orr, TDI Copy To:File Chris Polk, TDI Jonathan Chavez, COR Michael Faulkner, BDA Sherryl Sales, BDA Jarod Emerson, TDI Pat Decaro, COR Weather/Temperature:Most. Sunny 520 Alan J. Wyatt, COR PPNR Meeting:TDI Site Conditions:Workable Areas Contractor:Terra Dynamics, Inc. Item:Observations/Remarks:Action/Status: 1 Storm water drainage extension completed, placement of structures and pipe behind TDI ballfield on west property. Existing structure to have a solid lid placed on top. Area being prepared for dugout concrete work. Berm required rough grading for final placement and height. 2 Site area prepared for sodding, pending acceptable weather conditions for sod placement.TDI 3 Benches placed at pads and playground area. Site furnishing locations to be verified by BDA/COR BDA and COR for final placement. Benches to be cleaned, bolts cut to flush. 4 Concrete pads for site furnishings, walks, utility pads, and other concrete work to be TDI/Caliber Concrete completed. Concrete sub not on site. TDI to confirm schedule for concrete work. 5 Drainage structures, vault boxes, and irrigation valve boxes are being adjusted to TDI finish grade in preparation for sodding. 6 Irrigation sleeve and pipes installed in parking lot for parking lot island irrigation.TDI 7 Portland Loo base footing ready for concrete placement. Electrical and plumbing work TDI completed for setting Portland Loo structure. 8 Drainage structure lid to be adjusted to accommodate mow strip and decorative fence TDI at north side of walk entrance. Bollards have been roughed in for placement. 9 Zip Line playground equipment damaged area to be confirmed with TDI on resolution. TDI 10 South end of retaining wall to be checked for alignment, complete mow strip and fence. TDI 11 North end of Union Avenue, electrical connection complete, continue with walk prep. TDI 12 ADA accessible ramp on east side of Union Ave. to be completed during school vacation.TDI/Caliber Concrete 13 Demolition final inspection by COR, TDI to coordinate - extension permit expires 5/1/2023 TDI/COR 14 Coordinating with COR Parks Maintenance on north natural area, tennis court, pad clean.COR We believe the above record to be an accurate summary of decisions and related discussions. We would appreciate notification of exceptions to this record within ten (10) days of receipt. Failing such notification, we will consider this a statement of fact with which you concur. Alan J. Wyatt 4/12/2023 Submitted by:Date: Present at Site/ April 12, 2023Date: Contract No. Project Name: City of Renton 1055 S. Grady Way Renton, WA 98057 1 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 1 BALLFIELD DUGOUT AREA Installation of storm drainage extension completed in area. Area ready for concrete forming and placing for dugouts. 2 SITE STORM DRAINAGE EXTENSION Photo shows new drainage manhole for storm drainage connection. In foreground, existing inlet structure to have solid lid installed. City of Renton 1055 S. Grady Way Renton, WA 98057 2 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 3 SITE STORM DRAINAGE EXTENSION Photo shows the area at west planting bed and west park property line with new storm drainage manhole and pipe installed. Storm drainage connected to neighborhood drainage. 4 BALLFIELD DUGOUT AREA Rough grading and aggregate base placement for dugouts. Berm rough graded. City of Renton 1055 S. Grady Way Renton, WA 98057 3 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 5 SITE BALLFIED AREA Area rough graded with berm and coverage of drainage pipe. Ready for dugout and bleacher area forming. 6 BASKETBALL AREA Benches placed at seating area next to basketball court. Fine grading and compost placement in areas around basketball court. City of Renton 1055 S. Grady Way Renton, WA 98057 4 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 7 SITE BENCH PADS Photo show concrete crack in acute angle of concrete pad. 8 SITE - NORTH AREA TRAIL Drainage manhole covers and irrigation vault boxes adjusted to finish grade. Area prepared for sodding. City of Renton 1055 S. Grady Way Renton, WA 98057 5 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 9 SITE ELECTRICAL SERVICE Preparation for electrical cabinet concrete pad. 10 PARENT PLAZA PORTLAND LOO Preparation for forming Portland Loo Restroom structure base. Electrical and plumbing ready to receive Portland Loo structure. City of Renton 1055 S. Grady Way Renton, WA 98057 6 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 11 PARENT PLAZA Site furnishings placed around parent plaza area. Ready for review by BDA and COR for final placement and installation. 12 SITE IRRIGATION Photo shows a 2.5 and 3-inch irrigation lines. Concrete thrust blocks to be placed at 2.5 and 3" locations. City of Renton 1055 S. Grady Way Renton, WA 98057 7 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 13 SITE SITE FURNISHINGS Benches have been placed around site at pads and around playground area. Furnishings to be cleaned and bolts to be flush to final finish. 14 SITE UTILITY VAULTS Utility vault concrete pads to be placed around utility vaults, flush to finish grade. Vault Enclosures to be placed around utilities. City of Renton 1055 S. Grady Way Renton, WA 98057 8 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 15 SITE DRAINAGE Drainage manhole structure and lid to be placed at finish grade. Drainage manhole lid to be adjusted to avoid conflict with mow strip and decorative fence. 16 SITE DRAINAGE Drainage manhole structure and lid to be placed at finish grade. Drainage manhole lid to be adjusted to avoid conflict with mow strip and decorative fence. City of Renton 1055 S. Grady Way Renton, WA 98057 9 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 17 UNION AVENUE SOUTH WALL Contractor to check alignment and level of retaining wall connection at south end. Appears to slope inward to planter. 18 UNION AVENUE DECORATIVE FENCE Fence alignment to be checked for level and consistent top placement. City of Renton 1055 S. Grady Way Renton, WA 98057 10 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 19 UNION AVENUE NORTH END Electrical connection completed by PSE, sidewalk preparation in-progress. 20 SITE PARENT PLAZA/ SOUTH AREA Existing concrete pad with new picnic tables. Coordination with Parks Maintenance to power wash existing pad. City of Renton 1055 S. Grady Way Renton, WA 98057 11 City of Renton Parks and Recreation Parks Planning and Natural Resources FIELD REPORT 21 BALLFIELD DUGOUT AREA Photo shows placement of compacted aggregate for dugout pad, coverage over storm drainage extension. 22 PARKING LOT Trenching and placement of sleeves and pipe for parking lot island irrigation. City of Renton 1055 S. Grady Way Renton, WA 98057 12