DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105099941
1160 DUVALL AVE NE
NATHAN HARVILL 425-923-8944
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
BE
PREPARED
TO STOP
W20-7b
BE
PREPARED
TO STOP
W20-7b
W20-7A
W20-7A
350'
350'
350'
350'
200'
NE 12th St
NE 12th St
Duvall Ave NEDuvall Ave NELegend
Cone
Flagger
VALVE
ROAD
WORKAHEAD W20-1 road work ahead
W20-7A Flagger Ahead
BE PREPAREDTO STOP W20-7b be prepared to stop
Work Area
Manifest
12 x Cone
3 x W20-1 road work ahead
2 x W20-7A Flagger Ahead
2 x W20-7b be prepared to stop
1 x Sign
1 x VALVE
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
NOT TO SCALE
N
S
EW
NOTIFY EMS, FIRE
AND POLICE
72 HOURS IN ADVANCE
OFFICE: 800-343-4049
CELL:425.290.2577
WATCP@KNDSERVICES.NET
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
Nathan Harvill
425-923-8944
03.30.22
DESIGNED BY: BRANDON CALLIHAM
WSTCS#012803
105099941
PSE
1160 Duvall Ave NE
Renton,Wa
BRANDON CALLIHAM
www.invarion.com
1160138TH AVE SENE 12TH ST
318612-167326
75kVA 120/240V
318629-167326
318633-167328 318632-167344
EXISTING
CELL SITE#2ACSRB
ROW
84'
318630-167312
318646-167344
50kVA 120/240V (A)
318647-167338
75kVA 120/240V (C)
318629-167342
25kVA 120/240V
AØ42134
BØ42135
CØ42136
CØ42133
AØ42132
BØ42129
CUST. PROVIDED
4' X 8' BORE PIT
CUSTOMER SUPPLIED
6' X 6' WORK PIT
CUSTOMER SUPPLIED
6” BED WORTH OF 5/8" MINUS CRUSHED ROCK
CUSTOMER SUPPLIED
4' X 4' WORK PIT
PSE SUPPLIED AND INSTALLED
1-2" SCH'L 80 CONTINUOUS PVC CONDUIT ± 150'100'
50'
90
R=48"
CUSTOMER PROVIDED
4' X 8' BORE PIT
PSE SUPPLIED & INSTALLED
1-RUN 1/0 UG JKT CABLE (AØEIV763) ± 170'
318632-167344
SIDEWALK
NE 12TH ST
318632-167344
318629-167342
25kVA 120/240V
AØ42134
BØ42135
CØ42136
ROW
45'
5'
EOP
22'
6'
8'
9'
EOPEOP
EOP EOP
ROW ROW
ROWROW
CUST. PROVIDED
4' X 8' BORE PIT
SITE PLAN
N
Vicinity Map
47.5027,-122.156
Owner / Developer Contact Info
officeATTN:
Dish WIreless Holdings LLC
PO Box 5651
Bismarck ND 58506
John Clark 850-292-8973
SCALE: NONE
NEW CONDUIT DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
06/2020
384.00 418.00 415.00
3.82 0.00 0.00
387.82 418.00 415.00
GAS
PHONE
CABLE TV
104343396
3001825648
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Connect & Set
200A Meter
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted, crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MATTHEW FODE
425-873-4842
MATTHEW.FODE@PSE.COM
SCALE: 1" = 50'105099941THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. FODE 425-873-4842 2/7/22
N. HARVILL 425-923-8944 2/7/22
N. HARVILL 425-923-8944 2/7/22
RW-125848 RENTON
SESEA00486A May Creek
SET NEW OH TRF. SET RISER AND HH. CONNECT AND SET
1160 DUVALL AVENUE NE, RENTON, WA 98059
N/A N/A
N/A 105099941
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NW-10-23-5 N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105099941512454718
SITE SPECIFIC NOTES
AT J01: 318632-167344
-EXISTING VAULT AND J-BOX TO REMAIN
-INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J) TAP AØ
-INSTALL CABLES TAG AØEIV763
AT V01: 318629-167342
-INSTALL (1) 36" X 42" X 38" MINI-PAD UNISTRUT HH W/ GROUNDS PER STD 6045.1010 (MINU1SR)
-INSTALL (1) 25KVA PADMOUNT TRF (MID: 6247000)
-INSTALL (1) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (1) DUST CAP (MID: 7630600)
-INSTALL (3) #6-350 KCMIL SECONDARY CONNECTION BLOCKS (MID: 4842001)
-INSTALL GRID NUMBER
-INSTALL CABLES TAG AØEIV763
-CONNECT CUSTOMER OWNED, INSTALLED, & MAINTAINED 3/0 CU CABLE
AT BP1: CUSTOMER SUPPLIED BORE PIT
AT M01 EXISTING METER BASE
-INSTALL 200A METER
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT BP1
-REQUIRED TO PROVIDE 6' X 6' WORK PIT & 6" BED OF 5/8" CRUSHED ROCK AT V01
TRENCHING & CONDUIT.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEES WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
JOB SITE
PRE
14
00 1"2"
00 50'100'
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
SCALE: NONE
NEW CABLE DIAGRAM
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
CELL 1 V01 1 3/0 CU
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6247000
V01
318629-167342
FAULT CURRENT TABLE
1Ø OH AND PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 25KVA 0.8 2.23 9,300 AMPS 1.70 6,100 AMPS
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY
Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
J01 V01 2 1 150 X 1 50 56 1/0 AL
JKT 170 EIV763 1
170'
N/A
200A
N/A
23.4kW
N/A
1.9%
1.5%
PARTIAL SITE PLAN
SCALE: 1" = 20'
OVERHEAD CIRCUIT MAP @2305E040
SCALE: 6" = 1 MILESCALE: 1" = 50'
UNDERGROUND CIRCUIT MAP @2305E038 105099941THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. FODE 425-873-4842 2/7/22
N. HARVILL 425-923-8944 2/7/22
N. HARVILL 425-923-8944 2/7/22
RW-125848 RENTON
SESEA00486A May Creek
SET NEW OH TRF. SET RISER AND HH. CONNECT AND SET
1160 DUVALL AVENUE NE, RENTON, WA 98059
N/A N/A
N/A 105099941
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
NW-10-23-5 N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
JOB SITEJOB SITE
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
Internal vault ground
installed by vault manufacturer
Connect #2 Cu to internal
vault ground insert
2"
Grounding pigtail for telephone and
TV, #2 bare copper (locate at rear
corner of handhole adjacent to side
lot line)
Primary pigtail concentric
neutral pigtail 24"-30'
long from elbow
25
Make neutral connections with copper
"C" clamps. Allow for future installation
of grounding clamp25
MP TRANSFORMER GROUNDING DETAIL (V01)
Not to scale (Conduit System)6045.1010-3
TOP VIEW
SIDE VIEW
EXCAVATION: 4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
VAULT & EXCAVATION DETAIL (V01)
Not to scale 6045.1000
1950 lbs
EXISTING 1-2" CONDUIT
NEW 1-2" CONDUIT
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J- BOX CABLE ENTRY DETAIL (J01)
Not to scale
BUTTERFLY VAULT DETAIL (J01)
NOT TO SCALE
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
EXISTING 1-2"
CONDUIT EXISTING 1-2" CONDUIT
EXISTING 1-4"
CONDUIT
Will maintain 36" Min. depth while directional drilling
36" Min
Depth
Final Grade
TYPICAL BORE COVER
TYPICAL BORE NOTE
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2
BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT
DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY.
PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE
POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL
HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING
CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND
PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO
REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK
BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS
PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT
OF WAY
NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE
TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE
INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY
HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC
RIGHT OF WAY.
NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL
CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND
STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT
HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT
OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A
DIFFERENT MINIUM SEPARATION.