HomeMy WebLinkAboutMFP23001714.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP23001714
IVR Number: 23001714
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:04/03/2023Application Date:1723059136Parcel Number: 625 WILLIAMS AVE S
Permit Type:04/19/2023Issue Date:Franchise
Permit Work Class:04/18/2024Expiration Date:Minor Utility
Job Number: 105102371Franchise Type:Electric
Description: Puget Sound Energy Electric CREW (AND CUSTOMER) TO CUT OPEN EXISTING SIDEWALK AND ROAD TO
LOWER (2) 6" CONDUITS. CREW WILL REMOVE OLD CABLE AND PULL THROUGH NEW CABLE, APPROX 50' X 5'
6' WORK PIT NEEDE SHORING IS REQUIRED. WORK PIT TO EXTEND 25FT NE AND 25FT SW OF STORM DRAIN
CONFLICT.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
GMD RENTON LLLP 520 PIKE ST # 1010
SEATTLE , WA 98101
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
105102371
625 Williams Ave S
(253) 208-9480jenny chau
MFP23001714
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 4/19/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
625 Williams Ave S Renton WA 98057 USAP031J01P02WELLS
AVE
S22BUSSTOPBUSSTOPWIL
L
IAMS
AVE
S121312121212111112111111111211111111111111111111191112111112WILL
IAMS
AVE
SS GRADY WAYS GRADY WAYS GRADY WAYS GRADY WAYc-curbc-curbc-curbc-curbBUSSTOPARRW-BRD
RIGHT LANE
CLOSED
AHEAD W20-5RW4-2LROAD
WORK
AHEAD W20-1350'350'350'S/WCLOSEDR9-9CROSS HERESIDEWALK CLOSEDAHEADBUSINESS(ES)/RESIDENT(S)WILL BE INFORMED OF POSSIBLETEMPORARY DRIVEWAY CLOSUREBUSINESS DRIVEWAYCLOSED.ENTER/EXIT FROMDRIVEWAY FURTHER WESTON S GRADY WAY.C/W
CLOSED CW-CLSDDETOUR
PED-DETDIP2DIP1V0110
0
'ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'TALBOT RD SDETOURM4-9bR9-11SIDEWALKCLOSEDAHEAD1515ON
E
W
A
Y TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVSafaa Al Neema(425) 398-6077safaa.alneema@pse.com1 OF 3625 Williams Ave S, Renton, WA 980570 10510237103/02/2023Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROW
ROW MFP23001714
625 Williams Ave S Renton WA 98057 USAP031J01P02WELLS AV
E
S22POLICEUPOBUSSTOP
BUSSTOPWIL
L
IAMS
AVE
S121312121212111112111111111211111111111111111111191112111112WILLIAMS
AVE
SS GRADY WAYS GRADY WAYS GRADY WAYS GRADY
WAYc-curbc-curbc-curbc-curbBUSSTOPARRW-BRD M6-2RIGHT LANE
CLOSED
AHEAD W20-5RW4-2LROAD
WORK
AHEAD W20-1350'350'350'S/W
CLOSEDR9-9S/WCLOSEDR9-9CROSS HERESIDEWALK CLOSEDAHEADBUSINESS(ES)/RESIDENT(S)WILL BE INFORMED OF POSSIBLETEMPORARY DRIVEWAY CLOSUREMOVE BUS STOP 150' WEST.KING COUNTY METRO WILL BECONTACTED AT 206-477-1150 FIVE DAYSIN ADVANCE OF SCHEDULED DATE.C/W
CLOSED R9-3DETOUR M4-9bDIP2DIP1V01W20-7ABEPREPAREDTOSTOPW3-410
0
'
10
0
'RIGHT LANECLOSEDAHEADW20-5RW1-4L100
'
10
0
'
10
0
'ROADWORKAHEADW20-1W20-7ABE
PREPARED
TO
STOP W3-4350'350'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'TALBOT RD SDETOURM4-9bR9-11SIDEWALKCLOSEDAHEADW20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'1515ON
E
W
A
YProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVSafaa Al Neema(425) 398-6077safaa.alneema@pse.com2 OF 3625 Williams Ave S, Renton, WA 980570 10510237103/02/2023Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROW
ROW TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP23001714
625 Williams Ave S Renton WA 98057 USAP031J01P02WELLS AV
E
S
22POLICEUPOBUSSTOP
BUSSTOP121312121212111112111111111211111111111111111111191112111112WILL
IAMS
A
VE
SS GRADY WAYS GRADY WAYS GRADY WAYS GRADY
WAYc-curbc-curbc-curbc-curbBUSSTOPARRW-BRD
RIGHT LANE
CLOSED
AHEAD W20-5RW4-2LROAD
WORK
AHEAD W20-1350'350'350'CROSS HE
RE
SIDEWALK CLOSED
AHEADV01W20-7ABEPREPAREDTOSTOPW3-4100
'
100
'
100
'ROADWORKAHEADW20-1W20-7ABE
PREPARED
TO
STOP W3-4350'350'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'TALBOT RD SDETOURM4-9bR9-11SIDEWALKCLOSEDAHEADW20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'1515ON
E
W
A
Y
DETOUR M4-9bR9-11SIDEWALK
CLOSED
AHEADC/WCLOSEDR9-3DETOURM4-9bC/W
CLOSED R9-3Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVSafaa Al Neema(425) 398-6077safaa.alneema@pse.com3 OF 3625 Williams Ave S, Renton, WA 980570 10510237103/02/2023Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.28" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROW
ROW TEMPORARY TRAFFIC CONTROL PLANNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP23001714
620
900
615
607
S G
R
A
D
Y
W
AY
317589-166044
T87290 (100T)
T87289 (Soli)
317592-165032
300 kVA 208V (ABC)
STORM DRAIN CROSSING
SET CONDUIT TO EL 25.73
MAINTAIN 1FT VERTICAL CLEARANCE
FROM BOTTOM OF STORM DRAIN.
317614-166057
T87291
GRA17317595-166048
750 kVA 277/480V (ABC)
1000kVA 120/208V (ABC)
317614-166057
30 kVA 208V (ABC)
317623-166053
T87292 (100T)
SLAG6832
317621-166063
317621-166052
150 kVA 208V (ABC)
80'
R/W
60'
R/W
CUSTOMER PROVIDED 50' X 5' WORKPIT
**SHORING REQUIRED**
EXISTING 6" SPARE CONDUIT
EXISTING 6" SPARE CONDUIT
PSE INSTALL ±20 1- 6" SCH'L 80 AT EL 25.73
1' MIN CLEARANCE FROM STORM DRAIN
6" SPARE TO BE MODIFIED FIRST
PSE INSTALL ±20 1- 6" SCH'L 80 AT EL 25.73
1' MIN CLEARANCE FROM STORM DRAIN
MODIFY AFTER SPARE
CUSTOMER PROVIDED 11'X11'
W/ 6" BEDDING OF 5/8" CRUSHED ROCK
EXISTING 4" CONDUIT
EXISTING 6" CONDUIT
EXISTING 6" CONDUIT
PSE INSTALL ±485' OF
750KCMIL FEEDER CABLE
SITE PLAN
N
Vicinity Map
47.474021, -122.207247
Owner / Developer Contact Info
officeATTN:
GMD Renton LLLP
520 Pike St Suite 1010
Seattle WA. 98101
Steve Dymoke 206-745-6464
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
GRA-17
10/18/2022
190 232 207
27.28 27.28 27.28
217.28 259.28 234.28
GAS
PHONE
CABLE TV
N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Svc/MSA
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jenny Chau
253-208-9480
jenny.chau@pse.com
SCALE: 1" = 50'105102371THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 2/28/2023
Ray Reynolds 253-262-7409 2/28/2023
N/A N/A N/A
Ray Reynolds -2/28/2023
RW-_____RENTON
WATERSHED PERM POWER
INSTALL NEW 3Ø PADMOUNT TRF, LOWER AND REPLACE FEEDER
625 WILLIAMS AVE S RENTON, WA. 98057
N/A N/A
N/A 105102371
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
SW-17-23-5 N/A N/A
2305E072SE 2305E076 2305E072 GRA-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Service Stubs
105102371
N/A
N/A
513600442
N/A
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER
PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 11' X 11' WORK PIT & 6" BEDDING OF 5/8" MINUS CRUSHED ROCK AT V01
-REQUIRED TO PROVIDE 50’ X 5' WORKPIT WITH SHORING AT STORM DRAIN CROSS
TRENCHING & CONDUIT.
-SEE CABLE/CONDUIT TABLES FOR LENGTHS AND INSTALL
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5
BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH
AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS.
SITE SPECIFIC NOTES
AT P01: 317589-166044 EXISTING:
-EXISTING 2022 55' CL-2 POLE TO REMAIN
-REMOVE SOLID BLADE CUTOUT TO DE-ENERGIZE CABLES AØEIQ276, BØEIQ277, CØEIQ278
-RE-ENERGIZE CABLES AØEJN303, BØEJN304, CØEJN305 AFTER CONDUITS HAVE BEEN LOWERED
AT P02: 317614-166057 EXISTING:
-EXISTING UNK YR 40' CL-UNK POLE TO REMAIN
-REMOVE SOLID BLADE CUTOUT TO DE-ENERGIZE CABLES AØEIQ276, BØEIQ277, CØEIQ278
-RE-ENERGIZE CABLES AØEJN303, BØEJN304, CØEJN305 AFTER CONDUITS HAVE BEEN LOWERED
AT V01: 317595-166048 : NEW:
-REMOVE EXISTING 750kVA 277/480V TEMP TRF
-REMOVE TEMP PAD
-INSTALL (1) 7' X 7' X 4' VAULT W/ GRNDS PER STD 6045.5000 (PM312D)
-INSTALL VAULT COVER 7' X 7' X 6'-2" , 24 X 60" ACCESS, 8'-10' (MID: 7918000)
-INSTALL CABLE SUPPORT LADDER (MID: 9997916)
-INSTALL (1)1000 KVA PADMOUNT TRF (MID: 6258350)
-REROUTE EXISTING CABLES AØEJG496, BØEJG497, CØEJG498
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (16) #501 TO 750KCMIL CONNECTOR BARS (MID: 7651003)
-INSTALL (4) #2 TO 500KCMIL CONNECTOR BARS (MID: 7651000)
-INSTALL (72) MOUNTING BOLT KITS (MID: 7651008)
-INSTALL GRID #
-CONNECT 17-RUN OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 600KCMIL SVC
-CONNECT 1-RUN OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 250KCMIL SVC
AT M01 "HSE"
-POTELCO TO INSTALL (145) METERS ON 4000A PANEL
AT M02 "STANDBY SVC"
-PSE METER DEPT TO INSTALL (1) METER ON 200A PANEL
AT M03 "MDP"
-PSE METER DEPT TO INSTALL (1) METERS ON 1600A PANEL
SPAN SPECIFIC NOTES
-SEE TABLES AND ONE-LINES FOR INSTALL
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
1000kVA 120/208v
6258350
V01
317595-166048
CONDUIT DIAGRAM
SCALE: NTS
Vault & Equipment Table
Work
Location
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT
INFORMATION
Foreman-CompleteLBDC
V01 317595-166048 PM3P12D
(7'x7'x6.167')
PAD-3P-12-1
20/208-1000
(1000 kVA)
3
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT
INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY
Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built
Actual Amount
Installed
(Conduit & Cable)
DIP1 DIP2 6"2 20'X 0 0 0 0 0 0
P01 P02 EXISTING 6" CONDUIT 902.54 902.54 FEEDER
750 UG 485'EJN303 EJN304 EJN305
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V01
317595-166048
750kVA
CABLE DIAGRAM
SCALE: NTS
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
1 145 V01 12 600KCMIL -
1 1 V01 1 250KCMIL -
1 1 V01 5 600KCMIL -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
JOB SITE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
778 SQ FT PER UNIT
4000AMP
ELECTRIC
459KW
321A
2.0%
0.7%
00 1"2"
00 50'100'
DEDICATED FACILITIES
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
V01 ---TFR UPGRADE DUE TO #
OF RUNS 3-12
TOTAL FT=##
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
EIQ276 1700358
P01 P02
485'
EIQ277 1700359 485'
EIQ278 1700360 485'
TOTAL 1455'
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (208Y/120V)
120V WINDINGS 208V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 1000KVA 0.1 --5.30 52,400 AMPS
CIRCUIT FEET ADDED: 485'
CIRCUIT FEET REMOVED: 485'
MFP23001714
RESTORATION PER CITY OF RENTON STANDARDS
105102371FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
SPLICE PIT DETAIL
SCALE: NONE
2"
Excavation - 20 cubic yards
10'-0"
7'-0"
8'-0"
8"
6'-2"
SIDE VIEW
6'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
5'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
JOB SITE
OVERHEAD CIRCUIT MAP(D2305E088)
SCALE: 6" =1 MILE
UNDERGROUND MAP(D2305E067)
SCALE: NTS
JOB SITE
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
PM XFMR VAULT B-FLY DETAIL (V01)
SCALE: NONE
Customer Owned Services
Prop 4" (J01)FRONT OF TRANSFORMER
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 2/28/2023
Ray Reynolds 253-262-7409 2/28/2023
N/A N/A N/A
Ray Reynolds -2/28/2023
RW-_____RENTON
WATERSHED PERM POWER
INSTALL NEW 3Ø PADMOUNT TRF, LOWER AND REPLACE FEEDER
625 WILLIAMS AVE S RENTON, WA. 98057
N/A N/A
N/A 105102371
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
SW-17-23-5 N/A N/A
2305E072SE 2305E076 2305E072 GRA-17
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
MFP23001714