Loading...
HomeMy WebLinkAboutSTORM STORM TIR 12/31/14 Comments 1. Provide downstream analysis verifying the 9 foot section of 8 inch pipe downstream in South 2nd Street has adequate capacity. 2. Discuss how the requirement of a flow control BMP will be met and implemented on the site. This is a requirement. Sheet C0.1 1. Insert Conditions of Approval in the cover sheet 2. Call out total of pollution generation impervious surface on the cover sheet. 3. Call out total of impervious surface area on the cover sheet. Sheet C0.2 1. Insert current TESC Notes and Surface Water Drainage notes. See 2009 City of Renton Amendments on the City’s website. Sheet C1.0 1. Note construction sequence of TESC plan. Sheet C1.1 1. Complete information under AREAS. Sheet 1. New CB’s in Main Street shall be Type II SEWER 1. Provide sizing calculations for the grease interceptor. This needs to be reviewed by the wastewater department. Show sewer connection. 2. Applicant proposes underground parking. The building department will require floor drains and they will need to be connected to the sanitary sewer through an approved oil/water separator oil water separator and connection to the sewer. 3. Show IE at each side sewer. 4. Note on the sewer plan that the side sewer can only be reused if the side sewer is PVC. WATER 1. Continue working with Abdoul Gafour with the water main design GENERAL COMMENTSs 1. Add City of Renton standard detail Type II on the detail sheet. 2. Provide spot elevations along the curb line in Main Street. Show flow direction. 3. Why is there a Type I catch basin in the alley? What is the purpose? 4. Show FFE (finish floor elevation) on the building on the utility plan