HomeMy WebLinkAboutChange Order - 32
CAG-20-126. CO #32-23
Approved by Cheryl Beyer via 3/27/2023 email
Change Order No. 32
Contract Title: Lake Washington Loop Trail Project
Contract No. CAG -20-126
Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
This Change Order modifies the Disadvantaged Business Enterprise (DBE) Condition of Award (COA)
commitment to the DBE Subcontractor, based on the City of Renton and WSDOT Approval.
Reason for Change:
Change Order 15 modified the Condition of Award to $298,887.51. All work is completed, and
the amount of DBE work performed increased by $50,971.08. All COA subcontractors’ work
increased except for Green City who performed the landscape work. There were quantity
underruns in the landscape work and Green City has accepted the partial termination of their
work due to the underruns. The revised COA is $349,858.59.
Affects DBE Work: ܈܈ Yes ܆ No
Materials:
None
Plans:
N/A
Equitable Adjustment:
This Change Order does not include an equitable adjustment per Section 1-09.4 of the
2021 WSDOT/APWA Standard Specifications.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Name of DBE Description of Work
Original Amount
Applied
towards the Goal
(COA)
Previous Dollar
Amount
Applied Toward Goal
(Revised COA per
Change Order 15)
Final Dollar Amount
Applied Toward Goal
(Final COA)
Mobile Electric DistributorsMaterial Supply 151,000.00$ 151,000.00$ 160,710.56$
Perimeter Security Group Bridge Rail Installation 165,983.16$ 82,502.51$ 85,615.18$
Silver Streak, Inc Trucking 0 15,600.00$ 62,466.72$
Green City Landscaping 0 49,785.00$ 41,066.13$
DBE COA Goal -16%
Total 316,983.16$ 298,887.51$ 349,858.59$
Change Order No. 32
Contract Title: Lake Washington Loop Trail Project
Contract No. CAG -20-126
Page 3 of 3
Sections 1-04.4 and 1-04.5 of the 2021 WSDOT/APWA Standard Specifications shall govern
this Change Order. The Work of the referenced Contract is modified to include the changes
detailed herein. The payment provided for herein shall constitute the complete and final
settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all
other claims that may be made by the Contractor as a result of this change.
To be attached to Change Order:
܆܆ Plans