HomeMy WebLinkAboutEX_03_RS_18 19_GE Biological Assessment USACE attachM_220216 finalBiological Assessment and Essential Fish Habitat Evaluation Cedar River 205 Levee Certification Project Renton, Washington for Tetra Tech, Inc February 16, 2022 Biological Assessment and Essential Fish Habitat Evaluation Cedar River 205 Levee Certification Project Renton, Washington for Tetra Tech, Inc February 16, 2022 1101 South Fawcett Avenue, Suite 200 Tacoma, Washington 98402 253.383.4940 Biological Assessment and Essential Fish Habitat Evaluation Cedar River 205 Levee Certification Project Renton, Washington File No. 0693-078-01 February 16, 2022 Prepared for: Tetra Tech 1420 5th Avenue, Suite 650 Seattle, Washington 98101 Attention: Bill Fullerton Prepared by: GeoEngineers, Inc. 1101 South Fawcett Avenue, Suite 200 Tacoma, Washington 98402 253.383.4940 Emily R. Hurn Project Scientist David B. Conlin, MS, PWS Senior Biologist Joseph O. Callaghan, MS, PWS Principal ERH:DBC:JOC:tlm:mce Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. February 16, 2022 | Page i File No. 0693-078-01 Table of Contents 1.0 INTRODUCTION .................................................................................................................................................. 1 1.1. Purpose and Need ...................................................................................................................................... 1 1.2. Project Location .......................................................................................................................................... 1 1.3. Site Description ........................................................................................................................................... 2 2.0 DESCRIPTION OF THE PROPOSED ACTION .................................................................................................... 2 2.1. Project Description ...................................................................................................................................... 2 2.2. Construction Schedule and Sequence ...................................................................................................... 3 2.3. Impact and Minimization Measures .......................................................................................................... 4 2.3.1. Best Management Practices (BMPs) .............................................................................................. 4 2.3.2. General Conservation Measures .................................................................................................... 4 2.3.3. Additional Measures to Reduce Impacts to Species and Habitats .............................................. 5 3.0 ACTION AREA ..................................................................................................................................................... 6 3.1. Operation of Construction Equipment ....................................................................................................... 6 3.2. Construction-Related Noise........................................................................................................................ 6 3.3. Water Quality ............................................................................................................................................... 7 3.4. Habitat Alteration ........................................................................................................................................ 7 3.4.1. Riparian Vegetation ......................................................................................................................... 8 3.4.2. Floodplain Habitats and Processes ................................................................................................ 8 3.5. Action Area Summary ................................................................................................................................. 8 4.0 SPECIES AND HABITAT INFORMATION ........................................................................................................... 9 4.1. Species and Critical Habitat that May be Present in the Action Area ...................................................... 9 4.2. Species and Critical Habitat Not Addressed in the Biological Evaluation ............................................ 10 4.3. Utilization of Habitats by Listed Species ................................................................................................ 10 4.3.1. Chinook Salmon ........................................................................................................................... 11 4.3.2. Steelhead ...................................................................................................................................... 11 4.3.3. Bull Trout ....................................................................................................................................... 11 4.3.4. Primary Constituent Elements of Salmon and Steelhead Critical Habitat ................................ 11 4.4. Occurrence Summary .............................................................................................................................. 12 5.0 ENVIRONMENTAL BASELINE.......................................................................................................................... 13 5.1. Terrestrial Habitat .................................................................................................................................... 13 5.1.1. Topography ................................................................................................................................... 13 5.1.2. Vegetation ..................................................................................................................................... 13 5.1.3. Suitable Habitat ............................................................................................................................ 13 5.2. Freshwater Aquatic Habitat ..................................................................................................................... 13 5.2.1. General Aquatic Conditions ......................................................................................................... 14 5.2.2. Suitable Habitat ............................................................................................................................ 14 6.0 ANALYSIS OF EFFECTS ON SPECIES AND HABITAT .................................................................................... 14 6.1. Operation of Construction Equipment .................................................................................................... 15 6.2. Construction-Related Noise..................................................................................................................... 15 6.3. Habitat Alteration ..................................................................................................................................... 15 February 16, 2022 | Page ii File No. 0693-078-01 6.3.1. Riparian Habitat ........................................................................................................................... 15 6.3.2. Food Web Dynamics and Prey Resources .................................................................................. 16 6.3.3. Floodplain Habitat Functions ....................................................................................................... 16 6.4. Impacts to Water Quality ......................................................................................................................... 17 6.5. Interrelated and Interdependent Actions ............................................................................................... 17 7.0 EFFECT DETERMINATIONS ............................................................................................................................ 17 7.1. Chinook Salmon and Steelhead ............................................................................................................. 17 7.2. Bull Trout .................................................................................................................................................. 18 8.0 ESSENTIAL FISH HABITAT EVALUATION ....................................................................................................... 18 8.1. Designated EFH within the Action Area .................................................................................................. 19 8.2. Effects of the Proposed Action on EFH ................................................................................................... 19 9.0 CONCLUSIONS ................................................................................................................................................. 19 10.0 REFERENCES ................................................................................................................................................... 20 LIST OF FIGURES Figure 1. Cedar River Section 205 Levee System Improvement Locations Overview and Vicinity Map Figure 2. Cedar River Section 205 Levee System Vicinity Map and Action Area APPENDICES Appendix A. Project Design Drawings Appendix B. Species Lists February 16, 2022 | Page 1 File No. 0693-078-01 1.0 INTRODUCTION The City of Renton (City) is proposing to complete the Cedar River 205 Levee Certification Project, which consists of improvements to the existing Cedar River levee system to meet current flood design standards necessary for levee certification. The existing flood protection system is located on both banks of the lower Cedar River within the limits of the City of Renton, Washington. The levee system consists of earthen levee embankments (levees) and floodwalls along both banks of the lower 1.25 miles of the Cedar River between the river mouth at Lake Washington and just upstream of the Logan Avenue Bridge, as shown on the attached Cedar River Section 205 Levee System Improvement Locations Overview and Vicinity Map (Figure 1). As part of the recertification process, deficiencies in the flood protection system have been identified and will be corrected. 1.1. Purpose and Need The certification of the Cedar River Section 205 Levees was considered invalid by the U.S. Army Corps of Engineers (USACE) in August 2013. The Federal Emergency Management Agency (FEMA) granted a provisional accreditation status in 2016, with the expectation that the City is continuously working on accreditation. Leaving the levee unaccredited would remove the levee from the Flood Insurance Rate Map (FIRM) as providing protection for the 100-year recurrence interval flood event. This would change the flood hazard area protected by the levees from Zone X to Zone A, which would enforce floodplain management regulations and federal mandatory purchase of flood insurance. The area protected by the levees includes Renton Municipal Airport, the Boeing Commercial 737 Airplane Production Facility, the Renton Senior Center, the regional Cedar River Trail park and residential/commercial areas on both the left and right banks. Reclassifying the floodplain as a special flood hazard area would create gross economic and developmental impacts. The purpose of this Biological Assessment (BA) is to satisfy consultation requirements under Section 7 of the Endangered Species Act (ESA) in support of the Conditional Letter of Map Revision (CLOMR) application to FEMA, which will include proposed levee system improvements to meet current design standards and is intended to result in approval of levee modifications necessary to recertify the flood protection system. An Essential Fish Habitat (EFH) evaluation is also included for Magnuson Stevens Fishery Conservation and Management Act (MSA) compliance. GeoEngineers, Inc. (GeoEngineers) was subcontracted by Tetra Tech, Inc. (Tetra Tech) to prepare this BA report on behalf of the City. This document has been prepared based on current levee system improvement designs advanced to a 75 percent design level. 1.2. Project Location The project reach is located on the Cedar River upstream (south) from its mouth at the south end of Lake Washington in Renton, Washington, within Township 23 North, Range 5 West, Sections 7 and 18. Proposed improvements are located from just upstream (south) of the Logan Avenue bridge downstream (north) to the river mouth at Lake Washington, which defines the project reach (site) for purposes of analysis. Additionally, the proposed improvements occur at discrete locations within the project reach where levee deficiencies have been documented, but do not encompass the entire levee system. The analysis of impacts was therefore limited to the specific areas where improvements are proposed. A Vicinity Map and Improvement Locations Overview is included as Figure 1. February 16, 2022 | Page 2 File No. 0693-078-01 1.3. Site Description There are three bridges within the project reach, including (from upstream to downstream): Logan Avenue Bridge, South Boeing Bridge and North Boeing Bridge. Renton Municipal Airport is located west of the left bank of the lower river, and Boeing facilities and a public park (Cedar River Trail Park) are located east of the right bank of the lower river below Logan Avenue. Other commercial, industrial and residential developments are present upstream (south) of Logan Avenue. Within the project reach, between river mile 0 and 1.23, the Cedar River is a constructed channel that historically has required periodic maintenance dredging to reduce the bed elevation and ensure flood protection to surrounding areas. The river is channelized through the project reach and the banks are armored in numerous areas with riprap, concrete, gabion baskets and/or wood retaining walls. Vegetation within the riparian zone along this stretch of the Cedar River is comprised of a mix of: mature native trees and shrubs; recently planted native trees, shrubs and herbaceous species that were installed as mitigation for the most recent maintenance dredging cycle, which was completed in 2016; park landscaping trees, shrubs and mowed grasses; unmaintained grass areas; and sections dominated by invasive species. Native tree species located within the riparian zone include red alder (Alnus rubra), Pacific willow (Salix lasiandra), Sitka willow (Salix sitchensis) and black cottonwood (Populus balsamifera ssp. trichocarpa). Additional native shrubs and herbaceous species within the riparian zone include vine maple (Acer circinatum), snowberry (Symphoricarpos albus), Nootka rose (Rosa nutkana), clustered wild rose (Rosa pisocarpa), redosier dogwood (Cornus sericea), twinberry (Lonicera involucrate), Pacific ninebark (Physocarpus capitatus), sword fern (Polystichum munitum), lady fern (Athyrium filix-femina) and scouring rush (Equisetum hyemale). Many of these species were recently installed. Typical invasive species include Japanese knotweed (Polygonum cuspidatum), reed canarygrass (Phalaris arundinacea), Himalayan blackberry (Rubus armeniacus) and Scotch broom (Cytisus scoparius). 2.0 DESCRIPTION OF THE PROPOSED ACTION 2.1. Project Description The proposed levee improvements include minor modifications at eight improvement sites associated with the existing levee and floodwall system along both the left and right banks of the Cedar River. Project design drawings are provided as Appendix A, Project Design Drawings, showing the locations of each improvement area in detail. A summary of the proposed locations and description of improvements are provided in Table 1 below: February 16, 2022 | Page 3 File No. 0693-078-01 TABLE 1. SUMMARY OF LEVEE IMPROVEMENT AREAS Location (Levee Stationing) Description of Improvement Right Bank 49+60 Improve Floodwall to Embankment Transition. The existing floodwall will be embedded into an elevated embankment. The embankment will be elevated using common borrow material. See Sheet C-111 in Appendix A for more details. 63+50 to 64+20 Raise Levee Embankment. Adjacent to the trail, the existing embankment will be raised by adding common borrow. The crown width of the embankment is 8 feet. See Sheet C-112 in Appendix A for more details. 65+50 Replace Sidewalk. The sidewalk will be reconstructed in its existing alignment to slightly raise the elevation in compliance with levee crest requirements. See Sheet C-113 in Appendix A for more details. 66+35 to 68+85 Raise/Extend Floodwall. Approximately 3.5 feet from the Senior Center Building, a new floodwall will be installed. This will require removal of existing shrubs and excavation to install the floodwall footing and floodwall. The reinforced concrete floodwall is approximately 4 feet wide and buried approximately 3 feet into the ground. See Sheet C-114 in Appendix A for more details. Left Bank 19+20 Improve Transition from Levee Embankment to Wall. An additional 26 linear feet of floodwall will be added to the existing floodwall. This will require excavation of approximately 5 feet to install the floodwall footing and reinforced concrete floodwall. The excavation area will be backfilled with excavated native material or substituted fill that meets specifications. See details on Sheet C-101 in Appendix A for more details. 26+50 to 29+60 Raise Floodwall. The existing floodwall will be raised with a cast-in-place concrete cap. See Sheets C-102 and C-104 in Appendix A for more details. 29+60 to 33+50 Raise Levee Embankment with Curb Wall. This section will require shallow excavation for installation of the curb wall. Proposed curb wall is approximately 3 feet from the existing asphalt pavement and will be 18 inches high by 6 inches wide. A guard rail will be installed for full length of curb wall. See Sheets C-103 and C-104 in Appendix A for more details. 55+70 to 56+90 Widen Levee Embankment with Retaining Wall. Excavation landward of the existing floodwall approximately 20 feet wide and several feet deep to install a 4-inch-thick layer of base coarse material prior to construction of the Mechanically Stabilized Earth (MSE) retaining wall. The MSE is 11 inches wide and approximately 3 feet tall. See Sheets C-105, C-106 and C-107 in Appendix A for more details. 58+10 to 59+85 Construct Floodwall, Reconstruct Damaged Floodwall and Raise Levee Embankment. A new floodwall will be installed adjacent to the sidewalk. The existing damaged floodwall will be reconstructed and raised with cast-in-place concrete. The existing adjacent embankment will also be raised. The floodwall and embankment activities will require shallow excavation. See Sheets C-109 and C-110 in Appendix A for more details. 2.2. Construction Schedule and Sequence Currently, construction of the project is scheduled to start in summer 2022, pending CLOMR approval and receipt of applicable environmental permits. Construction is anticipated to take approximately 2 years to complete, tentatively concluding in summer 2024. It should be noted that the project schedule is only a likely representation of what the actual schedule may be and variations in work timing and possible phasing February 16, 2022 | Page 4 File No. 0693-078-01 may occur due to funding, contractor delays or adverse weather conditions. A generalized construction schedule at each improvement location follows: ■ Install temporary erosion and sediment control (TESC) measures and construction best management practices (BMPs) ■ Clearing and grubbing ■ Stripping and excavation/sawcut ■ Compacted fill/base course ■ Install wall footings (if applicable) ■ Fill and compact earthen embankments to meet freeboard requirement (if applicable) ■ Install curbs/walls or raise walls (if applicable) ■ Levee overbuild/regrading ■ Concrete/asphalt paving and other site restoration ■ Landscaping/replanting and associated habitat mitigation 2.3. Impact and Minimization Measures 2.3.1. Best Management Practices (BMPs) Conservation measures and BMPs will be employed during construction activities to avoid impacts to listed species and their habitat. Conservation measures will focus on: (1) constructing the levee outside the ordinary high water mark (OHWM); (2) managing stormwater quality (see below); (3) minimizing construction noise; and (4) reducing the possibility of spills, preventing soil erosion and minimizing impacts to vegetation. Special measures will be taken to ensure that generated waste materials requiring disposal (such as construction debris, and land clearing debris) will be disposed of off-site and in accordance with applicable regulations. Adequate materials and procedures will be readily available on the site to respond to unanticipated weather conditions or accidental releases of materials, and a protocol for contacting Washington Department of Fish and Wildlife (WDFW) will be readily available in the event that activities are observed to result in fish kills, fish in distress or other water quality problems. 2.3.2. General Conservation Measures ■ The TESC plan will be fully implemented as part of a Stormwater Pollution Prevention Plan (SWPPP). Construction techniques will utilize BMPs such as those described in the most recent version of Washington State Department of Transportation’s (WSDOT) Standards and Specifications for Road, Bridge, and Municipal Construction (WSDOT 2021) and Washington State Department of Ecology’s (Ecology) Stormwater Management Manual for Western Washington (Ecology 2019), and as required by the City stormwater code. Appropriate erosion control measures will be erected at appropriate locations according to the SWPPP. ■ The contractor will prepare a Spill Prevention, Control and Countermeasures (SPCC) Plan for this project. Spills will be handled and disposed of in a manner that does not contaminate the surrounding area. Adequate materials and procedures to respond to unanticipated weather conditions or accidental releases of materials (sediment, petroleum hydrocarbons, etc.) will be available on site. The SPCC Plan will also ensure the proper management of oil, gasoline and solvents used in the operation and February 16, 2022 | Page 5 File No. 0693-078-01 maintenance of construction equipment and that equipment remains free of external petroleum-based products prior to entering the work area and during the work, and for making necessary repairs prior to returning the equipment to operation in the work area. ■ An emergency spill containment kit must be located on site along with a pollution prevention plan detailing planned fueling, materials storage and equipment storage. Waste storage areas must be prepared to address prevention and cleanup of accidental spills. ■ Construction-related debris within riparian/shoreline areas (200 feet from waterbodies) will be cleaned up daily. Proper conservation measures will be taken to ensure that debris will not contaminate critical areas. ■ Waste materials, including concrete, riprap, miscellaneous garbage and/or other debris removed from the project site, will be transported off-site for disposal in accordance with applicable regulations. ■ Work will follow other local, state and federal regulations and restrictions. ■ Within riparian/shoreline areas, excavation will be limited to those areas necessary for access to the work areas and construction activities. The construction limits will be marked in the field and equipment will not be allowed outside the work area. ■ Adequate materials will be maintained on site to respond to weather conditions and modify the construction plan as needed to accommodate unanticipated events. ■ Routine inspections of the erosion control measures will be conducted daily to ensure the effectiveness of the measures and to identify the need for maintenance or additional control measures. ■ Grading and construction will be phased to reduce the time that soil is exposed to the extent possible. ■ Silt fences will be constructed around excavation areas that are within the riparian/shoreline zone. ■ Spoil stockpiles within the riparian/shoreline zone will be contained using BMPs to reduce the potential for introduction of fine sediments into adjacent waters. ■ Disturbed slopes will be hydroseeded following project completion. ■ Disturbance will be limited to the smallest area feasible for each phase of the project and element under construction and will stay within the limits of construction as identified on the site plans. ■ Fueling areas will be distinctly identified and established outside of riparian/shoreline zones, but within the construction area. These areas will be equipped with spill prevention and control devices. 2.3.3. Additional Measures to Reduce Impacts to Species and Habitats Specific conservation measures and BMPs to minimize impacts to species and habitats could include but are not limited to: ■ There will be no work below the OHWM of waterbodies under state or federal jurisdiction. ■ The project will obtain and comply with conditions that will be outlined in state and federal permits. ■ Debris resulting from construction within the riparian/shoreline zone shall be removed from the project area and prevented from entering the river. ■ Construction procedures within riparian/shoreline areas have been designed to minimize the opportunity for erosion to occur or sediment-laden water to enter downstream areas. February 16, 2022 | Page 6 File No. 0693-078-01 ■ Depending on slope and weather conditions, sediment laden run-off will be managed with appropriate stormwater BMPs such as silt fences, sediment traps and other approved measured. 3.0 ACTION AREA The Action Area is defined as “all areas to be affected directly or indirectly by the federal action and not merely the immediate area involved in the action” (50 Code of Federal Regulations [CFR] §402-02). The Action Area, therefore, includes the spatial extent of direct and indirect effects, as well as effects of interrelated and interdependent activities of the project. Many project effects are temporary in nature, occurring during or immediately after construction; other project effects may persist after project completion as a result of long-term changes to the environment. For this project, the Action Area was identified as the footprint of the levee improvements as well as the surrounding area within which noise effects will extend (which varies depending on levee construction type) above land and water surfaces, as shown on Figure 2, Cedar River Section 205 Levee System Vicinity Map and Action Area. The Action Area includes upland and riparian but does not include any aquatic habitats as no work will be performed below the OHWM and no effects of the project generated in upland locations are anticipated to extend below the OHWM. Project-specific effects that were considered to identify the Action Area for the project include: ■ Operation of construction equipment (direct effect, short-term temporary impact); ■ Construction-related noise (direct effect, short-term temporary impact); ■ Degradation of water quality (direct effect, short-term impact); and ■ Habitat alteration (direct and indirect effects, potential for both short-term and long-term impacts). The spatial extents of these effects were used to identify the Action Area, as discussed in the following sections. 3.1. Operation of Construction Equipment During construction of the levee repairs, equipment will operate in natural habitat areas potentially utilized by terrestrial species. There will be no in-water work within the Cedar River as part of this project. Species occupying terrestrial forested or other vegetated areas, if present, could be affected as a result of interaction with construction equipment and/or construction materials. 3.2. Construction-Related Noise Construction-related noise will occur as a result of operation of general construction equipment. This effect is limited to the construction period and will not persist once construction is complete. Construction-related noise will permeate terrestrial (in-air) environments and may carry into the surrounding environment beyond the project site. Construction-related noise will not affect aquatic (underwater) environments because construction will occur above OHWM. The extent that in-air noise will permeate the surrounding environment was estimated using guidance provided by WSDOT (2020). These activities will require the use of heavy machinery. Heavy machinery includes earth-moving equipment such as excavators, front end loaders, haul trucks and other equipment. February 16, 2022 | Page 7 File No. 0693-078-01 Excavator, concrete saw and paving equipment are the three loudest pieces of equipment to be used at the site, both the excavator and the concrete saw generate 85 decibles A (dBA) and the paving equipment generates 82 dBA, at a distance of 50 feet (WSDOT 2020). Due to the possibility of all three pieces of machinery being operated simultaneously, the rule of decibel addition provided in the WSDOT BA Manual (WSDOT 2020) was applied to the construction noise assessment. Based on this analysis, construction noise is estimated to be up to 89 dBA if all of these pieces of equipment are run simultaneously. The project area is located adjacent to Renton Municipal Airport. The WSDOT BA Manual (2020) identifies jet takeoff to generate noise levels of up to 120 dBA at a distance of 200 feet and regular noise intrusions from traffic and aircraft overflights to generate noise levels between 45 and 72 dBA. This site is immediately adjacent to the airport and surrounded by heavy urban traffic; therefore, a relatively conservative noise level of 70 dBA was selected for ambient background noise at the site. Although there is a narrow riparian buffer (more significant on the east bank) and some grassy areas on both sides of the river, the project surroundings are generally dominated by buildings, paved surfaces and water (Cedar River and Lake Washington), creating a “hard site” condition as defined for the purposes of estimating noise level attenuation (WSDOT 2020). Based on the noise level from the loudest pieces of equipment (89 dBA) and attenuation calculated by the equation provided in the WSDOT BA Manual (WSDOT 2020) with “hard site” conditions, the distance from the project site at which the loudest equipment would become indistinguishable from background in-air, ambient noise conditions (i.e., 70 dBA) is approximately 446 feet. 3.3. Water Quality The project is expected to have minimal impact to water quality of the Cedar River, since there is no in- water work and the application of construction stormwater BMPs and spill prevention activities. In the event of failure of these protective measures, there is a potential for impact to river water quality from sediment erosion, spilling hazardous materials or release of petroleum-based products during construction. This potential is limited to the construction period and would not have lasting impacts once construction is complete. The potential for sediment erosion and spills will be controlled through proper implementation of BMPs. The project does not have the potential to impact water quality indirectly as a result of long-term changes because there will be no new pollution-generating impervious surfaces (PGIS) resulting from this project and there will be no long-term change to the discharge volume and treatment of stormwater. The zone of influence in which water quality could be temporarily impacted because of spills or other construction-related degradation is limited to the Cedar River which is immediately adjacent to the project construction footprint. 3.4. Habitat Alteration Habitat alteration may result from direct impacts to riparian vegetation from levee improvement construction, as well as indirect changes in flood storage capacity, availability of refuge habitat and habitat forming processes. Direct effects (impacts to vegetation) and indirect effects (impacts to other floodplain habitats and processes) are discussed separately in the following sections. Alteration of stream habitats is not anticipated. February 16, 2022 | Page 8 File No. 0693-078-01 3.4.1. Riparian Vegetation Impacts to riparian vegetation within the Protected Area will be limited. Where the levee alignment is immediately adjacent to the river, the concrete floodwall will generally be constructed at the immediate edge of existing road infrastructure, thereby minimizing impacts to riparian vegetation. There will be approximately 12,000 square feet of temporary impacts and 1,200 square feet of permanent impacts to shrubs and turf grass due to construction. The existing riparian vegetation that will be affected is mostly comprised of turf grass, invasive shrubs and ornamental landscape shrubs, with some native shrub areas being temporarily affected as well (but no native shrub areas permanently removed). A total of nine native trees will be removed as well from within the riparian vegetation conservation buffer. In-kind mitigation for riparian buffer impacts is proposed through a combination of the following: ■ Restoring all temporarily impacted areas with vegetation equal in habitat value or better than what was temporarily removed. For example, turf grass will typically be replaced with turf grass, landscape and invasive shrubs will be replaced with native shrubs and native shrubs will also be replaced with native shrubs. ■ Removal of invasive vegetation and installation of native plants in additional compensatory riparian mitigation areas to offset permanent impacts to invasive shrub communities. Compensatory riparian mitigation areas are located within the project reach to provide on-site improvement of ecological functions. ■ Replacement of native trees removed at a ratio exceeding 2:1 within the replanted areas. Details regarding riparian vegetation mitigation are provided in the Riparian Habitat Mitigation Plan (GeoEngineers 2021) and the riparian planting plan is included in Appendix A. The zone of influence for potential alteration of riparian habitats is limited to areas directly impacted by construction activity, which is defined as the construction footprint, including the compensatory mitigation areas that will be cleared of invasive species and planted with native riparian vegetation as mitigation for the project. 3.4.2. Floodplain Habitats and Processes The zone of influence for potential alteration of floodplain habitats and processes is limited to undeveloped habitat areas within the levee improvement construction footprint as well as landward of where the levee improvements will be constructed. This zone includes minimal undeveloped riparian vegetation as well as some turf grass areas associated with the Senior Activities Center and the Renton Municipal Airport. These areas may extend some distance from the levee and/or river, but all occur within the same zone of influence identified for noise above. 3.5. Action Area Summary The overall Action Area includes the spatial extent of all project effects on the environment and is presented in Figure 2. Because of the construction sequencing and the planned BMPs, stormwater and debris will largely be contained within the project limits; therefore, the in-air noise effects from construction activities will extend the furthest (446 feet) and set the boundary for the Action Area, which will define the limits of analyses for effects on species and habitats. February 16, 2022 | Page 9 File No. 0693-078-01 4.0 SPECIES AND HABITAT INFORMATION Species listed under the ESA fall under the jurisdiction of one of two federal agencies: the U.S Fish and Wildlife Service (USFWS) for terrestrial and freshwater species, and the National Marine Fisheries Service (NMFS) for marine species. A list of the listed or proposed species and designated or proposed critical habitat for the project area was obtained from the USFWS (2021a; 2021b). Lists of the listed or proposed species and designated or proposed critical habitat for marine species in the Puget Sound were also obtained from NOAA Fisheries/NMFS (NOAA Fisheries 2021). These official species lists and critical habitat maps are included in Appendix B, Species Lists. According to WDFW Priority Habitats and Species (PHS) data and USFWS Information for Planning and Consultation (IPaC) data, the project site potentially contains numerous fish species. Washington State Department of Natural Resources (DNR) shows no sensitive plant records in the vicinity of the project (DNR 2020). 4.1. Species and Critical Habitat that May be Present in the Action Area The USFWS and NMFS lists identify species and critical habitat potentially present within the Action Area based on regional distribution. Consequently, not all species on these lists are expected to occur within the Action Area based on actual habitat conditions and occurrences. Information regarding the presence of listed species within the Action Area was obtained from the WDFW PHS online mapper (WDFW 2021a) and USFWS IPaC (USFWS 2020). A summary of listed species and critical habitat status found in the Action Area is listed in Table 2. TABLE 2. ESA SPECIES AND CRITICAL HABITAT THAT MAY OCCUR IN THE ACTION AREA Common Name Specific Name Status Jurisdiction Critical Habitat Presence1 Gray wolf Canis lupus Proposed Endangered USFWS N/A North American wolverine Gulo gulo luscus Proposed Threatened USFWS N/A Marbled murrelet Brachyramphus marmoratus Threatened USFWS No Streaked horned lark Eremophila alpestris strigata Threatened USFWS No Yellow-billed cuckoo Coccyzus americanus Threatened USFWS No Chinook Salmon Oncorhynchus tshawytscha Threatened NMFS Yes Steelhead Oncorhynchus mykiss Threatened NMFS Yes Bull trout Salvelinus confluentus Threatened USFWS No Notes 1. Critical habitat listings are as follows: Yes indicates that critical habitat occurs in within the Action Area; No indicates that critical habitat for the species has been designated but it does not occur within the Action Area; N/A indicates that critical habitat has not been designated or proposed for the species. February 16, 2022 | Page 10 File No. 0693-078-01 4.2. Species and Critical Habitat Not Addressed in the Biological Evaluation The following is a list of species and critical habitat that are not addressed further in this report due to lack of suitable habitat in the Action Area: ■ Gray wolf (Canis lupus). Gray wolves are wide ranging and will occupy a variety of habitat types with no apparent preference for one type or another. They tend to be present in areas with few roads, low human presence and abundant prey bases. A minimum of approximately 4,000 to 5,000 square miles of contiguous habitat with low road density may be required to support a viable population. Gray wolves are reported to be rare in Washington and they are considered critically imperiled (i.e., at very high risk of extinction because of extreme rarity, very steep declines or other factors) (NatureServe 2021). PHS data does not indicate their presence in the Action Area (WDFW 2021a). The Action Area does not contain habitat for this species due to the lack of suitable forested areas and the presence of urban human activities. Therefore, gray wolves are not expected to occur in the Action Area. ■ North American Wolverine (Gulo gulo luscus). There are no known North American Wolverines inhabiting Renton. Wolverines are not expected to occur in the urban environment of the City. The likelihood of a wolverine entering the Action Area is minimal to none. ■ Marbled murrelet (Brachyramphus marmoratus). Marbled murrelet foraging occurs in marine waters and nesting occurs in old growth and mature forests. The closest designated critical habitat for the marbled murrelet occurs approximately 30 miles east of the Action Area for the project (USFWS 2021b). The Action Area does not contain habitat for this species due to the lack of marine foraging areas or old growth forest nesting areas. Therefore, marbled murrelets are not expected to occur in the Action Area. ■ Streaked Horned Lark (Eremophila alpestris strigata). This species typically utilizes open spaces dominated by grasses and other herbaceous vegetation (Stinson 2005). The adjacent Renton Municipal Airport partially meets these habitat needs but consists of predominantly asphalted surfaces and is surrounded by urban development. Although airports typically provided suitable habitat for this species, there are no populations identified at the Renton Municipal Airport (Stinson 2016). Therefore, streaked horned larks are not expected to be within the project area. ■ Yellow-billed cuckoo (Coccyzus americanus). Yellow-billed cuckoos are associated with open deciduous woodlands and deciduous forests that are at least 25 acres in size (NatureServe 2021). Yellow-billed cuckoos are not expected to occur in the developed riverine and shoreline environment where there are limited forested areas. The likelihood of a yellow-billed cuckoo entering the Action Area is minimal to none. 4.3. Utilization of Habitats by Listed Species Terrestrial habitats surrounding the project site are influenced by urban development. Vegetation within the riparian zone along this stretch of the Cedar River is comprised of a mix of: mature native trees and shrubs; recently planted native trees, shrubs and herbaceous species that were installed as mitigation for the 2016 maintenance dredging cycle; park landscaping, including ornamental trees, shrubs and mowed grasses; unmaintained grass areas; and sections dominated by invasive species. Aquatic habitats adjacent to the levees is highly modified as a result of the history of channel modification including the re-alignment of the lower Cedar River, as well as recurring dredging. The lower Cedar River through the project area is a straightened channel with floodwalls and levee embankements on either side, February 16, 2022 | Page 11 File No. 0693-078-01 bank armoring in places, and several bridges. Dredging of this section of river has been implemented repeatedly since the channel was constructed at the time the Cedar River was diverted from its original alignment into the Black River and Duwamish Channel to Lake Washington instead. The river was last dredged in 2016 and in 1998 before that. Recent mitigation has included removal of some hard bank armoring in favor of “soft” bioengineered bank stabilization methods, as well as other efforts to reduce the impacts of human alteration on rivering conditions. 4.3.1. Chinook Salmon The Puget Sound evolutionarily significant unit (ESU) for Chinook Salmon includes those stocks in tributaries of Puget Sound westward to the Elwha River. Spawning occurs in late summer and fall. The Cedar River is known to contain a native stock of Chinook Salmon with wild reproduction (USFWS 2011, WDFW 2021b, WDFW 2019). The Cedar River is a high priority area because it includes spawning areas higher up in the watershed (upstream from the project reach) and rearing areas, which occur downstream to the mouth of the river at Lake Washington, including the project reach (WRIA 8 2017). Recent data collected from a screw trap located upstream of the project reach, where Interstate 405 crosses the Cedar River, indicates 31,804 natural-origin Chinook parr emigrated into Lake Washington from the Cedar River during 2018, with a peak in early March (Lisi 2019). Therefore, Chinook Salmon are expected to occur seasonally in the Cedar River within the Action Area. 4.3.2. Steelhead The Puget Sound distinct population segment (DPS) of Steelhead includes winter- and summer-run Steelhead in the river basins of the Strait of Juan de Fuca, Puget Sound and Hood Canal, Washington, bounded to the west by the Elhwa River and to the north by the Nooksack River and Dakota Creek, both of which are included in the DPS (72 FR 26722). The Cedar River is known to support a native stock of winter Steelhead with wild reproduction (Cram et al 2018). As with Chinook, Steelhead spawning typically occurs upstream of the project reach; however, the project reach of the Cedar River is documented to provide year- round winter Steelhead rearing habitat (WDFW 2021a; 2021b). Therefore, Puget Sound Steelhead are expected to occur in the Cedar River within the Action Area. 4.3.3. Bull Trout Coastal/Puget Sound DPS Bull Trout occur within marine areas and freshwater streams of King County (75 FR 63897-64070). Native Bull Trout are present in some reaches of the Cedar River and in Lake Washington (WDFW 2021a; 2021b). Consequently, Bull Trout may occur in the Cedar River within the Action Area and are therefore addressed in this BA. Critical habitat for Bull Trout is not designated within the Action Area and is therefore not addressed. 4.3.4. Primary Constituent Elements of Salmon and Steelhead Critical Habitat The Cedar River is designated critical habitat for Chinook Salmon and Steelhead. Primary Constituent Elements (PCEs) for Chinook Salmon (70 FR 52630-52853) and Steelhead (81 FR 9252-9325) include: 1. Freshwater spawning sites with water quantity and quality conditions and substrate supporting spawning, incubation and larval development; 2. Freshwater rearing sites with water quantity and floodplain connectivity to form and maintain physical habitat conditions and support juvenile growth and mobility; water quality and forage supporting juvenile development; and natural cover such as shade, submerged and overhanging large wood, log February 16, 2022 | Page 12 File No. 0693-078-01 jams and beaver dams, aquatic vegetation, large rocks and boulders, side channels and undercut banks; 3. Freshwater migration corridors free of obstruction with water quantity and quality conditions and natural cover such as submerged and overhanging large wood, aquatic vegetation, large rocks and boulders, side channels, and undercut banks supporting juvenile and adult mobility and survival; 4. Estuarine areas free of obstruction with water quality, water quantity and salinity conditions supporting juvenile and adult physiological transitions between fresh and saltwater; natural cover such as submerged and overhanging large wood, aquatic vegetation, large rocks and boulders, and side channels; and juvenile and adult forage, including aquatic invertebrates and fishes, supporting growth and maturation; 5. Near-shore marine areas free of obstruction with water quality and quantity conditions and forage, including aquatic invertebrates and fishes, supporting growth and maturation; and natural cover such as submerged and overhanging large wood, aquatic vegetation, large rocks and boulders, and side channels; and 6. Offshore marine areas with water quality conditions and forage, including aquatic invertebrates and fishes, supporting growth and maturation. The project Action Area includes freshwater specific PCEs (PCEs 2 and 3) for both Chinook Salmon and Steelhead. PCE 1 (spawning sites) typically do not occur in the Action Area and are located further upstream in the watershed for both species. In-stream habitat within Action Area supports rearing and migration for Chinook Salmon and Steelhead, as well as other salmon species. The project site does not contain marine areas; therefore, PCEs 4, 5 and 6 are not present within the Action Area. 4.4. Occurrence Summary As described in Section 6.1 Operation of Construction Equipment and Section 6.2, Construction-Related Noise, some of the listed and proposed species and critical habitat that occur in King County are not expected to occur in the Action Area and are therefore not addressed in the remainder of this BA. The project will have no effect on the following species and critical habitat: ■ Gray wolf ■ North American wolverine ■ Marbled murrelet (including critical habitat) ■ Streaked horned lark (including critical habitat) ■ Yellow-billed cuckoo (including critical habitat) ■ Designated critical habitat for Bull Trout February 16, 2022 | Page 13 File No. 0693-078-01 5.0 ENVIRONMENTAL BASELINE Land use surrounding the project reach and Action Area, including some of the terrestrial portions of the Action Area, includes predominantly commercial and industrial development, as well as a narrow corridor of recreational park and riparian habitat on the right bank of the river, as well as on the left bank upstream (south) of Logan Avenue. 5.1. Terrestrial Habitat 5.1.1. Topography The upland topography in the project area is generally flat with some short steep banks along the Cedar River. The river banks in the project reach are armored in most areas with riprap and/or concrete and include slopes as steep as approximately a 2H:1V (Horizontal:Vertical) slope in some locations. 5.1.2. Vegetation Terrestrial habitat conditions within the project corridor are generally degraded and consist primarily of a narrow strip of riparian vegetation constrained by adjacent development, with high densities of invasive species. Vegetation within the project reach includes relatively mature trees and large shrubs, such as red alder, Pacific willow, Sitka willow and black cottonwood as well as recent native shrub plantings that have yet to mature. Invasive species management is being implemented by the City of Renton for areas that were previously designated as mitigation for the 2016 maintenance dredging cycle. Other areas continue to harbor invasive species communities including Japanese knotweed, reed canarygrass, Himalayan blackberry and Scotch broom. The Cedar River Trail Park is located immediately adjacent to the east bank of the Cedar River within the project reach. Cedar Triver Trail Park is maintained with extensive grass lawn areas, ornamental trees and manicured shrubs. 5.1.3. Suitable Habitat The Action Area does not contain suitable habitat for listed terrestrial species due to the high level of urban development and the lack of forested areas. Therefore, terrestrial species are not discussed further in this assessment. Terrestrial riparian vegetation performs a critical role in maintaining suitable habitat for salmonids in adjacent aquatic habitat. Native trees and shrubs within the riparian buffer provide: shade to the aquatic system, reducing water temperatures; nutrient inputs such as organic detritus; habitat supporting macroinvertebrate communities; and contribute large woody material (LWM) that increases habitat heterogeneity and encourages habitat-forming riverine processes, among other functions. Although salmon do not directly occupy terrestrial areas, condition of the terrestrial riparian vegetation adjacent to the river plays an important role in maintaining healthy aquatic habitat for salmon. 5.2. Freshwater Aquatic Habitat The Cedar River is a major tributary of Lake Washington providing approximately 57 percent of the flow into the lake. Cedar River is part of Washington State WRIA 8 – Cedar/Sammamish. Most of the lower Cedar River basin is rural and forested, with the exception of the cities of Renton and Maple Valley, which are heavily urbanized (Kerwin 2001). The lower Cedar River basin contains 60 percent forested land cover, 29 percent low- to medium-density development and 0.9 percent high-density development (King County 1997). The project reach of the Cedar River was diverted from the Green/Duwamish River system February 16, 2022 | Page 14 File No. 0693-078-01 into Lake Washington in 1912. This has resulted in the need for 64 percent of the lower Cedar River to have levees or revetments along at least one of the banks (Kerwin 2001). The lower reach of the Cedar River also requires recurrent maintenance dredging to remove sediment deposition and maintain flood flow conveyance while protecting adjacent infrastructure from flood damage. 5.2.1. General Aquatic Conditions The project reach of the Cedar River was artificially constructed when the Cedar River was diverted into Lake Washington and is constrained by levees and revetments. The project reach is linear and channelized, with limited habitat complexity. The river banks in this area are armored with riprap and/or retaining walls in some places, though recent efforts to remove hard armoring in favor of soft solutions have been implemented in some places during the prior 2016 maintenance dredge cycle. Through the project reach, the Cedar River is completely disconnected from its historic floodplain and off-channel habitat is mostly lacking. The low gradient within the project reach contributes to sediment loading (Kerwin 2001). River substrate is primarily composed of gravel with cobbles, sand and a very small fraction of silt. Dredging is necessary within this reach of the river to reduce flooding caused by sediment deposition. Riparian conditions are mixed within the Action Area. The Renton Municipal Airport is located immediately adjacent to the project on the left (west) bank. The right (east) bank of the river contains a riverfront park with managed lawn grasses, trees and shrubs. Beyond the park to the east is the Renton Boeing Facility. Development along the banks of the river has limited the riparian corridor to a small strip on either side of the river containing a mix of invasive and native plant species, which has been the subject of prior mitigation to offset the impacts of dredging. Three bridges cross the Cedar River in the project reach, contributing to interruption of the riparian buffer and overwater shading with static hard edges. 5.2.2. Suitable Habitat Although this portion of the Cedar River is highly altered and degraded, the project reach provides suitable migratory habitat and limited rearing habitat for anadromous salmonids, including documented use by Chinook Salmon and Steelhead as they migrate further upstream to suitable spawning reaches and downstream during outmigration toward the ocean. Bull Trout have been documented in Lake Washington but rarely in the Cedar River and they have not been observed in the WDFW trap in the lower river over the past 20 years. 6.0 ANALYSIS OF EFFECTS ON SPECIES AND HABITAT This section provides analysis of the effects the project is likely to have on Chinook Salmon, Steelhead and Bull Trout within the Action Area. Direct effects include all impacts directly associated with project implementation and construction activities as well as any disturbances that would occur very close to the time of construction. Indirect effects are those that could result from the project, but occur later in time. For this project, direct effects include: operation of construction equipment, construction-related noise, habitat alteration adjacent to the Cedar River and construction-related impacts to water quality. Indirect effects are related to the impact on food web dynamics and prey resources from removal of vegetation. Project-related direct and indirect effects on species and habitat are discussed in the following sections. February 16, 2022 | Page 15 File No. 0693-078-01 6.1. Operation of Construction Equipment As described in Section 3.0 Action Area, construction equipment will operate in upland locations near the banks of the river (riparian areas) in order to complete levee improvements. If ESA-listed species occur within the areas where construction equipment is operating, there could be a direct interaction resulting in harm or harassment. However, as presented in Section 4.2 Species and Critical Habitat Not Addessed in the Biological Evaluation, there are no ESA-listed terrestrial species or suitable habitat within the Action Area. As a result, operation of construction equipment will not affect listed terrestrial species. Likewise, listed salmonids including Chinook Salmon, Steelhead and potentially Bull Trout, could be present within the Cedar River channel. Since construction equipment will not operate below the OHWM, construction equipment will not directly affect listed fish species present in the Action Area. 6.2. Construction-Related Noise In-air construction noise may permeate terrestrial environments up to approximately 446 feet from the project area due to use of construction machinery that generates noise in excess of baseline conditions extending into the surrounding environment. Since there are no terrestrial ESA-listed species within the Action Area, in-air construction-related noise effects are non-existent. Equipment will not operate below the OHWM and therefore no in-water noise impacts will occur as part of this project. Therefore, construction- related noise will not affect listed fish species either. 6.3. Habitat Alteration 6.3.1. Riparian Habitat Temporary alteration of riparian habitat associated with the Cedar River is anticipated to result from construction of proposed levee improvements. Temporary habitat alteration consists of disturbance of turf grass and shrub communities, which will be removed during construction and subsequently restored. Vegetation that will be removed is primarily invasive or lacking in habitat function (e.g., manicured landscape shrubs and turf grass). However, in some areas, native shrubs will be affected. In a few locations, alteration of riparian habitat, including some tree removals, is permanent, due to either (1) displacement of the existing habitat by levee infrastructure, and/or (2) restrictions on replanting/restoring affected areas due to levee vegetation standards or the occurrence of underground utilities. GeoEngineers has developed a riparian habitat mitigation plan to document impacts to riparian habitat and associated mitigation (GeoEngineers 2021). Temporarily impacted areas will be restored with an equivalent or more functional habitat type than what is removed. For example, turf grass areas will typically be replaced with turf grass, landscaping shrubs will be replaced with native shrubs and invasive species communities will be replaced with native trees and shrubs. Permanently impacted areas will either be replaced with a lower functioning habitat type, for example where levee vegetation standards restrict the ability to replant trees, or will be completely displaced by proposed improvements. Permanent impacts are extremely limited for this project and will be mitigated using adjacent on-site compensatory mitigation, as documented in the Mitigation Plan. Native communities installed as restoration and compensatory mitigation, once established, are expected to provide greater levels of riparian function than existing communities they replace. Restoration and mitigation plantings will specify fast-growing species that are anticipated to become established within February 16, 2022 | Page 16 File No. 0693-078-01 1 to 2 years. However, there will still be a short-term temporal loss of functions that riparian vegetation provides during and immediately after construction work, which is accounted for by proposing mitigation ratios that exceed 1:1. Therefore, the net effects of vegetation impacts and restoration/mitigation are expected to be similar to or slightly beneficial with regard to habitat conditions relative to baseline conditions. Increasing riparian vegetation along the river banks will create overwater shading and increase invertebrate habitat along the margins of the river. These effects will improve habitat quality and quantity as well as increase food sources for salmonids. With implementation of appropriate site restoration and compensatory habitat mitigation, the short-term effects on riparian vegetation cover are considered insignificant. Because affected riparian habitat will be replaced with native communities that exceed the functional value of baseline conditions in some places, these actions will result in long-term beneficial effects. 6.3.2. Food Web Dynamics and Prey Resources Temporal loss of riparian vegetation is considered an indirect effect to short-term reductions of allocthonous inputs that may provide prey sources or support other prey resources. Because the project is in the lowest reach of the Cedar River, with ample source populations of benthic invertebrates immediately upstream that would be transported naturally into the reach, and most vegetation impacts are not immediately adjacent to the river, quantity of prey resources are not anticipated to be impacted by project actions. Loss of riparian habitat will be very limited, occurring primarily in areas dominated by invasive vegetation, and will be restored and/or mitigated as part of the project. Once restored plantings mature, they will replace this short term reduction in inputs. Therefore, this effect is anticipated to be insignificant. 6.3.3. Floodplain Habitat Functions The project will permanently increase the level of flood protection provided by the levee system. Consequently, there is potential for adverse impacts on floodplain habitat functions, such as flood storage capacity and refuge from high velocity flows, that are important to fish, particularly during times of high river discharge and/or flooding. With levee improvements, the level of isolation of the historic floodplain from the primary channel of the river will be maintained and/or increased. However, it should be noted that: (a) the historic floodplain adjacent to the project reach is highly developed and previously degraded from providing habitat functions; and (b) the levee system already isolates the historic floodplain from flows exceeding the 100-year recurrence interval flood – proposed improvements generally increase the freeboard requirement and therefore will not have a substantive effect on the level of floodplain isolation. Therefore, potential areas that could be isolated by the levee system provide limited habitat function and are already isolated at all but the most extreme flow levels due to prior topographic alterations and initial installation of the levee system, therefore rendering this effect discountable. Habitat-forming process, such as contribution of LWM, may be affected only to the extent there is alteration to the riparian vegetation community. Tree removals are limited and will be mitigated by planting replacement trees at an increased ratio. There will be no bank armoring or other bank alterations associated with the project. Spawning habitat for ESA-listed species does not occur within the Action Area and rearing or migratory habitats within the river will not be directly altered by the project because there will be no work below the OHWM. Therefore, there are no anticipated changes to habitat-forming processes that will result from the project. February 16, 2022 | Page 17 File No. 0693-078-01 6.4. Impacts to Water Quality Potential water quality impacts that could occur in the Cedar River during construction are anticipated to be limited to construction stormwater runoff associated with upland construction work adjacent to the river. Increased turbidity within the Cedar River is not anticipated with proper implementation of BMPs that will control and minimize transport of fine sediments off-site during construction. These BMP measures will include developing and implementing a TESC plan as part of the SWPPP. Therefore, effects of turbidity on critical habitat are considered discountable. 6.5. Interrelated and Interdependent Actions Interrelated actions are those that are part of a larger action and depend on the larger action for their justification. Interdependent actions are those that have no independent utility apart from the action being considered. There are no interdependent or interrelated actions associated with the proposed project. 7.0 EFFECT DETERMINATIONS Based on the analysis of effects presented in Section 6.0 Analysis of Effects on Species and Habitat, we have made effect determinations for each listed species and designated or proposed critical habitat that may occur in the Action Area. Effects determinations take into account all of the possible project effects; our determinations are summarized in Table 3 and discussed below. TABLE 3. EFFECT DETERMINATIONS FOR LISTED AND PROPOSED SPECIES Common Name Federal Status Jurisdiction Effect Determination for Species Effect Determination for Critical Habitat Chinook Salmon Threatened NMFS NLTAA NLTAA Steelhead trout Threatened NMFS NLTAA NLTAA Bull Trout Threatened USFWS NLTAA N/A Notes: NLTAA = Not Likely to Adversely Affect 7.1. Chinook Salmon and Steelhead The project may affect Chinook Salmon and Steelhead because: ■ Suitable habitat for these species is present in the Cedar River within the Action Area, and they have been documented to utilize the river as a migratory corridor and rearing area within the Action Area. ■ Project construction activities will alter riparian habitat and potentially generate turbidity, temporarily degrading water quality in the Cedar River. The project is not likely to adversely affect Chinook Salmon and Steelhead because: ■ Construction equipment will not operate within the water in potentially occupied habitat. ■ Construction-related noise will not permeate underwater environments. ■ Impacted riparian habitat will be restored and/or mitigated following construction. February 16, 2022 | Page 18 File No. 0693-078-01 ■ Construction activities will incorporate BMPs to minimize turbidity impacts from stormwater. The project may affect designated critical habitat for Chinook Salmon and Steelhead because: ■ The Action Area includes portions of the Cedar River and associated riparian buffer that are designated as Critical Habitat for these species. ■ Construction will involve removal of vegetation within the riparian buffer of the Cedar River. The project is not likely to adversely affect designated critical habitat for Chinook Salmon and Steelhead because: ■ Temporary impacts to riparian habitat predominantly affect invasive species communities or other low value habitat (mowed grass, landscape shrubs); temporarily affected vegetation will be restored following construction with replacement plantings of an equal or better habitat functional value. ■ Permanent alteration of riparian habitat adjacent to the Cedar River, either by degrading habitat that will not be able to be restored or fully displacing habitat, will be mitigated through adjacent riparian habitat enhancements, resulting in no net loss of riparian habitat function. ■ The project will have no impacts on in-stream habitat. 7.2. Bull Trout The project may affect Bull Trout because: ■ Suitable habitat for Bull Trout is present in Lake Washington, which is hydrologically connected to portions of the Cedar River within the Action Area; there are no barriers preventing Bull Trout from entering the project reach of the Cedar River. ■ Project construction activities will alter riparian habitat and potentially generate turbidity, temporarily degrading water quality in the Cedar River. The project is not likely to adversely affect Bull Trout because: ■ Bull trout have not been documented to use portions of the Cedar River within the Action Area; the chance of occurrence of Bull Trout is considered discountable, and therefore, alteration of riparian habitat (the effects of which are insignificant) and potential construction-related elevated turbidity (which is discountable itself) are not anticipated to impact this species. 8.0 ESSENTIAL FISH HABITAT EVALUATION The MSA, as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), includes a mandate that NMFS must identify EFH for federally managed marine fish, and federal agencies must consult with NMFS on activities that may adversely affect EFH. The Pacific Fisheries Management Council has designated EFH for the Pacific salmon fishery, and federally managed groundfish and coastal pelagic fisheries. The objective of the EFH assessment is to describe potential adverse effects to designated EFH for federally managed fisheries species within the proposed Action Area. It also describes conservation February 16, 2022 | Page 19 File No. 0693-078-01 measures proposed to avoid, minimize or otherwise offset potential adverse effects to designated EFH resulting from the proposed action. 8.1. Designated EFH within the Action Area There is no habitat for coastal pelagic or groundfish species within the Action Area. The Pacific salmon fishery management unit includes Chinook Salmon, Coho Salmon (O. kisutch) and Pink Salmon (O. gorbuscha). Pacific salmon designated EFH includes all streams, lakes, ponds, wetlands and other water bodies currently or historically accessible to salmon in Washington State, except above impassable barriers. Estuarine and marine areas extend from the nearshore and tidal submerged environments within Washington territorial waters out to the full extent of the exclusive economic zone offshore (PFMC 2014). Therefore, the Cedar River is designated EFH for Pacific salmon. 8.2. Effects of the Proposed Action on EFH As stated in the BA analysis above, the project will not alter habitat within the Cedar River. Project impacts to fish habitat are limited to alteration of riparian vegetation. Impacted vegetation predominantly consists of invasive species. These areas will be restored following completion of construction, in accordance with the approved mitigation plan for the project, which has considered levee and airport restrictions,. Native communities, once they are established, are expected to provide greater levels of riparian function than many of the existing communities affected by the project. Proposed project-specific mitigation is anticipated to offset impacts and therefore the appropriate effect determination for Pacific salmon EFH is will not adversely affect. 9.0 CONCLUSIONS The Cedar River Section 205 Levee Certification Project will involve levee improvements to the existing Cedar River levee system to meet current flood design standards necessary for levee certification. The project will require the use of heavy machinery including excavators and concrete saw and paving equipment. Project impacts will include operation of construction equipment, construction noise, riparian habitat alteration and potential impacts to water quality. However, the project has been carefully designed to minimize these effects and mitigation has been identified to offset unavoidable impacts as described in this report. The Action Area for the project was defined as the sum of extents of all project effects on the environment and comprises a 446-foot-radius around the project site. The Action Area was largely dictated by the extent that in-air construction noise could permeate the environment. There is no work proposed below the OHWM. It was determined that fish species are the only ESA-listed species that may be present in the Action Area for the project, including Chinook Salmon, Steelhead and Bull Trout. The effects determination for the project is not likely to adversely affect Puget Sound ESU Chinook Salmon, Puget Sound DPS Steelhead trout and Bull Trout. The effects determination for designated critical habitat for both Chinook and Steelhead is also not likely to adversely affect. The project will have no effect on other listed species, including no effect on designated critical habitat for Bull Trout. Additionally, the project will not adversely affect EFH for Pacific salmon. February 16, 2022 | Page 20 File No. 0693-078-01 10.0 REFERENCES 70 FR 52630-52853. 2005. 50 CFR Part 226. Endangered and Threatened Species; Designation of Critical Habitat for 12 Evolutionary Significant Units of West Coast Salmon and Steelhead in Washington, Oregon and Idaho. Federal Register, Vol. 70, No. 170. 72 FR 26722. 50 CFR Part 223. Endangered and Threatened Species: Final Listing Determination for Puget Sound Steelhead. Federal Register, Vol. 72, No. 92. 2007. 75 FR 63897-64070. 2010. 50 CFR Part 17. Endangered and Threatened Wildlife and Plants; Revised Designation of Critical Habitat for Bull Trout in the Coterminous United States; Final Rule. Federal Register, Vol. 75, No. 200. 81 FR 9252-9325. 2016. Endangered and Threatened Species; Designation of Critical Habitat for Lower Columbia River Coho Salmon and Puget Sound Steelhead. Department of Commerce, National Oceanic and Atmospheric Administration. Federal Register, Vol. 81, No. 36. February 24, 2016 Cram, J, N. Kendall, A. Marshall, T. Buehrens, T. Seamons, B. Leland, K. Ryding, and E. Neatherlin 2018. Steelhead at Risk Report: Assessment of Washington’s Steelhead Populations. Available at: https://wdfw.wa.gov/sites/default/files/publications/02070/fpt_19- 03%20steelhead%20at%20risk_oct%202018_final.pdf. GeoEngineers, Inc. (GeoEngineers). 2021. Riparian Mitigation Plan, Cedar River 205 Levee Certification Project, Renton, Washington. Prepared for Tetra Tech, Inc. Draft in progress. GeoEngineers File No. 0693-078-01. Kerwin, J., 2001. Salmon and Steelhead Habitat Limiting Factors Report for the Cedar – Sammamish Basin (Water Resource Inventory Area 8). Washington Conservation Commission. Olympia, WA. Available at: https://www.snohomishcountywa.gov/ArchiveCenter/ViewFile/Item/2136 King County. 1997. Seattle’s Watersheds Outside the Municipal Boundaries. Seattle Public Utilities. Available at: https://www.seattle.gov/util/cs/groups/public/@spu/@conservation/documents/ webcontent/spu01_002713.pdf Lisi, P., 2019. Evaluation of Juvenile Salmon Production in 2018 from the Cedar River and Bear Creek. Washington State Department of Fish and Wildlife. FPA 19-03. April 2019. Available at: https://wdfw.wa.gov/sites/default/files/publications/02082/wdfw02082.pdf National Oceanic and Atmospheric Administration – Nation Marine Fisheries Service (NOAA Fisheries). 2021. Protected Resource App. https://www.webapps.nwfsc.noaa.gov/portal/apps/ webappviewer/index.html?id=7514c715b8594944a6e468dd25aaacc9&extent=- 13608376.5375%2C6020796.9238%2C-13599204.0941%2C6024962.7419%2C102100 NatureServe, 2021. Available at: http://explorer.natureserve.org/#. Pacific Fishery Management Council (PFMC) 2014. Appendix A to the Pacific Coast Salmon Fishery Management Plan. Available at: https://www.pcouncil.org/documents/2019/08/salmon-efh- appendix-a.pdf/ February 16, 2022 | Page 21 File No. 0693-078-01 Public Law 104-267. Sustainable Fisheries Act. Senate Report. S39. Senate Commerce, Science and Transportation Committee. Available at: https://www.congress.gov/congressional-report/104th- congress/senate-report/276/1 Stinson, D 2005. Draft Washington State Status Report for the Mazama Pocket Gopher, Streaked Horned Lark, and Taylor’s Checkerspot. Washington State Department of Fish and Wildlife. July 2005. At: https://wdfw.wa.gov/sites/default/files/publications/00390/draft_prairie_species.pdf Stinson, D.W. 2016. Periodic Status Review for the Streaked Horned Lark in Washington. Washington Department of Fish and Wildlife. Olympia, Washington. Available at: https://wdfw.wa.gov/publications/01774/wdfw01774.pdf. United States Fish and Wildlife Service (USFWS). 2011. Movement and Habitat Use of Chinook Salmon smolts in the Lake Washington Ship Canal, 2007-2008 Acoustic Tracking Studies. United States Fish and Wildlife Service (USFWS). 2021a. List of Threatened and Endangered Species that May Occur in Your Proposed Project Location, and/or May Be Affected By Your Proposed Project. Consultation Tracking Number: 01EWFW00-2021-SLI-0924. April 15, 2021. United States Fish and Wildlife Service. (USFWS). 2021b. Critical Habitat Portal: Online Mapper and Spatial Data Distribution. Available at https://ecos.fws.gov/ecp/report/table/critical-habitat.html. Washington Department of Fish and Wildlife (WDFW). 2019 Joint Staff Report: Stock Status and Fisheries For Spring Chinook, Summer Chinook, Sockeye, Steelhead, And Other Species. https://wdfw.wa.gov/sites/default/files/publications/02043/wdfw02043.pdf Washington Department of Fish and Wildlife (WDFW). 2021a. Priority Habitat and Species Interactive Map Viewer. Available at: http://wdfw.wa.gov/mapping/phs/ Washington Department of Fish and Wildlife (WDFW). 2021b. Statewide Washington Integrated Fish Distribution. https://geo.nwifc.org/SWIFD/ Washington Department of Natural Resources (DNR). 2020. Sections that Contain Natural Heritage Features. Available at: http://www.dnr.wa.gov/Publications/amp_nh_trs.pdf. Washington State Department of Ecology (Ecology). 2019. (2012, Amended in 2019). “Stormwater Management Manual for Western Washington.” Available at: http://www.ecy.wa.gov/programs/wq/stormwater/manual.html Washington State Department of Transportation. 2020. Biological Assessment Preparation for Transportation Projects: Advanced Training Manual. Available at https://www.wsdot.wa.gov/ environment/technical/fish-wildlife/esa-efh/BA-preparation-manual, revised August 2020. Washington State Department of Transportation (WSDOT). 2021. Standard Specifications for Road, Bridge, and Municipal Construction. Publication Number M 41-10. September 9, 2020. Water Resources Inventory Area (WRIA) 8. 2017. Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan, 10-year Update. Available at: https://www.govlink.org/watersheds/8/reports/pdf/wria-8-ten-year-salmon-conservation-plan- combined-10-25-2017.pdf FIGURES 500 0 500 Feet Notes: 1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intendedto assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and contentof electronic files. The master file is stored by GeoEngineers, Inc.and will serve as the official record of this communication. Projection: NAD 1983 HARN StatePlane Washington North FIPS 4601 Feet Legend Bank Stationing Cedar River Levee Alignment Ordinary High Water Mark (OHWM) Vegetation Conservation Buffer Identified Improvements Improve transition from levee embankment to wall Raise and extend existing wall Raise levee embankment/Regrade Floodwall/Retaining Wall P:\0\0693078\GIS\MXD\069307801_F01_OverviewVMMap.mxd Date Exported: 10/11/21 by ccabrera Cedar R i v e r FACTORYAVE N N 1ST ST STEVENSAVE N WS 115TH PLBURNETTAVE S S 2ND ST85TH AVESS 117TH PLGARDEN AVE N S122NDSTS 120TH ST84TH AVE S 87THAVE S S TOBIN STRAINIERAVES N AIRPORT WAY SHATTUCK AVES 88TH AVE SS 116TH STSTILLICUMST89THAVES NW 7TH STN 6TH STS 118TH STWELLSAVESHOUS ER WAY N S 123RDST86TH CTS S123RDPLN MARION STMAIN AVE S TAYLOR AVE NW N 2ND STN 3RD STN 4TH STN 5TH STS 117TH STFACTORY PL N S 121ST STWILLIAMSAVE S LIND AVE N W LOGAN AVE S PELLYAVE N S 119TH STBUR N E T T P L S PARK AVE N L O G A N A V E N MEADO W AVE N NW6THSTWELLS AVE N WILLIAMS AVE NBURNETTAVE N SL A T E R S T S RAINIERAVEN N RIV E R S I D E D R 0+00 5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 Data Source: 2019 image and streets from King County GIS. ESRI.Bank, stationing and improvements from Tetra Tech, August 2019. Cedar River Section 205 Levee SystemImprovement Locations Overview and Vicinity Map Cedar River 205 Levee Certification ProjectRenton, Washington Figure 1 SITE 500 0 500 Feet Notes: 1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intendedto assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and contentof electronic files. The master file is stored by GeoEngineers, Inc.and will serve as the official record of this communication. Projection: NAD 1983 HARN StatePlane Washington North FIPS 4601 Feet Legend Action Area (In-Air Noise) Bank Stationing Cedar River Bank Ordinary High Water Mark (OHWM) Vegetation Conservation Buffer Identified Improvements Improve transition from levee embankment to wall Raise and extend existing wall Raise levee embankment/Regrade Floodwall/Retaining Wall P:\0\0693078\GIS\MXD\069307801_F02_ActionArea.mxd Date Exported: 10/11/21 by ccabrera Cedar R i v e r FACTORYAVE N N 1ST ST STEVENSAVE N WS 115TH PLBURNETTAVE S S 2ND ST85TH AVESS 117TH PLGARDEN AVE N S122NDSTS 120TH ST84TH AVE S 87THAVE S S TOBIN STRAINIERAVES N AIRPORT WAY SHATTUCK AVES 88TH AVE SS 116TH STSTILLICUMST89THAVES NW 7TH STN 6TH STS 118TH STWELLSAVESHOUS ER WAY N S 123RDST86TH CTS S123RDPLN MARION STMAIN AVE S TAYLOR AVE NW N 2ND STN 3RD STN 4TH STN 5TH STS 117TH STFACTORY PL N S 121ST STWILLIAMSAVE S LIND AVE N W LOGAN AVE S PELLYAVE N S 119TH STBUR N E T T P L S PARK AVE N L O G A N A V E N MEADO W AVE N NW6THSTWELLS AVE N WILLIAMS AVE NBURNETTAVE N SL A T E R S T S RAINIERAVEN N RIV E R S I D E D R 0+00 5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 Data Source: 2017 image and streets from King County GIS.Bank, stationing and improvements from Tetra Tech, August 2019. Cedar River Section 205 Levee SystemVicinity Map and Action Area Cedar River 205 Levee Certification ProjectRenton, Washington Figure 2446 feetSITE APPENDICES APPENDIX A Project Design Drawings KING SNOHOMISH SKAGIT WHATCOM PIERCE KITSAP JEFFERSON CLALLAM SAN JUAN ISLAND MASON GRAYS HARBOR THURSTON KITTITAS YAKIMA ABERDEEN FORKS PORT ANGELES OLYMPIA TACOMA SEATTLE EVERETT BELLINGHAM PROJECT SITE LAT:47° 29' 34.12" LONG:122° 12' 47.07" DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED: IN COMPLIANCE WITH CITY OF RENTON STANDARDS FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 G-01 COVER SHEET.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEE IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 COVER SHEET GENERAL NOTES 1.PRIOR TO GRADING, ALL VEGETATION, TRASH, AND DEBRIS SHALL BE REMOVED FROM ALL AREAS OF CONSTRUCTION. 2.IMPORT SOILS SHALL BE OBSERVED AND EVALUATED BY THE PROJECT ENGINEER PRIOR TO TRANSPORTING THE SOILS TO THE PROJECT SITE. 3.EXISTING ROCK RIPRAP SHALL BE PROTECTED IN PLACE. REMOVE AND STOCKPILE INTERFERING PORTION OF EXISTING ROCK RIPRAP BANK PROTECTION AND REPLACE PER SPECIFICATIONS. 4.PORTIONS OF THE CONSTRUCTION SITE ARE ADJACENT TO OR LOCATED WITHIN THE RENTON MUNICIPAL AIRPORT. THE CONTRACTOR SHALL COORDINATE WITH THE RENTON MUNICIPAL AIRPORT WHEN SITE ACCESS REQUIRES TRAVELING THROUGH THE AIRPORT LIMITS OR WHEN WORKING WITHIN THE AIRPORT LIMITS. 5.EXISTING SIDEWALKS, SHARED USE PATHS, ROADWAYS, FENCES, GATES, GUARD RAILS, MARKED UTILITIES, AND OTHER EXISTING INFRASTRUCTURE SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 6.ANY DAMAGE TO THE EXISTING SHARED USE PATHS, SIDEWALKS, ROADWAYS, UTILITIES, OR OTHER EXISTING INFRASTRUCTURE SHALL BE REPLACED IN KIND PER CURRENT CITY OF RENTON STANDARDS AT THE CONTRACTOR'S EXPENSE. 7.THE TEMPORARY WORK AREA LIMITS SHALL BE STAKED AND ALL EQUIPMENTS SHALL BE OPERATED WITHIN THE TEMPORARY WORK ARE LIMITS. 8.THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION AND INVERT ELEVATIONS OF EXISTING UTILITY PIPES CROSSING UNDER THE EXISTING LEVEE PRISM PRIOR TO CONSTRUCTION AND REPORT THAT INFORMATION TO THE PROJECT ENGINEER. 9.PROTECT ALL TREES, BUSHES, SHRUBS, OR OTHER LARGE VEGETATION UNLESS OTHERWISE NOTED. 10.CONTRACTOR SHALL VERIFY THE LOCATION OF TREES, BUSHES, SHRUBS, OR OTHER LARGE VEGETATION PRIOR TO BEGINNING EXCAVATION/GRADING ACTIVITIES IN AREAS ADJACENT TO TREES OR LANDSCAPING AREAS. 11.NO CONSTRUCTION EQUIPMENT SHALL CROSS THE EXISTING PUBLIC ACCESS PATH WITHOUT A GROUND GUIDE. DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 G-02 GENERAL NOTES.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM GENERAL NOTES AGENCY DEPARTMENT/UTILITY CONTACT PHONE EMAIL PSE GAS JEFF KIESZ 206.348.2347 Jeffrey.Kiesz@pse.com BOEING 1ST SHIFT PLUMBER LEAD (6:00AM - 2:00PM)KYLE GROBLER 252.273.8727 kyle.e.grobler@boeing.com BOEING 2ND SHIFT PLUMBER (2:00PM - 10:00PM)MIKE HANSOW 425.336.9183 michael.h.hansow@boeing.com BOEING BOEING INFRASTRUCTURE MANAGER GABE BERG 206.495.7773 BOEING MECHANICAL ENGINEER JOHN TAYLOR 206.245.9301 john.taylor20@boeing.com BOEING MECHANICAL ENGINEER THOMAS KAJOR 253.241.2072 thomas.p.kajor@boeing.com BOEING DISPATCH (IF UNABLE TO REACH STAFF)206.544.6500 BOEING EMERGENCY HOTLINE 206.655.2222 KING COUNTY WASTEWATER MARK LAMPARD 206.477.5414 Ipa.team@kingcounty.gov COR WATER ABDOUL GAFOUR 425.430.7210 Agafour@Rentonwa.gov COR WASTEWATER JOE STOWELL 425.430.7212 jstowell@Rentonwa.gov COR SURFACE WATER AMANDA PIERCE 425.430.7205 APierce@Rentonwa.gov COR AIRPORT WILLIAM ADAMS 425.430.7473 wadams@rentonwa.gov COR TRANSPORTATION BOB HANSON 425.430.7223 bhanson@rentonwa.gov UTILITIES AND CITY OF RENTON CONTACT LIST EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES 1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE-CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2.THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3.THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST-PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4.THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK-OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6.WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF-SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUR CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON-SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7.ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON-SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON-SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10.APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE, NOR LOCATION OF PIPES, RESTRICTIONS, CHANNELS, OR STORMWATER FACILITIES. 11.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15.THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18.ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON-SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20.PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT-LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON-SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. FLOODWALL / FLOODWALL ADDITION FLOODWALL / FLOODWALL ADDITION (PROFILE AND SECTION VIEW) ORDINARY HIGH WATER 100-YEAR WSE MINIMUM FREEBOARD TEST HOLE LOCATIONS EMBANKMENT FILL EMBANKMENT OVERBUILD EXCAVATION LIMITS SHORING FULL DEPTH ROAD REPLACEMENT REPLACED PAVEMENT (SECTION VIEW) CONCRETE SIDEWALK CRUSHED SURFACING BASE COURSE GRADE BREAK PROTECT EXISTING TREE CONCRETE CURB WALL CUT LINE FILL LINE CRUSHED SURFACING TOP COURSE OHW C F FOUND MONUMENT (AS NOTED) FOUND REBAR (AS NOTED) CALCULATED MONUMENT SET STAKE MEASURED DISTANCE CALCULATED DISTANCE PLAT DISTANCE SANITARY SEWER MANHOLE YARD DRAIN CATCH BASIN (CB) STORM DRAIN MANHOLE STORM DRAIN CLEANOUT WATER VALVE FIRE HYDRANT FIRE DEPARTMENT CONNECTION IRRIGATION CONTROL VALVE CONCRETE VALVE MARKER WATER METER HOSE BIB POST-INDICATOR VALVE GAS VALVE GAS METER ELECTRIC HANDHOLE ELECTRIC JUNCTION BOX ELECTRIC METER UTILITY POLE WITH LIGHT YARD LIGHT UTILITY POLE STREET LIGHT VAULT GUY ANCHOR BOLLARD SIGN - WOODEN POST SIGN - METAL POST WETLAND FLAG MONITORING WELL BORE HOLE CONIFEROUS TREE DECIDUOUS TREE SPECIAL EXCEPTION (#) OVERHEAD WIRE WHEELCHAIR RAMP CONCRETE CONCRETE CURB EXTRUDED CONCRETE CURB EXISTING DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 G-03 LEGEND, SYMBOLS AND ABBREVIATIONS.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM INVERT ELEVATION CONCRETE PIPE CHAINLINK FENCE WOOD FENCE SANITARY SEWER MANHOLE STORM DRAIN LINE SANITARY SEWER LINE RIGHT OF WAY FENCE ROCKERY CENTERLINE RIGHT OF WAY PLAT LOT LINE PROPERTY LINE EXISTING PAVEMENT (SECTION VIEW) EXISTING FLOODWALL SD SS X AVE B/FTG CL CONC CONST COR CSBC CSTC DESC EG EL EXST FG HMA HORIZ HPW IE LF MAX MIN MSE OHW PG PSE ROW RT SD SS STD T/C T/FTG T/W TESC TYP USACE VERT W/ W WSDOT WSE AVENUE BOTTOM OF FOOTING CENTERLINE, CLASS CONCRETE CONSTRUCTION CITY OF RENTON CRUSHED SURFACING BASE COURSE CRUSHED SURFACING TOP COURSE DESCRIPTION EXISTING GROUND ELEVATION EXISTING FINISHED GRADE HOT MIX ASPHALT HORIZONTAL HIGH PRESSURE WATER INVERT ELEVATION LINEAR FEET MAXIMUM MINIMUM MECHANICALLY STABILIZED EARTH ORDINARY HIGH WATER PAVEMENT GRADE PUGET SOUND ENERGY RIGHT OF WAY RIGHT TANGENT STORM DRAIN SANITARY SEWER STANDARD TOP OF CURB TOP OF FOOTING TOP OF WALL TEMPORARY EROSION AND SEDIMENT CONTROL TYPICAL UNITED STATES ARMY CORPS OF ENGINEERS VERTICAL WITH WATER WASHINGTON STATE DEPARTMENT OF TRANSPORTATION WATER SURFACE ELEVATION ABBREVIATIONS PROPOSED LEGEND LEGEND, SYMBOLS AND ABBREVIATIONS TOPSOIL STRIPPING RIP RAP REMOVAL AREA SILT FENCE STRAW WATTLES HIGH VISIBILITY FENCE SAWCUT INLET PROTECTION REMOVE SHRUB REMOVE TREE REMOVE EXISTING FLOODWALL CLEAR AND GRUB LIMITS REMOVE EXISTING FEATURE TEMPORARY CONSTRUCTION FENCE SF TESC LEGEND HVF C&G 100' FROM NORTH BOEING BRIDGE PUBLIC ROW RIGHT BANK USACE ALIGNMENT NORTH BOEING BRIDGESEE SHEET C-101CEDAR RIVER LEFT BANK USACE ALIGNMENTRENTON MUNICIPAL AIRPORT 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 10+0 0 11+0 0 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 CONTROL POINT 1686 CONTROL POINT 1687 100' FROM SOUTH BOEING BRIDGEBOEING RENTON FACILITY RENTON MUNICIPAL AIRPORT RENTON MEMORIAL STADIUM RIGHT BANK USACE ALIGNMENT SEE SHEET C-111 SEE SHEET C-102 CEDAR RIVER SEE SHEET C-103 LEFT BANK USACE ALIGNMENT 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 SOUTH BOEING BRIDGE32+00 33+00 34+0 0 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 EXISTING 12" CITY WATER LINE CROSSING UNDER CEDAR RIVER RIGHT BANK USACE ALIGNMENT LEFT BANK USACE ALIGNMENT RENTON SENIOR ACTIVITY CENTER LOGAN AVENUE BR IDGE SEE SHEET C-114 SEE SHEET C-105 SEE SHEET C-109 CEDAR RIVER CEDA R R I V E R RIGHT RIVER BANK 100' FROM LOGAN AVENUE BRIDGE LEFT RIVER BANK 47+ 0 0 48+00 49+00 50+0 0 51+0 0 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60 + 0 0 61+0062+00 63+00 63+94.85 56+00 57+ 0 0 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 68+84.19 2-12" BOEING HIGH PRESSURE WATER LINES SEE SHEET C-112 CONTROL POINT 301 CONTROL POINT 302 CONTROL POINT 3667 SEE SHEET C-113 SURVEY CONTROL TABLE PT# 300 301 302 1686 1687 3667 NORTHING 178057.70 179385.80 179471.24 183719.68 183619.80 180338.67 EASTING 1302312.06 1301191.52 1301255.02 1299022.00 1299022.03 1300258.90 ELEVATION 112.41 39.99 40.75 27.41 23.49 40.16 DESCRIPTION GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) GP17405-66 3 1/2" BRASS DISK, IN CONCRETE SIDEWALK AT THE SR-405 - RENTON AVE. UNDERCROSSING (NOT SHOWN ON PLANS) (MONUMENT NO. TBD AT 90%) 3" BRASS DISK WITH PUNCH, FLUSH WITH CONCRETE (LOCATION TO BE CONFIRMED FOR 90%) (MONUMENT NO. TBD AT 90%) 3" BRASS DISK WITH PUNCH, FLUSH WITH CONCRETE (LOCATION TO BE CONFIRMED FOR 90%) (MONUMENT NO. TBD AT 90%) MONUMENT IN CASE, 3" BRASS DISK AT TOP OF LEVEE EMBANKMENT NEAR RENTON MUNICIPAL AIRPORT WEATHER STATION (MONUMENT NO. TBD AT 90%) MONUMENT IN CASE, 3" BRASS DISK AT RENTON MUNICIPAL AIRPORT WEATHER STATION COR BM 2120 2 1/2" BRASS DISK IN CONCRETE GUARDRAIL AT LOGAN AVENUE BRIDGENNNMATCHLINE STATION 32+00RIGHT BANK USACE ALIGNMENTMATCHLINE STATION 56+00RIGHT BANK USACE ALIGNMENTMATCHLINE STATION 56+00RIGHT BANK USACE ALIGNMENTMATCHLINE STATION 32+00RIGHT BANK USACE ALIGNMENT0 SCALE: 50'100'200' 1'' = 100' NOTE 1.USACE STATIONING BASED ON "LOWER CEDAR RIVER FLOOD CONTROL: LEVEES AND FLOODWALLS" PREPARED BY THE US ARMY CORPS OF ENGINEERS, SEATTLE DISTRICT DATED DECEMBER 03, 1998 AND SURVEY CONTROL OVERALL SITE PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-01 OVERALL SITE PLAN - USACE.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM BOEING RENTON PLANT SURVEY CONTROL NOTES 1.HORIZONTAL DATUM: NAD 83/11, WASHINGTON STATE PLAN NORTH. 2.VERTICAL DATUM: NAVD 88, WSDOT MONUMENT GP17405-66. OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW HVFHVFHVFC&GC&GC&GC&GC&G C&G C&G SF SF SP 1 2 3 4 5 6 25 25 23 24 24 26 26 27 27 20 18 19 21 22 23 CEDAR RIVER 7 8 100-YEAR FLOOD EXTENTS 9 SUGGESTED TOPSOIL STOCKPILE LOCATION TESC AND SITE PREPARATION PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 TEC-01 TESC AND SITE PREP PLAN.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM IMPROVE FLOODWALL TO EMBANKMENT TRANSITION LB STA 18+50 TO 19+50 SCALE: 1" = 10' KEY NOTES EXISTING PAVEMENT TO SERVE AS CONSTRUCTION ENTRANCE. INSTALL SILT FENCE PER CITY OF RENTON STANDARD PLAN 214.00 ON RIVER SIDE OF EXISTING LEVEE, DOWN SLOPE FROM CONSTRUCTION SITE. INSTALL STRAW WATTLES PER CITY OF RENTON STANDARD PLAN 213.40. INSTALL HIGH VISIBILITY FENCE PER WSDOT STANDARD PLAN I-10.10-01. SURROUND WEATHER STATION WIND TOWER WITH HIGH VISIBILITY FENCE (SEE KEYNOTE 4). PROTECT WEATHER STATION WIND TOWER DURING CONSTRUCTION. PROTECT EXISTING 3" BRASS DISK. REMOVE EXISTING RIP RAP AND STOCKPILE FOR RE-USE. STRIP EXISTING TOPSOIL AND STOCKPILE FOR REUSE. 0 SCALE: 5'10'20' 1'' = 10'NEROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES SEE SHEET G-02 FOR THE CITY OF RENTON'S ESC STANDARD PLAN NOTES. RECOMMENDED CONSTRUCTION SEQUENCE 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATION WITH THE REQUIRED NOTICE OF A CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE-RELATED pH MEASURES FOR UTILITY, VAULT, OR ROADWAY CONSTRUCTION). 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION CONSTRAINTS 1.ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL PROJECT PERMITS. 2.THIS SITE IS LOCATED WITHIN THE RENTON MUNICIPAL AIRPORT LIMITS. THE CONSTRUCTION CONTRACTOR SHALL COORDINATE WITH THE RENTON MUNICIPAL AIRPORT WHEN TRAVELING WITHIN THE AIRPORT LIMITS AND WHEN WORKING WITHIN THE AIRPORT LIMITS. 3.NO TEMPORARY OR PERMANENT ESC BMPS MAY BE PLACED WITHIN THE ORDINARY HIGH WATER MARK. 2 3 1 4 5 6 7 8 9 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 252426272825 23 24 1 CEDAR RIVER 100-YEAR FLOOD EXTENTS 1 3 2 4 5 1 6 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 25 25 23 23 24 24 26 26 27 27 28 28 29 29 SF SF SF SF SF SF SF SF SF CEDAR RIVER 100-YEAR FLOOD EXTENTS 3 2 4 1 5 2 BEGIN REMOVING AND RESETTING GUARDRAILEND REMOVING AND RESETTING GUARDRAIL6 POINT TABLE POINT 1 2 NORTHING 182674.5± 182319.3± EASTING 1299266.8± 1299355.3± DESCRIPTION BEGIN REMOVING AND RESETTING GUARDRAIL END REMOVING AND RESETTING GUARDRAIL TESC AND SITE PREPARATION PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 TEC-02 TESC AND SITE PREP PLAN.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM LEVEE EMBANKMENT WITH CURB WALL LB STA 29+50 TO 33+50 SCALE: 1" = 20' FLOODWALL ADDITION AND CURB WALL LB STA 26+50 TO 29+50 SCALE: 1" = 20' KEY NOTES EXISTING PAVEMENT TO SERVE AS CONSTRUCTION ENTRANCE. INSTALL SILT FENCE PER CITY OF RENTON STANDARD PLAN 214.00 ON RIVER SIDE OF EXISTING LEVEE, DOWN SLOPE FROM CONSTRUCTION SITE. INSTALL STRAW WATTLES PER CITY OF RENTON STANDARD PLAN 213.40. INSTALL INLET PROTECTION PER CITY OF RENTON STANDARD PLAN 216.30 AT ALL INLETS WITHIN 500 FEET DOWNSTREAM OF THE PROJECT SITE. REMOVE AND RESET EXISTING GUARDRAIL, SEE SHEET C-103. REMOVE EXISTING CHAINLINK FENCE. EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES SEE SHEET G-02 FOR THE CITY OF RENTON'S ESC STANDARD PLAN NOTES. RECOMMENDED CONSTRUCTION SEQUENCE 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATION WITH THE REQUIRED NOTICE OF A CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE-RELATED pH MEASURES FOR UTILITY, VAULT, OR ROADWAY CONSTRUCTION). 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION CONSTRAINTS 1.ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL PROJECT PERMITS. 2.THIS SITE IS LOCATED WITHIN THE RENTON MUNICIPAL AIRPORT LIMITS. THE CONSTRUCTION CONTRACTOR SHALL COORDINATE WITH THE RENTON MUNICIPAL AIRPORT WHEN TRAVELING WITHIN THE AIRPORT LIMITS AND WHEN WORKING WITHIN THE AIRPORT LIMITS. 3.NO TEMPORARY OR PERMANENT ESC BMPS MAY BE PLACED WITHIN THE ORDINARY HIGH WATER MARK.MATCHLINE SEE BELOWMATCHLINE SEE ABOVE0 SCALE: 10'20'40' 1'' = 20' 0 SCALE: 10'20'40' 1'' = 20'NN2 3 1 4 5 6 SF SF SF SF SF SFC&G C&G C&G C&G C&G C&G C&G C&G C&G C&GC&G C&G C&G C&G C&G C&G C&G C&G C&G 3 4 5 6 6 6 8 8 88 9 1818 12 13 100-YEAR FLOOD EXTENTS 30 35313233343637IMPROVEMENTS TO THE EXISTING SITE PER THE LAKE WASHINGTON LOOP TRAIL PROJECT (BY OTHERS) 16 SFSFSF SF SF SF SF SF SF C&G C&G C&G C&G C&G C&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&G C&G C&G C&G C&G 14 3 4 5 5 6 17 6 4 7 8 10 11 13 15 15 100-YEAR FLOOD EXTENTS 3 5 3 5 33 3434 36 363532 33 3416 TESC AND SITE PREPARATION PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 TEC-03 TESC AND SITE PREP PLAN.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY NOTES ACCESS SITE VIA EAST PERIMETER ROAD AND EAST PERIMETER DRIVE. SEE TEC-05 FOR STAGING LOCATION. ACCESS SITE VIA "SUB SHOP #8" PARKING LOT. SEE TEC-05 FOR STAGING LOCATION. INSTALL SILT FENCE PER CITY OF RENTON STANDARD PLAN 214.00. INSTALL STRAW WATTLES PER CITY OF RENTON STANDARD PLAN 213.40. INSTALL TEMPORARY CONSTRUCTION FENCE. INSTALL INLET PROTRECTION PER CITY OF RENTON STANDARD PLAN 216.30 AT ALL INLETS WITHIN 500 FEET DOWNSTREAM OF THE PROJECT SITE. REMOVE EXISTING SHRUB. REMOVE EXISTING TREE. REMOVE EXISTING SIGN AND POST. REMOVE EXISTING CONCRETE FLOODWALL. PLACE STRAW WATTLES AROUND EXISTING CATCH BASIN RIM. SEE KEY NOTE 4. PROTECT EXISTING FLOOD WALL. PROTECT EXISTING MANHOLE / CATCHBASIN. PROTECT EXISTING LIGHT. PROTECT EXISTING SIDEWALK. STRIP EXISTING TOPSOIL AND STOCKPILE FOR REUSE. REMOVE EXISTING CATCH BASIN. REMOVE EXISTING PIPES WHERE THEY CONFLICT WITH THE REINFORCED CONCRETE FLOODWALL TYPE 2 AS SHOWN ON SHEET C-109. PLUG AND ABANDON IN PLACE ELSEWHERE. 1 RECOMMENDED CONSTRUCTION SEQUENCE 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATION WITH THE REQUIRED NOTICE OF A CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE-RELATED pH MEASURES FOR UTILITY, VAULT, OR ROADWAY CONSTRUCTION). 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION CONSTRAINTS 1.ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL PROJECT PERMITS. 2.NO TEMPORARY OR PERMANENT ESC BMPS MAY BE PLACED WITHIN THE ORDINARY HIGH WATER MARK. EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES SEE SHEET G-02 FOR THE CITY OF RENTON'S ESC STANDARD PLAN NOTES. REPAIR AND RAISE FLOODWALL LB STA 58+00 TO 60+00 SCALE: 1" = 10' WIDEN LEVEE EMBANKMENT LB STA 55+40 TO 56+90 SCALE: 1" = 10'NN 0 SCALE: 5'10'20' 1'' = 10' 0 SCALE: 5'10'20' 1'' = 10' 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 REMOVE EXISTING SIGN AND POST. RETAIN SIGN FOR RELOCATION. SEE SHEET C-105. 18 30 27 28 29 31 3230282931 1 4 6 10 7 12 13 100-YEAR FLOOD EXTENTS SOUTH BOEING BRIDGE SF SF SF SF SF SFHVFHVF HVFC&G C&GC&G C&G C&G C&G C&G C&G C&GC&GC&GC&GC&GC&GC&G14 11 5 35 35 34 353534 365 2 6 10 7 13 IMPROVEMENTS TO THE EXISTING SITE PER THE LAKE WASHINGTON LOOP TRAIL PROJECT (BY OTHERS) 100-YEAR FLOOD EXTENTS PROTECT EXISTING COMMUNICATIONS C&GC&G C&G C&G C&GC&G C&G C&GC&GC&GC&GC&GC&GC&G8 14 403738394138 373 5 6 13 9 100-YEAR FLOOD EXTENTS C&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&GC&G13 5 14 TESC AND SITE PREPARATION PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 TEC-04 TESC AND SITE PREP PLAN.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM RAISE LEVEE EMBANKMENT LANDSCAPING BERM RB STA 63+30 TO 64+30 SCALE: 1" = 10' IMPROVE FLOODWALL TO EMBANKMENT TRANSITION RB STA 49+30 TO 50+30 SCALE: 1" = 10' KEY NOTES ACCESS SITE FROM RENTON AIRPORT VIA SOUTH BOEING BRIDGE. CONSTRUCTION CONTRACTOR SHALL COORDINATE WITH RENTON AIRPORT AND BOEING FOR ACCESS. ACCESS SITE VIA EXISTING PARKING LOT. ACCESS SITE VIA EXISTING SIDEWALKS. USE THE SAME STAGING LOCATION DETAILED ON SHEET TEC-05. INSTALL SILT FENCE PER CITY OF RENTON STANDARD PLAN 214.00. INSTALL STRAW WATTLES PER CITY OF RENTON STANDARD PLAN 213.40. INSTALL TEMPORARY CONSTRUCTION FENCE. INSTALL INLET PROTECTION PER CITY OF RENTON STANDARD PLAN 216.30 AT ALL INLETS WITHIN 500 FEET DOWNSTREAM OF THE PROJECT SITE. REMOVE EXISTING SHRUB. REMOVE EXISTING TREE PER PROJECT LANDSCAPING PLANS. PROTECT EXISTING BENCH. SURROUND THE EXISTING BENCH WITH HIGH VISIBILITY FENCE PER WSDOT STANDARD PLAN I-10.10-01 TO MARK THE PROTECTED AREA. PROTECT EXISTING LIGHT AND ELECTRICAL BOX. PROTECT EXISTING CONCRETE POCKET WALL. PROTECT EXISTING ASPHALT/CONCRETE WALK. STRIP EXISTING TOPSOIL AND STOCKPILE FOR REUSE. 2 3 1 EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES SEE SHEET G-02 FOR THE CITY OF RENTON'S ESC STANDARD PLAN NOTES. RECOMMENDED CONSTRUCTION SEQUENCE 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATION WITH THE REQUIRED NOTICE OF A CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE-RELATED pH MEASURES FOR UTILITY, VAULT, OR ROADWAY CONSTRUCTION). 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION CONSTRAINTS 1.ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL PROJECT PERMITS. 2.NO HEAVY MACHINERY SHALL BE DRIVEN ON PUBLIC TRAIL 3.NO TEMPORARY OR PERMANENT ESC BMPS MAY BE PLACED WITHIN THE ORDINARY HIGH WATER MARK. 4 5 6 7 8 REMOVE AND REPLACE SIDEWALK AREA RB STA 65+50 SCALE: 1" = 10' 0 SCALE: 5'10'20' 1'' = 10'NNN 0 SCALE: 5'10'20' 1'' = 10' 0 SCALE: 5'10'20' 1'' = 10' 9 10 11 12 7 13 14 HVF HVFHVFHVF HVF HVF HVF HVF HVF HVFHVFHVFHVFHVFC&G C&GC&GC&G C&G C&G C&G C&G C&G C&GC&G C&G C & G C&G C&G C&G C&G C&GC&G 3 6 6 1 2 4 5 7 8 9 4 100-YEAR FLOOD EXTENTS (2 TREES)40363 7 3839414235 35 3233 343636 37 373534 2 10 TESC AND SITE PREPARATION PLAN DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 TEC-05 TESC AND SITE PREP PLAN.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM RAISE LEVEE EMBANKMENT WITH FLOODWALL RB STA 65+90 TO 68+50 SCALE: 1" = 10' KEY NOTES ACCESS SITE FROM THE STAGING AREA LOCATED IN THE SENIOR ACTIVITIES CENTER PARKING LOT. INSTALL STRAW WATTLES PER CITY OF RENTON STANDARD PLAN 213.40. INSTALL HIGH VISIBILITY FENCE PER WSDOT STANDARD PLAN I-10.10-01. INSTALL INLET PROTECTION PER CITY OF RENTON STANDARD PLAN 216.30 AT ALL INLETS WITHIN 500 FEET DOWNSTREAM OF THE PROJECT SITE. REMOVE EXISTING HEDGE. REMOVE EXISTING TREE. REMOVE EXISTING FLAGPOLE.AND FOUNDATION. RETAIN FLAGPOLE FOR RESETTING. SEE SHT C-114 PROTECT EXISTING BUILDING AND FOUNDATION. PROTECT EXISTING CONCRETE WALK. STRIP EXISTING TOPSOIL AND STOCKPILE FOR REUSE. 2 3 1 RECOMMENDED CONSTRUCTION SEQUENCE 1.PRE-CONSTRUCTION MEETING. 2.POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE CONSOLIDATION WITH THE REQUIRED NOTICE OF A CONSTRUCTION SIGN). 3.FLAG OR FENCE CLEARING LIMITS. 4.INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION AS REQUIRED. 5.GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). 6.INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). 7.CONSTRUCT SEDIMENT PONDS AND TRAPS. 8.GRADE AND STABILIZE CONSTRUCTION ROADS. 9.CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED CONSTRUCTION ACTIVITY (E.G., CONCRETE-RELATED pH MEASURES FOR UTILITY, VAULT, OR ROADWAY CONSTRUCTION). 10.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S RECOMMENDATIONS. 11.RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT CONTROL STANDARDS. 12.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. 13.STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. 14.SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. 15.UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE STABILIZED AND BMPS REMOVED IF APPROPRIATE. CONSTRUCTION CONSTRAINTS 1.ALL WORK SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL PROJECT PERMITS. 2.NO TEMPORARY OR PERMANENT ESC BMPS MAY BE PLACED WITHIN THE ORDINARY HIGH WATER MARK. 4 5 6 7 8 9 0 SCALE: 5'10'20' 1'' = 10' N EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES SEE SHEET G-02 FOR THE CITY OF RENTON'S ESC STANDARD PLAN NOTES. 10 15 20 25 30 15 20 25 30 1.5 1 1.5 1 2' FREEBOARD EXST GROUND ADJACENT TO WALL100 YEAR WSE FLOODWALL FOOTING EXCAVATION LIMIT 2 4 5 1 4 3 8 EXST T/W 27.1'±T/W 27.1'± FG 27.1'± FLOODWALL FOOTING KEY EG 27.2'± 13 20 18 19 21 22 23 24 27 26 24 23 25 25 25 25 2 3 OHW OHW OHW OHW OHW OHW OHW OHW CEDAR RIVER X X X 18+50 19+00 19+50 RENTON MUNICIPAL AIRPORT LIMIT OF EXCAVATION 100-YEAR FLOOD EXTENTS ROTATED ARM EL 29.5' 26± LF FLOODWALL EXST USACE LEFT BANK ALIGNMENT TOP OF EMBANKMENT 2 3 4 BEGIN CONSTRUCTION STA 18+50.00 END CONSTRUCTION STA 19+50.00 1 3 2 4 5 6 6 7 B A 10 11 11 14 COORDINATE TABLE POINT 1 2 3 4 5 6 NORTHING 183748.92 183708.06 183708.71 183701.93 183680.29 183652.85 EASTING 1299012.79 1299016.58 1299026.81 1299018.15 1299032.16 1299040.54 DESCRIPTION BEGIN CONSTRUCTION MATCH EXISTING GROUND MATCH EXISTING GROUND BEGIN FLOODWALL END FLOODWALL END CONSTRUCTION OHW OHW 15 20 25 30 35 15 20 25 30 35 0 5 10 15 200-5-10-15-20 1.5 1 FLOODWALL FOOTING KEY EXCAVATION LIMIT 100 YEAR WSE 2' FREEBOARD EXST GROUND FINISHED GRADE 5 WIDTH VARIES 0.0' - 10.0' FINISHED GRADE 9 2% 1.5 1 GRADE TO EXST GROUND AT 3H:1V NEAT LINE EXCAVATION AROUND KEY 1'1' 14 15 20 25 30 35 15 20 25 30 35 0 5 10 15 200-5-10-15-20 APPROXIMATE LOCATION OF WEATHER STATION ARM 1.5 1 FLOODWALL FOOTING KEY EXCAVATION LIMIT 100 YEAR WSE 2' FREEBOARD EXST GROUND FINISHED GRADE 5 2 4.9'± WIDTH VARIES 0.0' - 10.0' OHW OHW 5.9'± FINISHED GRADE9 2% 11 GRADE TO EXST GROUND AT 3H:1V NEAT LINE EXCAVATION AROUND KEY 1' 14 CONSTRUCTION NOTES 1.LOCATION OF EXISTING EMBEDDED FLOODWALL AND EXISTING STEEL SHEET PILE WALL ARE APPROXIMATE. PROTECT IN PLACE. 2.PROVIDE TEMPORARY PROTECTION FOR WEATHER STATION DURING CONSTRUCTION. SEE CONTRACT SPECIFICATION SECTION 1-12. 3.PROTECT EXISTING FLOODWALL. 4.MATCH EXISTING FLOODWALL TOP ELEVATION. 5.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 6.PROTECT EXISTING 3" BRASS DISK DURING CONSTRUCTION. 7.TOP OF LEVEE WIDTH SHALL BE 10' MINIMUM. 8.EMBED FLOODWALL 5' MINIMUM INTO EMBANKMENT AT TRANSITION. 9.REINFORCED CONCRETE FLOODWALL TYPE 1 PER DETAIL 1, THIS SHEET. 10.REPLACE STOCKPILED RIPRAP ON RIVERWARD SLOPE. 11.SHORE EXCAVATION WHEN IN THE VICINITY OF THE WEATHER STATION. 12.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-01. 13.JOIN NEW FLOODWALL STEM TO EXISTING FLOODWALL WITH WATERSTOP. SEE DETAIL 2, THIS SHEET. 14.INSTALL AIRPORT SECURITY FENCE (BY OTHERS). 1 2 3 4 5 8 6 7 9 10 11 12 13 14 1'-3"3'-6"1'-3"1'-0"1'-6"3'-9" 4'-0" 5'-3"2'-0"3"2"#5@12" O.C. EACH WAY, EACH FACE #5@12" O.C. EACH WAY, EACH FACE #5 TIE @ 12" O.C. 2-#5 BARS FINISHED GRADE 0 SCALE: 5'10'20' 1'' = 10' FLOODWALL PLAN SCALE: 1" = 10' FLOODWALL PROFILE SCALE: HORIZ: 1" = 10', VERT: 1" = 2'NLB STA 18+50 TO 19+50 IMPROVE FLOODWALL TO EMBANKMENT TRANSITION DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-101 IMPROVE FLOODWALL TO EMBANKMENT TRANSITION.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY MAP SCALE: 1" = 1000' N PLAN AND PROFILE SITE LOCATION FLOODWALL SECTIONA _SCALE: HORIZ: 1" = 5', VERT: 1" = 5' FLOODWALL SECTIONB _SCALE: HORIZ: 1" = 5', VERT: 1" = 5' REINFORCED CONCRETE FLOODWALL TYPE 1 DETAIL SCALE: NTS1 FLEXIBLE JOINT SEALANT COMPRESSIBLE BACKER SEALANT DEPTHSEE NOTE 3.0 BFLEXIBLE JOINT SEALANT NOTES: 1.0 FLEXIBLE JOINT SEALANT: A.FLEXIBLE JOINT SEALANT SHALL BE SIKAFLEX-2C NS, OR APPROVED EQUAL. B.JOINT SEALANT MATERIAL SHALL BE A GUNNABLE OR CAULKABLE MATERIAL MEETING THE REQUIREMENTS OF ASTM C 920, TYPE S (SINGLE COMPONENT) OR TYPE M (MULTICOMPONENT). GRADE NS (A NON-SAP OR GUNNABLE SEALANT THAT PERMITS APPLICATION IN JOINTS ON VERTICAL SURFACES WITHOUT SAGGING OR SLUMPING WHEN APPLIED AT TEMPERATURES BETWEEN 4.4 AND 50°C (40 AND 122°F)) 2.0 JOINT SURFACE PREPARATION: A.JOINT SURFACE PREPARATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. B.ALL JOINT WALL SURFACES MUST BE CLEAN, SOUND, AND FROST-FREE. JOINT WALLS MUST BE FREE OF OLD SEALANT, OILS, GREASE, CURING COMPOUND RESIDUES, AND ANY OTHER FOREIGN MATTER THAT MIGHT PREVENT BOND. SUBSTRATE SHALL BE CLEANED BY MECHANICAL MEANS. C.PLANT MATERIAL SHALL BE REMOVED FROM JOINT AND REMOVED FROM ADJACENT AREAS TO PREVENT FUTURE GROWTH FROM ENTERING THE JOINT. FLEXIBLE JOINT SEALANT NOTES (CONT.) D.SIKAFLEX 429 PRIMER SHALL BE APPLIED TO THE JOINTS AFTER CLEANING, PRIOR TO FLEXIBLE JOINT SEALANT APPLICATION, ACCORDING TO THE MANUFACTURER'S WRITTEN INSTRUCTIONS, INCLUDING HEALTH AND SAFETY RECOMMENDATIONS. 3.0 FLEXIBLE JOINT SEALANT APPLICATION: A.FINISHED DEPTH OF SEALANT SHALL BE ½ OF THE JOINT WIDTH, BUT NOT LESS THAN ¼ INCH OR GREATER THAN ½ INCH. DEPTH SHALL BE MEASURED FROM INSIDE OF CHAMFERED EDGE TO OUTSIDE FACE OF BACKER MATERIAL. B.BACKER SHALL BE INSTALLED IN BOTTOM OF JOINT TO ACHIEVE THE REQUIRED SEALANT DEPTH. BACKER MATERIAL SHALL BE COMPRESSIBLE TO ALLOW UNRESTRICTED MOVEMENT OF THE JOINT AND COMPATIBLE WITH THE SEALANT. C.JOINT SEALANT APPLICATION SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. D.APPLICATION SHALL OCCUR IN TEMPERATURES BETWEEN 40° F AND 100°F. E.SEALANT SHALL ONLY BE APPLIED TO CLEAN, SOUND, DRY, AND FROST-FREE SUBSTRATES. F.AVOID OVERLAPPING OF SEALANT AS OVERLAPS MAY ENTRAP AIR IN THE JOINT. G.TOOL SEALANT TO ENSURE FULL CONTACT WITH JOINT WALLS AND REMOVE AIR ENTRAPMENT. EXST FLOODWALL NEW FLOODWALL COMPRESSIBLE BACKER FLEXIBLE JOINT SEALANT WATERSTOP WALL CONNECTION DETAIL SCALE: NTS2 20 25 30 35 20 25 30 35 100 YEAR WSE EXST FLOODWALL EXST GROUND 2 EXCAVATION LIMIT 7 T/W 28.7'± EXST T/W 28.2'± 2' FREEBOARD xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx T/W 29.0'± EXST T/W 28.5'± EG 28.2'± 4 TOP OF FLOODWALL ADDITION TOP OF FENCE TOP OF BARBED WIRE 9 9 4 252426272820 2525 22 23 24 26 27 282323 22 21 CEDAR RIVER 26+00 26+50 27+00 27+50 28+00 28+50 29+0 0 29+5 0 30+00 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW EXST USACE LEFT BANK ALIGNMENT 1 2 3 BEGIN CONSTRUCTION STA 26+50.00 1 2 3 4 5 100-YEAR FLOOD EXTENTS 25 EXCAVATION LIMITS 5 25 2324 26 27 28 68 7 9 CONSTRUCTION NOTES1.FLOODWALL RAISE PER DETAIL 1, C-104.2.CONCRETE CURB WALL PER SECTION A, SHEET C-1033.REMOVE AND REPLACE EXISTING BIRD PREVENTION WIRE ALONGLENGTH OF FLOODWALL RAISE.4.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACTSPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BESUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION.5.PROTECT EXISTING CATCH BASIN.6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104.7.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FORFULL LENGTH OF REINFORCED CONCRETE CURB WALL. THE FACE OFGUARDRAIL SHALL BE FLUSH WITH THE FACE OF THE REINFORCEDCONCRETE CURB WALL.8.INSTALL BEAM GUARDRAIL ANCHOR TYPE 10 PER WSDOT STANDARDPLAN C-23.60-04.9.WHERE FLOODWALL TOP IS LESS THAN 6' ABOVE EXISTING GROUND,BOLT AIRPORT SECURITY FENCE TO TOP OF FLOODWALL. ADJUST FENCEHEIGHT SO THAT THE TOP OF FENCE IS 6' ABOVE ADJACENT GRADE. (BYOTHERS).CONSTRUCTION NOTES1.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACT SPECIFICATIONSECTION 2-03. NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THISSPECIFICATION.2.CONCRETE CURB WALL PER SECTION A, THIS SHEET.3.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FOR FULL LENGTHOF CONCRETE CURB WALL.THE FACE OF THE GUARDRAIL SHALL BE FLUSH WITH THEFACE OF THE CONCRETE CURB WALL.6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104.7.FILL ON BACKSIDE OF CONCRETE CURB WALL SHALL BE COMMON BORROW. SLOPE2H:1V TO EXISTING GRADE.8.PROTECT EXISTING CARSONITE MARKER. COORDINATE TABLE POINT 1 2 3 4 5 NORTHING 182976.65 182970.43 182770.43 182679.02 182671.37 EASTING 1299220.73 1299221.70 1299270.34 1299264.53 1299264.07 DESCRIPTION BEGIN CONSTRUCTION BEGIN FLOODWALL RAISE ANGLE POINT END FLOODWALL RAISE, BEGIN CONCRETE CURB WALL ANGLE POINT CONSTRUCTION NOTES 1.FLOODWALL RAISE PER DETAIL 1, C-104. 2.CONCRETE CURB WALL PER SECTION A, SHEET C-103 3.REMOVE AND REPLACE EXISTING BIRD PREVENTION WIRE ALONG LENGTH OF FLOODWALL RAISE. 4.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 5.PROTECT EXISTING CATCH BASIN. 6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104. 7.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FOR FULL LENGTH OF REINFORCED CONCRETE CURB WALL. THE FACE OF GUARDRAIL SHALL BE FLUSH WITH THE FACE OF THE REINFORCED CONCRETE CURB WALL. 8.INSTALL BEAM GUARDRAIL ANCHOR TYPE 10 PER WSDOT STANDARD PLAN C-23.60-04. 9.WHERE FLOODWALL TOP IS LESS THAN 6' ABOVE EXISTING GROUND, BOLT AIRPORT SECURITY FENCE TO TOP OF FLOODWALL. ADJUST FENCE HEIGHT SO THAT THE TOP OF FENCE IS 6' ABOVE ADJACENT GRADE. (BY OTHERS). 1 2 3 4 5 6 7 8 9 0 SCALE: 10'20'40' 1'' = 20' FLOODWALL RAISE PLAN SCALE: 1" = 20' FLOODWALL RAISE PROFILE SCALE: HORIZ: 1" = 20' VERT: 1" = 4'NMATCHLINE SEE SHEET C-103DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-102 RAISE FLOODWALL AND EMBANKMENT.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY MAP SCALE: 1" = 1000' N SITE LOCATIONMATCHLINE SEE SHEET C-103LB STA 26+50 TO 29+50 FLOODWALL RAISE AND CURB WALL PLAN AND PROFILE 20 25 30 35 20 25 30 35 2' FREEBOARD 100 YEAR WSE TOP OF CURB WALL 6 EXCAVATION LIMITEXST GROUND 1 T/W 30.1'± EG 29.6'± 25 24 26 27 28 29 19202122 23 24 25 26 27 28 29 28 27 26 25 24 23 23 22 CEDAR RIVER 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 100-YEAR FLOOD EXTENTS EXST USACE LEFT BANK ALIGNMENTA EXST ACCESS ROAD END CONSTRUCTION STA 33+50.00 6 7 EXST GUARDRAIL 3 EXCAVATION LIMITS EXST CITY WATER LINE CROSSING UNDER CEDAR RIVER 4 6 CONSTRUCTION NOTES1.FLOODWALL RAISE PER DETAIL 1, C-104.2.CONCRETE CURB WALL PER SECTION A, SHEET C-1033.REMOVE AND REPLACE EXISTING BIRD PREVENTION WIRE ALONGLENGTH OF FLOODWALL RAISE.4.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACTSPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BESUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION.5.PROTECT EXISTING CATCH BASIN.6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104.7.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FORFULL LENGTH OF REINFORCED CONCRETE CURB WALL. THE FACE OFGUARDRAIL SHALL BE FLUSH WITH THE FACE OF THE REINFORCEDCONCRETE CURB WALL.8.INSTALL BEAM GUARDRAIL ANCHOR TYPE 10 PER WSDOT STANDARDPLAN C-23.60-04.9.WHERE FLOODWALL TOP IS LESS THAN 6' ABOVE EXISTING GROUND,BOLT AIRPORT SECURITY FENCE TO TOP OF FLOODWALL. ADJUST FENCEHEIGHT SO THAT THE TOP OF FENCE IS 6' ABOVE ADJACENT GRADE. (BYOTHERS).CONSTRUCTION NOTES1.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACT SPECIFICATIONSECTION 2-03. NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THISSPECIFICATION.2.CONCRETE CURB WALL PER SECTION A, THIS SHEET.3.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FOR FULL LENGTHOF CONCRETE CURB WALL.THE FACE OF THE GUARDRAIL SHALL BE FLUSH WITH THEFACE OF THE CONCRETE CURB WALL.6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104.7.FILL ON BACKSIDE OF CONCRETE CURB WALL SHALL BE COMMON BORROW. SLOPE2H:1V TO EXISTING GRADE.8.PROTECT EXISTING CARSONITE MARKER. COORDINATE TABLE POINT 6 7 NORTHING 182326.39 182298.95 EASTING 1299349.80 1299349.24 DESCRIPTION END CONCRETE CURB WALL END CONSTRUCTION OTHERS). CONSTRUCTION NOTES 1.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACT SPECIFICATION SECTION 2-03. NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 2.CONCRETE CURB WALL PER SECTION A, THIS SHEET. 3.REMOVE AND RESET BEAM GUARDRAIL IN ORIGINAL ALIGNMENT FOR FULL LENGTH OF CONCRETE CURB WALL.THE FACE OF THE GUARDRAIL SHALL BE FLUSH WITH THE FACE OF THE CONCRETE CURB WALL. 6.INSTALL AIRPORT SECURITY FENCE PER DETAIL 3, SHEET C-104. 7.FILL ON BACKSIDE OF CONCRETE CURB WALL SHALL BE COMMON BORROW. SLOPE 2H:1V TO EXISTING GRADE. 8.PROTECT EXISTING CARSONITE MARKER. 1 3 4 5 6 2 0 SCALE: 10'20'40' 1'' = 20' CONCRETE CURB WALL PLAN SCALE: 1" = 20' CONCRETE CURB WALL PROFILE SCALE: HORIZ: 1" = 20' VERT: 1" = 4'NMATCHLINE SEE SHEET C-102DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-102 RAISE FLOODWALL AND EMBANKMENT.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY MAP SCALE: 1" = 1000' N SITE LOCATIONMATCHLINE SEE SHEET C-102LB STA 29+50 TO 33+50 LEVEE EMBANKMENT WITH CURB WALL PLAN AND PROFILE 6"3'±EXISTING ASPHALT PAVEMENT RESTORED GRASS STRIP 18"CONCRETE CURB WALL6"VARIES#4 LONGITUDINAL BARS #4 DOWEL BARS INTO EXST FLOODWALL (TYP) EXST GROUND #4 LONGITUDINAL BARS #4 DOWEL BARS @ 12" O.C. EXST CONC FLOODWALL LONGITUDINAL SECTION NTS CROSS SECTION NTS6"VARIESxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxEXST CONC FLOODWALL FLOODWALL NOTES 1.WHERE THE RAISED FLOODWALL TOP IS LESS THAN 6' ABOVE EXISTING GROUND, BOLT AIRPORT SECURITY FENCE TO TOP OF FLOODWALL. ADJUST FENCE HEIGHT SO THAT THE TOP OF FENCE IS 6' ABOVE ADJACENT GRADE. SEE DETAIL 3, THIS SHEET FOR AIRPORT SECURITY FENCE. 1 1 12"12" 1" EXPANSION JOINTS, MATCH EXST FLOODWALL LOCATIONS EXST GROUND 2' FREEBOARD 100 YEAR WSE 3 1 EXST GUARDRAIL EXST PAVEMENT 1 4 CONCRETE CURB WALLA NTS EXCAVATION LIMITS 34 1 2 CONCRETE CURB WALL NOTES 1.BEDDING SHALL BE WITH LEVEE EMBANKMENT FILL PER CONTRACT SPECIFICATION SECTION 2-03. NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 2.REMOVE AND RESET BEAM GUARDRAIL FOR FULL LENGTH OF CONCRETE CURB WALL.THE FACE OF THE GUARDRAIL SHALL BE FLUSH WITH THE FACE OF THE CONCRETE CURB WALL. 3.FILL ON BACKSIDE OF CURB WALL SHALL BE COMMON BORROW. SLOPE 2H:1V TO EXISTING GRADE. 4.CONCRETE CURB WALL PER DETAIL 2, THIS SHEET. TOP OF WALL ELEVATION PER PROFILE, SHEET C-103. 5.AIRPORT SECURITY FENCE. SEE DETAIL 3, THIS SHEET. 1 3 4 2 5 4 XXXXX X X X X X X X X X X XXXXX X X X X X X X X X X XXXXX X X X X X XXXXX XXX X X X X X XXXX XXXX X X X X XXXX XXXX X X X X XXXX XXXXX X X X X X XXXXX XXXX X XX X X XXX X X X X X X XX X X X X XXXXX X X X X X X XX XXXXX X X X X XXXX X X XXXX X X X X XXXX X X XX X X X STEEL POST SCHEDULE USE AND SECTION CORNER, END & PULL POSTS TUBULAR - ROUND LINE POSTS TUBULAR - ROUND BOTTOM & BRACE RAILS TUBULAR - ROUND LINE POST EXTENSION ARM DETAILS CORNER POST BRACE RAIL ATTACHMENT END OR GATE POST DETAIL TENSION BAND DETAIL FASTENING DETAILS LINE POST ATTACHMENTS BRACE RAIL CLAMP DETAIL TRUSS ROD AND BAND BRACE PANEL DETAIL PROVIDE BRACE PANEL WHENEVER STRAIGHT RUNS EXCEED 500 FEET. NOTE: GROUNDING DETAIL 10' MAXIMUM 10' MAXIMUM LINE POSTS TO BE EQUALLY SPACED 16" MIN. DIA.12"1/2" (TYP.) 10' MAX.10'12"45°24"35°12"NO SCALE MINIMUM OUTSIDE DIMENSIONS (NOMINAL)A.WIRE TIES, RAILS, POSTS, AND BRACES SHALL BE CONSTRUCTED ON THE SECURE SIDE OF THE FENCE ALIGNMENT. CHAIN-LINK FABRIC SHALL BE PLACED ON THE SIDE OPPOSITE THE SECURE AREA. B.ONLY 9-GAGE GALVANIZED STEEL TIE WIRES SHALL BE USED FOR FASTENING THE FENCE FABRIC TO FENCE POSTS AND RAILS. 16-GAGE, STAINLESS STEEL TIE WIRES SHALL BE USED FOR FASTENING FENCE FABRIC TO TENSION WIRES. HOG RINGS SHALL NOT BE ALLOWED ON SENSORED FENCES. C.BOTTOM RAIL SHALL BE ATTACHED TO DOUBLE RAIL ENDS USING 1 2" CARRIAGE BOLTS AS SHOWN. ADDITIONAL HOLES SHALL BE DRILLED THROUGH THE BOTTOM RAIL ENDS TO ENSURE THAT CARRIAGE BOLTS PASS THROUGH THE BOTTOM RAIL AS SHOWN.6"36"6'1" MAX10" MIN. DIA. 6" (TYP.) 24" 8" (T Y P.) 2 7/8" O.D. 2" O.D.12"HORIZONTAL CONNECTION 2 3/8" O.D. 1.3 STRAND BARBED -WIRE APRON ON EXTENSION ARMS 2.TOP TENSION WIRE, 2" BELOW TOP OF FABRIC 3.BRACE RAIL 4.9-GAGE STEEL TIE WIRES, 16" O.C. MAX & W/IN 4" FROM TOP & BOTTOM OF FABRIC 5.TRUSS ROD (1 2" MIN. DIA.) 6.CORNER, END, OR PULL POST 7.LINE POST 8.9-GAGE STEEL TIE WIRES (TYP.),(12"mm O.C. MAX.) 9.CHAIN-LINK FABRIC (9 GAGE, 2" MESH), BLACK WEATHER RESISTANCE GRATED STEEL WIRE 10.BOTTOM OF FABRIC, ABOVE FINISHED GRADE - 1 1 2" MIN, 2 1 2" MAX 11.BOTTOM TENSION WIRE, 2" ABOVE BOTTOM OF FABRIC 12.CONCRETE BASE 13.GRADE LINE 14.TENSION BAND (16" O.C. MAX. & W/IN 2" FROM TOP & BOTTOM OF FABRIC) 15.TENSION BAR TO ENGAGE EACH FABRIC LINK 16.CARRIAGE BOLT W/PEENED THREADS 17.PULL POST 18.#8 AWG SOLID COPPER WIRE 19.MOLDED EXOTHERMIC WELD OR APPROVED CLAMP-TYPE FITTING OF COPPER 20.3" DIA. COPPER-CLAD STEEL GROUND ROD 21.ENDS TWISTED AT LEAST THREE FULL TURNS 22.1 2" PLAIN PIN RIVETED FLUSH (TYP.) 23.SECURE SIDE 24.LOCK PIN, TYP 25.1" X 1 8" FLAT BAR FASTEN TO STEEL BEAM 26.1 2" BOLT 10' MAX. SECURITY FENCE NOTES NO SCALE NO SCALE NO SCALE SECURITY FENCE KEY NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 2 2 2 3 3 3 4 4 5 5 5 5 6 5 7 7 7 7 7 8 8 9 9 9 9 10 11 11 12 12 13 14 14 15 16 17 18 19 20 21 22 22 23 23 24 24 25 26 12" FLOODWALL RAISE WITH CAST-IN-PLACE CONCRETE SCALE: NTS1 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-104 FLOODWALL ADDITION AND LEVEE EMBANKMENT WITH CURBWALL DETAILS.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM CONCRETE CURB WALL DETAIL SCALE: NTS2 LB STA 26+50 TO 33+50 FLOODWALL RAISE AND LEVEE EMBANKMENT WITH CURBWALL DETAILS AIRPORT SECURITY FENCE DETAIL SCALE: NTS3 30 34 35 35 3530 30 38 30 29 37 34 33 31 323533343736OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW CEDAR RIVER 100' FROM LOGAN AVENUE BRIDGE 0+50 1+00 1+50 2+00 2+50 2+65.30C C FC C C C C C55+00 55+50 56+00 56+50 57+00 57+50 100-YEAR FLOOD EXTENTS LOGAN AVENUE BR IDGE A C-107 1 3 4 5 6 EXCAVATION LIMIT TEST HOLE #1A EG 30.10 IE 25.02 TEST HOLE #1 EG 30.06 IE 26.23 TEST HOLE #3 EG 34.98 IE 27.15 LAKE WASHINGTON TRAIL LOOP PROJECT (BY OTHERS) MSE FLOODWALL LEVELING PAD 1 2 2 2 2 3 3 4 5 6 12 9 B C-107 C C-107 D C-107 7 3532333436353132333487 8 9 EXST FLOODWALL STA 0+59.53 STA 1+12.19 STA 1+22.69 STA 1+61.33 STA 2+36.69 FL 30.1± MATCH EXST FL 31.55 FL 36.4± MATCH EXST 13 14 10 11 10 STA 2+50.00 15 USACE STA 55+09.53, OFF 1.15'L USACE STA 56+91.32, OFF 11.92'R USACE LEFT BANK ALIGNMENT CONSTRUCTION NOTES 1.SHORE ON SOUTHERN END OF WALL EXCAVATION TO PROTECT NEW SIDEWALKS, RAMPS, AND ROAD INSTALLED UNDER THE LAKE WASHINGTON LOOP TRAIL PROJECT. 2.PROTECT EXISTING CATCH BASIN / MANHOLE. 3.PROTECT EXISTING 12" HIGH PRESSURE WATER MAINS (BOEING). CONTRACTOR TO VERIFY IN FIELD VIA POTHOLING. 4.PROTECT EXISTING 12" WATER LINE (CITY OF RENTON). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 5.PROTECT EXISTING 24" SEWER (KING COUNTY). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 6.PROTECT EXISTING 4" GAS (PSE). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 7.SAWCUT EXISTING ROAD AND REPLACE PAVEMENT PER CITY OF RENTON STANDARD PLAN 103. 8.STEP MSE FLOODWALL IN SINGLE-BLOCK INCREMENTS. SEE WALL PROFILE, C-106. 9.INSTALL CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER CITY OF RENTON STANDARD PLAN 101 ON THE NORTHEAST SIDE OF PERMITER ROAD. 10.PROTECT EXISTING FLOODWALL. 11.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-04. 12.PLACE 20' WIDTH OF 4" THICK CSBC. SEE MSE FLOODWALL AT ACCESS POINT, SECTION D, C-107. 13.RELOCATE EXISTING STOP SIGN. 14.RELOCATE EXISTING NO PARKING / BIKE ROUTE / E. PERIMETER RD. SIGNS FROM CURRENT LOCATION TO NEW LOCATION BEYOND MSE FLOODWALL. 15.RESTORE 16" STOPBAR IN PAVEMENT RESTORATION AREA PER CITY OF RENTON STANDARD PLAN 128. 6 2 3 4 5 1 7 8 9 10 11 12 13 14 15 TRAFFIC CONTROL NOTES 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING AND IMPLEMENTING A TRAFFIC CONTROL PLAN. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE ENGINEER FOR REVIEW AND APPROVAL. COORDINATE TABLE POINT 1 3 4 5 6 7 8 9 10 NORTHING 180319.28 180281.16 180272.58 180241.03 180178.16 180279.67 180238.52 180170.51 180167.05 EASTING 1300108.32 1300129.29 1300135.35 1300157.65 1300199.19 1300127.19 1300153.97 1300196.81 1300206.53 DESCRIPTION BEGIN CONSTRUCTION BEGIN MSE FLOODWALL / BEGIN TAPER END TAPER ANGLE POINT END MSE FLOODWALL FLOW LINE FLOW LINE ANGLE POINT FLOW LINE END CONSTRUCTION DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-105 WIDEN LEVEE EMBANKMENT.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM MSE FLOODWALL PLAN SCALE: 1" = 10' 0 SCALE: 5'10'20' 1" = 10'NKEY MAP SCALE: 1" = 1000' N SITE LOCATION 8' TOP OF LEVEE WIDTH LB STA 55+40 TO 56+90 WIDEN LEVEE EMBANKMENT PLAN 15 20 25 30 35 40 15 20 25 30 35 40 1+00 2+00 2+60 100' FROM LOGAN AVENUE BRIDGE 2' MINIMUM FREEBOARD 3' MINIMUM FREEBOARD 12" EXST HPW 12" EXST HPW 4" EXST GAS STA 2+37.42 T/W 37.0'±STA 1+84.92 T/W 37.0'±STA 1+84.92 T/W 36.3'± STA 1+23.42 T/W 36.3'± STA 1+12.92 T/W 31.62' STA 2+37.42 FG 36.75' STA 2+19.33 FG 36.25' STA 1+24.31 FG 35.60' 2H:1VSTEP WALL DOWNTO APPROXIMATE2H:1V SLOPEEXST FLOODWALL EXST HIGH GROUND (OFFSET FROM EXST FLOODWALL) 1.5H:1V EXCAVATION LIMITS STA 2+03.4± 24" EXST SS CROSSING IE 17.4'±12.1'±0.8'±4.1'±3.6'±1.6'± 8 7 1 9 10 (TYP) 4 4 3 6 5 FINISHED GRADE EXST GROUND GEOGRID (TYP) B/FTG 28.12' B/FTG 28.79' B/FTG 29.45' B/FTG 30.12' B/FTG 30.79' B/FTG 31.45' B/FTG 32.12' B/FTG 32.79' B/FTG 33.45' STA 1+19.4± 12" EXST HPW CROSSING IE 26.3'± STA 1+62.5± 4" EXST GAS CROSSING IE 27.6'± STA 2+17.9± 12" EXST HPW CROSSING IE 28.2'± STA 2+14.8± 12" EXST HPW CROSSING IE 27.0'±2 MSE FLOODWALL PROFILE SCALE: HORIZ: 1" = 10' VERT: 1" = 2' DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-105 WIDEN LEVEE EMBANKMENT.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM CONSTRUCTION NOTES 1.SHORE ON SOUTHERN END OF WALL EXCAVATION TO PROTECT NEW SIDEWALKS, RAMPS, AND ROAD INSTALLED UNDER THE LAKE WASHINGTON LOOP TRAIL PROJECT. 2.POTHOLE EXISTING UTILITY AT CROSSING. OMIT MASONRY BLOCKS WITHIN 2' OF PIPE CROWN. BACKFILL AREA WITH CSBC. 3.PROTECT EXISTING 12" HIGH PRESSURE WATER MAINS (BOEING). CONTRACTOR TO VERIFY IN FIELD VIA POTHOLING. 4.ADJUST GEOTEXTILE LOCATION UPWARDS BY ONE (1) MASONRY BLOCK WHERE THE WALL HEIGHT INCREASES. 5.PROTECT EXISTING 24" SEWER (KING COUNTY). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 6.PROTECT EXISTING 4" GAS (PSE). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 7.PLACE 20' WIDTH OF 4" THICK CSBC. SEE MSE FLOODWALL AT ACCESS POINT, SECTION D, C-107. 8.PROTECT EXISTING FLOODWALL. 9.GRAVEL LEVELING PAD PER DETAIL 1, SHEET C-108. 10.LEVELING PAD STEP PER DETAIL 2, SHEET C-108. 6 2 3 4 5 1 7 8 9 10 LB STA 55+40 TO 56+90 WIDEN LEVEE EMBANKMENT PROFILE 15 20 25 30 35 40 45 15 20 25 30 35 40 45 0 5 10 15 200-5-10-15-20 2' FREEBOARD EXST GROUND FINISHED GRADE GEOGRID (TYP) 12" MIN GRAVEL BACKFILL FOR WALLS 8' MIN CROWN WIDTH EXCAVATION LIMIT 9 EXST FLOODWALL 1.5H:1V (TYP) MSE WALL 11" WIDTH 6' 2.6'EXST 12" HPWLOCATION APPROX.IE 25.2' ±EXST 12" HPWLOCATION APPROX.IE 26.4' ±EXST 4" GASLOCATION APPROX.IE 27.5' ±0.7'± 7' 1 2 4 8 7 11 33615 20 25 30 35 40 45 15 20 25 30 35 40 45 0 5 10 15 200-5-10-15-20 EXST GROUND 3' FREEBOARD FINISHED GRADE GEOGRID (TYP) 12" MIN GRAVEL BACKFILL FOR WALLS EXCAVATION LIMIT 9 1.5H:1V (TYP) EXST 24" SS LOCATION APPROX. IE 17.4' ± 2.6'EXST 12" HPWLOCATION APPROX.IE 25.9' ±EXST 12" HPWLOCATION APPROX.IE 27.1' ±8' CROWN WIDTH MSE WALL 11" WIDTH 6' 2'30"7'EXST 4" GASLOCATION APPROX.IE 27.5' ±7' 8'3367 8 2 4 12 5 RELOCATED STOP SIGN 1.6'15 20 25 30 35 40 45 15 20 25 30 35 40 45 0 5 10 15 200-5-10-15-20 3' FREEBOARD FINISHED GRADE FINISHED GRADE 12" MIN GRAVEL BACKFILL FOR WALLS EXST GROUND 1.5H:1V (TYP) 10H:1V EXCAVATION LIMIT 2.8' 8' CROWN WIDTH MSE WALL 11" WIDTH EXST 4" GASLOCATION APPROX.IE 27.7' ±6'68 2 4 7 10 EXST 24" SS LOCATION APPROX. IE 17.4' ± 5 15 20 25 30 35 40 45 15 20 25 30 35 40 45 0 5 10 15 200-5-10-15-20 3' FREEBOARD EXST GROUND FINISHED GRADE GEOGRID (TYP) 12" MIN GRAVEL BACKFILL FOR WALLS EXCAVATION LIMIT 9 SLOPE VARIES TRANSITION AREA BETWEEN 10% AND 2H:1V EXST 24" SS LOCATION APPROX. IE 17.4' ± PIPES ADJACENT TO SECTION ARE SHOWN FOR REFERENCE 3.1' 8' CROWN WIDTH MSE WALL 11" WIDTH 6'EXST 4" GASLOCATION APPROX.IE 27.6' ±12" EXST HPW 12" EXST HPW 4.5' PIPE CROSSING 7'65 7 3 1.5H:1V (TYP) 8 2 4 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-105 WIDEN LEVEE EMBANKMENT.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM MSE FLOODWALL SECTION - HPW CROSSINGA _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' MSE FLOODWALL SECTION - STOP SIGN RELOCATIONB _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' MSE FLOODWALL SECTION - HPW CROSSINGC _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' MSE FLOODWALL SECTION - MAINTENANCE ACCESSD _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' CONSTRUCTION NOTES 1.POTHOLE EXISTING UTILITY AT CROSSING. OMIT MASONRY BLOCKS WITHIN 2' OF PIPE CROWN. BACKFILL AREA WITH CSBC. 2.SAWCUT EXISTING ROAD AND REPLACE PAVEMENT 2' OFFSET FROM EDGE OF NEW CURB AND GUTTER PER CITY OF RENTON STANDARD PLAN 103. 3.PROTECT EXISTING 12" HIGH PRESSURE WATER MAINS (BOEING). CONTRACTOR TO VERIFY IN FIELD VIA POTHOLING. 4.INSTALL CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER CITY OF RENTON STANDARD PLAN 101 ON NORTHEAST SIDE OF PERIMETER ROAD. 5.PROTECT EXISTING 24" SEWER (KING COUNTY). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 6.PROTECT EXISTING 4" GAS (PSE). CONTRACTOR TO VERIFY IN FIELD VIA SURFACE LOCATES. 7.GRAVEL LEVELING PAD PER DETAIL 1, SHEET C-108. 8.BACKFILL WITH CSBC. 9.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 10.4" CSBC. 11.PROTECT EXISTING FLOODWALL. 12.SIGN MOUNTING POST PER CITY OF RENTON STANDARD PLAN 129. 6 2 3 4 5 1 7 8 9 10 11 12 LB STA 55+40 TO 56+90 WIDEN LEVEE EMBANKMENT DETAILS 2'-0"6"61 2"11" STANDARD MASONRY UNIT (MSE FLOODWALL) 1/2"-3/4" CRUSHED STONE OR GRAVEL (95% STANDARD PROCTOR DENSITY)6"8"9"1'-6" 6"45°' STANDARD MASONRY UNIT (MSE FLOODWALL) GRAVEL LEVELING PAD GRAVEL LEVELING PAD SCALE: NTS1 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-108 WIDEN EVEE EMBANKMENT DETAILS.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM LEVELING PAD STEP SCALE: NTS2 LB STA 55+40 TO 56+90 WIDEN LEVEE EMBANKMENT DETAILS 25 30 35 40 45 25 30 35 40 45 EXST GROUND 100 YEAR WSE 2.5% EXST WALL EXST WALL EXCAVATION LIMITS TOP OF EXST WALL TOP OF EXST WALL EXST GROUND AT LOGAN AVENUE BRIDGE EXST GROUND ADJACENT TO EXST WALL EXST HIGH GROUND TIE IN 7 3 6 5 2 6 4 3 2 100' FROM LOGAN AVENUE BRIDGE 2' MINIMUM FREEBOARD 3' MINIMUM FREEBOARD TEST HOLE #6 IE 26.6'± TEST HOLE #6A IE 29.1'± 1.5H:1V 1.5H:1V 3.6'5.2'11 12 8 T/W 37.3'± MATCH EXST EG 36.2'± EL 38.03' T/W 37.4'± T/W 37.3'± 4.5' TOTAL HEIGHT TOP OF OVERBUILD FILL 37.6'± TOP OF EMBANKMENT FILL 36.2'± OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW CEDAR RIVE R 100' FROM LOGAN AVENUE BRIDGE 8 57+ 5 0 58+ 0 0 58+5 0 59+0 0 59+50 6 0 + 0 0 60 + 5 0 TOP OF EMBANKMENT FILL EXST USACE LEFT BANK ALIGNMENT 100-YEAR FLOOD EXTENTSLOGAN AVENUE BR IDGE EXCAVATION LIMIT C - A - 3 327 26 4 24 13 1 12 8 8 9 5 8 9 9 TEST HOLE #6 TEST HOLE #6A B - 35 3 5 33 3434 36 3 6 5 1310 14 STA 58+00.00 STA 60+50.00 TOP OF OVERBUILD FG 37.0± 3H:1V MAX 8' MINIMUM LEVEE SECTION CROWN WIDTH EXST GROUND 100 YEAR WSE 2' FREEBOARD 1.5H:1V 1.5H:1V EXCAVATION LIMITS EMBANKMENT SECTIONC _NTS 5 7 6 EXST CONC WALL VARIESCONCRETE FLOODWALL RAISEA _NTS EXST SIDEWALK EXST GROUND EXISTING CURB AT LOGAN AVE. 6.5' ±LOGAN AVENUE 6"MIN1 COORDINATE TABLE POINT 1 2 3 4 5 6 7 8 9 NORTHING 180110.86 180098.02 180051.71 180047.29 180041.61 180031.76 180010.35 179985.69 179926.95 EASTING 1300285.68 1300312.61 1300302.69 1300308.04 1300312.45 1300366.14 1300380.75 1300414.77 1300425.01 DESCRIPTION BEGIN CONSTRUCTION BEGIN FLOODWALL RAISE END FLOODWALL RAISE BEGIN REINFORCED CONCRETE FLOODWALL TYPE 2 ANGLE POINT ANGLE POINT END REINFORCED CONCRETE FLOODWALL TYPE 2 /BEGIN EMBANKMENT END EMBANKMENT END CONSTRUCTION CONSTRUCTION NOTES 1.FLOODWALL RAISE PER DETAIL 1, C-110. 2.REINFORCED CONCRETE FLOODWALL TYPE 2 PER DETAIL 2, C-110. 3.RAISE EMBANKMENT PER SECTION A, THIS SHEET. 4.TAPER EMBANKMENT AND OVERBUILD AT TRANSITION TO CONCRETE FLOODWALL. 5.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 6.EMBANKMENT OVERBUILD FILL SHALL BE 6" MIN COMMON BORROW. 7.STRIP EXISTING TOPSOIL AND STOCKPILE FOR RE-USE. 8.PROTECT EXISTING 12" HIGH PRESSURE WATER MAINS (BOEING). 9.PROTECT EXISTING 24" SEWER MAIN (KING COUNTY). 10.INSTALL NEW CONCRETE INLET PER CITY OF RENTON STANDARD PLAN 200.30. 11.BEDDING SHALL BE LEVEE EMBANKMENT FILL IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. 12.PROTECT EXISTING 1" UNKNOWN UTILITY. 13.PROTECT EXISTING CATCH BASIN 14.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-05. 6 2 3 4 5 1 7 8 9 10 11 12 13 14 25 30 35 40 25 30 35 40 0 5 100-5-10 EXCAVATION LIMIT 11 23' FREEBOARD EXST GROUND 100-YR WSE NEAT LINE EXCAVATION AROUND KEY 0 SCALE: 10'20'40' 1" = 20'FLOODWALL AND EMBANKMENT PLAN SCALE: 1" = 20' FLOODWALL AND EMBANKMENT PROFILE SCALE: HORIZ: 1" = 20' VERT: 1" = 5' N DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-109 REPAIR AND RAISE FLOODWALL.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY MAP SCALE: 1" = 1000' N REINFORCED CONCRETE FLOODWALL TYPE 2 SECTIONB _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' LB STA 58+00 TO 60+00 REPAIR AND RAISE FLOODWALL PLAN AND PROFILE SITE LOCATION 12"12"6"VARIES#4 LONGITUDINAL BARS #4 DOWEL BARS INTO EXST FLOODWALL (TYP) 1" EXPANSION JOINTS, MATCH EXST FLOODWALL LOCATIONS EXST CONC FLOODWALL EXST GROUND #4 LONGITUDINAL BARS #4 DOWEL BARS EXST CONC FLOODWALL LONGITUDINAL SECTION NTS CROSS SECTION NTS6"VARIES4'-6"4'-6"1'-3"8" 1'-0 3/4"2'-4 1/2"1'-0 3/4"2'-0"3"2"2"1'-0"1'-6" 3/4" CHAMFER (TYP) #5@12" O.C. EACH FACE #5@6" O.C. EACH FACE #5@12" O.C. EACH WAY, TOP AND BOT FINISHED GRADE 2-#5 BARS #5 TIE @ 12" O.C. FLOODWALL RAISE WITH CAST-IN-PLACE CONCRETE SCALE: NTS1 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-110 REPAIR AND RAISE FLOODWALL DETAILS.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM REINFORCED CONCRETE FLOODWALL TYPE 2 DETAIL SCALE: NTS2 LB STA 58+00 TO 60+00 REPAIR AND RAISE FLOODWALL DETAILS 25 30 35 40 25 30 35 40 EXST GROUND ADJACENT TO POCKET WALL 100 YEAR WSE 1 END OF EXST FLOODWALL EXST T/W 32.8'± TOP OF OVERBUILD FG 33.3'± TOP OF LEVEE EMBANKMENT FILL EL 32.8'± FLOODWALL/CLOSURE TRANSITION EXST T/W 32.9'± TOP OF LEVEE EMBANKMENT FILL EL 32.8'±TOP OF OVERBUILD FG 33.3'± MATCH EXST EG 32.3'± MATCH EXST EG 31.0'± MATCH EXST EG 31.5'± MATCH EXST EG 32.2'± 2 3 5 6 4 3 5 SOUTH BOEING BRIDGE EXCAVATION LIMIT 100' FROM SOUTH BOEING BRIDGE 2' MINIMUM FREEBOARD 3' MINIMUM FREEBOARD 2H:1V 2H:1V 24 6.7% 5H:1V 2 5 30 30 25 26 27 28 29 31 322930313228 CEDAR RIVER OH W OHW OHW OHW OHW OHW OHW OHW OHW OHW 49+00 49+50 50+00 50+50FFFFFF F FF F F F F F F TOP OF EMBANKMENT FILL EXCAVATION LIMIT 100-YEAR FLOOD EXTENTS 100' FROM SOUTH BOEING BRIDGESOUTH BOEING BRIDGEEXST USACE RIGHT BANK ALIGNMENT A 8' MIN. CROWN WIDTH 6 5 1 2 3 4 5 6 7 7 TOP OF EMBANKMENT OVERBUILD 3 9 10 11 12 STA 49+30.00 STA 50+30.00 20 25 30 35 40 20 25 30 35 40 0 5 10 15 20 250-5-10-15-20-25 EXST 8' TRAIL EXCAVATION LIMIT 100 YEAR WSE 3' FREEBOARD 2H:1V MAX SIDESLOPE (TYP)8' MIN CROWN WIDTH TOP OF OVERBUILD FG 33.3'± TOP OF LEVEE EMBANKMENT FILL EL 32.8'± 4 7 2 8 CONSTRUCTION NOTES1.LOCATION OF EXISTING EMBEDDED FLOODWALL AND EXISTING STEEL SHEET PILEWALL ARE APPROXIMATE. LOCATION TO BE VERIFIED IN FIELD BY CONTRACTOR.2.EMBANKMENT OVERBUILD SHALL BE 6" MIN. COMMON BORROW.3.EMBED EXISTING FLOODWALL 5' MINIMUM INTO EMBANKMENT AT TRANSITION.4.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACTSPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BESUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION.5.PROTECT EXISTING FLOODWALL AND POCKET WALL CLOSURE GATE.6.PROTECT EXISTING 4" GAS (PSE).7.NO CONSTRUCTION ACTIVITIES SHALL OCCUR WITHIN 2' OF THE EXISTING TRAIL.8.STRIP EXISTING TOPSOIL AND STOCKPILE FOR RE-USE.9.TAPER EMBANKMENT AT TRANSITION TO EXISTING FLOODWALL.10.ADJUST JUNCTION BOX TO GRADE.11.PROTECT EXISTING LIGHTING POLE.12.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEETL-01. COORDINATE TABLE POINT 1 2 3 4 5 6 7 NORTHING 181770.04 181757.32 181756.85 181751.90 181699.40 181698.92 181672.98 EASTING 1299684.27 1299687.84 1299687.94 1299689.26 1299700.01 1299700.14 1299708.35 DESCRIPTION BEGIN CONSTRUCTION BEGIN EMBANKMENT OVERBUILD BEGIN LEVEE EMBANKMENT FILL END OF EXISTING FLOODWALL END LEVEE EMBANKMENT FILL END EMBANKMENT OVERBUILD END CONSTRUCTION CONSTRUCTION NOTES 1.LOCATION OF EXISTING EMBEDDED FLOODWALL AND EXISTING STEEL SHEET PILE WALL ARE APPROXIMATE. LOCATION TO BE VERIFIED IN FIELD BY CONTRACTOR. 2.EMBANKMENT OVERBUILD SHALL BE 6" MIN. COMMON BORROW. 3.EMBED EXISTING FLOODWALL 5' MINIMUM INTO EMBANKMENT AT TRANSITION. 4.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 5.PROTECT EXISTING FLOODWALL AND POCKET WALL CLOSURE GATE. 6.PROTECT EXISTING 4" GAS (PSE). 7.NO CONSTRUCTION ACTIVITIES SHALL OCCUR WITHIN 2' OF THE EXISTING TRAIL. 8.STRIP EXISTING TOPSOIL AND STOCKPILE FOR RE-USE. 9.TAPER EMBANKMENT AT TRANSITION TO EXISTING FLOODWALL. 10.ADJUST JUNCTION BOX TO GRADE. 11.PROTECT EXISTING LIGHTING POLE. 12.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-01. 6 2 3 4 1 7 8 9 5 10 11 12 EMBANKMENT PLAN SCALE: Custom EMBANKMENT PROFILE SCALE: HORIZ: 1" = 10', VERT: 1" = 2' 0 SCALE: 5.0229'10.0459'20.0918' CustomN EMBANKMENT SECTIONA _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-111 IMPROVE FLOODWALL TO EMBANKMENT TRANSITION.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM KEY MAP SCALE: 1" = 1000' N RB STA 49+30 TO 50+30 IMPROVE FLOODWALL TO EMBANKMENT TRANSITION PLAN AND PROFILE SITE LOCATION 30 35 40 30 35 40 TOP OF OVERBUILD 100 YEAR WSE EXISTING HIGH GROUND 100' FROM LOGAN AVENUE BRIDGE 3' MINIMUM FREEBOARD 2' MINIMUM FREEBOARD APPROX. SHARED USE PATH FINISHED GRADE (BY OTHERS) TOP OF LEVEE EMBANKMENT FILL4H:1V 2H:1V 4H:1V EXCAVATION LIMITS SHORING 2 TOP OF OVERBUILD FG 36.3'±2 TOP OF LEVEE EMBANKMENT FILL EL 35.8'±3 5 TOP OF LEVEE EMBANKMENT FILL EL 36.0'± 5 LAKE WASHINGTON LOOP TRAIL PROJECT (BY OTHERS) 3 4 35 35 363433 3435353435 34 33 363738100' FROM LOGAN AVENUE BRIDGE 100-YEAR FLOOD EXTENTS 63+50 64+00 64+50 65+00 LOGAN AVENUE BR IDGE A - EXISTING USACE RIGHT BANK ALIGNMENT EXCAVATION LIMIT 4 4 3 SHARED USE PATH REVISION PER THE LAKE WASHINGTON TRAIL LOOP PROJECT (BY OTHERS) STA 63+30.00 STA 64+30.00 1 2 3 6 TOP OF EMBANKMENT OVERBUILD TOP OF EMBANKMENT FILL 1 2 4 5 5 5FG 35.3'± 7 EXCAVATION LIMIT 35 35 36 36 25 30 35 40 45 25 30 35 40 45 0 10 200-10-20 EXCAVATION LIMIT 100 YEAR WSE 3' FREEBOARD2H:1V MAX SIDESLOPE (TYP) 8' MIN CROWN WIDTH TOP OF OVERBUILD EL 36.4±TOP OF LEVEE EMBANKMENT FILL EL 35.99 2 1 4H:1V (TYP) (OVERBUILD) COORDINATE TABLE POINT 1 2 3 4 5 6 NORTHING 180513.99 180505.05 180505.05 180469.96 180462.39 180456.82 EASTING 1300194.01 1300204.51 1300204.51 1300239.99 1300269.86 1300274.34 DESCRIPTION BEGIN CONSTRUCTION BEGIN EMBANKMENT OVERBUILD BEGIN EMBANKMENT FILL END EMBANKMENT OVERBUILD / EMBANKMENT FILL END EMBANKMENT OVERBUILD / EMBANKMENT FILL END CONSTRUCTION CONSTRUCTION NOTES 1.EMBANKMENT OVERBUILD SHALL BE 6" MIN COMMON BORROW. 2.LEVEE EMBANKMENT FILL SHALL BE IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. EXCAVATED NATIVE MATERIAL MAY BE SUBSTITUTED PROVIDED IT MEETS THIS SPECIFICATION. 3.PROTECT EXISTING 4" GAS (PSE). 4.PROTECT EXISTING COMMUNICATION LINES AND STRUCTURES. 5.TOP OF EMBANKMENT FILL TO BE FLUSH WITH SHARED USE PATH CONSTRUCTED BY LAKE WASHINGTON LOOP TRAIL PROJECT. 6.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE 2 AS SHOWN ON SHEET L-02. 7.REPLACE EXISTING SIDEWALK WITH NEW SIDEWALK LANDING AND TRANSITION PANEL PER CITY OF RENTON STANDARD PLAN 102. 2 3 4 1 5 7 6 EMBANKMENT PLAN SCALE: 1" = 10' EMBANKMENT PROFILE SCALE: HORIZ: 1" = 10' VERT: 1" = 2' 0 SCALE: 5'10'20' 1" = 10'NPLANTING NOTES 1.SEE SHEET L-06 FOR PLANTING NOTES. EMBANKMENT SECTIONA _SCALE: HORIZ: 1" = 5', VERT: 1" = 5' KEY MAP SCALE: 1" = 1000' N DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-112 RAISE LEVEE EMBANKMENT LANDSCAPING BERM.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM RB STA 63+30 TO 64+30 RAISE LEVEE EMBANKMENT LANDSCAPING BERM PLAN AND PROFILE SITE LOCATION 30 35 40 30 35 40 3' FREEBOARD 100 YEAR WSE 1MATCH EXISTING EG 37.6'± MATCH EXISTING EG 37.5'± FG 37.10' FG 37.00' 1 22H:1V 3 403737 38393735363938 4040 24.5'± 11'±5% MAX1.25%3% MAXEXCAVATION LIMIT 32 2 1 1 2 3 4 5 6 A COORDINATE TABLE POINT NORTHING EASTING DESCRIPTION CONSTRUCTION NOTES 1.REPLACE SIDEWALK PER CITY OF RENTON STANDARD PLAN 102. 2.SAWCUT AT NEAREST EXPANSION JOINT. 3.PROTECT EXISTING 12" HIGH POWER WATER MAIN (BOEING). LOCATION SHOWN IS APPROXIMATE. COVER DEPTH IS ASSUMED BASED ON MINIMUM COVER DEPTHS SPECIFIED IN AVAILABLE AS-BUILT INFORMATION. 4.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-02. 2 3 1 4 1 2 3 4 5 6 180338.31 180337.61 180313.42 180314.18 180349.36 180348.80 1300376.95 1300384.95 1300381.04 1300372.99 1300375.54 1300385.26 SIDEWALK HIGH GROUND SIDEWALK HIGH GROUND SIDEWALK CORNER SIDEWALK CORNER SIDEWALK CORNER SIDEWALK CORNER 65 + 5 0 EXISTING RIGHT BANK USACE ALIGNMENT STA 65+50.00 0 SCALE: 5'10'20' 1" = 10' SIDEWALK PLAN SCALE: 1" = 10' SIDEWALK SECTION SCALE: HORIZ: 1" = 10' VERT: 1" = 2'A N KEY MAP SCALE: 1" = 1000' N DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-112 RAISE LEVEE EMBANKMENT LANDSCAPING BERM.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM RB STA 65+50 REMOVE AND REPLACE SIDEWALK AREA PLAN AND SECTION SITE LOCATION 66+50 67+00 67+50 68+00 EXISTING USACE RIGHT BANK ALIGNMENT 100-YEAR FLOOD EXTENTS 100' FROM LOGAN AVENUE BRIDGE SENIOR ACTIVITIES CENTER A EXCAVATION LIMIT 3.5' 8" 35 4034 36 37 38 39 35 3334 36 37 35403637 3 839414 2 3535353535 403 2 3 4 5 6 1 2 4 4 4 5 6 36 35 3232 33 34 1 1 9 10 STA 66+36.62 OFF 16.86'L 30 35 40 30 35 40 2' MINIMUM FREEBOARD 3' MINIMUM FREEBOARD 100 YEAR WSE EXST CONCRETE FOUNTAIN EXST CONCRETE WALL SENIOR ACTIVITIES CENTER EXST CONCRETE PAVEMENT EXST BERM EXST GROUND 2' MIN. EXST CONCRETE WALL 2 2 CONCRETE FLOODWALL T/W 37.3'± EXCAVATION LIMIT 8 610 1 1.5 1 FLOODWALL FOOTING KEY FLOODWALL FOOTING 100' FROM LOGAN AVENUE BRIDGE 30 35 40 45 30 35 40 45 0 100-10 4.5' OVERHANG 3' FREEBOARD EXCAVATION LIMIT 7 EXST GROUND SENIOR ACTIVITIES CENTER 3.5' 1 9 10 2' MIN. 100 YEAR WSE1.5 1 COORDINATE TABLE POINT 1 2 3 4 5 6 NORTHING 180379.56 180381.34 180383.18 180336.29 180332.82 180316.63 EASTING 1300431.26 1300467.12 1300499.36 1300544.02 1300540.35 1300555.89 DESCRIPTION BEGIN CONSTRUCTION BEGIN FLOODWALL ANGLE POINT ANGLE POINT ANGLE POINT END FLOODWALL / END CONSTRUCTION CONSTRUCTION NOTES 1.SHORE TO PROTECT EXISTING FLAGPOLE, ADJACENT CONCRETE, AND SENIOR ACTIVITIES CENTER BUILDING. 2.EMBED FLOODWALL 5' MINIMUM INTO EXISTING HILL. 3.PROTECT EXISTING 12" HIGH PRESSURE WATER MAIN (BOEING). CONTRACTOR TO VERIFY IN FIELD. 4.PROTECT EXISTING TREES. SEE CONTRACT SPECIFICATION SECTION 8-02.3(1)A. 5.SEED, FERTILIZE, AND MULCH AND PLACE TOPSOIL TYPE B AS SHOWN ON SHEET L-02. 6.REMOVE AND RESET EXISTING FLAGPOLE AND FOUNDATION. 7.REMOVE EXISTING SHRUB. SEE SHEET L-03 FOR REPLACEMENT. 8.BEDDING SHALL BE LEVEE EMBANKMENT FILL IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 2-03. 9.REINFORCED CONCRETE FLOODWALL TYPE 3. SEE DETAIL 1, THIS SHEET. 10.PROTECT EXISTING UNDERGROUND ROOF DRAIN PIPES. 2 3 4 5 1 6 7 8 9 10 1'-0" MIN5'-0"10"4'-0"1'-0"4'-0" 2" 3/4" CHAMFER (TYP) #5@9" O.C. EACH WAY #5@12" O.C. EACH WAY, EACH FACE #5 TIE @12" O.C. 2-#5 BARS FINISHED GRADE 1'-0"1'-6" FLOODWALL PLAN SCALE: 1" = 10' FLOODWALL PROFILE SCALE: HORIZ: 1" = 10' VERT: 1" = 2' 0 SCALE: 5 10 20 1" = 10'NPLANTING NOTES 1.SEE SHEET L-06 FOR PLANTING NOTES. FLOODWALL SECTIONA _SCALE: HORIZ: 1" = 5' VERT: 1" = 5' KEY MAP SCALE: 1" = 1000' N DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\T35277 - Cedar River Levee Certification\04 CAD\Phase III\Sheet Files\T35277 C-114 RAISE LEVEE EMBANKMENT WITH FLOODWALL.dwgCITY OF RENTON Public Works Department SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-27-3708 AS NOTED 33 PGS, INC. AB/SH/MH SH/IL KA CP www.tetratech.com PHONE: 206.728.9655 FAX: 206.728.9670 SEATTLE WASHINGTON 98101 1420 FIFTH AVENUE, SUITE 650 75% SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM REINFORCED CONCRETE FLOODWALL TYPE 3 DETAIL SCALE: NTS1 RB STA 65+90 TO 68+50 RAISE LEVEE EMBANKMENT WITH FLOODWALL PLAN AND PROFILE SITE LOCATION OH W OHW OHW OHW OHW OHW OHW OHW OHW OHW 41+00 42+00 43+00 CEDAR RIVER RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH) 100-YEAR FLOOD LINE SOUTH BOEING BRIDGEEX TREES TO REMAIN, TYP 20 20 25 30 3 0 49+50 50+00 50+50 51+00 51+50 52+00 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 IMPACTS LEGEND - AREA 4 TEMPORARY IMPACT: LANDSCAPE SHRUBS (707 SF) TEMPORARY IMPACT: GRASS (2,006 SF) IMPACTS CALCULATIONS PERMANENT IMPACT: TREES 9 PERMANENT IMPACT: INVASIVE SHRUBS 1,301 SF PERMANENT IMPACT: GRASS 76 SF TEMPORARY IMPACT: NATIVE SHRUBS 1,541 SF TEMPORARY IMPACT: LANDSCAPE SHRUBS 1,769 SF TEMPORARY IMPACT: INVASIVE SHRUBS 1,910 SF TEMPORARY IMPACT: GRASS 6,315 SF DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-01 IMPACTS - AREA 4.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONIMPACTS - AREA 4 AREA 4 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N KEY PLAN - AREA 4 SCALE: 1"=1000' N NOTES: 1.AREAS 1-3 ARE MITIGATION PLANTING AREAS ONLY. 2.AREAS 4-10 INCLUDE IMPACTS AND MITIGATION. 3.SEE SHEET L-10 FOR MITIGATION NOTES AND DETAILS. 59+0 0 60+0061+00 100-YEAR FLOOD LINE RENTON SENIOR ACTIVITIES CENTER RIGHT BANK ALIGNMENT (TETRA TECH) RIGHT BANK ALIGNMENT (USACE) 35 4 0 35 VEGETATION CONSERVATION BUFFER 66+00 66+50 67+00 67+50 OHW OHW OHW OHW OHW OHW OHW OHW 54+00 55+00 56+00 CEDAR RIVER 100-YEAR FLOOD LINE RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH) LOGAN AVE N 20 25 30 35 VEGETATION CONSERVATION BUFFER LIMIT OF LAKE WASHINGTON LOOP TRAIL PROJECT 62+50 63+00 63+50 64+00 64+50 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 IMPACTS LEGEND - AREA 6 PERMANENT IMPACT: TREE REMOVAL (1 FOR PERMITTING IMPACTS COUNT, 3 TOTAL REMOVED) TEMPORARY IMPACT: LANDSCAPE SHRUBS (533 SF) IMPACTS LEGEND - AREA 5 TEMPORARY IMPACT: LANDSCAPE SHRUBS (84 SF) TEMPORARY IMPACT: GRASS (1,614 SF) DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-02 IMPACTS - AREAS 5 AND 6.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONIMPACTS - AREAS 5 AND 6 N AREA 6 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' NAREA 5 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' KEY PLAN - AREA 6 SCALE: 1"=1000' N KEY PLAN - AREA 5 SCALE: 1"=1000' N NOTES: 1.AREAS 1, 2, AND 3 ARE MITIGATION PLANTING AREAS ONLY. 2.TWO OF THE TREES TO BE REMOVED ARE OUTSIDE THE VEGETATION CONSERVATION BUFFER IN AREA 6. TREE IMPACTS OUTSIDE OF THE VEGETATION CONSERVATION BUFFER ARE NOT COUNTED FOR THE PURPOSE OF ENVIRONMENTAL PERMITTING. OHW OHW OHW OHW OHW 20+0021+00 CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (USACE) LEFT BANK ALIGNMENT (TETRA TECH) 25 2025 19+00 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 31+0 0 32+00 33+00 34+00 31+0 0 32+00 33+00 34+00 CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (TETRA TECH) LEFT BANK ALIGNMENT (USACE) 25 20 25 30+00 31+00 32+00 33+00 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 25 20 25 25 20 25 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 25 20 25 2520 25 IMPACTS LEGEND - AREA 7 PERMANENT IMPACT: GRASS (26 SF) TEMPORARY IMPACT: INVASIVE SHRUBS (308 SF) TEMPORARY IMPACT: GRASS (457 SF) IMPACTS LEGEND - AREA 8 TEMPORARY IMPACT: NATIVE SHRUBS (1,541 SF) DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-03 IMPACTS - AREAS 7 AND 8.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONIMPACTS - AREAS 7 AND 8 AREA 7 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N AREA 8 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20'N KEY PLAN - AREA 7 SCALE: 1"=1000' N KEY PLAN - AREA 8 SCALE: 1"=1000' N OHW OHW OHW OHW OHW OHW OHW OHW OHW 60+0061+0 0 6 2 + 0 0 3+50 0+00 0+60. 8 5 LOGAN AVE N GRADING LIMITS FLOODWALL LIMIT OF DISTURBANCE CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (USACE) LEFT BANK ALIGNMENT (TETRA TECH) 30 35 3535 VEGETATION CONSERVATION BUFFER 58+ 0 0 59+0 0 6 0 + 0 0 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 57+00 58+00 59+0 0 CEDAR RIVER LEFT BANK ALIGNMENT (TETRA TECH) LEFT BANK ALIGNMENT (USACE) 100-YEAR FLOOD LINE LOGAN AVE N3530 VEGETATION CONSERVATION BUFFER LIMIT OF LAKE WASHINGTON LOOP TRAIL PROJECT 55+00 56+00 57+00 58+00 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 IMPACTS LEGEND - AREA 9 PERMANENT IMPACT: TREE REMOVAL (7) PERMANENT IMPACT: INVASIVE SHRUBS (1,301 SF) TEMPORARY IMPACT: INVASIVE SHRUBS (1,602 SF) IMPACTS LEGEND - AREA 10 PERMANENT IMPACT: TREE REMOVAL (1) PERMANENT IMPACT: GRASS (50 SF) TEMPORARY IMPACT: LANDSCAPE SHRUBS (445 SF) TEMPORARY IMPACT: GRASS (2,238 SF) DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-04 IMPACTS - AREAS 9 AND 10.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONIMPACTS - AREAS 9 AND 10 AREA 10 IMPACTS SCALE: 1"=20' N 0 SCALE: 10'20'40' 1"=20' KEY PLAN - AREA 10 SCALE: 1"=1000' N AREA 9 IMPACTS SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N KEY PLAN - AREA 9 SCALE: 1"=1000' N OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OH W OHW 6+00 7+00 8+ 0 0 CEDAR RIVER RIGHT BANK ALIGNMENT (TETRA TECH) RIGHT BANK ALIGNMENT (USACE) 100-YEAR FLOOD LINE REMOVE INVASIVE VEGETATION IN THIS AREA 25 15 20 14+00 14+50 15+00 15+50 16+00 16+50 17+00 OHW OHW OHW OHW OHW OHW 22+00 23+00 CEDAR RIVER 100-YEAR FLOOD LINE RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH) REMOVE INVASIVE VEGETATION IN THIS AREA 25 15 20 30+00 30+50 31+00 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 PLANTING LEGEND - AREA 1 ROSA NUTKANA (NOOTKA ROSE) SALIX LASIANDRA (PACIFIC WILLOW) SYMPHORICARPOS ALBUS (SNOWBERRY) PLANTING LEGEND - AREA 2 FRAXINUS LATIFOLIA (OREGON ASH) CORNUS SERICEA (RED OSIER DOGWOOD) SALIX LASIANDRA (PACIFIC WILLOW) SALIX SITCHENSIS (SITKA WILLOW) DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-05 MITIGATION PLANTING - AREAS 1 AND 2.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONMITIGATION PLANTING - AREAS 1 AND 2 AREA 1 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N N AREA 2 MITIGATION PLANTING PLAN SCALE: 1"=20' PLANTING NOTES 1.SEE SHEET L-10 FOR PLANTING DETAILS AND NOTES. 2.SEE SHEET L-10 FOR TOPSOIL PLACEMENT. 0 SCALE: 10'20'40' 1"=20' KEY PLAN - AREA 1 SCALE: 1"=1000' N KEY PLAN - AREA 2 SCALE: 1"=1000' N OHW OHW OHW OHW OHW OHW OHW OHW OHW 35+00 36+00 37+00 CEDAR RIVER RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH) 100-YEAR FLOOD LINE REMOVE INVASIVE VEGETATION FROM THIS AREA 30 25 20 30 43+00 43+50 44+00 44+50 45+00 45+50 OH W OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 41+00 42+00 43+00 44+00 45+00 46+00 47+00SFSFSF CEDAR RIVER RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH) 100-YEAR FLOOD LINE SOUTH BOEING BRIDGEREMOVE INVASIVE VEGETATION FROM THIS AREA 20 20 25 3 0 30 VEGETATION CONSERVATION BUFFER 49+50 50+00 50+50 51+00 51+50 52+00 52+50 53+00 53+50 54+00 54+50 55+00 55+50 PLANTING LEGEND - AREA 3 THUJA PLICATA (WESTERN RED CEDAR) CORNUS SERICEA (RED OSIER DOGWOOD) PHYSOCARPUS CAPITATUS (PACIFIC NINEBARK) AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 PLANTING LEGEND - AREA 4 ACER CIRCINATUM (VINE MAPLE) PSEUDOTSUGA MENZIESII (DOUGLAS FIR) CORNUS SERICEA (RED OSIER DOGWOOD) POLYSTICHUM MUNITUM (SWORD FERN) ROSA PISOCARPA (CLUSTERED WILD ROSE) SALIX SITCHENSIS (SITKA WILLOW) SYMPHORICARPOS ALBUS (SNOWBERRY) SEEDING AREA SEE SPEC 9-14.3 FOR SEED MIX AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-06 MITIGATION PLANTING - AREAS 3 AND 4.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONMITIGATION PLANTING - AREAS 3 AND 4 PLANTING NOTES 1.SEE SHEET L-10 FOR PLANTING DETAILS AND NOTES. 2.SEE SHEET L-10 FOR TOPSOIL PLACEMENT. KEY PLAN - AREA 3 SCALE: 1"=1000' N AREA 3 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N AREA 4 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N KEY PLAN - AREA 4 SCALE: 1"=1000' N 59+0 0 60+0061+00 HVF HVF HVF HVF HVF HVFHVF100-YEAR FLOOD LINE RENTON SENIOR ACTIVITIES CENTER RIGHT BANK ALIGNMENT (TETRA TECH) RIGHT BANK ALIGNMENT (USACE) 35 4 0 35 VEGETATION CONSERVATION BUFFER 66+00 66+50 67+00 67+50 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 50+00 51+00 52+00 53+00 54+00 55+00 56+00 CEDAR RIVER 100-YEAR FLOOD LINE RIGHT BANK ALIGNMENT (USACE) RIGHT BANK ALIGNMENT (TETRA TECH)LOGAN AVE N REMOVE INVASIVE VEGETATION IN THIS AREA 20 25 30 35 30 VEGETATION CONSERVATION BUFFER LIMIT OF LAKE WASHINGTON LOOP TRAIL PROJECT 58+50 59+00 59 + 5 0 60+00 60+50 61+00 61+50 62+00 62+50 63+00 63+50 64+00 64+50 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 PLANTING LEGEND - AREAS 5 AND 6 ACER CIRCINATUM (VINE MAPLE) FRAXINUS LATIFOLIA (OREGON ASH) THUJA PLICATA (WESTERN RED CEDAR) LONICERA INVOLUCRATA (TWINBERRY) PHYSOCARPUS CAPITATUS (PACIFIC NINEBARK) POLYSTICHUM MUNITUM (SWORD FERN) RHODODENDRON YAKUSHIMANUM 'PERCY WISEMAN (PERCY WISEMAN RHODODENDRON') ROSA PISOCARPA (CLUSTERED WILD ROSE) SYMPHORICARPOS ALBUS (SNOWBERRY) SEEDING AREA SEE SPEC 9-14.3 FOR SEED MIX AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-07 MITIGATION PLANTING - AREAS 5 AND 6.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONMITIGATION PLANTING - AREAS 5 AND 6 N PLANTING NOTES 1.SEE SHEET L-10 FOR PLANTING DETAILS AND NOTES. 2.SEE SHEET L-10 FOR TOPSOIL PLACEMENT. AREA 6 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' NAREA 5 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' KEY PLAN - AREA 6 SCALE: 1"=1000' N KEY PLAN - AREA 5 SCALE: 1"=1000' N OHW OHW OHW OHW OHW 20+0021+00 CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (USACE) LEFT BANK ALIGNMENT (TETRA TECH) 25 2025 19+00 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 31+0 0 32+00 33+00 34+00 31+0 0 32+00 33+00 34+00 CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (TETRA TECH) LEFT BANK ALIGNMENT (USACE) 25 20 25 30+00 31+00 32+00 33+00 PLANTING LEGEND - AREA 7 ROSA PISOCARPA (CLUSTERED WILD ROSE) SALIX SITCHENSIS (SITKA WILLOW) SEEDING AREA SEE SPEC 9-14.3 FOR SEED MIX AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 25 20 25 25 20 25 AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 25 20 25 2520 25 PLANTING LEGEND - AREA 8 AMELANCHIER ALNIFOLIA (SERVICEBERRY) RIBES SANGIUNEUM (RED FLOWERING CURRANT) ROSA NUTKANA (NOOTKA ROSE) DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-08 MITIGATION PLANTING - AREAS 7 AND 8.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONMITIGATION PLANTING - AREAS 7 AND 8 AREA 7 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N AREA 8 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20'N KEY PLAN - AREA 7 SCALE: 1"=1000' N KEY PLAN - AREA 8 SCALE: 1"=1000' N OHW OHW OHW OHW OHW OHW OHW OHW OHW 60+0061+0 0 6 2 + 0 0 3+50 0+00 0+60. 8 5 LOGAN AVE N GRADING LIMITS FLOODWALL LIMIT OF DISTURBANCE CEDAR RIVER 100-YEAR FLOOD LINE LEFT BANK ALIGNMENT (USACE) LEFT BANK ALIGNMENT (TETRA TECH) 30 35 3535 VEGETATION CONSERVATION BUFFER 58+ 0 0 59+0 0 6 0 + 0 0 PLANTING LEGEND - AREA 10 RHAMNUS PURSHIANA (CASCARA) SYMPHORICARPOS ALBUS (SNOWBERRY) SEEDING AREA SEE SPEC 9-14.3 FOR SEED MIX AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW 57+00 58+00 59+0 0 CEDAR RIVER LEFT BANK ALIGNMENT (TETRA TECH) LEFT BANK ALIGNMENT (USACE) 100-YEAR FLOOD LINE LOGAN AVE N3530 VEGETATION CONSERVATION BUFFER LIMIT OF LAKE WASHINGTON LOOP TRAIL PROJECT 55+00 56+00 57+00 58+00 PLANTING LEGEND - AREA 9 CORNUS SERICEA (RED OSIER DOGWOOD) ROSA NUTKANA (NOOTKA ROSE) SEEDING AREA SEE SPEC 9-14.3 FOR SEED MIX AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 10 AREA 9 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-09 MITIGATION PLANTING - AREAS 9 AND 10.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONMITIGATION PLANTING - AREAS 9 AND 10 AREA 10 MITIGATION PLANTING PLAN SCALE: 1"=20' N PLANTING NOTES 1.SEE SHEET L-10 FOR PLANTING DETAILS AND NOTES. 2.SEE SHEET L-10 FOR TOPSOIL PLACEMENT.0 SCALE: 10'20'40' 1"=20' KEY PLAN - AREA 10 SCALE: 1"=1000' N AREA 9 MITIGATION PLANTING PLAN SCALE: 1"=20' 0 SCALE: 10'20'40' 1"=20' N KEY PLAN - AREA 9 SCALE: 1"=1000' N 2X ROOTBALL DIA BACKFILL WITH NATIVE SOIL REMOVE CONTAINER, GENTLY LOOSEN TIGHT ROOT MASS AND UNTANGLE ROOTS WOOD CHIP MULCH RING, 3" DEPTH, 3' DIAMETER UNDISTURBED SUBGRADE PEDESTAL OF EXISTING SOIL. TAMP THOROUGHLY WITH FOOT ONLYVARIESFINISH GRADE4"INSTALL 4" DEPTH TOPSOIL LAYER TO LEVEE FILL APPLY HYDROMULCH AND SEED PER SPECIFICATIONS ENGINEERED LEVEE FILL 1/2" DIA. TOP, 1" DIA. BOTTOM TAPERED POLE CUTTING, 4'-5' LENGTH, SET VERTICAL ENSURE BUDS ARE FACING UPWARD FINISH GRADE PLANTING PIT: APPROXIMATE DIMENSIONS SHOWN. PLANTING PIT CAN BE DUG MANUALLY, USING A PLANTING BAR. SCARIFY THE SURFACE BEFORE BACKFILLING. TAMP SOIL PERIODICALLY DURING PLANT INSTALLATION TO REMOVE AIR GAPS. 8"1/3 LENGTH2/3LENGTH12"PLANTING SCHEDULE QUANTITIES SYMBOL BOTANICAL NAME COMMON NAME SIZE TYPE SPACING AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7 AREA 8 AREA 9 AREA 10 TOTAL ACER CIRCINATUM VINE MAPLE 2 GAL.CONTAINER 10' O.C.3 6 9 FRAXINUS LATIFOLIA OREGON ASH 2 GAL.CONTAINER 12' O.C.2 3 5 PSEUDOTSUGA MENZIESII DOUGLAS FIR 2 GAL.CONTAINER 12' O.C.5 5 RHAMNUS PURSHIANA CASCARA 2 GAL.CONTAINER 12' O.C.3 3 THUJA PLICATA WESTERN RED CEDAR 2 GAL.CONTAINER 12' O.C.4 3 7 AMELANCHIER ALNIFOLIA SERVICEBERRY 1 GAL.CONTAINER 6' O.C.22 22 CORNUS SERICEA RED OSIER DOGWOOD 1 GAL.CONTAINER 6' O.C.24 35 18 77 CORNUS SERICEA RED OSIER DOGWOOD 3' LENGTH LIVESTAKE 3' O.C.13 13 LONICERA INVOLUCRATA BLACK TWINBERRY 1 GAL.CONTAINER 6' O.C.11 11 PHYSOCARPUS CAPITATUS PACIFIC NINEBARK 1 GAL.CONTAINER 6' O.C.28 6 34 POLYSTICHUM MUNITUM SWORD FERN 1 GAL.CONTAINER 3' O.C.18 39 57 RHODODENDRON YAKUSHIMANUM 'PERCY WISEMAN'RHODODENDRON 5 GAL.CONTAINER 5' O.C.3 3 RIBES SANGIUNEUM RED FLOWERING CURRANT 1 GAL.CONTAINER 6' O.C.23 23 ROSA NUTKANA NOOTKA ROSE 1 GAL.CONTAINER 4' O.C.20 27 42 89 ROSA PISOCARPA CLUSTERED WILD ROSE 1 GAL.CONTAINER 6' O.C.42 14 6 62 SALIX LASIANDRA PACIFIC WILLOW 3' LENGTH LIVESTAKE 3' O.C.36 15 51 SALIX SITCHENSIS SITKA WILLOW 3' LENGTH LIVESTAKE 3' O.C.13 198 11 222 SYMPHORICARPOS ALBUS SNOWBERRY 1 GAL.CONTAINER 6' O.C.11 21 3 15 50 DATE: DRAWING NO: SHEET: DESIGNED: DRAWN: CHECKED: APPROVED: SURVEYED:FILENAME: P:\01 CAD\18xxxx\D20181192.00 - Cedar River Levees Improvements City of Renton\08_CAD\DWG\L-10 PLANTING DETAILS AND SCHEDULE.dwgCITY OF RENTON Planning/Building/Public Works Dept. SCALE: COR PROJECT NO: NO.REVISION BY DATE APPR OF:CEDAR RIVER LEVEES IMPROVEMENTSCEDAR RIVER LEVEE IMPROVEMENTS SWP-XX-XXXX AS NOTED 7/30/2021 33 PGS, INC. ABG ABG/TTF SAR CP PERMIT SUBMITTAL - NOT FOR CONSTRUCTION CALL TWO DAYS PRIOR TO DIG or 1-800-424-5555 VERTICAL: NAVD 1988 IF NOT ONE INCH ONE INCH AT FULL SCALE HORIZONTAL: NAD 1983/1991 SCALE ACCORDINGLY DATUM 5309 SHILSHOLE AVE NW SUITE 200 SEATTLE, WA 98107 T 206.789.9658 WWW.ESASSOC.COMALLISONA B . GREE N BERGNO. 1 047 EXP. 2 /2 8 /2023LANDS CAPE A R C H ITECTSTATE O F W ASHIN G T ONPLANTING DETAILS AND SCHEDULE CONTAINER PLANTING SCALE: NTS2SOIL PREPARATION FOR SEEDING SCALE: NTS1 PLANTING NOTES 1.VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK AND REPORT IN WRITING TO ENGINEER DEVIATIONS OR CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS, AND SITE CONDITIONS. 2.VERIFY LOCATION OF EXISTING UTILITIES AND EXISTING VEGETATION TO REMAIN PRIOR TO BEGINNING WORK. PROTECT VEGETATION AND UTILITIES NOT NOTED FOR REMOVAL. NOT TREES OR SHUBS SHALL BE PLANTED WITHIN 6 HORIZONTAL FEET OF OVERHEAD OR UNDERGROUND UTILITIES. 5.PROTECT ALL EXISTING IRRIGATION DURING PLANTING WORK. 6.PRESERVE AND PROTECT ALL EXISTING TREES AND SHRUBS NOT DESIGNATED FOR REMOVAL. NO SOIL SCARIFICATION SHALL OCCUR WITHIN THE DRIP LINE OF VEGETATION TO BE RETAINED UNLESS APPROVED BY THE ENGINEER. 7.REMOVE ALL INVASIVE SPECIES FROM THE MITIGATION PLANTING AREA PRIOR TO INSTALLATION USING METHODS LISTED IN THE SPECIFICATIONS. 8.DECOMPACT SOILS IN ALL PLANTING AREAS WHERE SOIL COMPACTION HAS OCCURRED. AT MINIMUM, DECOMPACTION MUST OCCUR WHERE HARD SURFACES HAVE BEEN REMOVED AND STAGING AREAS HAVE BEEN CLEARED. 9.SOIL DECOMPACTION IN WET SOILS AT ANY TIME OF THE YEAR OR DURING INCLEMENT WEATHER OR DURING PERIODS OF PROLONGED DRY OR HOT WEATHER IS NOT ALLOWED WITHOUT APPROVAL BY THE ENGINEER PRIOR TO EXECUTION IN ORDER THAT SOIL STRUCTURE WILL BE MAINTAINED. SOIL SHOULD BE MOIST ENOUGH THAT DIGGING DOESN'T CREATE DUST, BUT DRY ENOUGH TO DRIVE EQUIPMENT WITHOUT CREATING RUTS. 10.SMOOTH GRADE AND SEED ALL LANDSCAPE AREAS DISTURBED BY CONSTRUCTION THAT ARE NOT NOTED TO BE PLANTED. PRIOR TO SEEDING, REMOVE ROCKS AND DEBRIS LARGER THAN 1" IN DIAMETER AND GRADE TO MAKE SMOOTH TRANSITIONS BACK TO ADJACENT EXISTING GRADES. 11.PROVIDE ENGINEER A MINIMUM OF 15 DAYS ADVANCE NOTICE WHEN REQUESTING PLANT MATERIAL DELIVERY TO THE PROJECT SITE. 12.STAKE PLANT LOCATIONS FOR ENGINEER'S APPROVAL PRIOR TO PLANTING. 13.MONITORING OF MITIGATION AREAS SHALL OCCUR ONCE 30 DAYS AFTER PLANTING (STEM COUNT AND AS-BUILT PREPARATION), ONCE EARLY IN THE GROWING SEASON OF THE FIRST FULL GROWING SEASON FOLLOWING PLANTING, AND ONCE AT THE END OF THE FIRST FULL GROWING SEASON. 14.IF ANY PORTION OF THE MITIGATION IS NOT SUCCESSFUL, A CONTINGENCY PLAN SHALL BE IMPLEMENTED. SUCH PLANS ARE DEVELOPED ON A CASE-BY-CASE BASIS TO REMEDY ASPECTS OF MITIGATION THAT DO NOT MEET STATED SITE GOALS. THE CONTINGENCY PLAN WOULD BE DEVELOPED IN COOPERATION WITH THE ENGINEER. 15.SEE SPECIFICATIONS FOR RESTORATION SEED MIX. LIVE STAKE SCALE: NTS3 CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG 4" HP MAIN RELOCATE MAIN ID #006. C-3 CEDAR RIVER SEC 205, RENTON, WA 109137788 3D10-395 1/1 PROJECT CONTACT LIST FOR JOB#109137788 PLOT PLAN GAS MAIN PRESSURE AND TESTING REVISIONS FITTER'S CHECKLIST LOGAN AVE NE PER IMETER ROAD E P ER IM E T ER RO AD VICINITY MAP SAP ORDER #109137788 APPENDIX B Species Lists 4/16/2021 PHS Report 1/12 PHS Species/Habitats Overview: Priority Habitats and Species on the Web Report Date: 04/16/2021 4/16/2021 PHS Report 2/12 Occurence Name Federal Status State Status Generalized Location Sockeye Not Warranted N/A No Sockeye N/A N/A No Dolly Varden/ Bull Trout N/A N/A No Kokanee N/A N/A No Winter Steelhead N/A N/A No Coho N/A N/A No Steelhead Threatened N/A No Fall Chinook N/A N/A No Coho Candidate N/A No Resident Coastal Cutthroat N/A N/A No Chinook Threatened N/A No Sockeye Scientific Name Oncorhynchus nerka Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Cedar Sockeye, Run: Unspecified, Status: Depressed Source Record 5400 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Not Warranted State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines PHS Species/Habitats Details: 4/16/2021 PHS Report 3/12 Sockeye Scientific Name Oncorhynchus nerka Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Sockeye Salmon, Run Time: Unknown or not Applicable, Life History: Anadromous Source Record 38813 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Dolly Varden/ Bull Trout Scientific Name Salvelinus malma/S. confluentus Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Bull Trout, Run Time: Unknown or not Applicable, Life History: Unknown Source Record 38807 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 4/12 Kokanee Scientific Name Oncorhynchus nerka Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Kokanee Salmon, Run Time: Unknown or not Applicable, Life History: Adfluvial Source Record 38810 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Winter Steelhead Scientific Name Oncorhynchus mykiss Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Steelhead Trout, Run Time: Winter, Life History: Anadromous Source Record 38817 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 5/12 Sockeye Scientific Name Oncorhynchus nerka Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Lake Washington/Sammamish Tribs Sockeye, Run: Unspecified, Status: Healthy Source Record 5200 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Not Warranted State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Coho Scientific Name Oncorhynchus kisutch Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Coho Salmon, Run Time: Unknown or not Applicable, Life History: Anadromous Source Record 38804 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 6/12 Steelhead Scientific Name Oncorhynchus mykiss Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Lake Washington Winter Steelhead, Run: Winter, Status: Critical Source Record 6154 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Threatened State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Fall Chinook Scientific Name Oncorhynchus tshawytscha Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Chinook Salmon, Run Time: Fall, Life History: Anadromous Source Record 38800 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 7/12 Winter Steelhead Scientific Name Oncorhynchus mykiss Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Steelhead Trout, Run Time: Winter, Life History: Anadromous Source Record 38815 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Coho Scientific Name Oncorhynchus kisutch Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Coho Salmon, Run Time: Unknown or not Applicable, Life History: Anadromous Source Record 38805 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 8/12 Coho Scientific Name Oncorhynchus kisutch Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Cedar Coho, Run: Unspecified, Status: Depressed Source Record 3130 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Candidate State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Fall Chinook Scientific Name Oncorhynchus tshawytscha Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Chinook Salmon, Run Time: Fall, Life History: Anadromous Source Record 38801 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 9/12 Dolly Varden/ Bull Trout Scientific Name Salvelinus malma/S. confluentus Priority Area Breeding Area Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Bull Trout, Run Time: Unknown or not Applicable, Life History: Unknown Source Record 38809 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Sockeye Scientific Name Oncorhynchus nerka Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Lake Washington Beach Spawning Sockeye, Run: Unspecified, Status: Depressed Source Record 5300 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Not Warranted State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 10/12 Resident Coastal Cutthroat Scientific Name Oncorhynchus clarki Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Cutthroat Trout, Run Time: Unknown or not Applicable, Life History: Unknown Source Record 38798 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Chinook Scientific Name Oncorhynchus tshawytscha Priority Area Occurrence Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Stock Name: Cedar Chinook, Run: Sum/Fall, Status: Depressed Source Record 1144 Source Dataset SASI Source Name Not Given Source Entity WDFW Fish Program Federal Status Threatened State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 11/12 Fall Chinook Scientific Name Oncorhynchus tshawytscha Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Chinook Salmon, Run Time: Fall, Life History: Anadromous Source Record 38799 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines Coho Scientific Name Oncorhynchus kisutch Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Coho Salmon, Run Time: Unknown or not Applicable, Life History: Anadromous Source Record 38803 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines 4/16/2021 PHS Report 12/12 Sockeye Scientific Name Oncorhynchus nerka Priority Area Occurrence/Migration Site Name Cedar River Accuracy NA Notes LLID: 1222590476452, Fish Name: Sockeye Salmon, Run Time: Unknown or not Applicable, Life History: Anadromous Source Record 38812 Source Dataset SWIFD Federal Status N/A State Status N/A PHS Listing Status PHS Listed Occurrence Sensitive N SGCN N Display Resolution AS MAPPED More Info http://wdfw.wa.gov/wlm/diversty/soc/soc.htm Geometry Type Lines DISCLAIMER. This report includes information that the Washington Department of Fish and Wildlife (WDFW) maintains in a central computer database. It is not an attempt to provide you with an official agency response as to the impacts of your project on fish and wildlife. This information only documents the location of fish and wildlife resources to the best of our knowledge. It is not a complete inventory and it is important to note that fish and wildlife resources may occur in areas not currently known to WDFW biologists, or in areas for which comprehensive surveys have not been conducted. Site specific surveys are frequently necesssary to rule out the presence of priority resources. Locations of fish and wildlife resources are subject to variation caused by disturbance, changes in season and weather, and other factors. WDFW does not recommend using reports more than six months old. 6/28/2021 Protected Resources App https://www.webapps.nwfsc.noaa.gov/portal/apps/webappviewer/index.html?id=7514c715b8594944a6e468dd25aaacc9&extent=-13608376.5375%2C6020796.9238%2C-13599204.0941%2C6024962.…1/1 0.3km 0.2mi -122.204713 47.499809 Degrees + –   Protected Resources App v1.0 Esri World Geocoder (1 of 2) ESA Critical Habitat Designation: Steelhead (Puget Sound DPS) FID 2348 Shape STRM_NAME Cedar River USEDESC Known Juvenile Rearing LENGTH 1.80 Zoom to 6/28/2021 Protected Resources App https://www.webapps.nwfsc.noaa.gov/portal/apps/webappviewer/index.html?id=7514c715b8594944a6e468dd25aaacc9&extent=-13608376.5375%2C6020796.9238%2C-13599204.0941%2C6024962.…1/1 0.3km 0.2mi -122.205400 47.498244 Degrees + –   Protected Resources App v1.0 Esri World Geocoder (2 of 2) ESA Critical Habitat Designation: Salmon, Chinook (Puget Sound ESU) FID 1159 Shape LENGTH 9,917.19 LLID 1222590476452 STRM_NAME Cedar River Zoom to April 15, 2021 United States Department of the Interior FISH AND WILDLIFE SERVICE Washington Fish And Wildlife Office 510 Desmond Drive Se, Suite 102 Lacey, WA 98503-1263 Phone: (360) 753-9440 Fax: (360) 753-9405 http://www.fws.gov/wafwo/ In Reply Refer To: Consultation Code: 01EWFW00-2021-SLI-0924 Event Code: 01EWFW00-2021-E-01806 Project Name: Cedar River 205 Levee Recert Project Subject:List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, and proposed species, designated and proposed critical habitat, and candidate species that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. The species list is currently compiled at the county level. Additional information is available from the Washington Department of Fish and Wildlife, Priority Habitats and Species website: http://wdfw.wa.gov/ mapping/phs/ or at our office website: http://www.fws.gov/wafwo/species_new.html. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. 04/15/2021 Event Code: 01EWFW00-2021-E-01806   2    ▪ A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether or not the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species, and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.). You may visit our website at http://www.fws.gov/pacific/ eagle/for information on disturbance or take of the species and information on how to get a permit and what current guidelines and regulations are. Some projects affecting these species may require development of an eagle conservation plan: (http://www.fws.gov/windenergy/ eagle_guidance.html). Additionally, wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenergy/) for minimizing impacts to migratory birds and bats. Also be aware that all marine mammals are protected under the Marine Mammal Protection Act (MMPA). The MMPA prohibits, with certain exceptions, the "take" of marine mammals in U.S. waters and by U.S. citizens on the high seas. The importation of marine mammals and marine mammal products into the U.S. is also prohibited. More information can be found on the MMPA website: http://www.nmfs.noaa.gov/pr/laws/mmpa/. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Related website: National Marine Fisheries Service: http://www.nwr.noaa.gov/protected_species/species_list/ species_lists.html Attachment(s): Official Species List 04/15/2021 Event Code: 01EWFW00-2021-E-01806   1    Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Washington Fish And Wildlife Office 510 Desmond Drive Se, Suite 102 Lacey, WA 98503-1263 (360) 753-9440 04/15/2021 Event Code: 01EWFW00-2021-E-01806   2    Project Summary Consultation Code:01EWFW00-2021-SLI-0924 Event Code:01EWFW00-2021-E-01806 Project Name:Cedar River 205 Levee Recert Project Project Type:LAND - FLOODING Project Description:levee recertification project Project Location: Approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@47.4925291,-122.21266535203588,14z Counties:King County, Washington 04/15/2021 Event Code: 01EWFW00-2021-E-01806   3    1. Endangered Species Act Species There is a total of 5 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME STATUS Gray Wolf Canis lupus Population: Western Distinct Population Segment No critical habitat has been designated for this species. Proposed Endangered Birds NAME STATUS Marbled Murrelet Brachyramphus marmoratus Population: U.S.A. (CA, OR, WA) There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/4467 Threatened Streaked Horned Lark Eremophila alpestris strigata There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/7268 Threatened Yellow-billed Cuckoo Coccyzus americanus Population: Western U.S. DPS There is proposed critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/3911 Threatened 1 04/15/2021 Event Code: 01EWFW00-2021-E-01806   4    Fishes NAME STATUS Bull Trout Salvelinus confluentus Population: U.S.A., conterminous, lower 48 states There is final critical habitat for this species. Your location overlaps the critical habitat. Species profile: https://ecos.fws.gov/ecp/species/8212 Threatened Critical habitats There is 1 critical habitat wholly or partially within your project area under this office's jurisdiction. NAME STATUS Bull Trout Salvelinus confluentus https://ecos.fws.gov/ecp/species/8212#crithab Final