Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2023-01-05_FR_077 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 11/17/2022 Renton Elementary School 16 20180398E003 077 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Collin Marshall Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 40’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite at 9:00 am at the request of the general contractor to observe a proof roll of the planned south parking lot. While onsite we met with representatives from both Cornerstone and Continental Dirt Contractors. Proof Roll: AESI observed the contractor performing a proof roll of the southern parking lot with a front-end loader at full capacity. We observed visually that the parking lot subgrade was dense, firm and unyielding in all areas with the exception of 2 locations in the vicinity of the Stormtech vault. AESI marked the locations requiring improvement. AESI observed the contractor using an excavator to remove approximately 15 cubic yards of material from the top of the parking lot subgrade in the areas marked for improvement. The contractor then backfilled the excavations with approximately 15 cubic yards of 2.5-inch minus crushed rock before using a Hoepack to recompact the subgrade. We probed the improved subgrade area with a ½” diameter steel t-probe, probing to an average depth of 1 to 2 inches, indicating a firm and unyielding condition. AESI also confirmed the suitability of the subgrade for placement of pavement by observing the contractor performing a proof roll on the improved areas. Fig. 1: Improved parking lot subgrade areas highlighted in green. 16 Date Project Name Project No. Report No. 01/05/2023 Renton ES 16 20180398E003 077 Page 2 of 2 FIELD REPORT Photo 1: Contractor using an excavator to remove material from the yielding areas of the parking lot subgrade. Looking west.