Loading...
HomeMy WebLinkAboutW_SPR Waiver Email_230329_v1.pdf1 Ali Masterson From:Alex Morganroth <AMorganroth@Rentonwa.gov> Sent:Wednesday, February 08, 2023 2:25 PM To:Lisa Klein Cc:Calvin Gasaway; Michael (Mike) Cato; Ali Masterson; Jeff Glander; KEVIN MCFARLAND Subject:[EXTERNAL] RE: Hazen HS - Site Plan Review Waiver Items Hi Lisa – yes, if no tree removal is proposed, no arborist report/tree retention worksheet is required.    Thank you,    ALEX MORGANROTH, AICP, Senior Planner  City of Renton | CED | Planning Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7219 | amorganroth@rentonwa.gov    From: Lisa Klein <LKlein@AHBL.com>   Sent: Wednesday, February 8, 2023 1:45 PM  To: Alex Morganroth <AMorganroth@Rentonwa.gov>  Cc: Calvin Gasaway <calvin@greenegasaway.com>; Michael (Mike) Cato <michael.cato@rentonschools.us>; Ali  Masterson <amasterson@AHBL.com>; Jeff Glander <jeff.glander@scjalliance.com>; KEVIN MCFARLAND  <suf1234@comcast.net>  Subject: RE: Hazen HS ‐ Site Plan Review Waiver Items    Hi Alex,  I’m following up with you on the previous questions about submittal requirements for Hazen HS, but this time in light of  the recent site plan change you have heard about.  At this time we believe that there will be no tree removal.   If there is  no tree removal, can the arborist report and tree retention worksheet be waived?  Thank you,  Lisa    Lisa Klein, AICP ª B¡¡ylri¢n R rxlrzi u AHBL, Inc. | TACOMA Ò UFBV V NF Ò UR QMBPF Ò V T K-DKVKFU 253.383.2422 TEL ª 253.284.0256 DIRECT ª 253.651.7907 MOBILE ª utunrxAi qku.lyw EMAIL ª Unxm £¡ i orun. Di  nn  Qzzy ¢£xr¢rn¡ i¤iruikun ª Nni  x wy n ¢ymi § !     From: Alex Morganroth <AMorganroth@Rentonwa.gov>   Sent: Tuesday, January 24, 2023 2:54 PM  To: Lisa Klein <LKlein@AHBL.com>  Cc: Calvin Gasaway <calvin@greenegasaway.com>; Michael (Mike) Cato <michael.cato@rentonschools.us>; Ali  Masterson <amasterson@AHBL.com>; Jeff Glander <jeff.glander@scjalliance.com>; KEVIN MCFARLAND  <suf1234@comcast.net>  Subject: [EXTERNAL] RE: Hazen HS ‐ Site Plan Review Waiver Items   CAUTION: Vqr¡ nwi ru y  rprxi ¢nm o yw y£¢¡rmn ¢qn Dr¢§ yo Tnx¢yx . Ey xy¢ lurlt urxt¡ ,  nzu§ y  yz n x i¢¢ilqwnx¢¡ £xun¡ ¡ §y£ txy¥ ¢qn lyx¢nx¢ r¡ ¡ion.   2   Hi Lisa – yes and no, which I realize is not a great answer. The arborist can focus on the two parcels, but we will still be  reviewing for site‐wide compliance with the tree credit standards. This may be difficult to do without the arborist  looking at the entire site as a whole. If they think they can demonstrate compliance with our tree regulations without  inventorying the entire site, that is fine, but I believe it’d be difficult to meet the code requirements without doing so. If  you’d like to discuss more, please let me know and I’d be happy to give you a call.    Thank you,    ALEX MORGANROTH, AICP, Senior Planner  City of Renton | CED | Planning Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7219 | amorganroth@rentonwa.gov    From: Lisa Klein <LKlein@AHBL.com>   Sent: Tuesday, January 24, 2023 2:04 PM  To: Alex Morganroth <AMorganroth@Rentonwa.gov>  Cc: Calvin Gasaway <calvin@greenegasaway.com>; Michael (Mike) Cato <michael.cato@rentonschools.us>; Ali  Masterson <amasterson@AHBL.com>; Jeff Glander <jeff.glander@scjalliance.com>; KEVIN MCFARLAND  <suf1234@comcast.net>  Subject: RE: Hazen HS ‐ Site Plan Review Waiver Items    Alex,  One follow up question for you on the arborist report and tree retention worksheet.  Will it be acceptable is the arborist  focuses the report on the two affected tax parcels where the improvements will occur?  In other words, instead of  looking at the entire 32‐acre Hazen High School Site, the arborist report will focus on tree retention within the two  parcels that comprise less than 10 acres??  This makes sense to me but we need to confirm with you.  Regards,  Lisa     Lisa Klein, AICP ª B¡¡ylri¢n R rxlrzi u AHBL, Inc. | TACOMA Ò UFBV V NF Ò UR QMBPF Ò V T K-DKVKFU 253.383.2422 TEL ª 253.284.0256 DIRECT ª 253.651.7907 MOBILE ª utunrxAi qku.lyw EMAIL ª Unxm £¡ i orun. Di  nn  Qzzy ¢£xr¢rn¡ i¤iruikun ª Nni  x wy n ¢ymi § !     From: Alex Morganroth <AMorganroth@Rentonwa.gov>   Sent: Friday, January 20, 2023 9:54 AM  To: Lisa Klein <LKlein@AHBL.com>  Cc: Calvin Gasaway <calvin@greenegasaway.com>; Michael (Mike) Cato <michael.cato@rentonschools.us>; Ali  Masterson <amasterson@AHBL.com>; Jeff Glander <jeff.glander@scjalliance.com>  Subject: [EXTERNAL] RE: Hazen HS ‐ Site Plan Review Waiver Items    Hi Lisa –     The geotech report, letter of understanding of geologic risk, and proof of neighborhood meeting are not needed.     CAUTION: Vqr¡ nwi ru y  rprxi ¢nm o yw y£¢¡rmn ¢qn Dr¢§ yo Tnx¢yx . Ey xy¢ lurlt urxt¡ ,  nzu§ y  yz n x i¢¢ilqwnx¢¡ £xun¡ ¡ §y£ txy¥ ¢qn lyx¢nx¢ r¡ ¡ion.   3 Yes, an arborist report (or shorter memo) needs to be provided. This could also be prepared by a licensed landscape  architect.     Some projects require a detailed landscape plan up front, but most only need a conceptual plan (detailed plan is  typically submitted at time of civil or building permit review). In the case of this project, a conceptual plan is just fine.    Thank you,    ALEX MORGANROTH, AICP, Senior Planner  City of Renton | CED | Planning Division  1055 S Grady Way | 6th Floor | Renton, WA 98057   Virtual Permit Center | Online Applications and Inspections  (425) 430‐7219 | amorganroth@rentonwa.gov    From: Lisa Klein <LKlein@AHBL.com>   Sent: Monday, January 16, 2023 12:37 PM  To: Alex Morganroth <AMorganroth@Rentonwa.gov>  Cc: Calvin Gasaway <calvin@greenegasaway.com>; Michael (Mike) Cato <michael.cato@rentonschools.us>; Ali  Masterson <amasterson@AHBL.com>; Jeff Glander <jeff.glander@scjalliance.com>  Subject: Hazen HS ‐ Site Plan Review Waiver Items    Hi Alex,  I know you are working on our pre‐app meeting notes.  The following items are what we understand would be waived  for SPR for Hazen HS portables.  Could you please confirm?   Geotechnical Report    Letter of Understanding of Geologic Risk   Proof of Neighborhood meeting  There are questions related to trees and landscaping that needs clarification:   Arborist Report – the trees to be removed are in the parking lot, is an arborist report needed?   Why does the submittal checklist list both a conceptual landscape plan and a detailed landscape plan?  Which of  these is needed for Hazen HS?    Thank you,  Lisa      Lisa Klein, AICP ª B¡¡ylri¢n R rxlrzi u AHBL, Inc. | TACOMA Ò UFBV V NF Ò UR QMBPF Ò V T K-DKVKFU 253.383.2422 TEL ª 253.284.0256 DIRECT ª 253.651.7907 MOBILE ª utunrxAi qku.lyw EMAIL Civil Engineers • Structural Engineers • Landscape Architects • Community Planners • Land Surveyors Xr¡r¢ £¡ i¢ ¥¥¥.iqku.lyw. ª Gyuuy¥ £¡ yx NrxtnmKx ixm Gi ln kyyt . ª Unxm £¡ i orun. Di  nn  Qzzy ¢£xr¢rn¡ i¤iruikun ª Nni  x wy n ¢ymi § !      CAUTION: Vqr¡ nwi ru y  rprxi ¢nm o yw y£¢¡rmn ¢qn Dr¢§ yo Tnx¢yx . Ey xy¢ lurlt urxt¡ ,  nzu§ y  yz n x i¢¢ilqwnx¢¡ £xun¡ ¡ §y£ txy¥ ¢qn lyx¢nx¢ r¡ ¡ion.