Supplemental Agreement Organization and Address
Number 1 . Parametrix,Inc.
Original Agreement Number 1019 39th Ave SE,Suite t00,Puyallup,�VA 48374
CAG-16-063
Phone: 253-604-6739
Project Number Execution Date Completion Date �
TIB-8-1-102(037) 6/21/2016 December 31,2018
Project Title New Maximum Amount Payable
Duvall Avenue NE $423,710(this supplement increased by$32,862)
Descripfion af Work � �
Engineering services for design improvements on Duvall Avenue NE to restore the paved surface,and fill in missing ,
❑on-motorized facilities such as sidewalks and bicycle lanes,illumination,and channelization.
As outline in attached Exhibit A-1,this Supplemental Agreement Number t will provide potholing services to verify utility
conflicts for the design.
The Local Agency of C�ty ot'xenton
desires to supplement the agreement entered in to with Parametrix.Inc. ___i__ ___
and executed on 6l21/2016 and identified asAgreement No. CAG-16-o63 �
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
The Scope of Work described in Section II of the Agreement is amended to add the Scope of Services described in the attached
Exhibit A-1.
11
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
fot'COrilpl@ti0n Of the WOfk to �e8d: Completion date is extended from Apri130 2018 to December 31 2018
111
Section V, PAYMENT, shall be amended as follows:
Additional services added by this Supplemental Agreement Number 1 increase the ma�cimum amount payable by$32,862 making a
new maximum amount payable$423,710. See attached Exhibits A thru A-2.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If yau concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
By; Parametrix Inc. gy; Gre g Zimmerman,PW Adminiatrator
� 'l�.. Y(
----� Consultant ture Appro A t i ignature
___ �Q C, e,,� ( Q, , � I �—
�
DOT Form 140-063
Revised 09/2005
Exhibit "A"
Summary of Payments
Basic Supplement#1 Total
Agreement
Direct Salary Cost $116,682 $2,527 $119,209
Overhead $219 361 $4,751 $224,112
(Including Payroll Additives) '
Direct Non-Salary Costs $16,300 $24,750 $41,050
Fixed Fee $38,505 $834 $39,339
Total $390,848 $32,862 $423,710
DOT Form 140-063
Revised 09/2005
Exhibit A-1
Scope of Work - Supplement 1
City of Renton
Duvall Avenue NE, NE 10th Street to Sunset Boulevard
PROJECT OVERVIEW
The City of Renton Transportation Systems Division (AGENCY), as part of its Capital Improvement
Program,has identified improvements on Duvall Avenue NE,NE l Oth Street to Sunset Boulevard to restore
the paved surface, and fill in missing non-motorized facilities, such as sidewalks and bicycle lanes,
illumination, and channelization.
The AGENCY has hired Parametrix (CONSULTANT) to provide design services. This supplement was
created to provide potholing services, which was not included in the original scope of work.
PHASE 1 — PRELIMINARY AND FINAL DESIGN WORK
Task 2 —Surveying and Base Mapping (NTP through December 201�
Work will include conducting a field survey and preparation of an electronic base map of the project area
as defined below,to be used in engineering design.
Approach
The CONSULTANT shall arranQe for up to 30 potholes to verify utilitv con icts usin�Applied Pro essional
Services. Potholin�will take place prior to the 90%submittal. One engineer and survevor will be present
duringpotholing e�'forts to document the results o the potholing.
Assumption(s)
• The CONSULTANT will identify potential utility conflicts and prepare a pothole plan for APS.
• The AGENCY will waive permit fees for the potholing effort.
Deliverable(s)
• Potholing data, including location,type of utility and depth.
City of Renton 214-1�79-878
Duvall Avenue NElmprovements: l October 20l7
NE IOth Street to Sunset Boulevard
Scope of Work—Supplement 1
Client:City of Renton ExhibitA-2
Project: Duvall Avenue NE,10th to 12th Street Prime Consultant Cost Computations
BUDGET ESTIMATE
y � � � r d
� �
-oT�e i�o o a c�i � o� m rn c c o"E « a`�i E �' � � �v w m � t��
�t c ip . c c � o � m m c� c - n
c m t c� @ m E �- � o m � °� c� n a a� E � m m t o o " m
GU U�n �Y c� �3 �3 �m �Y �n�n Qm Q� ❑u� Ua � ��
City of Renton Duvall Avenue, 10th to Sunset ;,^ � �' °' m � �' a � �
C C N N N N � N C N �O O � C t0 41 "0
U Of OI U OI � N C C �i N t0 T� T � YI N C U� � � � J
� � � � � � c �rn �rn � c � d � d d a � �� d u� d o
Supplement No. 1 - Potholing �w w
o� a m rn m m �+ o rn Z a Z 2 o o c o o ` rn o u
a�in Cr in �w` �o �0 in w` U in in <'n r'n 3 a �o a U in w` a a
Salaried Rates: $75.24 $67.81 $47.03 $36.00 $44.28 $55.91 $58.92 $54.47 $35.34 $26.64 $30.87 $59.81 $36.44 $66.97 $33.17
Project Rates: $241.52 $217.67 $150.97 $115.56 $142.14 $179.47 $189.13 $174.85 $113.44 $85.51 $99.09 $191.99 $116.97 $214.97 $106.48
Phase Task Descri tion �abor pollars Labor Hours 2 0 24 0 0 0 0 6 24 0 0 0 2 0 0
07 DESIGN E9,111.86
U4 Ot "PROJECT MANA�EMENT $0.00 0 0 0 0 0 0 0 0 0 0 0 0 , A � - 0 0
Contract Set U $0.00 0
Subconsultant Coordination $0.00 0
Conference Calls $0.00 0
Pro ress Meetin s 6 4 additional) $0.00 0
Schedule Pre aration&U dates $0.00 0
Ea4ension Ana/sis&Re uests $0.00 0
Misc.Cornes ondence $0.00 0
KickoffiWalkthou h $0.00 0
Roll Plot re aration $0.00 0
DraR Cost Estimate $0.00 0
Pro ress Re ort 15,6 additional $0.00 0
01 02 , SURVEY/4ND MAPPINC> '$8�71].86 58 2 0 24 0 0 0 Q 6 24 0 0 U 2 0 . 0
Records Research $0.00 0
Fie/d Work $0.00 0
Basema Pre aration $0.00 0
APS Coordination&Potholin $8,111.86 58 2 24 6 24 2
O7 03 CsEOTEGHNICALANALYSIS $0.00 4 0 0 0 0 0 0 . 0 - 0 0 0 Q 0 Q 0 0
See Subconsultant Cost(Be/ow) $0.00 0
Ot 44 OUTREACH 3E?.00 0 0 0 0 0 0 0 6 r,0 0 -0 0 0 0 0 ' 0
One-on-One Meetin s 5 $0.00 0
Ac uisition Su ort $0.00 0
Meetin notes $0.00 0
01 DS ;DESIGN R€POR7 $�.QO 0 0 : 0 0 0 0 0 0 0 0 0 U 0 0 0 U
Draft Memo $0.00 0
Final Memo $0.00 0
01 O6 STORM4VATER ANALYSIS $0.0� 0 0 -0 0 0 0 0 0 0 0 A 0 0 0 0 0
Gather Info $0.00 0
Offsite Analt sis $0.00 0
Downsheam Anal sis $0.00 0
Meetin with Cit $0.00 0
Pre are DraR TIR $0.00 0
Meetin with Cit $0.00 0
Pre are Final TIR $0.00 0
01 07 PREUMlNARY UESIGN 3t?.00 0 0 0 0 0 0 0 0 U 0 0 0 0 0 0 0
Preliminar P/an 6 Profile $0.00 0
Worsksho Meetin w/Cit $0.00 0
Cover Sheet $0.00 0
Le end $0.00 0
T ica/Sections $0.00 0
Demo $0.00 0
Plan 8 Profi/e Sheets $0.00 0
Storm Draina e Plans $0.00 0
Storm Draina e Details $0.00 0
Wal/Plan $0.00 0
Wall Profiles $0.00 0
Channelization,Si nin 8111umination $0.00 0
Traffic Si nal $0.00
Utili Conflict Plans $0.00 0
Plantin Plans 6 Details $0.00 0
DraR S ecifications $0.00 0
Preliminar O inion of Cost $0.00 0
Utili Coordination Meetin $0.00 0
Assemble and Su6mit Prelim PS&E $0.00 0
Review Meetin with Cit $0.00 0
$0.00 0
Ot U8 ENVIRONMENTACASSISTAMCE ' SO.QO U 0 U 4 0 0 0 Q 0 0 0 6 4 0 0 0
Coordinafe with Widener 8 Assoc. $0.00 0
$0.00 0
ot os em pocu�a�ts .� o : o 0 0 0 0 0 0 o a a o 0 o a o
Incor orate Prelim Comments $0.00 0
U date Plan Sheets $0.00 0
U date S ecs $0.00 0
U date Estimate $0.00 0
Submit 90%PSBE $0.00 0
Review Meetin with Cit $0.00 0
U date PS&E $0.00 0
Submit Final PS&E $0.00 0
Post to Builders Exchan e � $0.00 0
$0.00
41 14" BIC1E)ING ASSISTANCE .� 0 Q 0 0 0 0 0 0 "0 0 , 0 Q Q ' U � 0
4 RFIs,2 Addenda $0.00 0
Bid Tabs $0.00 0
LaborTotais: 58,111.86 58 5483.04 50.00 E3,623.19 50.00 50.00 50.00 50.00 51,049.09 E2,722.59 50.00 E0.00 50.00 5z33.94 E0.00 50.00
Page 1 of 2 10/16/2017
Client:City of Renton ExhibifA-2
Project: Duvall Avenue NE,10th to 12th Street Prime Consu/tant Cost Computations
BUDGET ESTIMATE
�
� � L �� y a � C � N � N
'O� �L � C U J �.p y OI C C � � "' N E 7 � � d"O N � t Oi
i�c� vin �Y c� E �3 �� �m �Y v�u�-i Dm ¢� oin va � E�
Cit of Renton Duvall Avenue 10th to Sunset � �' �' - - �' °' ° �
Y 1 p`� C C N N 01 N � N C y p � N A C � ry �
j� Of Of U Of ❑ N C C 3 UI l6 T� T � N C V�- � N U J
� t0 C � C � C � OI � O] E C � N � N N � N 01 � C
Supplement No. 1 -Potholing o�W a w ,� �, ,� �, ,� o �, z a � Z o o = - o o � m o�
a`.�in din �w �o �o v�w` c�.� �'nr'n in r'n 3a �o dc°� inw a "
Salaried Rates: $75.24 $67.81 $47.03 $36.00 $44.28 $55.91 $58.92 $54.47 $35.34 $26.64 $30.87 $59.81 $36.44 $66.97 $33.17
Project Rates: $241.52 $217.67 $150.97 $115.56 $142.14 $179.47 $189.13 $174.85 $113.44 $85.51 $99.09 $191.99 $116.97 $214.97 $106.48
Phase Task Descri tion Labor pollars Labor Hours 2 0 24 0 0 0 0 6 24 0 0 0 2 0 0
TOTAL
LABOR
Labor Total E8,112
SUBCONSULTANTS
Subconsultant Name
Applied Professional Services,Inc. $24,450 .
HWA $0
Subconsultant Total: E24,450
DIRECT EXPENSES:
Descriotion Amount
Plotter Bond
Mileage $200
WA Survey Equipment $100
Wa Survey Vehicle
Expenses(non-survey)
Title Reports
Expense Total: 5300
Project Total: $32,862