Loading...
HomeMy WebLinkAboutMFP23001701.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23001701 IVR Number: 23001701 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/02/2023Application Date:7841300400Parcel Number: 530 SHATTUCK AVE S Permit Type:05/03/2023Issue Date:Franchise Permit Work Class:05/02/2024Expiration Date:Minor Utility Job Number: 101153166Franchise Type:Electric Description: Puget Sound Energy Electric REMOVE POLE P02. TRENCH FROM P01 TO V01 (10'), UNIT A TO V02 (70'). TOTAL TRENCH (80'). RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CASTLE DEVELOPMENT LLC PO BOX 40631 BELLEVUE , WA 98015 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101153166 530 SHATTUCK AVE S Randy Blackie 253-395-6850 MFP23001701 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 4/6/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01 P02 V01 V02 H2A VVW20-7AW20-4ONE LANEROADAHEADX'X'X'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADX'X' X'ROADWORKAHEADW20-1FROM TO TOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK16161717 11111717 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA S 6TH STSHATTUCK AVE SHOUSER W A Y S STOP FLAGGER STOP FLAGGER TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 02/17/2023 513269182 0 530 SHATTUCK AVE S, RENTON, WA 98057. JOSE RODRIGUEZ 425-424-6658 Jose.rodriguez@pse.com 1 OF 2 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY 0'80'40' MFP23001701 P01 P02 V01 V02 H2A VVW20-7AW20-4ONE LANEROADAHEADX'X'X'ROAD WORK AHEAD W20-1W20-7ABEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEADX'X' X'ROADWORKAHEADW20-1FROM TO TOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKINGNO-PARK 16161717 11111717 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA S 6TH STSHATTUCK AVE SHOUSER W A Y S STOP FLAGGER STOP FLAGGER Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 02/17/2023 513269182 0 530 SHATTUCK AVE S, RENTON, WA 98057. JOSE RODRIGUEZ 425-424-6658 Jose.rodriguez@pse.com 2 OF 2 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 TEMPORARY TRAFFIC CONTROL PLAN N SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY 0'80'40' MFP23001701 N Vicinity Map 47.4757, -122.2132 Owner / Developer Contact Info officeATTN: CASTLE DEVELOPMENT 6210 129TH PL SE BELLEVUE, WA 98006 DANIEL NGUYEN 206.369.1061 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) No No Yes Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PHONE CABLE TV 513269182 101153166 N/A 108142519 N/A 583071467 N/A 593248546 N/A 594152743 PROJECT PHASE PWR NOTIF#ORDER# Superior Removal OH XFMR OH Modification UG Modification 101153166 N/A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . S. LEWISON . 12.15.22 N/A .N/A S. LEWISON . 12.15.22 REDT # ( RW-129352 )RENTON CASTLE TH SCH 73 OH TO UG CONVERSION 530 SHATTUCK AVE S, RENTON, WA 98057 PUGET SOUND ENERGY N/A N/A N/A 101153166 AS SHOWN 1 OF 3 KING N/A N/A QCSOKE 18SE-T23N-R05E N/A N/A 2305E072 2305E076 2305E072 GRA-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY PEYTON TAMAYO 425.462.3055 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:RANDY BLACKIE 425.457.2614 randy.blackie@pse.com x xx ... ... ... ACMLLC71@GMAIL.COM SITE SHATTUCK AVE SS 6TH ST ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CASTLE TH SCHEDULE 73 OH TO UG CONVERSION GENERAL 1. Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilites or obstructions, trench route may need to be moved to opposite side of street. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover. Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. GENERAL OVERHEAD NOTES: 1. Poles, conductors, devices to be installed per PSE Standards & Specifications. 2. Poles are to be installed or relocated as staked. 3. All new poles set shall be the class indicated on the sketch or better. 4. Install ground plate assembly on all new poles. 5. Install grid numbers on all new and existing poles as shown on sketch. 6. Treat all field-drilled poles with copper Naphthenate wood preservative. 7. Customer/Developer to coordinate between utilities. 8. All new and relocated poles -locations- to be approved by city of Renton ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC SCH80 or 2", 3", 4", or 6" by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent unnecessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. If terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concrentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. EX OVERHEAD CIRCUIT MAP 2305E076 SCALE: 6" = 1 MILE DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARDSURFACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED), NOTE: LEGEND EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER J-BOX NEW TRENCH LINE EXIST. 3Ø WIRE EXISTING CENTER LINE EXISTING CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXIST. 1Ø WIRE EXISTING RIGHT OF WAY PROPOSED PULL VAULT EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED EXISTING STREETLIGHT NEW POLE PROPOSED PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER HANDHOLE MOSES LN SWHITWORTH AVE SRAIN IER AVE S S 5TH ST WHITWORTH LN SS 7TH ST x SITE MFP23001701 5 6 13S M I T H E R S F I F T H A D D.40.0'4' SIDEYARD SETBACK 120.0'10' REAR YARD SETBACK3.5' R.O.W. DEDICATION 40.0'120.0' 4' SIDEYARD SETBACK 5 4 7 14 15 unit A; 1819 sq. ft. unit B; 1819 sq. ft. garage 460 sq. ft. unit A; 1819 sq. ft. garage 460 sq. ft. garage 460 sq. ft.16' ALLEYSHATTUCK AVE. SOUTH (60' R.O.W.)S. 6TH ST. ABC #2ACSRABC CBA#2ACSR 529 539 FEEDGRA 15 528 COMM. 1823059136 501 COMM. ST LIGHT CAB. TO REMAIN ABC539 ADU EXISTING: VD: 1.8 FL: 1.5 NEW: VD: 2.5 FL: 1.2 REMOVE 'A' EXISTING: VD: 2.1 FL: 3.2 NEW: VD: 1.9 FL: 3.1 FUSE @ 40T SW#T88553 (E) FUSE @ 15T SW#T88554 (N) 60'60'16' 10'X10' EASEMENT 10'X10' EASEMENT 'B'#2ACSREXISTING: VD: 2.4 FL: 2.6 NEW: VD: 2.6 FL: 2.3 EXISTING: VD: 2.3 FL: 1.9 NEW: VD: 2.5 FL: 1.7 EXISTING: VD: 2.6 FL: 3.4 NEW: VD: 2.8 FL: 3.0 1" = 20' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . S. LEWISON . 12.15.22 N/A .N/A S. LEWISON . 12.15.22 REDT # ( RW-129352 )RENTON CASTLE TH SCH 73 OH TO UG CONVERSION 530 SHATTUCK AVE S, RENTON, WA 98057 PUGET SOUND ENERGY N/A N/A N/A 101153166 1" = 20' 2 OF 3 KING N/A N/A QCSOKE 18SE-T23N-R05E N/A N/A 2305E072 2305E076 2305E072 GRA-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY PEYTON TAMAYO 425.462.3055 . . . SITE PLAN ... ... ... CIRCUIT FEET REMOVED: 120' CIRCUIT FEET ADDED: 160' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES AT P01 (317657-165909) 1982 CLASS 3 - 40' RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID # HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P02 317671 165909 45' 3 2012 COMCAST, LUMEN WIRE REMOVAL TABLE Location Pri Sec Wire Size & Type Quantity Length (ft per conductor)RemarksFrom To P01 P02 #2ACSR PRI & NEUT 4 115 Total Feet (#2ACSR PRI & NEUT) Removed 460 -REMOVE EX. 25kVA OH XMFR & L/B CUTOUT -INSTALL 1Ø TERM ARM MOUNTED W/ LINK BREAK C/O (SOUTH) -INSTALL 3Ø TANGENT DE #2ACSR (DE2315) 6033.1040 -INSTALL 3Ø TERM ON NEW F.G. ARM W/ LINK BREAK C/O (SOUTH) Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE AT P02 (317671-165909) 2012 CLASS 3 - 45' -REMOVE EX. OH 15KVA (3) XFMR BANK -REMOVE EX. ANCHOR (N) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317657-165909 25kVA CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A' 'B' 2 SCH 80 1 70 ( )'NCL PRIMARY X02 UNIT A P01 4 SCH 80 1 10 ( )'NCL PRIMARY P01 3 SCH 80 1 10 ( )'NCL SECONDARY 2" SCH 80 PVC = 80 FT 2" PVC PLUG /CAPS = 2 3" SCH 80 PVC = 10 FT 3" PVC PLUG /CAPS = 2 4" SCH 80 PVC = 10 FT 4" PVC PLUG /CAPS = 2 -REMOVE POLE & ALL PSE RELATED FACILITIES & SURGE ARRESTOR (TSU3C1F) 6043.1000 & SURGE ARRESTOR (TSU1C1) 6043.1000 -ALUM "H" CONNECTOR (2167000) -FUSE AT 40T (3412500), TAP 'A' PHASE -INSTALL SWITCH # T88553 -STIRRUP (2254000) -INSTALL 2" PRI RISER ON NEW S.O. BRACKETS (RIS2CSS) 6042.1000 -INSTALL 3" SEC RISER (RIS3CSS) 6042.1000 -ALUM "H" CONNECTOR (2167000) -FUSE AT 15T (3412300), TAP 3 PHASE -INSTALL SWITCH # T88554 -(3) STIRRUPS (2254000) -INSTALL 3/8" PRI. DOWN GUY (GYD3SA) 6013.0100 (N) -INSTALL 10" SINGLE HELIX ANCHOR (ANDH1) 6012.1000 ± 15' LEAD -INSTALL 4" PRI RISER (RIS4CSS) 6042.1000 VAULT DETAIL @ V01 NOT TO SCALE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTMINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN TOP VIEW Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 8'-0" 4'-8" 3'-6" 4'-8" 6" 20" 4'-8"5'-6" 44" 8'-0" No Secondary PSE Primary Conduit Customer's conduit/cables may enter on any vault side except the front or side where PSE's primary conduit/cable enters. Note: Customer's conduit/cables must match PSE's left/right vault entry orientation and coil in the same direction as PSE's primary conductors. VAULT DETAIL @ V02 NOT TO SCALE -REMOVE AMR (801138) ANCHOR DETAIL - SINGLE HELIX 6" to 12" Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix -INSTALL 3/8" NEUT. DOWN GUY (GYD3SAN) 6013.0100 (N) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 317671-165909 15kVA-AØ Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 317671-165909 15kVA-BØ Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 317671-165909 15kVA-CØ SPAN NOTES REMOVE ±100 4/O SEC. QUAD CABLES P02 TO H2A REMOVED ( ') 4/O QUAD AT H2A - TO REMAIN, EX. CONC. HANDHOLE - DISCONNECT AND REMOVE EX. PSE FEED - INSTALL NEW BELL END AND KNOCKOUT (SEE SEC. TBL.) MFP23001701 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Maintain maximum separation between utilities #2ACSRFEEDGRA 15 NEW 1/O AL EJH043-AØ EJH044-BØ EJH045-CØ NEW 1/O AL EJI874-AØ 'A' FUSE @ 40T SW#T88553 (E) FUSE @ 15T SW#T88554 (N) 'B' ABC 'A''B' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 425.457.2614 . S. LEWISON . 12.15.22 N/A .N/A S. LEWISON . 12.15.22 REDT # ( RW-129352 )RENTON CASTLE TH SCH 73 OH TO UG CONVERSION 530 SHATTUCK AVE S, RENTON, WA 98057 PUGET SOUND ENERGY N/A N/A N/A 101153166 N/A 3 OF 3 KING N/A N/A QCSOKE 18SE-T23N-R05E N/A N/A 2305E072 2305E076 2305E072 GRA-15 COMCAST TODD ZIMNY 360.507.0598 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY PEYTON TAMAYO 425.462.3055 . . . ... ... ... NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) EX UNIVERSAL MAP 2305E072 1:100 EX UNDERGROUND CIRCUIT MAP 2305E072 1:100 WORKZONE WORKZONE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45°22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL P01 V01 2 1 20 - - - -15 99 1/O AL JKT 70 EJI874 ---0.3 P01 V02 4 1 80 1 2 - -237 620 1/O AL JKT 195 EJH043 EJH044 EJH045 -1.4 0 0 0 0 1/O AL JKT (FT) =70 TTL (Gal.)1.7 6" SCH80 (FT) & BENDS =100 1 2 0 0 3Ø 1/O AL JKT (FT) =195 NOT TO SCALE NEW CONDUIT DIAGRAM The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. GUARD POST INSTALLATION 0700.1600-02 CONCRETE GUARD POST INSTALLATION MIN 6" PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" LENGTH DEVELOPER NOTE: Developer to install bollards per this detail if transformers cannot be placed a minimum of 5' from drivable surfaces. GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN WORK SPACE 5' MAX 5' MAX 5' MAX 5' MIN 5' MIN CURB OR EDGE OF PAVEMENT CURB OR EDGEOF PAVEMENTPAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in) Design (ft)90° 45°22° 11°(Percent) (Percent)Actual Amount Installed Cable Conduit V01 P01 350 55 -3 45 1 1 - -2.5 1.2 - TPX V02 H2A 4/O 50 -3 40 - - 1 -1.9 3.1 - QUAD 350 UG Triplex (ft) =55 3" SCH80 PVC & BENDS (ft)=105 1 1 1 0 0.4 4/O UG Quad (ft) =50 TOTAL QTS OF GLUE 0.4 SECONDARY 3" PRIMARY 2" PRIMARY 4" CONDUIT LEGEND VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 317657 165907 42"x48"x38" Unistrut HH Matid: 7663001 50KVA MP TRF 120/240 Matid: 6247100 1 1 CON. BAR (7650000) MINU1SR 6045.1010 V02 317667 165900 4'8"x4'8"x4' w/20"x44" Hole Matid: 7663900 Cover: 7655200 45KVA MP TRF 120/208 Matid: 6258000 3 -PM3P15S 6045.5000 3Ø CONNECTORS (7651002)x4 BOLT KITS (7651008)x4 JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min 48" Max 36" Min Cover Phone & TV Primary Power Cable in Customer Provided Schedule 40 Conduit ROADSIDE To Excavated Dirt Pile TYPICAL NOTCH-OUT FOR TRANSFORMER, & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) UTILITY POLE EROSION CONTROL DETAIL Drainage ditches or Dry vegetated sites TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE MFP23001701