HomeMy WebLinkAboutEX_06_C_Transportation_Concurrency_220627DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: June 27, 2022 TO: Jill Ding, Senior Planner FROM: Brianne Bannwarth, Development Engineering Director SUBJECT: Traffic Concurrency Test – Palermo Short Plat (APN 6198400340); LUA22-000230 The applicant is requesting Preliminary Short Plat approval for the subdivision of an existing, vacant 46,441 sq. ft. project site located within the R-4 (Residential - 4) zone into three (3) lots for the future construction of single-family residences. Proposed Lot 1 would have an area of 19,501 sq. ft., Lot 2 would have an area of 11,989 sq. ft., and Lot 3 would have an area of 12,948 sq. ft. Access to the proposed lots would be provided via individual driveways off of 120th Ave SE. The project site is mapped within a Wellhead Protection area, Zone 2. The proposed development would generate approximately 28 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 2 net new trips (1 inbound and 1 outbound). During the weekday PM peak hour, the project would generate approximately 3 net new trips (2 inbound and 1 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows: Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees Yes Site specific street improvements to be completed by project Yes Traffic Concurrency Test Passes Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is 100% of the scheduled expenditure through 2022. EXHIBIT 6DocuSign Envelope ID: E57591F1-FA5B-4216-A128-ADD733ABC676 Transportation Concurrency Test – Palermo Short Plat Page 2 of 2 June 27, 2022 Within allowed growth levels: The citywide traffic concurrency trip capacity for concurrency with the city adopted model for 2022 is 2,675 trips, which provides sufficient capacity to accommodate approximately 3 additional trips from this project. A resulting 2,672 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permits for the project. Site specific street improvements to be completed by project: The project will be required to complete frontage street improvements prior to final short plat recording. Any additional off-site improvements identified through land use appr oval will also be completed prior to final short plat recording. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI -65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements. DocuSign Envelope ID: E57591F1-FA5B-4216-A128-ADD733ABC676