Loading...
HomeMy WebLinkAboutMFP23002137DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP23002137 IVR Number: 23002137 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/24/2023Application Date:3779200005Parcel Number: 510 MONSTER RD SW, LOT Permit Type:05/08/2023Issue Date:Franchise Permit Work Class:05/07/2024Expiration Date:Major Utility Job Number: 101140203Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW. Restoration Per City of Renton Standards Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Scott Warlick 1055 S Grady Way Renton, WA 98057 Applicant Test UserContact Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact POINTE HERON LLC 9125 10TH AVE S SEATTLE , WA 98108 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101140203 510 Monster Rd SW Tin Nguyen 253-244-4303 Monday Friday 8:00AM 3:00PM Huy Huynh CED 5/8/2023 MFP23002137 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. MFP23002137 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG MFP23002137 RR BLACK R IVERBLACK R IVER MONSTER RD SW1212171 6 1 1 MONSTER RD SWP03M01RR P02P01MSTOPFLAGGER STOP FLAGGER W20-7AW20-4ONE LANEROADAHEAD350'350'350'ROADWORKAHEADW20-1W20-7AW20-4ONE LANE ROADAHEAD350'350'350'ROAD WORK AHEAD W20-1X'X'PLACE W20-1 SIGNS ON ALLADJACENT PUBLIC STREETSWHERE TRAFFIC COULD ENTERWORK AREA WITHIN1050 FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV04/12/2023 1011402031510 Monster Rd SW, Renton, WA 98055 Safaa Al Neema(425) 398-6077safaa.alneema@pse.com1 OF 1TEMPORARY TRAFFIC CONTROL PLANSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NPuget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-607728" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotification # 511342915Relocate flagger to thisposition to watch traffic atprivate entranceMFP23002137 75' R O W℄℄ 317667-165037 X9072 (25T) X9072 (25T) 317662-165029 25 kVA 120/240V (B) 317662-165034 EAR 15 PRIV A T E D/ W MO N S T E R R D SW TO BE SOLD TO CUSTOMER #2AC S R CBA317669-165020 25 kVA 120/240V (B) 75' R O W EAR 15 PRIV A T E D/ W #2AC S R CBA317689-165083 225 kVA 480V (ABC) TO BE SOLD TO CUSTOMER 317785-165102 500 kVA 120/208V (ABC) 317735-165105 TO BE SOLD TO CUSTOMER JSuperior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"101140203THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101140203511342915 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE EAR-15 9/2021 135.25 131.00 125.00 --- 135.25 131.00 125.00 SITE SPECIFIC NOTES: P01 - EXISTING 317662-165029 -EXISTING POLE TO REMAIN -INSTALL 1-PHASE SLACK SPAN DEADEND -TRANSFER EXISTING 25KVA OH XFMR TO P02 -INSTALL 3-PHASE L/I FUSE @ 65T -INSTALL SWITCH# X89547 P02 - NEW 317669-165020 -INSTALL 60' CL 2 DISTRIBUTION POLE -INSTALL 1-PHASE SLACK SPAN DEADEND -TRANSFER 25KVA OH XFMR FROM P01 P03 - EXISTING #317667-165037 -EXISTING 40' UNK DISTRIBUTION POLE TO REMAIN -REMOVE (2) EXISTING T25 FUSED & SWITCH #X9072 -REMOVE (2) 4" RISERS AND BACKETS -INSTALL (1) OH PRIMARY METER 3-PHASE 12 KV 6028.1000 (OHPM315) -INSTALL (6) CLAMP 1B FITS #8-1/0 & TAP ABCØ (MID: 2153100) -INSTALL (6) STIRRUP, BOLTED (MID: 2254100) V01 - EXISTING #317689-165083 -EXISTING 225 kVA 277/480V PADMOUNT XFMR & VAULT TO REMAIN, AND SOLD TO CUSTOMER V02 - EXISTING #317785-165102 -EXISTING 500 kVA 277/480V PADMOUNT XFMR & VAULT TO REMAIN, AND SOLD TO CUSTOMER J01 - EXISTING #317735-165105 -EXISTING VAULT AND EQUIPMENT TO REMAIN, AND SOLD TO CUSTOMER M01 - EXISTING -PSE METER DEPARTMENT TO REMOVE SECONDARY SERVICE METER. M02 - EXISTING -PSE METER DEPARTMENT TO REMOVE SECONDARY SERVICE METER. SPAN NOTE: -REFER TO SITE PLAN AND TABLES TO INSTALL -THE FOLLOWING 3Ø UG PRIMARY CABLE RUNS TO BE SOLD TO CUSTOMER: - P01-V01 - P01-J01 - J01-V02 CIRCUIT FEED ADDED: 0' 587033278 3001542537 E-Mail: Cell Phone: Project Manager Contact Information: Manager: Tin.Nguyen@pse.com (253) 244-4303 Tin Nguyen POWER GENERAL NOTES - COMMERICAL PROJECT 1.ALL MATERIALS TO BE INSTALLED IN ACCORDANCE WITH PUGET SOUND ENERGY'S (PSE) STANDARDS. ANY DEVIATION FROM THIS WORK SKETCH MUST BE AUTHORIZED BY PSE'S PROJECT MANAGER AND NOTED ON THE FOREMANS' COPY. 2.ALL SWITCHING ARRANGEMENTS AND/OR OUTAGE ARRANGEMENTS ARE TO BE MADE WITH THE PROJECT MANAGER AT LEAST THREE (3) WORKING DAYS IN ADVANCE. 3.CONTACT THE UTILITIES UNDERGROUND LOCATION CENTER (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO COMMENCING WORK TO GET THE UNDERGROUND FACILITIES LOCATED. 4.STAKING: THE CUSTOMER WILL PROVIDE ALL STAKING (TRANSFORMER, HANDHOLE, TRENCH, GRADE, LOT, POLE, SIDEWALK, ETC.). SEE SKETCH AND DETAILS FOR LOCATIONS. EQUIPMENT LOCATIONS MUST BE APPROVED BY THE PROJECT MANAGER. 5.SITE PREPARATION: THE WORK AREA WILL BE AT OR NEAR FINISHED GRADE, CLEAR OF TRENCH SPOILS OR CONSTRUCTION MATERIALS WHICH WOULD RESTRICT CONSTRUCTION AND/OR EQUIPMENT ACCESS, BEFORE WORK CAN BEGIN. 6.ROADS SHALL BE PAVED OR HAVE A COMPACTED , CRUSHED ROCK BASE IN PLACE. 7.CLEARANCES: TRANSFORMERS REQUIRE A MINIMUM OF 6 FEET FROM FIRE FIGHTING EQUIPMENT, 10 FEET FROM COMBUSTIBLE WALLS, OVERHANGS, DOORS, AND WINDOWS, AND A MINIMUM OF 5 FEET FROM THE BACK OF CURB (OR GUARD POSTS WILL BE REQUIRED PER PSE STANDARDS). ALL CONDUITS AND VAULTS ARE TO BE AT LEAST 5 FEET AWAY FROM WATER, STORM AND SEWER LINES WHEN PARALLELING THEM IN THE RIGHT OF WAY, AND AT LEAST 1 FOOT WHEN CROSSING THEM. 8.ALL WORK IS TO BE DONE IN ACCORDANCE WITH LOCAL MUNICIPAL AND COUNTY PERMIT REQUIREMENTS AS APPLICABLE. 9.CUSTOMER/DEVELOPER IS RESPONSIBLE TO PROVIDE, INSTALL AND MAINTAIN ALL SECONDARY SERVICE CABLES, CONDUITS AND CROSSINGS FROM THE INDIVIDUAL UNIT'S METER BASE TO THE DESIGNATED CONNECTION POINT. 10.INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. 11.EXCAVATION: THE CUSTOMER IS TO PROVIDE ALL TRENCHING, BACKFILL, VAULT EXCAVATIONS, COMPACTION AND RESTORATION PER THIS SKETCH AND PER PSE STANDARDS. A MINIMUM PROTECTIVE COVER OF 36" IS REQUIRED OVER PSE'S PRIMARY VOLTAGE EQUIPMENT AND 24" IS REQUIRED OF PSE'S SECONDARY VOLTAGE EQUIPMENT. THE CUSTOMER WILL PROVIDE ANY AND ALL SHORING OR THEY WILL SIDE SLOPE THE TRENCH TO 1:1. SITE PLAN SCALE: 1" = 50' SITE PLAN DETAIL SCALE: 1" = 30' Owner / Developer Contact Info officeATTN: Stoneway Concrete 9125 10th Ave S Seattle, WA 98108 Ralph Lopriore 206-762-9125 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE T. NGUYEN 253-244-4303 6/1/21 D. BRINKMANN 206-794-8599 6/28/21 D. BRINKMANN -7/2/21 RW-124788 PRIVATE STONEWAY CONCRETE INSTALL OH PRIMARY METERING 510 MONSTER RD SW, RENTON 98055 N/A N/A N/A 101140203 AS NOTED 1/1 KING COUNTY N/A N/A CSPSKEPM T23N.R04E.SW 13 N/A N/A 2304E051 2305E076 2304E051 EAR-15 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A 6/6/22 TN CUST. REQUESTED OH PRI. METER N/A N/A N/A N/A N/A N/A N Vicinity Map N/A JOB SITE Meter Connection Primary Meter 317667-165037 X9072 (25T) X9072 (25T) DEVELOPER & CUSTOMER NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: JOB SITE READINESS -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR WSDOT, A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . 00 1"2" 00 50'100' 594147862Misc UG CIRCUIT FEED REMOVED: 1400'BREAKLINE ±560'BREAKLINE ±210'UNDERGROUND CIRCUIT MAP 2304E051 SCALE: 1" = 75' OVERHEAD CIRCUIT MAP 2305E076 SCALE: 6" = 1 MILE JOB SITE JOB SITE WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 V01 PRI #2 ACSR 3 450 TO BE SOLD TO CUSTOMER P01 J01 PRI #2 ACSR 3 910 TO BE SOLD TO CUSTOMER J01 V02 PRI #2 ACSR 3 50 TO BE SOLD TO CUSTOMER 1,410 Total Feet (Wire Size & Type) Removed New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage P02 317669-165020 25KVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317662-165029 25KVA WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (per conductor) Total ActualFromTo P01 P02 XX 2ACSR 30 30 30 POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P02 317669-165020 60 2 PSE Equip # Restoration per City of Renton standards Pothole all existing utilities Ensure existing trees are not disturbed by pole installation. Ensure traffic sign remains visible MFP23002137