Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
MFP23002136.pdf
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23002136 IVR Number: 23002136 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:04/24/2023Application Date:1923059016Parcel Number: Permit Type:05/09/2023Issue Date:Franchise Permit Work Class:05/08/2024Expiration Date:Minor Utility Job Number: 101149899Franchise Type:Electric Description: Puget Sound Energy Electric Transformer upgrade at grid 317066 165830 for WSDOT cabinet SUA 4550 for WSDOT's I 405 Renton to Bellevue widening and express toll lanes project. Upgrading overhead transformer from a 25kVA 120/240v to a 50kVA 240/480v.. no hs cuts Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact RENTON CITY OF 1055 S GRADY WAY RENTON , WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101149899 2200 East Valley Rd Jessica Schultz 425-480-2925 MFP23002136 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 5/9/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 2200 E Valley Rd Renton WA 98057 USA P01 121213 12121111 SR-167 SRMP 25.67 ONE WAYONE WAY© ©TAL/3R100RIGHTSHOULDERCLOSEDW21-5aRX'X'X'ROADWORKAHEADW20-1SHOULDERWORKW21-5B1 MILE BEFORE WORK AREA PCMS PLACE PCMS BOARD 1 MILE BEFORE WORK AREA. TWO-SECOND SEQUENCE 2-LINE, 8 CHARACTER MESSAGES WILL READ: 1) 2) 3) UTILITY WORK AHEAD SHOULDER WORK AHEAD VICINITY MAP WORK AREA AAA TEMPORARY TRAFFIC CONTROL PLAN 0'80'40' PRINT ON 11X17" SHEETS ONLYN SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 1 OF 22200 E Valley Rd, Renton, WA 98057 0 511238210 04/05/2023 Puget Sound Energy Traffic Control Supervisor:Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024 Safaa.alneema@pse.com (425)398-6077 Notes: 1. Notify WSDOT at least 5 days prior to scheduled date. 2. At time of work, call wsdot radio (per region as instructed in permit) at the time the lane is closed (or intersection flagged); and again when the lane/intersection is opened. leave a contact name and cell phone number with radio. 3. All advanced warning signs and spacing to conform to the MUTCD and WSDOT standards. 4. Channelizing devices shall be traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 5. All signs are 48" x 48", Black legend on Orange background. Use class B signs unless otherwise specified. 6. Flaggers shall be in radio contact with each other at all times; flagger stations shall be illuminated during hours of darkness with minimum 150w lights 7. All lane closures shall not infringe upon adjacent lanes. 8. Alert affected residents and businesses if existing on WSDOT roadways. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 9. Work areas will be noted as per distances between State Route milepost markers. 10. See sheet 2 for WSDOT Notes and Tables. TRAFFIC BARRELS WITH BEACONS TRAFFIC FLOW SIGN LOCATION LEGEND POLE CAUTION BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Order # 101149899 MP 25.67 Additional approval from WSDOT will be needed for work in their ROW MFP23002136 TEMPORARY TRAFFIC CONTROL PLAN WSDOT NOTES & TABLES ”” – Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com 2 OF 22200 E Valley Rd, Renton, WA 98057 0 511238210 04/05/2023 Puget Sound Energy Traffic Control Supervisor: Safaa Al Neema Card No. 012611 Card Exp. 10/31/2024Safaa.alneema@pse.com (425)398-6077 Order # 101149899 MFP23002136 VALLEYFWYT T T T 50kVA 240/480V 336 ACSR 336 ACSR 336 ACSR 336 ACSRCBACBACBACBA "SUA 4550"UG SVCARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. LEGEND EXIST. OH 1Ø 1/0 WIRE EXISTING TRANSMISSION POLE EXIST. 115KV WIRE EXISTING PSE POLE T EXIST. UG 3Ø 1/0 WIRE SCALE: 1" = 50' SITE PLAN SITE OVERHEAD CIRCUIT MAP SCALE: NO SCALE P01: 317066-165830 -UPSIZE OH 25kVA TO 50kVA XFMR (MID 6203250) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317066-165830 25kVA 240/480v Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 317066-165830 50kVA 240/480v 6203250 GENERAL SPECIFICATIONS Scope of Work Upgrade OH 25kVA to 50kVA XFMR General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. Safety - Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. - Refer to PSE standards 6275.9050 for personal protective grounding requirements. - Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. - Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. - Provide signs, barricades, and traffic control in conformance with permit regulations. - Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. - Maintain traffic flow as required by permitting agency. N Vicinity Map 47.4592, -122.2164 Owner / Developer Contact Info officeATTN: THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PHONE CABLE TV 511238210 101149899 N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior OH Misc Expense UG Misc Expense OH Xfmr Expense UG Xfmr Expense Removal DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP E-Mail: Cell Phone: Project Manager Contact Information: Manager: ### ### ### No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" SITE J. SCHULTZ 425-480-2925 7/07/22 J. SCHULTZ 425-480-2925 7/07/22 ... T. MYER 714-893-2405 7/07/22 N/A City of Renton WSDOT SUA 4550 UPGRADE OH 25kVA TO 50kVA XFMR 2200 E VALLEY RD, RENTON, WA 98057 PUGET SOUND ENERGY N/A N/A N/A 101149899 1" = 50' 1 OF 1 KING N/A N/A QCSOKE S19-T23N-R05E N/A N/A 2305E076 2305E076 2305E076SW VIC-16 . . . . . . . . . . . . JESSICA SCHULTZ 425-480-2925 Jessica.Schultz@pse.com WSDOT - - JIM RHODES 425-213-9930 101149899N/A N/A N/A N/A N/A N/A UNIVERAL MAP (2305E076) JOB SITE TPX SERVICE EXISTING GUY AND ANCHOR SCALE: NO SCALE SUA 4550 MP 25.72 WSDOT I-405 EXPANSION 583072431 N/A RESTORATION PER CITY OF RENTON STANDARDS Additional approval from WSDOT will be needed for work in their ROW MFP23002136