Loading...
HomeMy WebLinkAboutR-394409N.NND-��•° ­1Before Call 3 Working Days YOU DIG, M STANDARD TYPE 2-60" DIAM iQ CB CONCRETE TOP SLAB �a Q Wawa rl'''Rg r FLOOR AND CAPILLARY BREAK 11-800-424-5555 WWeFTITFLATSIADFor PER STRUCTURAL DRAWINGS PNNFASNIuiiD LANCR N.NaoeaRAaxa NOUT IS IN TE PAVED 2' SQUARE LTHICKENED , PROVIDE EDGE & FINISHED GRADE ONCRETE SLOPE TO DRAIN AWAY FROM BUILDING PROPOSED GRADE ROOF DRAIN PER PLAN STANDARD LOCKING MH FRAME & COVER SEE KCRS DWG NO 2-022 HIC PER PLAN W W ..., 12"0 D.I. PIPE ��� FRAME LOCKING LID (MARKED -0 rcm� I,- Fors ACCESSSlA�NiD STEPS -, DIAM E-DPANCCENTRIC OPENING24° - - � b STEP TT FLAT SLAD TOP ^`✓w VAj/AA ASV ° 6 / /V�jAA CONCRETE /� COMPACTED PIPE BEDDING FIBER JOINT FILLER��j'v - i po �� o��pOo � CAST IRON COVER AND RING p� . ��� / / /� _FOOTING DRAIN"////TOP MARKED COMPACTED 45' BEND "FDCO" FOR FOOTING DRAINS o �0 SHALL BE . A MIN OF 4"SUBGRADE MAINTAIN I" GAP GAI B OEEN P OF "SDCO" FOR STORM LINES \�/\ \ \ \\/i\/i\ \ \ o - i/ /j\ c \i\BELOW TOP OF TRIOIERE PLIABLE "SSCO" FOR SANITARY SEWER \FOOTING ,a - LUDE DIRT 36° CMP RISER4e- ECCENTRIC CONE SECTIONDIA PER PLAN s) \ \ \� // /\/ / / /� 54�•„�T�� VARIES REMOVABLE CAP A� BUILDING FOOTING &WALLFLOW S 12" OC PER STRUCTURAL DRAWINGS. ti \\ RISER, 36' DIAM MIN, SAME - - COMPACT GRAVEL L FOR MATERIAL & GAGE AS TANKDRAINS T 0.13. SHALL PER WSDOT 0.1 WELDED OR FUSED TO TANKBE PLAN FOR DIA FOOTI) PLACED TO TOP OF FOOTING DO NOT DISTURB FOOTING FOOTING DRAIN PLACED LEVEL OR PLANSEE STEPS �l NSTALLINGOFOOTINGNE NDRAIN WITH POSITIVE SLOPE TO OUTLET nvonewxo°FewR',rm 4pxeNeaRnoDR �: 1� �s CIRCULAR ADJUSTMENT SECTION NECTAN000IR ADJUSTMENT SECTION 1.0 AeanemW,b�e.eerea arebN, ware-1, hwnga DETENTION TANK remirevre area of 0.12 se°ere in b . ae, turn re.v be °sad for ealu-n!..°deR.. I44IE5 SECTION 1. USE ADJUSTING BLOCKS AS REQUIRED TO BRING FRAME TO GUIDE. STD. Platy - 204.80 ^ PUBLIC WORKS MISCELLANEOUS DETAILS FOR 2. ALL MATERIALS TO BE ALUMINUM OR GALVANIZED AND ASPHALT COATED (TREATMENT 1 OR BETTER). DEPARTMENT DRAINAGE STRUCTURES 3. MUST BE LOCATED FOR ACCESS BY MAINTENANCE VEHICLES. MARCH 20D8 4. MAY SUBSTITUTE WSDOT SPECIAL TYPE N MANHOLE (RCP ONLY). 5. ACCESS RISERS SHALL BE LOCATED A MAXIMUM OF 50' FROM EITHER END OF DETENTION TANK MS NTS MS AND A MAXIMUM OF 100' OC BETWEEN RISERS. NTS COR STD PLAN 204,60 - MISCELLANEOUS DRAINAGE DETAILS CLEAN -OUT TO GRADE 2 FOOTING DRAIN 3 DETENTION TANK ACCESS DETAIL s ' Av "A"° ° "" �"' """" CONSTRUCTION SEQUENCE FOR BIORETENTION AREA SOLID COVER RIM EL 349.4 UPPER OMITS OF BIOR N 1. INSTALL TEMPORARY SEDIMENT CONTROL BAPS AS SHOWN ON PLAN. SOIL PER LA DWGS OR 1.5' 1.5' MIN r BOTTI)M LIARS OF BIORETENTION AREA AS DENOTED ON PUN WITH DARK RI PLANTINGS PER OUNE AND BIORETENTION AREA HATCH 2. COMPLETE SITE GRADING. PROVIDE PROTECTION SO THAT DRAINAGE IS PROHIBITED FROM ENTERING PIPE SUPPORTS (2 MIN.): LA Dwcs BIORETENTION CONSTRUCTION AREA. UPPER LIMITS OF BIORETENTON 3" x .090" ALUMINUM W/ •- I ^ SOIL PER LA DWGS OR 1.5' MIN 3. SITE STABILIZATION TO BE COMPLETE PRIOR TO INSTALLATION OF BIORETENTION AREA, 5/8" STAINLESS BOLTS - BIORETENTION AREAS THAT WERE USED AS TEMPORARY SEDIMENT TRAPS SHOULD BE EXCAVATED 6 6" PONDING .. a RRaDme° .mxr nueR I-) I INCHES BELOW THE BOTTOM OF THE SEDIMENT TRAP PRIOR TO CONSTRUCTION OF BIORETENTION DEPTH MWS _ ae: a v ✓ N'7 A N �,y, AREA. N EL 346.0 - - - - - - A ' LLEvnnoN AT TOP of 4. EXCAVATE BIORETENTION AREA TO PROPOSED DEPTH AND SCARIFY THE TOP 3"-4" OF EXISTING W� 3" TOP MULCH LAYER MULCH LAYER (PER PLAN) SOIL SURFACES. DO NOT COMPACT NATIVE SUBGRADE. PLAN NEW \ 1 BOTTOM OF BIORETENTION AREA SHOULD BE LEVEL WITH No SLOPE 5. BACKFlLL BIORETENTION AREA WITH BIORETENTION SOIL MIX AND AGGREGATE MATERIAL. OVERFILLING IS RECOMMENDED TO ACCOUNT FOR SETTLEMENT. LIGHT HAND TAMPING IS ACCEPTABLE IF 8" SHEAR GATE �• DO NOT COMPACT SUBGRADE WITHIN NECESSARY. 18" DEPTH BIORETENnON SOIL MIX A BIORETENTION BOTTOM AREA. SCARIFY 8" OUTLET PIPE 8" INLET PIPE IE 343.8 • O.ae) REQUIRED UNDER FULL EXTENT OF UPPER 3-4" PRIOR TO PLACEMENT OF BIORETENTION BOTTOM AREA 6. BIORETENTION SOIL MIX SHALL CONSIST OF THE FOLLOWING: AGGREGATE MATERIAL IE 343.8 e /,.R T„°veew,egur,a�eor,v. . Y xa.ow.r Renton Table 6.8.1. 12" DEPTH CITY OF OVERFLOW DRAIN - NYOPLAST 12' ROUND DRAIN MINERAL AGGREGATE REQUIRED UNDER FULL BASIN OR APPROVED EQUAL W LOCKING -AGGREGATE TO COMPOST RATIO: EI(IEM OF BIORETENTION BOTTOM AREA / 2.0' M - DUCTILE IRON DOMED GRATE. 60% MINERAL AGGREGATE (WITH LESS THAN 5% FINES), RIM SHALL BE 6" ABOVE BIORETENTION BOTTOM 40% COMPOST (MEET REQUIREMENTS IN WAC 173-350-220) .• (TOP OF MULCH LAYER) - TOTAL BIORETENTION SOIL MIX ORGANIC CONTENT SHALL BE 4-8% (BY DRY WEIGHT) RESTRICTOR PLATE WITH ADneocxr:crxv_xer,xnugm - BIORETENTION SOIL DEPTH SHALL BE A MINIMUM OF 18-INCHES - 2.125"0 ORIFICE 7. PRESOAK THE PLANTING SOIL PRIOR TO PLANTING VEGETATION TO AID IN SETTLEMENT. 2.0' M FRAME &POLYPROPYLENE BOTTOM UMII'S OF BIORETENTION AREA j LADDER OR STEPS OFFSET. -. AS DENOTED ON PLAN WITH DARK 8. COMPLETE FINAL GRADING TO ACHIEVE PROPOSED DESIGN ELEVATIONS. LEAVE SPACE FOR UPPER y - _ OUTUNE AND BIORETENTION AREA HATCH LAYER OF MULCH AS SPECIFIED ON PLANS. / UPPER LIMITS OF BIORE N UPPER UNITS OF _- F_ I. SOIL PER LA DWGS OR I. MIN eIORETENTION SOIL PER LA g PLANT VEGETATION ACCORDING TO PLANTING PLAN. DWGS OR 1.5' MIN i GENERA NOTES - O - - 10. MULCH AND INSTALL EROSION PROTECTION AT SURFACE FLOW ENTRANCES WHERE NECESSARY 6" PONDING 54" NNaA N.ES aeeiDn lemfedlilRb the mlaAl �� ofacemRDRS in with mninal dames - 3 V)UM DEPTH " .w M�' UNTIL ENTIRE SITE IS STABILIZED. MULCH MUST BE WOOD CHIPS CONSISTING OF SHREDDED OR n �.A- aH L'� CHIPPED HARDWOOD. MULCH SHOULD NOT CONTAIN WEED SEEDS, GRASS CLIPPINGS, LARGE of the am -- _--- AND SD #4 2 Theexpanelon johte o/the ���/ _ CHUNKS OF BARK. - 3" TOP MULCH LAYER TC sHnu ee xeNoavao nxTO ReacEPO At�ixe c°xmnct°aIF sexsex L tl1a°ent sidewalk shall /{ �.t I beedNuMedm6em Ilne wlth these wde 'T /i 11. CONTRACTOR IS /� ,,SS �S �� DO NOT COMPACT SUBGRADE WITHIN Rom_ (OOQ expenalon N°Inls / I Ia I _ BIORETENTION BOTTOM AREA 1, VV V SCARIFY UPPER 3-4" PRIOR TO PLACEMENT OF AGGREGATE MATERIAL IN COMPLIANCE WITH CITY OF RENTON STANDARDS NOTES: �' is roc `JE. ENLL SOIL MIX 18'RE DEPTH UNORNDER REQUIRED UNDER FULL EXTEM OF 1. FRAME LADDER AND STEPS OFFSET: a. CLEAN OUT IS VISIBLE FROM TOP BIORETENTION BOTTOM AREA DEVELOPMENT ENGINEERING 12" DEPTH NPE-26 MINERPL , PuB1ac WORKS OEPAATMENT CEMENT CONCRETE CURD INSTALLATION AT !!1'D. FIaN - 301.1 PRO D, b. CLIMB DOWN SPACE IS CLEAR OF RISER c. MH OPENING SHALL NOT BE PLACED DIRECTLY OVER THE TOP OF INLET PIPE AGGREGATE REQUIRED UNDER FULL EXTENT OF BIORETENTION BOTTOM Ann Fowler 07/13/2017 AREA TS1 CATCH BASINS NTS SURFACE WATER UTILITY COR STLAN 101.1 - CURB INSTALL AT CATCH BASINS FLOW CONTROL STRUCTURE (FCS)ND 5 SECTION A -A BIO RETENTION AREA / rstraka 07/1412,117 ' 41E J. Tp ADDENDUM 3 4 ev+^sa�,9 28 17 5 17 Rik1IX � 1"=20' °N"" ' o� . CITY OF RENTON SUNSET COURT APARTMENTS -n`^� HARRINGTON AVE NE 5/5/2017 932 First Ave suite 201 Seattle, WA 98101 mmm, ADDENDUM 4 5 N � P' c'bx T 2 PERMIT REVISIONS 5 _ CONFORMED SET 5 5 17 N.aN, UP 19 17 SwP I � I 29 17 P.206J25.1211 a a 4 PERMIT REVISIONS 6 e RENTON, WA 98056 f. 206.973.5344 e FINAL PERMIT SET 7 Fss DATUM Planning/Building/Public Works Dept. 13 17 - Z C2.3 DATE APPR engineering pIIC w .1Pdv9meering... ALCM 2p7 NO. REVISION BY S F 0R0N DRAINAGE DETAILS ^ ° 9 ai8 Ig} 9 u Me• 59 V 0 0 0 Q_ a- Z if See I, (L Q 0 z