HomeMy WebLinkAboutAdden 1 ORIGINAL�PAGE NO�OF�PAGES CAG-16-103, Adden #1-17 CITY OF _ -...,,,r�'''"�" „ ,� ��L 1 1..!�� � ��� ,� AMENDMENT NO. 1 TO AGREEMENT FOR REPLACEMENT OF HIGHLANDS 435 PRESSURE ZONE RESERVOIRS AND MAINS - FINAL DESIGN AND BIDDING CAG-16-103 THIS AMENDMENT, dated July 14, 2017, is by and between the City of Renton (the "City"), a Washington municipal corporation, and RH2 Engineering, Inc. ("Consultant"), a Washington corporation. The City and the Consultant are referred to collectively in this Amendment as the "Parties." Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-16-103, dated June 8, 2016, to provide necessary services for the Replacement of Highlands 435 Pressure Zone Reservoirs and Mains - Final Design and Bidding (referred to herein as the "Agreement"); Whereas, the Parties wish to amend the Agreement to expand the scope of work, change the time of performance, and change the compensation in order to address design changes requested by the City during the review of the 60% design plans. NOW THEREFORE, It is mutually agreed upon that CAG-16-103 is amended as follows: 1. Scope of Work: Section I, Scope of Work, is amended to add work as specified in Exhibit A-1, which is attached and incorporated herein. 2. Time of Performance:Section V,Time of Beginning and Completion, is amended pursuant to the schedule set forth in Exhibit B-1. All Work shall be performed by no later than June 30, 2018. 3. Compensation: Section VI, Payment, is amended so that the maximum amount of compensation payable to Consultant is increased from $697,088 to $924,364, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibits C-1 and C-2 which are attached and incorporated herein. 4. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. ORIGIhdAL I F�AGE NJ '�OF�pAGES IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON CONSULTANT � i �^...-� ` \ , ft By: � gy: / • ''�� Den s Law Tony Par i Mayor Presi nt �//��/j� � /�� 1� Date Date Attest � ., / , ,r i / � � / ``����,���uiu�r Jason . Seth '' � .��` 0� R�N''� •, ��. Cit CI rk ,.�`,��1 ��,,,,,�„���,,, � ''% y ;v�,,�' ''�,�ti '-. = �iL �' � Approved as to Legal Form = * = S E A L = * = � - - Z % � � w = ��yC�''���ii ���`` �.�0� ,,,���'o�AnRATE p,S�'��b��\``` J��j"ili7t1111\1\\\\ Shane Moloney Renton City Attorney Con tract Template Updated OS/30/2017 Page 2 of 2 ' � C?RlG1NAL , PAGE�10 � OF�PAGES EXHIBIT A-1 Scope of Work Amendment No. 1 To CAG-16-103 City of Renton Highlands 435 Pressure Zone Reservoir Improvements Phase 1 — 6.3 MG Reservoir and Transmission Main Final Design and Bidding Professional Engineering Services �uiy 201� Background RH2 Engineering, Inc., (RH2) is currently providing engineering services for the design and bidding of a new 6.3 million-gallon (MG) reservoir and 24-inch transmission main to replace the City of Renton's (City) existing Highlands 435 Pressure Zone(PZ) reservoirs and transmission main. During 30-percent and 60-percent design review meetings with the City,the City identified and requested a series of changes and additions that require an amendment to RH2's current scope of work. These changes and additions, which are described below, provide additional benefit to the City by: 1) improving constructability and phasing of the reservoir improvements; 2) improving the site layout to better respond to Hearing Examiner comments and citizen concerns identified during the Conditional Use permitting process; and 3) improving water system reliability and resiliency by replacing and re-purposing 435 and 565 PZ distribution main infrastructure located within the project limits. The changes and additions covered in the Scope of Work below generally include the following. • Approximately 1,500 lineal feet of 12-inch and 16-inch 565 PZ distribution main within NE 12th Street from Olympia Avenue to west of Sunset Avenue,and re-purposing of the 435 PZ 16-inch transmission main within NE 12th Street and west of Harrington Avenue for use as 565 PZ distribution main. • Additional exploratory work, including utility potholing and geotechnical investigation, within NE 12th Street to support the design and construction of the utility and roadway improvements. • Additional design and hydraulic analyses to evaluate closed-zone operation of the Highlands 435 PZ during replacement of the Highlands 435 PZ reservoirs. The design and analyses will primarily focus on upgrades to the Mt.Olivet Booster Pump Station(BPS)to replace the existing booster pump motor starters with variable frequency drives(VFDs)and install a recirculation valve to improve closed-zone operation during replacement of the Highlands 435 PZ reservoirs.lt is anticipated that the installation of the proposed improvements will be performed by the City's Water Department. • Additional design and coordination to provide a video surveillance security system for the Highlands reservoir site. • Revisions to the Master Site Plan and 60-percent design to include the demolition of the existing 2.0 MG reservoir under Phase 1, and reconfiguring the site to increase the buffer and visual screening of the proposed 6.3 MG reservoir from the retirement home community to the north of the property. Except where noted below, the above changes and additions are underway and will generally be completed in accordance with the original contract and Scope of Work. 1 7/12/2017 11:03:37 AM J:\Data\REN\113-104\00 Contrects and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and Bidding.docx ORIGl�IAL�PAGE NO � OF�� PAGES City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 -6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work GENERAL PROJECT TASKS Task 1 — Project Management Services (Amending Fee Only) Objective: Provide additional project management services in accordance with the original Scope of Work for the additional design services provided herein. Approach: 1.6 Provide additional project management services in accordance with the original Scope of Work for the additional design services provided herein. This change results in an increase in fee, but does not result in a scope modification. Tasks 2A and 2B — Permitting Assistance (No Change) No change in scope or fee. Tasks 3A and 3B—Services During Bidding (No Change) No change in scope or fee. Task 4—Additional Design and Permitting Services (No Change) No change in scope or fee. Task 5 —Additional Master Planning and Hydraulic Analysis (New Task) Background: As part of the 60-percent design review process, it was determined that it would be advantageous for a multitude of reasons to remove the existing Highlands 2.0 MG reservoir from service prior to constructing the proposed 6.3 MG reservoir.This represents a change in the original design criteria. Before incorporating this change into the operation of the water system and the current design plans, the City has requested that RH2 perform additional hydraulic analysis and master planning to confirm that fire flow requirements can still be met without the 2.0 MG reservoir in service.The analysis also will evaluate a scenario where the Highlands 1.5 MG reservoir is out of service as well.To facilitate water system operation under this scenario, it is anticipated that improvements will be made to the Mt. Olivet BPS to allow for closed-zone operation. Objective: Confirm, through hydraulic alternative analysis, that the Highlands 435 PZ can maintain a similar level of service if the 2.0 MG reservoir is out of service prior to construction of the 6.3 MG reservoir. Evaluate operation under a closed-zone operating scenario. Identify recommended mechanical, electrical, and control system changes that may be implemented prior to removing the Highlands 1.5 MG or 2.0 MG reservoir from service, and before the 6.3 MG reservoir is constructed. Prepare a technical memorandum that summarizes the findings and recommendations of the hydraulic analyses. Revisit the site master plan and prepare up to two (2) alternative site configurations based on the revised construction phasing and demolition of the 2.0 MG reservoir. Approach: 5.1. Evaluate and perform hydraulic analyses to confirm that the 2.0 MG Highlands reservoir can be removed from service prior to the completion of the proposed 6.3 MG reservoir, while maintaining required fire flows. 2 7/12/2017 11:03:37 AM J:\Data\REN\113-104\00 Coniracts and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and Bidding.docx Oi�IC7li�lAL__�___P.AGE(`,1'J� _OF�PAG�a City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 - 6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work 5.2. Evaluate operation of the Highlands 435 PZ under closed-zone operation. Develop up to three (3) conceptual alternatives in which the Highlands 435 PZ can maintain service ifthe existing 1.5 MG reservoir is out of service prior to construction of the proposed 6.3 MG reservoir.One(1)alternative is anticipated to include equipping the Mt. Olivet BPS with VFDs and a recirculation valve. Identify major mechanical, electrical,and control system modifications necessary for each alternative. 5.3. Revisit the Site Master Plan and prepare up to two(2)alternative site configurations based on the revised construction phasing and anticipated demolition of the 2.0 MG reservoir prior to construction of the 6.3 MG reservoir. Deliver preliminary alternative drawings in electronic PDF to the City for review. 5.4. Prepare a technical memorandum summarizing the findings and recommendations obtained in subtasks 5.1 and 5.2. Deliver a draft version in electronic PDF for City review and meet with the City to discuss the alternatives and recommendations. 5.5. Perform internal quality assurance/quality control (QA/QC) of technical memorandum and alternative site plan(s). 5.6. Incorporate City and internal review comments into technical memorandum and Master Site Plan, and finalize documents. Incorporate technical memorandum and updated master site plan into Preliminary Design Report and Site Master Plan Report as an amendment.lt is assumed that the amendments will be inserted into the front of the original documents to provide a single document for record purposes. RH2 Deliverables: • Technical memorandum documenting results from the hydraulic analysis and recommendations for operation of the water system without existing 2.0 MG and/or 1.5 MG reservoirs in service, and prior to the construction of the proposed 6.3 MG reservoir. • Attendance at meeting with the City to review and discuss alternatives and recommendations. • Preliminary alternatives and final revised site mater plan drawings in electronic format(PDF). • Amended Preliminary Design Report and Site Master Plan Report in electronic format(PDF). Task 6— Design of Mt. Olivet BPS Improvements (New Task) Objective: Prepare construction plans for the improvements to the Mt. Olivet BPS, including VFDs and recirculation valve. Incorporate recommendations from Task 5, including modifications to zone valve or other facifity setpoints, into the construction plans. Assist City Water Department staff in responding to questions during construction and provide startup and testing services to evaluate operation under a simulated closed-zone scenario. Approach: 6.1. Prepare construction plans for the improvements to the Mt. Olivet BPS, including VFDs and recirculation valve. Incorporate recommendations from Task 5, including modifications to the zone valve or other facility setpoints, into the construction plans. It is assumed that equipment details will be included on the plans and thot a separate specification document will not be included. Prepare a functional description for water system operation under a closed-zone operating scenario. It is assumed that the City Water Department will construct rhe improvements;no bidding or construction contract documents will be provided. Deliver documents in draft format to City for review and comment. Meet with the City to review and respond to comments. 3 7/12/2017 11:03:37 AM 1:\Data\REN\113-104\00 Lontrects and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and Bidding.docx ORiG���AL�_PAGE �90 I� OF'�PAGES City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 - 6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work 6.2. Perform internal QA/QC review of construction plans. 6.3. Incorporate City and internal review comments and finalize plans. 6.4. Assist City Water Department with equipment procurement and submittal review. Respond to questions during construction. 6.5. Coordinate with the Cit�s Integrator (Emerson) to modify the Mt. Olivet BPS and Master (Shop) programmable logic controllers (PLC) to allow the Mt. Olivet BPS to operate in either closed-zone or open-zone mode. Perform human machine interface (HMI) server programming to incorporate the changes into the existing supervisory control and data acquisition(SCADA)system.lt is assumed that the City will contract directly with the Integrator. 6.6. Provide up to two (2) days of testing and startup services to evaluate operation under a simulated closed-zone scenario. RH2 Deliverables: • Preliminary and final plans in electronic format(PDF). • Attendance at design review meeting. • Assistance in submittal review and responding to technical questions. • Attendance at startup and testing. SCHEDULE A—HIGHLANDS 435 RESERVOIR AND STREET FRONTAGE IMPROVEMENTS Task A1 — Reservoir 60-percent Design (Amending Scope and Fee) Objective:Revise the 60-percent design to include the demolition of the existing 2.0 MG reservoir under Phase 1,and reconfigure the site to increase the setback and visual screening of the proposed 6.3 MG reservoir from the retirement home community to the north of the property. Update stormwater design, calculations, and report to reflect changes in site development and for compliance with the City of Renton Surface Water Design Manual, December 2016 edition. Coordinate with City IT Department and incorporate the design of the City standard video surveillance security system into the 60-percent design. Approach: A.1.1 Additional 60-percent Reservoir Desi�n — Revise the 60-percent reservoir structural and mechanical design plans and calculations based on the revised site master plan. In general, it is assumed that the revisions fo the site master plan should have minimal impacts to the reservoir structure or internal piping. A.1.2 Additional 60-percent Site and Fronta�e Improvement Desi�n—Revise the 60-percent site and utility plans based on the revised site master plan. In general, it is assumed that that revisions to the site master plan will have a more significant impact to the site and utility plans. Work will be prioritized to expedite desiqn revisions required for presentation at a public meeting. A.1.3 Additional 60-percent Stormwater Detention and Pump Station Desi�n — Revise stormwater calculations, 60-percent collection system and stormwater detention vault plans, and structural calculations based on the revised site master plan. Revise Stormwater Technical Information Report 4 7/12/2017 11:03:37 AM 1:\Data\REN\113-104\00 Contrefts and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and 6idding.docx oI�IG;n1r�L_`__�'��� rf�__���1��AGF's City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 - 6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work (TIR)to reflect design changes. Revise and update the design and TIR for compliance with the updated City of Renton Surface Water Design Manual, December 2016 edition (RSWDM). A.1.4 Additional 60-percent Electrical and Control Desi�n — Revise the 60-percent electrical and control plans based on the revised site master plan. Coordinate with City IT Department and incorporate the design of the video surveillance security system into the 60-percent design. In general, it is assumed that the revisions to the site master plan should have minimal impacts to the electrical and control design. A.1.5 Additional 60-percent Technical Specifications — Develop additional technical specifications for the demolition and removal of the Highlands 2.0 MG Reservoir. A.1.6 Additional Topo�raphic Survev— Contract and coordinate with Triad, a division of David Evans and Associates, Inc., (Triad) to re-survey the existing trees located on the Highlands reservoir site as required to update the base map drawing with the current tree size prior to bidding. A.1.7 Perform Pilot Infiltration Test—Coordinate with City of Renton Surface Water Department to conduct three small-scale Pilot Infiltration Tests (PITs). The City will supply a backhoe and operator, water supply from City hydrants, and piping or hose to each infiltration test site. RH2 will provide flow measurement and water level measurement devices, and observe all testing. RH2 Deliverables: • Revised 60-percent site and reservoir plans relevant to public meeting in electronic format(PDF). Task A2 — Reservoir 90-percent Design (Amending Fee Only) Objective: Incorporate and advance design changes and additions from 60-percent re-design to a 90-percent design level. Approach: A.2.1. Additional 90-percent Desi�n — Incorporate and advance design changes and additions from 60-percent re-design to a 90-percent design level. Task A3 — Public Meeting Assistance (No Change) No change in scope or fee. Task A4— Final Construction Contract Documents (No Change) No change in scope or fee. 5 7/12/2017 11:03:37 AM J:\Data\REN\113-104\00 Contracts and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and 8idding.docx �R{viR�.AL��'t,G� P�0� C.}F�P!';G�S City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 -6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work SCHEDULES B AND C— OFF-SITE WATER MAIN AND FRONTAGE IMPROVEMENTS Task B1 —Topographic Survey and Geotechnical Investigations (Amending Scope and Fee) Objective: Contract with a private potholing drilling contractor and review subsurface soil conditions and utility depths at select locations relevant to the design and construction of the water main improvements. Approach: B.1.4 Additional Geotechnical Investi�ations — Coordinate with potholing contractor to conduct approximately four(4)explorations in native soil along alignment.Observe field exploration.Contract with soil testing laboratory for soil properties analysis. Amend technical memorandum summarizing geologic information and interpretation and field observations. Support design team and City to incorporate findings/recommendations into design. This task is supplemental to the work performed under Task 8.1.2 of the original scope. 6.1.5 Additional Utilitv Coordination and Subsurface Utilitv Investi�ations — Coordinate with the City and franchise utilities to confirm the depth and location of known utilities crossing the proposed water main alignment at select locations to assist in the finalization of the vertical profile design of the proposed off-site water mains and utilities.Contract and coordinate with a utility potholing contractor to conduct utility potholing in approximately twelve (12) locations. This task assumes that the potholing contractor will be responsible for providing traffic control,submitting application to the City for a street opening permit, and contacting the One-Call locate service prior to potholing the utilities. Review potholing reports and perform field visit (if necessary) to review pothole and known utility locations. Incorporate potholing information into construction plans and specifications. This task is supplemental to the work performed under Task 8.1.3 of the original scope. RH2 Deliverables: • Pothole reports for subsurface utilities at select locations. • Geotechnical investigation logs at potholes and amended geotechnical technical memorandum in electronic format(PDF). Task B2 — Off-site Water Main Preliminary Design (No Change) No change in scope or fee. Task B3— Off-site Water Main Final Design (Amending Scope and Fee) Objective: Expand the scope of the final water main design tasks to include approximately 1,500 lineal feet of additional 12-inch and 16-inch 565 PZ distribution main within NE 12th Street from Olympia Avenue to west of Sunset Avenue,and re-purposing of the existing 435 PZ 16-inch transmission main within NE 12`h Street and west of Harrington Avenue for use as 565 PZ distribution main. Approach B.3.7 Additional 565 PZ Distribution Main Improvements—Prepare water main design plans,specifications, and engineers estimate for approximately 1,500 lineal feet of additional 12-inch and 16-inch 565 PZ distribution main within NE 12`h Street from Olympia Avenue to west of Sunset Avenue, and 6 7/12/2017 11:03:37 AM 1:\Data\REN\313-104\00 Contrects and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and Bidding.docx ORlGIt`dAL � P.�GF NO "1 G�F�P!',GES City of Renton Highlands 435 Pressure Zone Reservoir Improvements Amendment No. 1 Phase 1 -6.3 MG Reservoir and Transmission Main Exhibit A-1 Final Design and Bidding Scope of Work re-purposing of the 435 PZ 16-inch transmission main within NE 12t'' Street and west of Harrington Avenue for use as 565 PZ distribution main. In general, additional work will be performed in accordance with the original scope of work. RH2 Deliverables: � Per original scope. 7 7/12/2017 11:03:37 AM 1:\Data\REN\113-104\00 Controcts and PM\Project Scoping\Final Design-Amendment 1\PSA_AMEND NO.1_SOW_Final Design and Bidding.docx � �, 0� �i:ufi,��--�?r1���. �.f'._� � � h �+r�+ � f-"7�'.Vi_J EXHIBIT B-1 -Time Schedule of Completion All Consultants' services are to be completed and all products shall be delivered by June 30, 2018. ��"�'(j�.7?,�I�`�-�°�F1�rC �'����}r= 1 [ P�iG�J --k�.. Exhibit C-i Consultant Fee Determination -Summary Sheet (Negotiated Hourly Rates of Pay) Fee Schedule Subconsultant: RH2 ENGINEERING, INC Negotiated Overhead Fee Multiplier Negotiated Rate Staff Classification Hourly Rate Multiplier Per Hour 183.3990 12% Professionall $ 44.42 $ 81.47 $ 15.11 $ 141.00 Professionalll $ 48.52 $ 88.98 $ 16.50 $ 154.00 Professionallll $ 51.99 $ 95.34 $ 17.68 $ 165.00 Profes5ionallV $ 55.14 $ 101.12 $ 18.75 $ 175.00 Professional V $ 58.60 $ 107.47 $ 19.93 $ 186.00 Professional VI $ 61.44 $ 112.67 $ 20.89 $ 195.00 Professional VII $ 66.48 $ 121.92 $ 22.61 $ 211.00 Professional VIII $ 69.00 $ 126.54 $ 23.46 $ 219.00 ProfessionallX $ 69.00 $ 126.54 $ 23.46 $ 219.00 Technician I $ 31.19 $ 57.20 $ 10.61 $ 99.00 Technician II $ 32.77 $ 60.09 $ 11.14 $ 104.00 Technician III $ 41.90 $ 76.85 $ 14.25 $ 133.00 Technician IV $ 44.42 $ 81.47 $ 15.11 $ 141.00 Administrative I $ 21.11 $ 38.71 $ 7.18 $ 67.00 Administrative II $ 24.89 $ 45.65 $ 8.46 $ 79.00 Administrative III $ 29.93 $ 54.89 $ 10.18 $ 95.00 Administrative IV $ 34.97 $ 64.14 $ 11.89 $ 111.00 Administrative V $ 41.59 $ 76.27 $ 14.14 $ 132.00 In-House Copies B/W-8.5x11 $ 0.09 In-House Copies B/W-8.5x14 $ 0.14 In-House Copies B/W- 11x17 $ 0.20 In-House Copies Color-8.5x11 $ 0.90 In-House Copies Color-8.5x14 $ 1.20 In-House Copies Color- 11x17 $ 2.00 CAD Plots Large $ 25.00 CAD Plots Full $ 10.00 CAD Plots Half $ 2.50 CAD System Per Hour $ 27.50 GIS System Per Hour $ 27.50 Mileage Current IRS Rate Subconsultants will be billed at cost plus 15%. Outside direct costs for permit fees, reports, maps, data, reprographics, couriers, postage, and non- mileage related travel expenses that are necessary for the execution of the project and are not specifically identified elsewhere in the contract will be billed at cost. EXHIBIT C-2 ORIGs'�JAL � P�GE RIG I�..OF I�-'F�AG�S City of Renton Amendment No.i Highlands 435 Pressure Zone Reservoir Impravements Phase 1-6.3 MG Reservoir and Transmission Main Final Design and Bidding Fee Estimate �f�l,s� y .� ar;` ?�;: ie a� . � 3;". r r��":{„, aiy � x i, s� 7�y tr �e � �. � �""���„yu€,�, yc,,, ; �y�. �.r'�n S �`r t �,:�� „ �ab,�';r i ? � � ;� s���": s ,..z' .:wK d i'*�',�'"� ' X"=� "-,n � ��� ; .., '. . �„�... . .. �, s F'�'"',��'�'�`''�n���,r #� ���r�,�r��:'�w`�� � ,��,�Z � �,. � .; , r �>., t � di �, ,"��-,�r ,',y,�� �����, ,�^� �, ,, rf�3s .�� w R a� ��,� .'n�,�� x�l. ,�.�,,...r��a ���.r�'Y"r�+' ai�f"%�„�����n���fis'�����✓{�:�r��' i� "`s... �m� e,. '�awE� :�""o,.a i��� '���.,-r"azz�„w.w�"�9;; d � ",`.. � ,r,"... ,, S t���,��,v �Ag'�Co./P�dJ t� �1'��"�¢ �� '.v .. s� xi.>t d x,. i� r.,��',,; � Y r^/.. '% ��°N �1-,n c�,�%i .� `: .v6,ruF.:w.,.....�,0.7�..Ktsw✓�..,,ar.�.�..ww:w�� r ........:. ......u..,,..I z. ......._w v` ..:.a..��uY�u�..a.ad.:�i. .„ a¢,.< ¢., :,�,;� , �;r x�� . '� < ._�.,w , , ,.. , ^�,.. ,. GENERAL PROJECT TASKS 7ask 1 Project Management Servlces 16 S 3,092 $ - S - S 3,092 Task 5 Additional Master Planning and Hydraulic Analysis 133 $ 22,996 $ - $ 1,255 S 24,251 ' S.1 Perform Fire Flow and H dreulic Anal ses 10 $ 1 830 $ $ 110 $ 1940 5.2 Evaluate Clased-zone O eretion and Develo u to Three 3 Alternatives for O eration 41 $ 6 909 $ - $ 645 $ 7 554 5.3 Revisit Site Master Plan and Pre are u to Two 2 Alternative Site La outs 40 $ 6 952 $ - $ 448 $ 7 400 5.4 Pre are Technical Memorandum Documentin Tasks 5.1 and 5.2 25 $ 4 322 $ - $ 29 $ 4 351 � 5.5 Perform QC Reviews of Deliverebles q $ 844 $ - $ 22 $ 866 � 5.6 Incor orate Review Comments and Finalize Documents 13 $ 2 139 $ $ 2 $ 2 141 Task 6 Design of MY.Olfvet BPS Improvements 185 $ 33,081 S - $ 1,588 $ 34,669 � 6.1 Pre are Canstruction Plans for the Im rovements 88 $ 14 826 S - $ 1 305 $ 16 131�� : 6.2 Perform QA QC Review of Construction Documents 8 $ 1 680 $ $ 8 $ 1688 6.3 Incor orate Review Comments and Finalize Documents 14 $ 2 316 $ - $ 193 $ 2 509 � 6.4 Assist with E ui men[Procurement and Submittal Review 17 $ 2 905 $ $ 2 $ 2 907 � 6.5 Coordinate with Ci 's Inte retor and HMI Pro rammin 20 S 4 028 $ $ 27 $ 4 O55 � 6.6 Provide Startu and Tes[in Services 38 $ 7 326 $ - $ 54 $ 7 380 u;`r, ` � � ' - �t„ia.,,. '.,..y `�s s' � r .� �' � -�t, .# ,�:; ,,��..- r.a�::,s =.�.� h 7„�'i��:.?�a: ,a°e�'a,rl., ,�,-I.�; ,i� SCHEDULE A-HIGHLANDS 435 RESERVOIR AND STREET FRONTAGE IMPROVEMENTS Task A1 Reservoir 60-percent Design 378 S 67,567 $ 3,450 $ 4,535 $ 72,552 '� A11 Additional 60- errent Reservoir Desi n 50 $ 7 910 $ - $ 1009 $ 8 919 �� A1.2 Additionai 60- ercent Site and Pronta e Im rovement Desi n 82 $ 13 546 $ - $ 1 290 14 836 A1.3 Additional 60- ercent Stormwater Detention and Pum Station Desi n 144 $ 24 492 $ ` - $ 1475 $ 25 967 ' A1.4 Additional 60- ercent Electrical and Control Desi n 48 $ 8 056 $ - $ 708 $ 8 764� . A1.5 Additiona160- ercentTechnical5 ecifitations 8 $ 1386 $ $ $ 1386. � A1.6 Additional To o ra hic 5urve 9 $ 1 317 $ 3 450 $ - $ 4 767 ' A1.7 Perform Pilot Infiltration Tests 38 $ 7 860 $ - $ 54 $ 7 914 Task A2 Reservair 90-percent Design 94 $ 36,119 S - S 1,183 $ 17,302 . A2.1 Additional 90- ercent Desi n 94 $ 16 119 $ - $ 1183 $ 17 302 ��:; �,w,.l r�-'�r 3+PB.��,;' � :; ,s^�„s .<� '.: , � , �.� .�,�^,t- � e,,.�3 Pa 7�`u w���#�r;, � �%�.3%•:�: SCHEDULES B and C-OFF-SITE WATER MAIN AND UTILITY IMPROVEMENTS Task B3 Topogrephic Survey and Geotechnical Investigations 36 $ 6,880 $ 37,030 S 271 S 44,181 � 81.4 AdditionalGeotechnicallnvesti ations 24 5 4791 $ 10580 S 80 $ 15451� B1.5 Additional Utilit Coordination and Subsurface Utili Investi ations 12 $ 2,089 $ 26,450 5 190 $ 28 729 Task B3 Off-site Water Main Final Design 170 S 28,830 $ - $ 2,420 S 31,230 � B3J Additional 565 PZ Distribution Main Im rovements 170 $ 28,810 $ - $ 2 420 $ 31 230�� �-� . � . . ��.a.�.s� �v�a ;s _,�ni..s' .,'�, y^a�,:n.� .°� t� !§�.: `^"' �,F"�i,-� �r��Et��w�.a�` �, k �x � . F , � . N � � �p. ,:�._ 'MT �n�no»31:OS�M l:WahWEN�L13-10�`�IOContracbandPhlpro�e<t5tepin{�InalOesl{n-AmendmantipSA AMEXONO.1 EahlbltC-]fEE_FlnalOe�16���delAAin{.alsm