HomeMy WebLinkAboutAdden 1 �RIGlP�AL�FA�E rlC��dF4 P/�GES
CAG-17-050, Adden #1-17
� CITY OF
-����� �� �� �
AMENDMENT NO. 1 TO AGREEMENT FOR LIFT STAT14iV AND
FORCE MAIN REHABILITATION GROUP 1 FACILITIES- PREDESIGN
CAG-17-050
THlS AMENDMENT, dated August 9, 2017, is by and between the City of Renton (the "City"j, a
Washington municipal corporation, and RH2 Engineering, Inc. ("Consuitant"), a Washington
corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-050, dated
March 20, 2d17, to provide necessary services for the Lift Station and Force Main Rehabilitation
Group 1 Facilities - Predesign (referred fio herein as the "Agreem�ent"�;�..� K,�
--•.,.,� , .: , ��. g �,
,��:� ,�s .,.�.w..
Whereas, the Parties wish to amend the Ag�eement to change"the scope of worEc and change the
compensation in order to provide replacement telemetry panel for the existing Oakesdale
Avenue and Rainier Avenue pump stations.
NOW THEREFORE, It is mutually agreed upon that CAG-17-050 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-1, which is attached and inco�porated herein.
2. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased from $176,379 to $203,450, plus any
applicable state and local sales taxes. The additionai compensation shall be paid based
upon Work actually perforrned according ta the rate(s) or amounts specified in Exhibit C-
3, which is attached and incorporated herein.
3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect
and such terms shall apply to Work performed according to this Amendment as if fully set
forth herein.
OR4Gl�tAL I F'AGE N�J v10F� PAGES
IN WITNESS WHEREOf, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTAIVT
� /��
gY- � By: i�'i%'� � �( .
Gregg Zim e m Tony V./P rdi
Public Works Administrator Presi��'nt
��//7
Date Date �
Approved as to Legal Form
„�j�1t,� i�"
Shane Moloney
Renton City Attorney
Contrect Template Updated OS/34/2017
Page 2 of 2 �� � � � � ` '� :�i/
OR1Gih�AL l PACF hlt� �J QF� pAGES
EXHIBIT A-1
Scope of Work
Amendment No. 1 to CAG-17-050
City of Renton
Lift Station and Force Main Rehabilitation Group 1 Facilities
Stormwater Pump Station Telemetry Panel Replacement
August 2017
Background
7he City of Renton(Cityj has three �3}stormwater pump stations:the Rainer Pump Station,Oakesdale Pump
5tation, and Strander Boulevard Pump Station. Both the Rainer and Oakesdale Pump Stations have obsolete
Rugid telemetry equipment that is becoming harder to maintain due to failing equipment and unavailability
of spare parts. The Strander Boulevard Pump Station is equipped with newer Allen-8radley control equipment
that the City has standardized on for its sewer pump stations.The City is in the process of replacing existing
wastewater telemetry panels with Allen-Bradley based telemetry panels. Task 3.9 Qf the original scope of
work includes preparation of conceptual electrical/contro) ptans for the telemetry improvemen#s at the
Cottonwood and East Valley Lift Stations.
As part of this contract amendment, The City has requested that RH2 Engineering, Inc., (RN2) design
replacements for the existing telemetry panels at the City's Rainer and Oakesdale stormwater pump stations.
In addition,the City has also requested that the additional design work needed to prepare the final telemetry
replacement plans and specifications for the Cottonwood and East Valley Lift Stations be included with this
amendment.The City has requested that a telemetry panel be included in the design to be used as a spare for
wastewater.It is desired that all five(5)wastewater/stormwater pump station telemetry panels be fabricated
at the same time. The new stormwater telemetry panels will be Allen-Bradley based to match the wastewater
telemetry panel design standard. Services during building and installation of these panels will be addressed
via a subsequent amendment.
The City has chosen to include the engineering costs for the stormwater pump stations in the existing
professional services agreement for the Lift Station and Force Main ReMabilitation for the following two
primary reasons
1. The wastewater utility has already begun design of new tontrol equipment for all of its pump stations.
Adding the design and fabrication of the stormwater pump station panels to the wastewater work will
result in economies of scale in design, bidding,and fabrication;and
2. The stormwater pump stations are operated by the wastewater utilities personnel. A uniform,
consistent product,designed and fabricated at the same time,will make maintenance simpier for the
City's maintenance staff.
The following Scope of Work includes preparation of construction documents for fabrication of the
rep{acement stormwater pump station telemetry panels at the Rainer and Oakesdale Pump Stations,
preparation of construction contract documents for fabrication of the replacement sewer lift station
telemetry panels at the Cottonwood and East Valley Lift Stations as well as a spare telemetry panel, a�d
services during bidding. Future phases of the project may include design and bidding of the telemetry panel
installation, sei-vices during construction, control system software development, and SCADA integration.
RH2's services for these future phases may be completed as part of a future contract amendment. The
1
9/9/26ll 10:17 AM 1;\Data\REN\Sll�037\Contract�Amend No.1\Amend Nn.1 EXHI0IT A SOW_Stormwa�er Pump 5[aqon TelemeGyPanel Replacement.dooc
{�RIGI�IAL � PAGE N�?�t�F� F'AGES
City of Renton Amendment No.1
l.ift Station and Force Main Refiabilitation Group 1 Facilities Exhibit A-1
Stormwater Pump Station Telemetry Panel Replacement Scope of Work
delineation between Stormwater and Sewer facilities for the design has been identified below so that the City
can separate out costs between departments. The project administration and services during bidding tasks
are shown as one common task for both s#ormwater and sewer. For internal accounting purposes,the City
can consider this a 50/50 split between the two departments for each of these tasks.
DEFINITIONS
SCADA — Supervisory cont�ol and data acquisitian. Distribu#ed computer control system used for
monitoring and controlling remote City water and wastewater facilities.
PLC— Programmable logic controller. Industrial monitoring and control computer used for controlling and
monitoring of the reservoirs.
MTU—Master telemetry unit.This refers to the central City headquarters SCADA equipment.
NMI—Human machine interface.The Microsoft Windows-based graphical computer interFace used by City
stafF for monitoring the entire SCADA system.
OI—Operator interface.Graphical touch screen provided at remote facilities for operator monitoring and
control of a facility while onsite.
O&M—Operations and maintenance.
QA/QC—Quality assurance and quality control.
Task 5— Project Administration
Objective: Administer project reco�ds and coordinate with the project team.
App�oach:
S.1 Manage the RH2 project team to track work elements accomplished,work items planned for the next
phase, personnel hours, scope changes, time, and budget needed to complete the work. Prepare
weekly progress reports to summarize work accomplished for the week, anticipate work for the
following weeks,and ide�tify potential problems or changes.Submit a monthly invoice summarizing
cos#s and remaining budget.
RH2 Deliverables:
• Weekly action-item list and project report.
• Monthly invoices.
• Meeting agendas and minutes,issued eiectronically(PDF).
Task 6—Stormwater Purr�p Station Telemetry Panel Upgrades Design
Objective: Prepare bid-ready design plans and specifications for the proposed control system work at the
Rainier and Oakesdale Pump 5tations.
Approach:
6.1 Prepare Rainer and Oakesdale Pump Stations Telemetry Replacement Electrical Plans — Prepare
electrical plans for the fabrication of the proposed telernetry panels at the pump stations.
2
8/9/2017 i0:17 AM 1;\Data�(1EN\117-037�Contract\Amend No.1\Amend Na.1 EXHtBIT A_SOW_Stormwater Pump Statlon Teleme[ry Panel Neplacement.doa
Of�ICINAL I PA�E RIC?�h� g PAGES
City of Rentan Amendment No. 1
lift S#ation and Force Main Rehabilitation Group 1 Facilities Exhibit A-1
Stormwater Pump Station Telemetry Panel Replacement Scope of Work
6.2 Prepare Technicaf Specifications — prepare specifications using RH2's standard technical
specifications. Review and update the City's standard specifications and general conditions as
warranted for this project.
6.3 Submit 90-percent Documents for City Review and Edit Plans—Design progress submittals shall be
made at the 90-percent design stage and will include specifications and drawings. The 90-percent
documents will be submitted to the City, and after a review period, RH2 will attend one (1) review
meeting with the City, Upon completion of addressing the 90-percent comments,RH2 wil!submit a
set of documents to the City for final comment(s).
6.4 Perform QA/QC and Internal Review—Provide QA/QC services as part of this Scope of Work.Services
will include a formal internal QA/QC process, which provides review of RH2's design and final
deliverables.
6.5 Prepare Cost Estimates—Prepare 90-percent and final construction cast estimates.
Assumptions: Refer to ihe attached Fee Estimate (Exhibit G3J for an estimate of time required for
design tasks.Revisions due to chonges in design criteria ofter those etements have been designed will require
a scope of wark and fee estimate amendment.
RH2 Deliverables:
• 90-percent design plan reviews.
• In-house Qq/QC reviews.
• 90-percent and final construction cost estimates in electronic format(PDFj.
Task 7—Sewer Lift Station Telemetry Panei Upgrades Design
Objective: Advance the design of the conceptual telemetry improvements plans developed under Task 3.9
for the Cottonwood and East Vafley Lift Stations to bid-ready design plans and specifications.
Approach:
7.1 Prepare Cottonwood and East Valley Lift Stations Telemetry Replacement Electrical Pians—Prepare
electrical plans for the fabrication of the proposed telemetry panels at the lift stations. Prepare
electrical plans for the fabrication of the spare(ift station telemetry panel.
7.2 Prepare Technica{ Specifications — Prepare specifications using RH2's standard technical
speci�cations. Review and update the City's standard specifications and general conditions as
warranted for this project.
7.3 Submit 90-percent Documents for City Review and Edit Plans— Design progress submittals shall be
made at the 90-percent design stage and will include specifications and drawings. The 90-percent
documents wili be submitted to the City, and after a review period, RH� will attend one (1) review
meeting with the City. Upon completion of addressing the 90-percent cornments, RH2 will submit a
set of documents ta the City for final comment(s).
7.4 Perform QA/QC and Internal Review—Provide Qq/QC services as part ofthis Scope of Work.Services
will include a formal internal QA/QC process, which provides review of RH2's design and final
delive�ables.
7.5 Prepare Cost Estimates—Prepare 90-percent and final construction cost estimates.
3
8/9j201710:1]AM 1:\Data\ftEN�117•937\Contrad\Amend No.1\Amend No.1 EXHI6IT A SOW Scormwater Pump Statlon Tekme[ry Panel Replacement.doa
ORIGlt�ll�� I {'AC�E I�10 t(/01= 4 PAGES
City of Renton Amendment lVo.l
Lift Station and Force Main Rehabilitation Group 1 Facilities Exhibit A-1
Stormwater Pump S#ation Telemetry i�anel Replacement Scope of Work
Assumptians: Refer to the attached Fee Estimate (Exhibit G3)for an esiimate of time required for
design tasks.Revisions due to changes in design criteria after tl�ose elements have been designed wi!!require
o scope of work and fee estimare amendment
RH2 Deliverables:
• 90-percent design plans and specificatians.
• In-house QA/QC reviews.
• 90-percent and final construction cost estimates in electronic format{PDF).
Task S—Services During Bidding
Objective; Provide assistan�e to the City during project bidding.
Approach:
8.1 Prepare Final Bid Documents—Coordinate with the City in providing final bid documents to bidders.
!t is assumed that five (5J sets of bid documents with half-sized(11-inch by 17-inch) plans wiJl be
prnduced,wi#h three(3J sets of each being for Ciry staff,and two{2)sets of each for RH2.Bidders wi II
receive electronic PDF versions only.RH2 will provide PDF versions of the plans and speci�cations to
the City.
8.2 Respond to Bidder Questions— Respond to bidders' technical questions, as needed, during the
bidding process. !t is assumed that the City wi!! respond to procedural questions. RN2 wrll not
coordinate directly with bidders;RH2 wil!receive bidder questions from fhe City and respond fo the
City.
8.3 Prepare Project Bid Addendum—Prepare up to one (1)addendum in electronic format for the City
to distribute ta the plan holders.
Assumptions: In the event the City prefers hard copies of bid sets for prospective bidders, ti►ese can be
prepared by RH2 and provided to the City using oursiandard hourly rotes and charges. The City will publish
the odvertisement in the required newspapers. The City will receive all bidder q�estions and record them
for forwarding to RH2 at the City's distretion. The City wil!conduct the 6id opening. It is assumed that
RH2 will not ottend. RH2's review of the bids will be limited to the Schedule of Prices ond checking
references. The City will review all ather elements of the bid propasals,as they deem oppropriate. The City
will handle bid award and construction contract execution.
Provided by City of Renton:
• Advertisement for bid.
� Receive,record,and provide responses to questions from bidders.
■ Bid opening.
• Submit bids for bid tabulation.
RHZ Deli�erables:
• Five(5)sets o#bid documents with half-size(11-inch by 17-inch) plans. Two (2)sets shall be for RN2
use and file.
4
8/9/2017 10:17 pM !:\Da[a\REN�S17•037\[ontrect�Amend No.1\Amend No.1 ExHl91T A SOW Stormwater Pump Statlan Teiemetry Panel ReplacemenC,doa
oai��r���I r-���r�� �c�r- $ Pa�ts
City of Renton Amendment No.1
Lift Station and Force Main Rehabilitation Group!Facilities Exhibit A-1
Stormwater Pump Station Telemetry Panel Replacement Scope of Work
� Bid-ready plans and specifications in electronic format (PDF} for the City's use in producing bid sets
for electronic distribution.
• Responses to bidder questions transmitted by the City to RN2.
• Up to one�1�addendum in electronic format(PDF).
Project Schedule
RH2 will commence work upon receipt of an executed amendment and will provide 90-percent plans and
specifications for client review and comment within forty-five(45)days.
Final plans and specifications will be delivered within fifteen (15)days of receipt of City review comments.
5
8/9/261710:17 AM 1:\Data\REN\117-037�Contrect\Amend No,i\Amend No.1_EXHIBITA SOW_S[armwater PumpStatlon Telemetry Panel Replacement.dn[r
ORIGIt�AL ( f�1rE h���OFv PAGES
EXHIBIT C-3
City of Renton
Amendment No.1 to CAG-17-050
Lift Station and Force Main Rehabilitation Group 1 Facilities
Stormwater Pump Statlon Telemetry Panel Replacement
Fee Estimate
Des�t�ption Tatai Tatal Labor ToWI Expense Totai Cost
--------_....�.�._..__ ____.._....—_.._---.....-------._.__.........,.V_
Haurs
Ciassfflcatlon
Task 5 ProJect Administratlon 6 S 1,278 $ - $ 1,278
Task 6 Stormwater Pump Station Telemetry Panel Upgrades Design 65 S 11,187 $ 888 $ 1t,075
7ask 7 Sewer Lift Station Telemetry Panel Upgrades Desfgn 59 $ 9,422 $ 668 $ 10,09D
Task S Servkes During Bidding 19 S 3,349 $ 278 $ 3,627
Amendment No.i to CAG-17-050 144 $ 25,236 $ 1,835 $ 27,071
Wastewater ABacaUon 67 $ 11,736 $ 807 $ 12,543
Stormwater Allocation 78 $ 13,501 $ 1,027 $ 14,528
� l:�pab4tENU17-037�[onlnctWmendNo.l�AmentlNo.1_E7tHIBlTt-3_ffE SmrmwalerPumpSbtbn7ekmelrypanelReplacemen4�h� 81§R03730:1lAM