Loading...
HomeMy WebLinkAboutP_MFP22005770_230113_v1DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP22005770 IVR Number: 22005770 Permit Information Permit Name: Comcast Cable Franchise Permit-JB0000588234 Address/Location:10/28/2022Application Date:9476200015Parcel Number: 529 GRANDEY WAY NE Permit Type:01/13/2023Issue Date:Franchise Permit Work Class:01/15/2024Expiration Date:Major Utility Job Number: JB0000588234Franchise Type:Cable Description: Comcast JB0000588234 TIE INTO EXISTING 288CT COIL. PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER. PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT. OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 ApplicantX David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 Contact Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Contact David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 Contractor Business License Number: 20838Construction Contractor: CANNOCL791JK Electrical Contractor: CANNOCI873CL Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date 10/28/2022 Comcast Cable Communications Management JB0000588234 Andrew Parker 253-225-0596 andrew_parker2@comcast.com 529 GRANDEY WAY NE T3D-WAKVD99100 1X2 OFF RN44C (4X4) TIE INTO EXISTING 288CT COIL; PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER; PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT; OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND Cannon Construction LLC - David Standring 253-922-2787 601590363 20838 Scott Warlick 1/13/2023 MFP22005770 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering T3D-WAKVD99100 1X2 OFF RN44C (4X4)JB0000588234 529 GRANDEY WAY NE, RENTON, WA 98056 Monday Friday 8:00am 3:00pm Cannon Construction Andrew Parker 253-225-0596 410 Valley Ave NW, Suite 12, Bldg C Puyallup TIE INTO EXISTING 288CT COIL; PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER; PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT; OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND MFP22005770 Scott Warlick CED 1/13/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) David Standring, Permitting Coordinator 12/12/22 1405 356 358 1407 359 353 350347MEADOW AVE NN 4TH ST ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROW ROWROWROW ROWROWROWROWROWROWROWROWROWROWEOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP WTXXR2-1 STREET PARKINGSTREET PARKINGSIDEWALKSPOTTER40.4068 PARKINGNOFROMTONAME OF FIRM 000-0000PHONE (CONTACT #)TOW-AWAY AREASIDEWALKDWYXSIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCAlex Fox (P): (253) 359-6809 (E): afox@teamcannon.comJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB TRAFFIC CONTROL 1 5 WORK TYPE:UNDERGROUND WORK CANNON CONSTRUCTION LLC CONTR O L S U P E R V I S O R ANGELI C A B O N G O T CE R T I F I E D TR A F F IC #013108 EX P . 6 / 3 0 / 2 0 2 6 MFP22005770 353 1407 1400 14111409 355 351 343 FACTORY PL NFACTORY AVE NN 4TH ST ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROWROWROW ROWROWROWROWROWROWROWROWROWROW EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEO P EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOPEOPEOPEOPEOPEOPN 4TH ST WT XXXLR2-1 6 DEVICE MIN 50'-100'XXXXR2-1 WT SPOTTER48.5541 PARKINGNO FROM TO NAME OF FIRM 000-0000 PHONE (CONTACT #)TOW-AWAY AREAEOPEOPEOPEOPEOPEOPEOP EOP EOP DWY FAS R2-1 R2-1 SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCAlex Fox (P): (253) 359-6809 (E): afox@teamcannon.comJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB TRAFFIC CONTROL 2 5 WORK TYPE:UNDERGROUND WORK CANNON CONSTRUCTION LLC CONTRO L S U P E R V I S O R ANGELI C A B O N G O T C E R T IF IE D T R A F F I C #013108 EX P . 6 / 3 0 / 2 0 2 6 MFP22005770 1675 HOUSER WAY NROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW EOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPV WT XX B 53.0697 PARKINGNO FROM TO NAME OF FIRM 000-0000 PHONE (CONTACT #) TOW-AWAY AREA SPOTTEREOP EOP EOP EOP EOP EOP EOP EOPEOPEOPXXR2-1 R2-1 R2-1 STREET PARKING STREET PARKING SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCAlex Fox (P): (253) 359-6809 (E): afox@teamcannon.comJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB TRAFFIC CONTROL 3 5 WORK TYPE:UNDERGROUND WORK CANNON CONSTRUCTION LLC CONTRO L S U P E R V I S O R ANGELIC A B O N G O T CE R T I F I E D TR A F F IC #013108 EX P . 6 / 3 0 / 2 0 2 6 MFP22005770 EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOP420 410 404 352 350 354 353 333 1675 N 4TH ST HOUSER WAY NSUNSET BLVD NI-405 FWYROW ROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROW ROW ROW ROWROWROWROWROWROWROWROWROWROW ROW ROWROWROWROW ROWEOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPROWEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/W S/WS/WS/WS/WS/WS/W FLFLFLFLFL FLFLFLFLEOPEOPEOPEOPEOPEOP EOPEOP EOPSUNSET BLVD NEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPWTBLR2-1 XXXDWYDWYDWYFAS DWYDWY6 DEVICE MIN 50'-100'WT DWYXEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLSIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCAlex Fox (P): (253) 359-6809 (E): afox@teamcannon.comJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB TRAFFIC CONTROL 4 5 WORK TYPE:UNDERGROUND WORK CANNON CONSTRUCTION LLC CONTR O L S U P E R V I S O R ANGELI C A B O N G O T C E R T I F I E D T R A F F IC #013108 EX P . 6 / 3 0 / 2 0 2 6 MFP22005770 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFL FLFLFLFLFLFLFLFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPFLFLFLEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOP EOP EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/WS/WS/WS/WS/W S/W S/W S/W S/ W S/WS/WS/WS/WS/WS/WS/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W S/W 501 579 578 509 473 551 478 469 505 582 529 SUNS E T B L V D N E GRA N D E Y W A Y N E BRONSON WAY NE ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROW ROW ROWROWROWROWROWROWROWROWROWROWROWON RAMPO N R A M P FLFLFLFLFLFL FL FL FL FLFLFLFLFLFLFLFLFLFL EOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOP EOP EOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWEOPEOP EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPI-405 FWYFL FL EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP HOUSER WAY BYPASSOFF RAMPX X X X WT B L R2-1 FASWT WTFLAGGERXXXFLAGGERXXXFLAGGERSIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCAlex Fox (P): (253) 359-6809 (E): afox@teamcannon.comJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB TRAFFIC CONTROL 5 5 NIGHT WORK ONLY WORK TYPE:AERIAL WORK CANNON CONSTRUCTION LLC CONTRO L S U P E R V I S O R ANGELIC A B O N G O T C E R T IF IE D T R A F F I C #013108 E X P . 6 / 3 0 / 2 0 2 6 MFP22005770 4 5 6 7 8 PROJECT MAP: POLE INFORMATION: POLE COUNT = POLES THAT NEED PERMIT = POLES THAT NEED MAKE READY = TRANSMISSION = DISTRIBUTION = 7 6 0 0 6 CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 SITE ADDRESS: 529 Grandey Way NE Renton, WA 98056 CONTACTS: CANNON COMPANIES Alex Fox - (253) 359-6809 - afox@teamcannon.com COMCAST COMMUNICATION Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com SCOPE OF WORK: JB0000588234 T3D - WAKVD99100 1X2 OFF RN44C (4X4) SHEET INDEX 1 -COVER 2 -GENERAL NOTES 3 -LEGEND 4-8 -CONSTRUCTION PLAN - TIE INTO EXISTING 288CT COIL - PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER - PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT - OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND N S EW *ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER = TOTAL ROW FOOTAGE = FT. FT. FT. FT. FT. FT. ROW FOOTAGES*: NEW BUILDING PATHWAY = EXISTING BUILDING PATHWAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL SITE FOOTAGE = FT. FT. FT. FT. FT. SITE FOOTAGES*: TOTAL PROJECT FOOTAGE = FT. 0 483 0 2,105 (2)50 2,638 0 0 0 0 0 2,638 FT + 20% STORAGE = FT288CT FIBER 2,638 3,166 Node This permit is for Major construction work in the ROW and will be billed at an additional $150/HR for inspections. After hours and weekend work will be billed at $175/HR MFP22005770 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB GENERAL NOTES 2 8 SCALE: NO SCALE STANDARD 1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS. 2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811 3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES. 4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES. 5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM. 6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE. 7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS. 8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED. 11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED. 12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION. TRAFFIC CONTROL 1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS. 2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN. SITE PREPARATION 1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE. 2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE). 3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. TRENCH EXCAVATION AND BACKFILL 1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS. 2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. UTILITY DUCT 1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT. 2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION. 3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE. 4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED. CEMENT CONCRETE PAVEMENT 1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF EACH JURISDICTION. ASPHALT CONCRETE PAVEMENT 1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION. GRAVEL AREAS 1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION. SITE RESTORATION 1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES. 2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND WATERED IN TO ENSURE ITS SURVIVAL. 3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO CONSTRUCTION. WATER QUALITY 1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S WATER QUALITY STANDARDS 2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE. DIRECTIONAL BORING 1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS. 2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES. FIRE PROTECTION 1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT. 2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT. AERIAL INSTALLATION 1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS. 2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION. 3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN WHERE APPLICABLE. 4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION. MFP22005770 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB LEGEND 3 8 SCALE: NO SCALE MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS LANE LINE CENTER LINE / STATION LINE FOG LINE EDGE OF PAVEMENT RIGHT OF WAY SIDEWALK FENCE GUARD RAIL POWER TRAFFIC SIGNAL COMMUNICATION TELECOMMUNICATION SEWER MAIN SIDE SEWER DRAIN MAIN DRAINAGE DITCH GAS OIL STEAM WATER UNKNOWN UTILITY STRAW WATTLES TRAFFIC CONES PROPOSED NEW CONDUIT PROPOSED NEW STRUCTURE PROPOSED NEW AERIAL STRAND FL FL EOP EOP ROW ROW S/W S/W U U U U P P TS TS C C T T S S SS SS D D DD DD G G OIL OIL ST ST W W UNK UNK EXISTING CONDUIT/INFRASTRUCTURE EXISTING AERIAL UTILITY POLE (EXIST / NEW) STREET LIGHT CROSS WALK SIGNAL SHRUBBERY TREE CATCH BASIN CATCH BASIN W/ SOCK MANHOLE UTILITY VALVE WATER METER UTILITY RISER (EXIST / NEW) CB CB V M CW SL R FIRE HYDRANTFH MH 17X30 VAULT 24X36 VAULT 36X48 VAULT 4X4 VAULT 25-TA VAULT 233-LA 444-LA 253-TA VAULT 35-TA VAULT UNK VAULT (SIZE MAY VARY) DH TH DOG HOUSE TIGER HOUSE P PEDESTAL EXISTING SPLICE CASE DISTANCE STATIONSTA 0+00 CONSTRUCTION NOTE CALLOUT# DISTANCE DIMENSION A # CROSS SECTION SYMBOL CROSS SECTION NAME CROSS SECTION PAGE WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT PHOTO LOCATOR/ORIENTATION CONCRETE ASPHALT CONCRETE PANELS LANDSCAPE LIMITS OF RESTORATION # NEW SPLICE CASE NEW STORAGE FOOTAGE NOTE FOOTAGE NOTE OVER(339') 339' MULTIPLE SHEETS CALLOUT GRAVEL BRICK/COBBLE 200' PARCEL LINES BOREPIT BOREPIT (SIZE MAY VARY) N S EW BUILDING OUTLINE UTILITY POTHOLE STREET SIGN NORTH ARROW LANE DIRECTION INDICATOR # POLE ANCHOR/GUY PROPOSED CROSSWALK R POLE # CALLOUT# CAB CABINET NEW COAX TAP BUS STOP LOCATION MFP22005770 353 1405 356 358 1407 1400 1411 333 1409359 344345 334335 355 337 345 353 340341 330329 351 350 329 347 336339 343 FACTORY PL NFACTORY AVE NMEADOW AVE NN 4TH ST N MARION ST N 4TH ST R25' V V 20' 275'225'3 2 1 V STREET PARKINGSTREET PARKINGCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 4 8 SCALE: 0 25'50' N S EW MFP22005770 EOPEOP320 1530 325 1525 325 1532 1655 1530 1544 353 333 1675 N 4TH ST HOUSER WAY NN MARION ST ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROW EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWEOPEOPEOPEOPEOP S/WSUNSET BLVD NV 500'EOPEOPEOPEOPEOPEOPEOPEOPEOP3 FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 5 8 SCALE: 0 25'50' N S EW MFP22005770 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP EOPEOPEOPEOPEOPEOPEOPEO P E O P 420 410 404 354 411 409 407 SUNSET BLVD NI-405 FWYROW ROWROWROWROW ROWROWROWROWROWROWROW ROWROWROWROWROW ROWROWROW ROWROWROWROW ROWROWROWROWROWROWROWEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEO P S/WS/WS/WS/WS/WS/W S/WS/W S/WS/WS/WS/W S/W FL FLFLFLFLFLFLFLFLFLFLFL GRANDEY WAY NEVEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPI-405 FWY430'V 3 FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 6 8 SCALE: 0 25'50' N S EW MFP22005770 EOP EOP EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPROWROW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLI-405 FWYFL FLFL FLFL FL FL FL FL FL FL FLFLHOUSER WAY NEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPHOUSER WAY BYPASSOFF RAMP560' 3 FLFL FL FLFL FL FL FL FL FL FLFLFLFLFLFLFLFL FL FLFL FL FL FL FL FL FL FLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 7 8 SCALE: 0 25'50' N S EW MFP22005770 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOP EOPEOP 501 510 509 470 473 551 478 466 469 505 529 474 SUNS E T B L V D N E GRA N D E Y W A Y N E ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ON RAMPO N R A M P FLFL FL FLFL FLFLFLFL EOP EOP EOP EOPE O P EOP EOPEOP ROWROWROWROWROW ROW ROWFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLI-405 FWYR 25' V 95' 124' 128' 105'62'64'4 6 5 4 3 2 1 3 2 OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:1 PSE 318191-166445 NEUTRAL 34 10 N/A SECONDARY 33 6 N/A COMCAST #1 24 9 N/A TELCO #1 23 2 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:2 PSE 318196-166457 NEUTRAL 33 7 N/A SECONDARY 33 2 N/A COMCAST #1 METAL ARM 22 10 N/A TELCO #1 20 10 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:3 PSE A1366439 NEUTRAL 35 1 N/A SECONDARY 31 4 N/A COMCAST #1 22 7 N/A TELCO #1 21 2 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:4 PSE 318207-166477 NEUTRAL 31 6 N/A SECONDARY 30 8 N/A COMCAST #1 METAL ARM 23 4 N/A TELCO #1 19 5 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:5 PSE 318212-166481 NEUTRAL 28 6 N/A COMCAST #1 23 10 N/A TELCO #1 21 6 N/A D N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:6 PSE 318219-166484 NEUTRAL 31 11 N/A SECONDARY 31 1 N/A COMCAST #1 25 1 N/A TELCO #1 20 5 N/A D N N N NFLFLFLFLFL CONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 8 8 SCALE: 0 25'50' N S EW MFP22005770 Cannon Construction LLC. 406 Porter Way Milton, WA 98354 11/15/2022 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JB0000588234-Strap To whom it may concern: Cannon Construction has been contracted to design and engineer this project on behalf of Comcast Cable Communications Management. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to – Tie into existing 288ct Coil. Proof and Pull (1) 288ct Fiber through existing riser. Proof and Pull 288ct Fiber through existing conduit. Overlash (1) 288ct Fiber on existing aerial strand at 529 Grandey Way NE Renton, WA 98056. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over-lash on existing plant will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand. 2. Risk of potential damage to underground facilities will be increased. 3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare. Comcast does agree to participate in future underground improvements for its proportionate share of the undergrounding costs, waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Chuck Schroeder - (253) 922-2787. Thank you for your consideration in this matter. David Standring Permit Coordinator Cannon Construction Inc. o 253-922-2787 | permitting@teamcannon.com January 13, 2023 David Standring Cannon Construction Inc. 4610 Tacoma Avenue, Sumner WA 98390 Via Email: Permitting@teamcannon.com SUBJECT: Request for Undergrounding Exemption (JB#588234, MFP22005770, 529 Grandey Way NE) Dear Mr. Standring: The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. Comcast proposes to have Cannon Construction Inc overlash new 288CT fiber for a total of approximately 483 lineal feet to existing Puget Sound Energy (PSE) poles along Sunset Blvd NE within the City. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720 grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below, through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton. Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are underground, Grantee shall place its Cable System’s distribution cables underground within that area; provided that such underground locations are actually capable of accommodating Grantee’s cable and other equipment without technical degradation of the Cable Systems’ signal quality. The proposal would utilize existing poles with other attached franchisee communication facilities and overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need to be provided for, any existing obsolete cable will need to be removed; staff recommends these as conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast franchise agreement which allows new overhead facilities to be placed overhead provided there are other similar providers overhead as well. Comcast is required to obtain all necessary private utility easements for work on private property. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with the Comcast Franchise Agreement. Comcast Job JB#588234 Page 2 of 2 January 13, 2023 Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, January 27, 2022. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-28.14 (and as amended), the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Sincerely, Brianne Bannwarth, PE Development Engineering Director cc: C.E. “Chip” Vincent, CED Administrator Justin Johnson, Construction Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Engineering Specialist III Franchise Permits Enclosures: Site Plan 4 5 6 7 8 PROJECT MAP: POLE INFORMATION: POLE COUNT = POLES THAT NEED PERMIT = POLES THAT NEED MAKE READY = TRANSMISSION = DISTRIBUTION = 7 6 0 0 6 CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 SITE ADDRESS: 529 Grandey Way NE Renton, WA 98056 CONTACTS: CANNON COMPANIES Alex Fox - (253) 359-6809 - afox@teamcannon.com COMCAST COMMUNICATION Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com SCOPE OF WORK: JB0000588234 T3D - WAKVD99100 1X2 OFF RN44C (4X4) SHEET INDEX 1 -COVER 2 -GENERAL NOTES 3 -LEGEND 4-8 -CONSTRUCTION PLAN - TIE INTO EXISTING 288CT COIL - PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER - PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT - OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND N S EW *ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER = TOTAL ROW FOOTAGE = FT. FT. FT. FT. FT. FT. ROW FOOTAGES*: NEW BUILDING PATHWAY = EXISTING BUILDING PATHWAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL SITE FOOTAGE = FT. FT. FT. FT. FT. SITE FOOTAGES*: TOTAL PROJECT FOOTAGE = FT. 0 483 0 2,105 (2)50 2,638 0 0 0 0 0 2,638 FT + 20% STORAGE = FT288CT FIBER 2,638 3,166 Node This permit is for Major construction work in the ROW and will be billed at an additional $150/HR for inspections. After hours and weekend work will be billed at $175/HR / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB GENERAL NOTES 2 8 SCALE: NO SCALE STANDARD 1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS. 2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811 3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES. 4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES. 5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM. 6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE. 7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS. 8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED. 11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED. 12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION. TRAFFIC CONTROL 1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS. 2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN. SITE PREPARATION 1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE. 2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE). 3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. TRENCH EXCAVATION AND BACKFILL 1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS. 2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. UTILITY DUCT 1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT. 2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION. 3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE. 4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED. CEMENT CONCRETE PAVEMENT 1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF EACH JURISDICTION. ASPHALT CONCRETE PAVEMENT 1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION. GRAVEL AREAS 1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION. SITE RESTORATION 1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES. 2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND WATERED IN TO ENSURE ITS SURVIVAL. 3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO CONSTRUCTION. WATER QUALITY 1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S WATER QUALITY STANDARDS 2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE. DIRECTIONAL BORING 1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS. 2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES. FIRE PROTECTION 1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT. 2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT. AERIAL INSTALLATION 1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS. 2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION. 3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN WHERE APPLICABLE. 4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION. / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB LEGEND 3 8 SCALE: NO SCALE MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS LANE LINE CENTER LINE / STATION LINE FOG LINE EDGE OF PAVEMENT RIGHT OF WAY SIDEWALK FENCE GUARD RAIL POWER TRAFFIC SIGNAL COMMUNICATION TELECOMMUNICATION SEWER MAIN SIDE SEWER DRAIN MAIN DRAINAGE DITCH GAS OIL STEAM WATER UNKNOWN UTILITY STRAW WATTLES TRAFFIC CONES PROPOSED NEW CONDUIT PROPOSED NEW STRUCTURE PROPOSED NEW AERIAL STRAND FL FL EOP EOP ROW ROW S/W S/W U U U U P P TS TS C C T T S S SS SS D D DD DD G G OIL OIL ST ST W W UNK UNK EXISTING CONDUIT/INFRASTRUCTURE EXISTING AERIAL UTILITY POLE (EXIST / NEW) STREET LIGHT CROSS WALK SIGNAL SHRUBBERY TREE CATCH BASIN CATCH BASIN W/ SOCK MANHOLE UTILITY VALVE WATER METER UTILITY RISER (EXIST / NEW) CB CB V M CW SL R FIRE HYDRANTFH MH 17X30 VAULT 24X36 VAULT 36X48 VAULT 4X4 VAULT 25-TA VAULT 233-LA 444-LA 253-TA VAULT 35-TA VAULT UNK VAULT (SIZE MAY VARY) DH TH DOG HOUSE TIGER HOUSE P PEDESTAL EXISTING SPLICE CASE DISTANCE STATIONSTA 0+00 CONSTRUCTION NOTE CALLOUT# DISTANCE DIMENSION A # CROSS SECTION SYMBOL CROSS SECTION NAME CROSS SECTION PAGE WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT PHOTO LOCATOR/ORIENTATION CONCRETE ASPHALT CONCRETE PANELS LANDSCAPE LIMITS OF RESTORATION # NEW SPLICE CASE NEW STORAGE FOOTAGE NOTE FOOTAGE NOTE OVER(339') 339' MULTIPLE SHEETS CALLOUT GRAVEL BRICK/COBBLE 200' PARCEL LINES BOREPIT BOREPIT (SIZE MAY VARY) N S EW BUILDING OUTLINE UTILITY POTHOLE STREET SIGN NORTH ARROW LANE DIRECTION INDICATOR # POLE ANCHOR/GUY PROPOSED CROSSWALK R POLE # CALLOUT# CAB CABINET NEW COAX TAP BUS STOP LOCATION 353 1405 356 358 1407 1400 1411 333 1409359 344345 334335 355 337 345 353 340341 330329 351 350 329 347 336339 343 FACTORY PL NFACTORY AVE NMEADOW AVE NN 4TH ST N MARION ST N 4TH ST R25' V V 20' 275'225'3 2 1 V STREET PARKINGSTREET PARKINGCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 4 8 SCALE: 0 25'50' N S EW EOPEOP320 1530 325 1525 325 1532 1655 1530 1544 353 333 1675 N 4TH ST HOUSER WAY NN MARION ST ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROW EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWEOPEOPEOPEOPEOP S/WSUNSET BLVD NV 500'EOPEOPEOPEOPEOPEOPEOPEOPEOP3 FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 5 8 SCALE: 0 25'50' N S EW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOP EOPEOPEOPEOPEOPEOPEOPEO P E O P 420 410 404 354 411 409 407 SUNSET BLVD NI-405 FWYROW ROWROWROWROW ROWROWROWROWROWROWROW ROWROWROWROWROW ROWROWROW ROWROWROWROW ROWROWROWROWROWROWROWEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEO P S/WS/WS/WS/WS/WS/W S/WS/W S/WS/WS/WS/W S/W FL FLFLFLFLFLFLFLFLFLFLFL GRANDEY WAY NEVEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPI-405 FWY430'V 3 FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 6 8 SCALE: 0 25'50' N S EW EOP EOP EOP EOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPROWROW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROW EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLI-405 FWYFL FLFL FLFL FL FL FL FL FL FL FLFLHOUSER WAY NEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPHOUSER WAY BYPASSOFF RAMP560' 3 FLFL FL FLFL FL FL FL FL FL FLFLFLFLFLFLFLFL FL FLFL FL FL FL FL FL FL FLFLFLFLFLFLFLCONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 7 8 SCALE: 0 25'50' N S EW EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOP EOPEOP 501 510 509 470 473 551 478 466 469 505 529 474 SUNS E T B L V D N E GRA N D E Y W A Y N E ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ON RAMPO N R A M P FLFL FL FLFL FLFLFLFL EOP EOP EOP EOPE O P EOP EOPEOP ROWROWROWROWROW ROW ROWFLFLFLFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPFLFLFLFL FLFLFLFLFLFLFLFLFLFLFLI-405 FWYR 25' V 95' 124' 128' 105'62'64'4 6 5 4 3 2 1 3 2 OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:1 PSE 318191-166445 NEUTRAL 34 10 N/A SECONDARY 33 6 N/A COMCAST #1 24 9 N/A TELCO #1 23 2 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:2 PSE 318196-166457 NEUTRAL 33 7 N/A SECONDARY 33 2 N/A COMCAST #1 METAL ARM 22 10 N/A TELCO #1 20 10 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:3 PSE A1366439 NEUTRAL 35 1 N/A SECONDARY 31 4 N/A COMCAST #1 22 7 N/A TELCO #1 21 2 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:4 PSE 318207-166477 NEUTRAL 31 6 N/A SECONDARY 30 8 N/A COMCAST #1 METAL ARM 23 4 N/A TELCO #1 19 5 N/A D N N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:5 PSE 318212-166481 NEUTRAL 28 6 N/A COMCAST #1 23 10 N/A TELCO #1 21 6 N/A D N N N OWNER: POLE#: - ATTACHMENTS - HEIGHT CLASS/HT: POLE TYPE: - MAKE READY - VIOLATION MID SPAN:6 PSE 318219-166484 NEUTRAL 31 11 N/A SECONDARY 31 1 N/A COMCAST #1 25 1 N/A TELCO #1 20 5 N/A D N N N NFLFLFLFLFL CONSTRUCTION NOTES: TIE INTO EXISTING 288CT COIL PROOF & PULL (1) 288CT FIBER THROUGH EXISTING RISER PROOF & PULL (1) 288CT FIBER THROUGH EXISTING CONDUIT OVERLASH (1) 288CT FIBER ON EXISTING AERIAL STRAND 1 2 3 4 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000588234T3D-WAKVD99100 2X4 OFF RN44C529 GRANDEY WAY NERENTON, WA 98056NODE17-050 10/22/2022 AF AB CONSTRUCTION PLAN 8 8 SCALE: 0 25'50' N S EW DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP22005770 Engineering 1 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. 2 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". 3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. Page 1 of 1