Loading...
HomeMy WebLinkAboutP_Plan_Drawings_Benson_Rd_S_Pole_Replacement_230406_v1AØAFR065BØAFR066CØAFR067AØAFR062BØAFR063CØAFR064S PUGET DRTALBOT RD S BRUSH CLEARNINGREQ'D FOR ACCESSCBA NVicinity MapN.T.S.Owner / Developer Contact InfoofficeATTN:PSE--KELLY ULICNY425-429-0949THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and proceduresand that all quality requirements are met.PHONECABLE TV11801240 101146281 N/A 593242777N/A N/AN/A N/AN/A N/AN/A 108134682PROJECT PHASEPWRNOTIF# ORDER#SuperiorOH Misc ExpenseUG Misc ExpenseOH Xfmr ExpenseUG Xfmr ExpenseRemovalDESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer Sect Gas Wk Ctr POWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENT MAOPGas Order Elect OrderSCALE PAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATE DESCRIPTIONBYCONTACT PHONE NO DATEOH CKT MAP CIRCUIT NOUG CKT MAPK. ULICNY 425-429-0949 10/13/22MS JEWELL 360-434-5315 10/13/22...S. MORALES 253-244-1200 10/13/22N/A RENTONGRA-25 REPL 1 POLEDISTRIBUTION POLE REPLACEMENT1400 TALBOT RD S, RENTON, WA 98055ASPLUNDH CONSTRUCTIONN/A N/AN/A 101146281AS NOTED 1 OF 1KING N/A N/A QCSOKENW20-T23N-R05E N/A N/A2305E078 2305E088 2305E078 GRA-25COMCAST...........E-Mail:Cell Phone:Project Manager Contact Information:Manager:KELLY ULICNY425-429-0949KELLY.ULICNY@PSE.COM.........101146281 GRA-25 REPL 1 POLEDISTRIBUTION POLE REPLACEMENTNoNoNoYesYesYes"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: 6" = 1 MILE POLE RETIREMENT TABLETEMP TRANSFERS ST. LIGHT TRANSFERSSITE#POLE DATA POLETEL TV FIBER TRAN RMVD ID NUMBERGRID # HEIGHT CLASS YEAR TOPPED RMVDP01 317326-166063 40 3 1958POLE TABLE (NEW)Site#Pole DataGrid #HeightClass Year Remarks / Location Ref.P01 317326-166063 45 1LEGENDCONDUIT RISEROVERHEAD TRANSFORMERJUNCTION VAULT/JUNCTION BOXNEW CONDUCTOR AND OR TRENCH LINEDISCONNECT - FUSEDPULL VAULT OR SPLICE VAULTEXISTING POLEDOWN GUYDISCONNECT - UNFUSEDNEW POLEPADMOUNT TRANSFORMERSECONDARY HANDHOLEEXISTING CONDUCTOR TO BE REMOVEDOR ABANDONEDSTREET LIGHTTOTAL UNDERGROUND TRANSFORMERENERGY CUSTOMER DEMAND POINTOROROROVERHEAD JUMPER CONNECTIONSITE 1S PUGET DR P01: 317326-166063BRUSH REMOVAL REQ'DGRID # MISSING IN FIELD-EX 40' CL 3, 1958 POLE TO BE REPLACED-INST 45' CL 1 (PD451) 6010.1000-DEEP SET +2' DUE TO SLOPE-INST 3Ø DE 336ACSR (DE3315) (E) 6033.1042-INST 3Ø SLACK SPAN 336ACSR (SSF313) (W) 6033.5010-TRANSFER 3Ø 336 ACSR PRI & 4/0 NEUT (E/W)-ROLL NEUT TO COMMON POSITION-RM EX DG (E)-INST 24" PLATE ANC (ANDP24) 6012.1000 (30', E)-INST 7/16” DBL PR & 3/8” NEUT DG (GYDD71A) (GYD3SAN) 6013.1000 TO NEW ANC-TOP POLE ABOVE COMM-REMOVE POLE STUB AFTER COMM HAS TRANSFERREDSITE PLAN 11" = 50'General- Return removed materials to the local storeroom or PSE storeroom.OVERHEAD CONSTRUCTIONPoles & Structures- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurementsare from the roadside face of the pole.- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole thanspecified.- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification6014.1000 at new gang operated switch locations.- Install grid numbers on all new and existing poles as shown on sketch.- Straighten existing poles as indicated or as necessary.- Treat all field-drilled poles with copper napthenate wood preservative.- Remove old poles after communication companies have transferred off and return to PSE storeroom. Filland crown pole holes and restore area similar to adjacent landscaping.Conductors & Equipment- Transfer all overhead and underground primary, secondary and service conductors and guys to new polesset, unless otherwise indicated on this sketch.- Transfer existing transformers to new poles unless otherwise indicated on this sketch.- Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sitesbeing worked within the scope of the project where they are currently missing.- For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SDaluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers withpreformed helical grip ties.- Apply avian protection devices when required per Standard 6015.2000.- Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.- Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.- All neutral connections to be made with solid compression connectors. Connect all pole grounds tocommon neutral.- Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fusedprotection above 40T.- Install Wildlife Protectors on all transformers..MORAL10/14/2210/14/222-812-10A2-129