1. PROJECT OVERVIEW
The original Greenleaf project is a 34-lot plat located on the west side of 108th Ave SE, just
north of SE 192nd St, in the City of Renton, WA. The proposed Greenleaf 2 project is an
extension of the original project, consisting of a 3-lot short plat on parcel 3223059088,
north of SE 188th Street, on 0.53 acres. See Figure 1.1 for the Greenleaf Vicinity Map.
Structures on the existing site have been demolished and the parcel is generally grassed
with trees. The existing site is moderately sloped at approximately 5 percent sloping
generally to the southwest. See Figure 1.2 for the Existing Site Conditions.
The Greenleaf 2 0.53 acre project site consists of 3 residential lots that will have new
single-family dwelling units. 31 lots were developed under a previously approved permit,
and 3 lots were added later. For access, the original project created a new intersection off
108th Ave SE at the northeast corner of the project site. There is also an access point to
108th Ave SE created at the midpoint of the project site, through an access easement of
the adjoining property. The Greenleaf 2 project will access off of this second access point
to 108th Ave SE, now called SE 188th Street. See Figure 1.3 for the Proposed Site
Conditions.
According to the Geotech Report prepared by Earth Solutions NW and the Summary Letter
for Greenleaf 2, the overall site is underlain primarily by native soils consisting of dense
glacial till and silty sand with gravel. Additionally, according to the USDA NRCS soil
mapping service, the entire site is underlain by Alderwood Gravelly Sandy Loam (a till soil),
which varies from 5-30%. See Figure 1.4 for the Soils Map.
A stormwater detention pond located in the southwest portion of the overall site was
previously approved to meet the overall project’s stormwater detention requirements. The
detention pond was designed with a factor of safety and has sufficient capacity to
accommodate the proposed Greenleaf 2 project. See Section 4 for more information.
For the 3 residential lots, 3 driveways are required, with a total pollution generating
impervious area of 608 square feet. A Kristar Perk Filter vault that follows the detention
pond treats the original Greenleaf project and has sufficient capacity to treat the additional
area. The detention pond/Kristar Perk Filter discharges to the west to Panther Creek, a well
defined stream.
Based on the City of Renton’s Flow Control Application Map, the project site is in the Flow
Control Duration Standard (Forested Conditions) area. The overall project will be subject
to Full Drainage Review per the City of Renton 2009 Surface Water Design Manual
Amendments and the 2009 King County Surface Water Design Manual (2009 KCSWDM).
The City of Renton 2009 Surface Water Design Manual Amendment and the 2009
KCSWDM will collectively be referred to as the “2009 Surface Water Design Manual”.
2-1
2. CONDITIONS AND REQUIREMENTS SUMMARY
Review of the 8 Core Requirements and 6 Special Requirements
This section describes how the project will meet the 2009 Surface Water Design Manual’s
Core and Special Requirements.
Core Requirement No. 1 Discharge at the Natural Location
In the existing conditions, the site drains to the west, towards Panther Creek. The original
project’s detention pond discharges to the west corner of the site, which is the natural
discharge location for the project site.
Core Requirement No. 2 Off-site Analysis
A Level 1 Downstream Analysis was performed by ESM on September 19, 2013 for the
original project, which also applies to the proposed Greenleaf 2 project. See Section 3 for
the offsite analysis.
Core Requirement No. 3 Flow Control
Based on the City of Renton’s Flow Control Application Map, the project site is in the Flow
Control Duration Standard (Forested Conditions) area. See Section 4 for Flow Control
Analysis and Calculations.
Core Requirement No. 4 Conveyance System
The stormwater drainage conveyance system has been sized to convey the 25 year
design storm event and to contain the 100 year design storm event as part of the original
Greenleaf project. The existing conveyance system has sufficient capacity to
accommodate the proposed Greenleaf 2 project. See Section 5 and Appendix A.
Core Requirement No. 5 Erosion and Sediment Control
Erosion and sediment controls will be provided to prevent, to the maximum extent
possible, the transport of sediment from the project site to downstream drainage facilities,
water resources, and adjacent properties. The Temporary Erosion and Sedimentation
Control (TESC) plan for the Greenleaf 2 project shows silt fence and a construction
entrance to maintain erosion and sediment control.
Core Requirement No. 6 Maintenance and Operations
The Operations and Maintenance Manual for the overall project is provided in Appendix D.
Core Requirement No. 7 Financial Guarantees and Liability
All drainage facilities constructed for the project comply with the financial guarantee
requirements is provided in the City of Renton Bond Quantities Worksheet in Section 9 of
this report.
Core Requirement No. 8 Water Quality
For the 3 residential lots, 3 driveways are required, with a total pollution generating
impervious area of 608 square feet. A Kristar Perk Filter vault that follows the detention
pond treats the original Greenleaf project and has sufficient capacity to treat the additional
area. See Section 4 for more information.
4-5
4.5 Water Quality Facility
For the 3 residential lots, 3 driveways are required, with a total pollution generating
impervious area of 608 square feet (0.014 acres). A Kristar Perk Filter vault that follows the
detention pond treats the original Greenleaf project using a 2 year storm treatment release
rate of 0.202 cfs. The additional pollution generating impervious area results in a 2 year
storm treatment release rate of 0.004 cfs, for a total treatment release rate of 0.2024 cfs. The
Kristar Perk Filter treatment flowrate provided is 0.33 cfs, which is adequate to the additional
3 lots. The rooftops, patios, landscaped areas and sidewalk are considered clean runoff.
In summary, the proposed Greenleaf 2 project does not require additional water quality
treatment.
greenleaf2.pks
Flow Frequency Analysis
Time Series File:greenleaf2.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.003 7 10/10/00 3:00 0.007 1 100.00 0.990
0.003 8 1/05/02 16:00 0.005 2 25.00 0.960
0.004 3 12/08/02 18:00 0.004 3 10.00 0.900
0.004 6 8/26/04 2:00 0.004 4 5.00 0.800
0.004 4 10/28/04 16:00 0.004 5 3.00 0.667
0.004 5 1/18/06 16:00 0.004 6 2.00 0.500
0.005 2 10/26/06 0:00 0.003 7 1.30 0.231
0.007 1 1/09/08 6:00 0.003 8 1.10 0.091
Computed Peaks 0.006 50.00 0.980
Page 1
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name:Date:
Location:Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
Clearing greater than or equal to 5,000 board feet of timber? profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
_____________yes __________________no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Greenleaf 2
18661 108th Avenue SE, Renton, WA
For alternate formats, call 206-296-6600.
__________________
5/19/2016
bondquantityworksheet.xls
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Unit # of
Reference #Price Unit Quantity Applications Cost
EROSION/SEDIMENT CONTROL Number
Backfill & compaction-embankment ESC-1 6.00$CY 260 1 1560
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$Each
Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3)95.00$CY
Ditching ESC-4 9.00$CY
Excavation-bulk ESC-5 2.00$CY
Fence, silt ESC-6 SWDM 5.4.3.1 1.50$LF 430 1 645
Fence, Temporary (NGPE)ESC-7 1.50$LF
Hydroseeding ESC-8 SWDM 5.4.2.4 0.80$SY 800 1 640
Jute Mesh ESC-9 SWDM 5.4.2.2 3.50$SY
Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 2.50$SY
Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 2.00$SY
Piping, temporary, CPP, 6"ESC-12 12.00$LF
Piping, temporary, CPP, 8"ESC-13 14.00$LF
Piping, temporary, CPP, 12"ESC-14 18.00$LF
Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 4.00$SY
Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2)45.00$CY
Rock Construction Entrance, 50'x15'x1'ESC-17 SWDM 5.4.4.1 1,800.00$Each 1 1 1800
Rock Construction Entrance, 100'x15'x1'ESC-18 SWDM 5.4.4.1 3,200.00$Each
Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 2,200.00$Each
Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 19.00$LF
Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 70.00$LF
Seeding, by hand ESC-22 SWDM 5.4.2.4 1.00$SY
Sodding, 1" deep, level ground ESC-23 SWDM 5.4.2.5 8.00$SY
Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 10.00$SY
TESC Supervisor ESC-25 110.00$HR
Water truck, dust control ESC-26 SWDM 5.4.7 140.00$HR
WRITE-IN-ITEMS **** (see page 9)
Each
ESC SUBTOTAL:4,645.00$
30% CONTINGENCY & MOBILIZATION:1,393.50$
ESC TOTAL:6,038.50$
COLUMN:A
Page 2 of 9
bondquantityworksheet.xls
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-Way Right of Way Improvements
Unit Price Unit Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS No.
Backfill & Compaction- embankment GI - 1 6.00$CY 260 1,560.00
Backfill & Compaction- trench GI - 2 9.00$CY
Clear/Remove Brush, by hand GI - 3 1.00$SY
Clearing/Grubbing/Tree Removal GI - 4 10,000.00$Acre
Excavation - bulk GI - 5 2.00$CY 510 1,020.00
Excavation - Trench GI - 6 5.00$CY
Fencing, cedar, 6' high GI - 7 20.00$LF
Fencing, chain link, vinyl coated, 6' high GI - 8 20.00$LF
Fencing, chain link, gate, vinyl coated, 20'GI - 9 1,400.00$Each
Fencing, split rail, 3' high GI - 10 15.00$LF
Fill & compact - common barrow GI - 11 25.00$CY
Fill & compact - gravel base GI - 12 27.00$CY
Fill & compact - screened topsoil GI - 13 39.00$CY
Gabion, 12" deep, stone filled mesh GI - 14 65.00$SY
Gabion, 18" deep, stone filled mesh GI - 15 90.00$SY
Gabion, 36" deep, stone filled mesh GI - 16 150.00$SY
Grading, fine, by hand GI - 17 2.50$SY
Grading, fine, with grader GI - 18 2.00$SY 2500 5,000.00
Monuments, 3' long GI - 19 250.00$Each
Sensitive Areas Sign GI - 20 7.00$Each
Sodding, 1" deep, sloped ground GI - 21 8.00$SY
Surveying, line & grade GI - 22 850.00$Day
Surveying, lot location/lines GI - 23 1,800.00$Acre
Traffic control crew ( 2 flaggers )GI - 24 120.00$HR
Trail, 4" chipped wood GI - 25 8.00$SY
Trail, 4" crushed cinder GI - 26 9.00$SY
Trail, 4" top course GI - 27 12.00$SY
Wall, retaining, concrete GI - 28 55.00$SF
Wall, rockery GI - 29 15.00$SF
Page 3 of 9 SUBTOTAL 7,580.00
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public
Right-of-way Right of Way Improvements
Unit Price Unit Quant.Cost Quant.Cost Quant.Cost
ROAD IMPROVEMENT No.
AC Grinding, 4' wide machine < 1000sy RI - 1 30.00$SY
AC Grinding, 4' wide machine 1000-2000syRI - 2 16.00$SY
AC Grinding, 4' wide machine > 2000sy RI - 3 10.00$SY
AC Removal/Disposal RI - 4 35.00$SY
Barricade, type III ( Permanent )RI - 6 56.00$LF
Curb & Gutter, rolled RI - 7 17.00$LF
Curb & Gutter, vertical RI - 8 12.50$LF 82 1,025.00
Curb and Gutter, demolition and disposal RI - 9 18.00$LF 28 504.00
Curb, extruded asphalt RI - 10 5.50$LF
Curb, extruded concrete RI - 11 7.00$LF
Sawcut, asphalt, 3" depth RI - 12 1.85$LF
Sawcut, concrete, per 1" depth RI - 13 3.00$LF
Sealant, asphalt RI - 14 2.00$LF
Shoulder, AC, ( see AC road unit price ) RI - 15 -$SY
Shoulder, gravel, 4" thick RI - 16 15.00$SY
Sidewalk, 4" thick RI - 17 38.00$SY 160 6,080.00
Sidewalk, 4" thick, demolition and disposal RI - 18 32.00$SY
Sidewalk, 5" thick RI - 19 41.00$SY
Sidewalk, 5" thick, demolition and disposal RI - 20 40.00$SY
Sign, handicap RI - 21 85.00$Each
Striping, per stall RI - 22 7.00$Each
Striping, thermoplastic, ( for crosswalk ) RI - 23 3.00$SF
Striping, 4" reflectorized line RI - 24 0.50$LF
Page 4 of 9 SUBTOTAL 7,609.00
Private
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant.Cost Quant.Cost Quant.Cost
ROAD SURFACING No. (4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing RS - 1 3.60$SY
HMA 1/2" Overlay, 1.5"RS - 2 14.00$SY
HMA 1/2" Overlay 2"RS - 3 18.00$SY
HMA Road, 2", 4" rock, First 2500 SY RS - 4 28.00$SY
HMA Road, 2", 4" rock, Qty. over 2500 SY RS - 5 21.00$SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY RS - 6 35.00$SY
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SYRS - 7 42.00$SY
Not Used RS - 8
Not Used RS - 9
HMA Road, 6" Depth, First 2500 SY RS - 10 33.10$SY
HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 30.00$SY
HMA 3/4" or 1", 4" Depth RS - 12 20.00$SY
Gravel Road, 4" rock, First 2500 SY RS - 13 15.00$SY
Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 10.00$SY
PCC Road (Add Under Write-Ins w/Design)RS - 15
Thickened Edge RS - 17 8.60$LF
Page 5 of 9 SUBTOTAL
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent)
Access Road, R/D D - 1 21.00$SY
Bollards - fixed D - 2 240.74$Each
Bollards - removable D - 3 452.34$Each
* (CBs include frame and lid)
CB Type I D - 4 1,500.00$Each
CB Type IL D - 5 1,750.00$Each
CB Type II, 48" diameter D - 6 2,300.00$Each
for additional depth over 4'D - 7 480.00$FT
CB Type II, 54" diameter D - 8 2,500.00$Each
for additional depth over 4'D - 9 495.00$FT
CB Type II, 60" diameter D - 10 2,800.00$Each
for additional depth over 4'D - 11 600.00$FT
CB Type II, 72" diameter D - 12 3,600.00$Each
for additional depth over 4'D - 13 850.00$FT
Through-curb Inlet Framework (Add)D - 14 400.00$Each
Cleanout, PVC, 4"D - 15 150.00$Each
Cleanout, PVC, 6"D - 16 170.00$Each 3 510.00
Cleanout, PVC, 8"D - 17 200.00$Each
Culvert, PVC, 4"D - 18 10.00$LF
Culvert, PVC, 6"D - 19 13.00$LF 60 780.00
Culvert, PVC, 8"D - 20 15.00$LF
Culvert, PVC, 12"D - 21 23.00$LF
Culvert, CMP, 8"D - 22 19.00$LF
Culvert, CMP, 12"D - 23 29.00$LF
Culvert, CMP, 15"D - 24 35.00$LF
Culvert, CMP, 18"D - 25 41.00$LF
Culvert, CMP, 24"D - 26 56.00$LF
Culvert, CMP, 30"D - 27 78.00$LF
Culvert, CMP, 36"D - 28 130.00$LF
Culvert, CMP, 48"D - 29 190.00$LF
Culvert, CMP, 60"D - 30 270.00$LF
Culvert, CMP, 72"D - 31 350.00$LF
Page 6 of 9 SUBTOTAL 1,290.00
& Drainage Facilities
For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
DRAINAGE CONTINUED
No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost
Culvert, Concrete, 8"D - 32 25.00$LF
Culvert, Concrete, 12"D - 33 36.00$LF
Culvert, Concrete, 15"D - 34 42.00$LF
Culvert, Concrete, 18"D - 35 48.00$LF
Culvert, Concrete, 24"D - 36 78.00$LF
Culvert, Concrete, 30"D - 37 125.00$LF
Culvert, Concrete, 36"D - 38 150.00$LF
Culvert, Concrete, 42"D - 39 175.00$LF
Culvert, Concrete, 48"D - 40 205.00$LF
Culvert, CPP, 6"D - 41 14.00$LF
Culvert, CPP, 8"D - 42 16.00$LF
Culvert, CPP, 12"D - 43 24.00$LF
Culvert, CPP, 15"D - 44 35.00$LF
Culvert, CPP, 18"D - 45 41.00$LF
Culvert, CPP, 24"D - 46 56.00$LF
Culvert, CPP, 30"D - 47 78.00$LF
Culvert, CPP, 36"D - 48 130.00$LF
Ditching D - 49 9.50$CY
Flow Dispersal Trench (1,436 base+)D - 50 28.00$LF
French Drain (3' depth)D - 51 26.00$LF
Geotextile, laid in trench, polypropylene D - 52 3.00$SY
Mid-tank Access Riser, 48" dia, 6' deep D - 54 2,000.00$Each
Pond Overflow Spillway D - 55 16.00$SY
Restrictor/Oil Separator, 12"D - 56 1,150.00$Each
Restrictor/Oil Separator, 15"D - 57 1,350.00$Each
Restrictor/Oil Separator, 18"D - 58 1,700.00$Each
Riprap, placed D - 59 42.00$CY
Tank End Reducer (36" diameter)D - 60 1,200.00$Each
Trash Rack, 12"D - 61 350.00$Each
Trash Rack, 15"D - 62 410.00$Each
Trash Rack, 18"D - 63 480.00$Each
Trash Rack, 21"D - 64 550.00$Each
Page 7 of 9 SUBTOTAL
& Drainage Facilities
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Existing Future Public Private
Right-of-way Right of Way Improvements
Unit Price Unit Quant.Price Quant.Cost Quant.Cost
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow PL - 1 21.00$SY NA NA
2" AC, 1.5" top course & 2.5" base coursePL - 2 28.00$SY NA NA
4" select borrow PL - 3 5.00$SY NA NA
1.5" top course rock & 2.5" base course PL - 4 14.00$SY NA NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation UP-1
Street Light Poles w/Luminaires UP-2 Each
WRITE-IN-ITEMS
(Such as detention/water quality vaults.)No.
WI - 1 Each
WI - 2 SY
WI - 3 CY
WI - 4 LF
WI - 5 FT
WI - 6
WI - 7
WI - 8
WI - 9
WI - 10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):7,609.00 8,870.00
30% CONTINGENCY & MOBILIZATION:2,282.70 2,661.00
GRANDTOTAL:9,891.70 11,531.00
COLUMN:B C D
Page 8 of 9
Lump Sum
& Drainage Facilities
Not To Be Used For Roads Or Shoulders
*KCC 27A authorizes only one bond reduction.
bondquantityworksheet.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name:Date:
PE Registration Number:Tel. #:
Firm Name:
Address:Project No:
Stabilization/Erosion Sediment Control (ESC)(A)
Existing Right-of-Way Improvements (B)
Future Public Right of Way & Drainage Facilities (C)
Private Improvements (D)
Calculated Quantity Completed
Total Right-of Way and/or Site Restoration Bond*/**(A+B)
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL (T)T x 0.30
Minimum is $2000.Minimum is $2000.
Maintenance/Defect Bond* Total
Minimum is $2000.
NAME OF PERSON PREPARING BOND* REDUCTION:Date:
* NOTE:The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE:KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off-site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE:Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
5/19/2016
(253) 838-6113
FINANCIAL GUARANTEE REQUIREMENTS
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
Laura Bartenhagen, P.E.
ESM Consulting Engineers, LLC
33400 8th Avenue South, Suite 205, Federal Way, WA 98003
PERFORMANCE BOND*
AMOUNT
40111
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
2/15/2016
2,472.9$
Laura Bartenhagen, P.E.
6,038.5$
-$
9,891.7$
8,238.4$
(B+C) x
0.25 =
6,038.5$
11,531.0$
27,461.2$
Page 9 of 9
bondquantityworksheet.xls
Check out the DDES Web site at www.kingcounty.gov/permits
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/19/2016