Loading...
HomeMy WebLinkAboutContractSMALL PUBLIC WORKS CONTRACT AGREEMENT 2023 Maple Valley Highway Roadside Tree Work THIS AGREEMENT (“Agreement”) is made as of the _____ day of ________, 2023, (the “Effective Date”) by and between the City of Renton, a non-charter code city under RCW 35A, and a Washington municipal corporation (“City”), Parks and Recreation Department and Trelstad Tree, LLC, (“Contractor”), who are collectively referred to as the “Parties”. City and Contractor agree as set forth below. 1.Scope of Work : Contractor will provide all material and labor necessary to perform all work described in the Scope of Work which is attached and fully incorporated into this Agreement by reference as Attachment “A.” 2.Changes in Scope of Work: City, without invalidating this Agreement, may order changes to the Scope of Work consisting of additions, deletions or modifications, the Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes in the work shall be authorized by written Change Order or Amendment signed by the Parties. 3.Time of Performance: Contractor shall commence performance of the Agreement no sooner than June 29,2023. 4.Term of Agreement: The Term of this Agreement shall end at completion of the Scope of Work, no later than August 25, 2023. This Agreement may be extended to accomplish change orders, if required, upon mutual written agreement of City and Contractor. 5.Agreement Sum: The total amount of this Agreement is the sum of $49,545.00 which includes Washington State Sales Tax. This amount may be adjusted to a mutually agreed amount based on changes to the Scope of Work. 6.Consideration: In exchange for Contractor’s performance of the items and responsibilities identified in the Scope of Work, City agrees to make payment of the amount identified as the Agreement Sum. 7.Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the Work will only be made after the Work has been performed and a voucher or invoice is submitted in a form acceptable to the City. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 30th May CAG-23-207 PAGE 2 OF 11 A.Prevailing Wage Rates: Contractor must comply with the State of Washington prevailing wage requirements. Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project and an Affidavit of Wages Paid at the end of the project with the Washington State Department of Labor and Industries. The State of Washington prevailing wage rates applicable for this project, which is located in King County, may be found at the following website address of the Department of Labor and Industries: http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant to WAC 296-127-011, the applicable effective date for prevailing wage rates paid for the duration of this contract shall be the date the contract is executed as reflected in the “Effective Date” identified at the top of the first page of this Agreement. Upon request, the City will provide a copy of the applicable prevailing wages for this project. Alternatively, the rates may be viewed at the City of Renton City Hall by making an appointment with the contact person identified herein or prior to contract award with the contact person identified as the City of Renton contact in Paragraph 15 Notices of this agreement. B.Retainage held by the City or in Escrow Account: Pursuant to RCW Chapter 60.28, a sum equal to five percent (5%) of the monies earned by the Contractor will be retained from payments made by the City to the Contractor under this Contract. This retainage shall be used as a trust fund for the protection and payment (1) to the State with respect to taxes imposed pursuant to RCW Title 82 and (2) the claims of any person arising under the Contract. Monies retained under the provisions of RCW Chapter 60.28 shall be: Contractor must pick one – if contractor does not pick one then the first option (retainage held in a fund by the City) applies. _______ Retained in a fund by the City. or ________ Deposited by the City in an escrow (interest-bearing) account in a bank, mutual saving bank, or savings and loan association (interest on monies so retained shall be paid to the Contractor). Deposits are to be in the name of the City and are not to be allowed to be withdrawn without the City’s written authorization. The City will issue a check representing the sum of the monies DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 3 OF 11 reserved, payable to the bank or trust company. Such check shall be converted into bonds and securities chosen by the Contractor as the interest accrues. At or before the time the Contract is executed, the Contractor shall designate the option desired. The Contractor in choosing option (2) agrees to assume full responsibility to pay all costs that may accrue from escrow services, brokerage charges or both, and further agrees to assume all risks in connection with the investment of the retained percentages in securities. The City may also, at its option, accept a bond in lieu of retainage. C.For Agreements over $150,000: Pursuant to RCW 60.28 and 39.08 The City requires a 5 % Retainage be withheld and that the Contractor will provide a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. D.For Agreements under $150,000 Pursuant to RCW 60.28 and 39.08 the City requires a 5 % Retainage be withheld and that the Contractor will provide either a Performance and Payment (Contract) Bond on the City approved form upon execution of the Agreement or waive the payment and performance bond and instead the City will retain 10%. Payment of the initial 95% will be made in the next pay cycle of the Renton Finance Department after receipt of such voucher or invoice (pay cycles are bi-weekly). The remaining 5% will be retained for the purpose of completion of the project and fulfillment of claims and liens. (Unless the Contractor waives the payment and performance bond below and opts for a 10% retainage below.) Contractor must pick one – if contractor does not pick one then the first option (5% retainage with contract bond) applies: _______ To provide a payment and performance bond (contract bond) in the amount of 100% of the estimate including taxes with a 5% retainage. or _______ To waive a payment and performance bond (contract bond) and instead the city will retain the remaining 10% will be retained for the purpose of completion of the project and fulfillment of claims and liens. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 4 OF 11 E.For limited Public Works Contracts under $50,000. For limited public works projects, the City may choose to waive the payment and performance bond requirements of chapter 39.08 RCW and the retainage requirements of chapter 60.28 RCW, for laborers, mechanics, subcontractors, materialpersons, suppliers, and taxes imposed under Title 82 RCW that may be due from the contractor for the limited public works project, however The City shall have the right of recovery against the contractor for any payments made on the contractor's behalf. F.City shall have the right to withhold payment to Contractor for any work not completed in a satisfactory manner until such time as Contractor modifies such work so that the same is satisfactory. G.Final Acceptance. Final Acceptance of the Project occurs when the Public Works Director has determined that the Project is one hundred percent (100%) complete and has been constructed in accordance with the Plans and Specifications. H.Payment in the Event of Termination. In the event this Contract is terminated by the either party, the Contractor shall not be entitled to receive any further amounts due under this Contract until the work specified in the Scope of Work is satisfactorily completed, as scheduled, up to the date of termination. At such time, if the unpaid balance of the amount to be paid under the Contract exceeds the expense incurred by the City in finishing the work, and all damages sustained by the City or which may be sustained by the City or which may be sustained by the reason of such refusal, neglect, failure or discontinuance of Contractor performing the work, such excess shall be paid by the City to the Contractor. If the City’s expense and damages exceed the unpaid balance, Contractor and his surety shall be jointly and severally liable therefore to the City and shall pay such difference to the City. Such expense and damages shall include all reasonable legal expenses and costs incurred by the City to protect the rights and interests of the City under the Contract. 8.Hold Harmless: Contractor shall indemnify, defend and hold harmless City, its elected officials, officers, agents, employees and volunteers, from and against any and all claims, losses or liability, or any portion of the same, including but not limited to reasonable attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons, including injuries, sickness, disease or death of Contractor’s own employees, agents and volunteers, or damage to property caused by Contractor’s negligent act or omission, except for those acts caused by or resulting from a negligent act or omission by City and its officers, agents, employees and volunteers. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 5 OF 11 construction, alteration, improvement, etc., of structure or improvement attached to real estate…) then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the contractor and City, its officers, officials, employees and volunteers, Contractor’s liability shall be only to the extent of Contractor’s negligence. It is further specifically and expressly understood that the indemnification provided in this Agreement constitute Contractor’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Insurance: Contractor shall secure and maintain: A.Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B.Professional liability insurance, in the minimum amount of $1,000,000 for each occurrence, shall also be secured for any professional services being provided to City that are excluded in the commercial general liability insurance. C.Workers’ compensation coverage, as required by the Industrial Insurance laws of the State of Washington, shall also be secured. D.It is agreed that on Contractor’s commercial general liability policy, the City of Renton will be named as an Additional Insured on a non-contributory primary basis. City’s insurance policies shall not be a source for payment of any Contractor liability. E.Subject to City’s review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to City before executing the work of this Agreement. F.Contractor shall provide City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. G.Additional Insurance if marked as “Required” by City: 1.☐ Required. Builders Risk insurance covering interests of the City, the Contractor, Subcontractors, and Sub-contractors in the work. Builders Risk insurance shall be on a special perils policy form and shall insure against the perils of fire and extended coverage and physical loss or damage including flood, earthquake, theft, vandalism, malicious mischief, and collapse. The Builders Risk insurance shall include coverage for temporary buildings, debris removal and damage to materials in transit or stored off- DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 6 OF 11 site. This Builders Risk insurance covering the work will have a deductible of $5,000 for each occurrence, which will be the responsibility of the Contractor. Higher deductibles for flood and earthquake perils may be accepted by the City upon written request by the Contractor and written acceptance by the City. Any increased deductibles accepted by the City will remain the responsibility of the Contractor. The Builders Risk insurance shall be maintained until final acceptance of the work by the City. 2.☐ Required. Contractors Pollution Liability insurance covering losses caused by pollution conditions that arise from the operations of the Contractor. Contractors Pollution Liability insurance shall be written in an amount of at least $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Contractors Pollution Liability shall cover bodily injury, property damage, cleanup costs and defense including costs and expenses incurred in the investigation, defense, or settlement of claims. If the Contractors Pollution Liability insurance is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this contract; and that continuous coverage will be maintained or an extended discovery period will be exercised for a period of three (3) years beginning from the time that work under the contract is completed. The City shall be named by endorsement as an additional insured on the Contractors Pollution Liability insurance policy. If the scope of services as defined in this contract includes the disposal of any hazardous materials from the job site, the Contractor must furnish to the City evidence of Pollution Liability insurance maintained by the disposal site operator for losses arising from the insured facility accepting waste under this contract. Coverage certified to the Public Entity under this paragraph must be maintained in minimum amounts of $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Pollution Liability coverage at least as broad as that provided under ISO Pollution Liability-Broadened Coverage for Covered Autos Endorsement CA 99 48 shall be provided and the Motor Carrier Act Endorsement (MCS 90) shall be attached. 10.Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Contractor agrees as follows: DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 7 OF 11 A.Contractor, and Contractor’s agents, employees, representatives, and volunteers with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B.The Contractor will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C.If Contractor fails to comply with any of this Agreement’s non-discrimination provisions, City shall have the right, at its option, to cancel the Agreement in whole or in part. D.Contractor is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws and worker's compensation. 11.Independent Contractor: Contractor’s employees, while engaged in the performance of any of Contractor’s Work under this Agreement, shall be considered employees of the Contractor and not employees, agents, representatives of City and as a result, shall not be entitled to any coverage or benefits from the City of Renton. Contractor’s relation to City shall be at all times as an independent contractor. Any and all Workman’s Compensation Act claims on behalf of Contractor employees, and any and all claims made by a third-party as a consequence of any negligent act or omission on the part of Contractor’s employees, while engaged in Work provided to be rendered under this Agreement, shall be the solely Contractor’s obligation and responsibility. 12.City of Renton Business License: The Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 8 OF 11 Information regarding acquiring a city business license can be found at: http://www.rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=9824882 Information regarding State business licensing requirements can be found at: http://dor.wa.gov/doing-business/register-my-business 13.Record Keeping and Reporting: Contractor shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement. The Contractor agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and charges and/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). 14.Public Records Compliance. To the full extent the City determines necessary to comply with the Washington State Public Records Act, Contractor shall make a due diligent search of all records in its possession, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Contractor believes said records need to be protected from disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor shall indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim or litigation related to a Public Records Act request for which Contractor has responsive records and for which Contractor has withheld records or information contained therein, or not provided them to the City in a timely manner. Contractor shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. 15.Other Provisions: A.Administration and Notices. Each individual executing this Agreement on behalf of City and Contractor represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of City or Contractor. Notice: Except for Service of Process in a legal proceeding, any notices required to be given by the Parties shall be delivered at the addresses set forth below. Any notices may be delivered personally to the addressee of the notice or may be deposited in the United States mail, postage prepaid, to the address set forth below. Any notice so posted in the United States mail shall be deemed received three (3) calendar days after the date of mailing. Email notice will be deemed received the date of the email so long as sent before 12:00 noon on a business day, if after 12:00 Noon it will be deemed received the next business day – a copy of email notice must be mailed as set forth above. This Agreement shall be administered by and any notices should be sent to the undersigned individuals or their designees. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 PAGE 9 OF 11 CITY OF RENTON Ian Gray - Urban Forestry City of Renton 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-6601 Email: igray@rentonwa.gov CONTRACTOR Bruce Trelstad Trelstad Tree, LLC PO Box 1167 Maple Valley, WA 98038 Phone: 206-793-6658 Email: trelstadent@gmail.com And to: City Clerk cityclerk@rentonwa.gov B.Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. C.Assignment and Subcontract. Contractor shall not assign or subcontract any portion of this Agreement without the City of Renton’s prior express written consent. D.Compliance with Laws. Contractor and all of the Contractor’s employees shall perform the Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. A copy of this language must be made a part of any contractor or subcontractor agreement. E.Conflicts. In the event of any inconsistencies between contractor proposals and this contract, the terms of this contract shall prevail. F.Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington. G.Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. H.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 Contnctor hereby e,xpressly con,enu to the personal and exclusve jurisdiction and venue of such court even If Contractor l.s a foreign corporation not rec'nered wlth the State of Washington. I.Severablllty A coun of compttent Jurisd1ctk>n's dtterminatlon that any provision or put of this Agreement is ille11I or untnforcuble shall not cancel or invalidate the remainder of this A&reement, which shall rema tn in full force and effect. J.Sole and Entire At,reement. This A&reemtnt contains the ent,r• •1re1ment of the Parties and any representations or undtrstimdins.s, whether oral or written, not incorporated are excluded. K.Third-Part\' Beneficiaries. Nothing in thrs Aareement ls tntendtd to, nor shall bt construed to 1:v, any riahts or ben1f,ts in the Aareemtnt to ,nyone other thi!'\ the Parties, end all dufes and res pons. bllities underuktn pursuant to this As;reement will be for the sole and tl<clusive benefit of the Parties i"'ld no one 1ls.e. L.Waivers. All Wilivers shall be in writlnc and Maned by the waMog party. Either p,irty's ',llure to enforce ,nv provision of this As;reem1nt shall not be I w,iver and shall not prev•nt either Cty or Contractor from enforcing th,t provision or any oth.r provision of this Aareement in the future. Waiver of breach of any provision of this Ag�eement shall not be deen-,ed to be a waiver o' any pdor or subsequent breach un ess it Is tl<pressty wa�ed in wtitin&- IN WITNESS WHEREOF, th.e Panles have volu"ltarily entered into this Ag.retment u of Effect ve Oatt. OTY OF RENTON Kelly Beymer - Parks and Receation Administrator 1055 South Grady W1y Renton, WA 98057 Attest CONTRACTOR a: ,· s��fi/ Trelst•d Tree, LLC PO Box 1167, Maple V1lley, WA 98038 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 5/30/2023 | 10:04 AM PDT -------------------- PAGE 11 OF 11 Jason A. Seth City Clerk Approved as to Legal Form _______________________________ Shane Moloney Renton City Attorney Small works Contract 3-16-23 Attachment A DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 (approved by Cheryl Beyer via email on 5/22/2023) City of Renton Parks and Recreation Department 2023 Route 169 Tree Maintenance Services Attachment A – Scope of Work City of Renton Community Services Department 2023 Maple Valley Highway Tree Work Services Attachment A – Scope of Work Project Manager: Ian Gray, Urban Forestry and Natural Resources Manager Contact Information: igray@rentonwa.gov; 425-430-6601 (Monday to Friday; 7:00 am–4:00 pm) The City of Renton requests tree maintenance services at one general location in the city. The work includes the removal of approximately 130 tree stems to low stumps. Please see the attached work list and site photos below for details. A map is provided, but bidders will need to locate the trees and understand which ones are to be removed. Additional requirements of the work are included below. It is your responsibility to read these requirements thoroughly and to become familiar with each site location and the work assigned. Please use the spreadsheet to submit your lump sum costs for the tree work inclusive of traffic control costs. Fill out your name, address and phone number and total costs on the form provided. Please return that sheet, including lists of equipment, ISA arborists with certification numbers and assigned crews along with the wage the wage affidavit to have your bid considered. Bids are due by 5:00 PM, Friday, April 21, 2023. Time of Performance: This project shall begin by June 29, 2023 but no sooner, and shall be completed not later than August 25, 2023. The contractor awarded the work will receive notice to proceed only when a Department of Labor & Industries Intent To Pay Prevailing Wages Declaration is filed with the State of Washington, certificate of insurance and business license are current and a vendor account is active. Minimum Requirements of Contractor •Renton Business License, registered contractor with the State of Washington, current State Unified Business Identifier Number •Proof of Insurance - Minimum amounts to be approved in advance by City Risk Management. Includes General Liability, Automobile Liability, Workers Compensation and Employers’ Liability. •Include with the first invoice the company’s intent to pay prevailing wage rates and submit the affidavit to pay prevailing wage rates at the completion of the contract with the final invoice. Labor rates shall be Prevailing Wage Rates for the industry. •A detailed list of equipment to be used during contract is required as part of the bid submission (preference will be given to contractors with insulated aerial lifts or equivalent bucket truck with a reach of at least 55' feet and a brush chipper with a minimum capacity of 10" inches). •All personnel shall wear the most up-to-date personal protective equipment including but not limited to safety vests and hard hats while on the job site in accordance with OSHA and ANSI •Use of traffic control equipment which meets the Manual of Traffic Control Devices requirements for each job location and follows City of Renton Traffic Control Plan requirements DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 City of Renton Parks and Recreation Department 2023 Route 169 Tree Maintenance Services Attachment A - Scope of Work •Possess the equipment and experience in lowering tree parts using ropes and other devices to prevent damage to turf, plants, irrigation, sidewalks, curbs, streets, signs, benches, fences and all other structures. *An Aerial lift or bucket truck is required for this contract. •Locations left incomplete at the end of the work day shall be barricaded to access from the public if needed to secure the site safely. Required Qualifications of Contractor and/or Tree Workers •An International Society of Arboriculture (ISA) Certified Arborist or ISA Certified Tree Climber MUST be in charge of each crew and be present on site for the duration of the work at each location. A list of names and certification numbers is required as part of the bid submission. •Familiarity with and adherence to: o American National Standard for Arboricultural Operations – Safety Requirements, ANSI Z133.1-2006 or newer. o American National Standard for Tree Care Operations – Tree, Shrub, and Other Woody Plant Management – Standard Practices (Pruning), ANSI A300 (Part I) - 2008 or newer. o Any deviations from ANSI standards must discussed with and approved by the Preferred Additional Qualifications of Contractor o Tree Care Industry Association Membership. o Society of Municipal Arborists Accreditation. Project Area Specifications – Prior to Beginning Work •Traffic Control Plan Approval – please see http://rentonwa.gov/living/default.aspx?id=880. •On-site meeting with the Project Manager or representative to review operations, public safety plan and traffic control plan. •Tree Locations – to view the trees in Renton’s Tree Inventory: Rentonwa.gov/How Do I?/Find/Map & GIS Data, then select Tree Inventory. Search by address or parcel number, zoom to see details. Note: Maps can be provided for Park Locations Tree Removal Specifications •Contractor shall be responsible for contacting locating services in advance of stump grinding work by calling 811. •Contractor must have staff that are line clearance certified or have access to line clearance certified personnel for locations indicated on the spreadsheet. •Removal includes the complete removal of all tree-related debris generated by the activity including litter, sawdust, chips, soil debris, twigs, leaves, needles, buds, branches, trunks, stumps, and surface roots, unless indicated otherwise. •Where debris is indicated to remain on site, stump heights and branches shall be no higher than 12 inches above grade. All tree stems and trunks shall lie flat on the ground. •Stumps and surface roots shall be ground to a minimum depth of 9 inches below existing grade, if no curb and sidewalk, or sidewalk grade when present. Stump and roots should not be visible in turf and along curbs and sidewalks, following grinding. Hand grubbing is required to remove roots too close to hard surfaces for grinding equipment. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 City of Renton Parks and Recreation Department 2023 Route 169 Tree Maintenance Services Attachment A - Scope of Work •Remove all stump and/or root grinding debris, unless indicated otherwise. The hole left from stump grinding can be temporarily covered with stump debris that is made level with surrounding grades until such debris can be removed and replacement soil added. •Stump debris shall be completely removed from the resulting holes, replaced with high quality topsoil (less than 3% organic matter), graded to match existing grades, lightly compacted, and the area seeded. Soil should be lightly raked to mix with seed and a high quality compost product broadcast lightly over the seed to cover. •Only official company personnel may enter the work site. Contractor is solely responsible for preventing others entering the work site especially those seeking to take wood. •All contractor activities, staff, and equipment shall work from the street right-of-way or City- owned property and not enter upon private property unless approved in advance by the Manager and the property owner. •Use of cranes or other heavy equipment shall be approved by the Project Manager in advance of submitting bids. •The use of materials (e.g. mats) that eliminate or minimize site damage is required. •Use of ropes to lower tree sections are required in order to prevent unnecessary damage to turf, plants, adjacent trees, all street, park or facility infrastructure and private property. Time and materials to repair damage from operations where tree parts were not safely lowered using ropes or other devices shall not be reimbursable. •All depressions created as the result of operations shall be made level with existing grades using high quality topsoil and seeded or sodded and top-dressed with a high quality compost product. •Repairs shall be to pre-existing conditions or better. The Project Manager will determine the extent of repairs from damage as a result of tree maintenance activities. •Damage that occurs as a direct result of contractor actions or inaction is the sole responsibility of the contractor. Tree Pruning Specifications •Only an ISA Certified Arborist shall prune trees. Non-certified workers are prohibited from pruning trees. •Minimum height following pruning shall provide for the following: o Street and Pathway – not less than 15 feet over the roadway and 8 feet over sidewalks o Clearance pruning around signs and streetlight sshould provide unobstructed view to sign and illumination cone of lights for the next 5 years. •Pruning cuts shall be made outside the branch bark ridge and branch collar. Cuts should be at an angle of 45 degrees from the branch bark ridge. •No stub-cutting or heading of branches is permitted. Prune branches to branch nodes only. •Remove entire branches whenever possible or if lion-tailing will be the end result. •Do not prune more than 25% of the total live crown unless authorized by the City. •Pruning dead branches means to remove 100% of dead twigs and branches. •The use of spurs to access trees and gas-powered pole saws (stick saws) to make pruning cuts are prohibited. •Reduction cuts shall follow the rule of thirds. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 City of Renton Parks and Recreation Department 2023 Route 169 Tree Maintenance Services Attachment A - Scope of Work •Use of ropes to lower tree sections should be considered in order to prevent unnecessary damage to turf, plants, adjacent trees, netting, all street, park or facility infrastructure and private property. Time and materials to repair damage from operations where tree parts were not safely lowered using ropes or other devices shall not be compensated. •Repairs shall be to pre-existing conditions or better. The Project Manager will determine the extent of repairs from damage as a result of tree pruning activities. •All depressions created as the result of operations shall be made level with existing grades using high quality topsoil and seeded or sodded. •Full site and off-site clean-up similar to conditions prior to beginning work is required. •Damage that occurs as a direct result of contractor actions or inaction is the sole responsibility of the contractor. •Pruning around street lights shall be performed with the end result that no branches are in the way of lights shining to the ground in a triangular illumination pattern. Special Conditions •Protect the public at all times using a combination of warning signs, barricades and company staff to prevent access to work zones. •Clean, hardwood wood chips generated from operations can be dumped at a City designated facility provided the Project Manager approves in advance; incidental leaves are acceptable. Conifer chips are not allowed to be dumped at such facilities. •All wood debris shall be recycled to the fullest extent possible. •Use of mats or plywood is mandatory when soil conditions are wet. •The attached short form contract agreement is an example of the contract used to execute the work. Invoices •Invoices should be submitted to: Ian Gray, Urban Forestry and Natural Resources Manager Parks and recreation Department, 6th Floor 1055 South Grady Way, Renton WA 98057 Email: igray@rentonwa.gov Telephone: 425-430-6601 •Invoices should contain the following information to prevent a delay in processing: o Contractor name, address and telephone number o Contract Number – assigned upon execution of agreement o Unique Invoice Number o Date work was performed o Each address and location where work was performed o Amount due, Washington sales tax and total amount due DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 P1B20 Worklist, Map and Notes The objective of this work is to reduce the risk of tree failures on to a busy roadway, but leave stumps and root wads in place to continue help stabilize the soil. This work will entail the removal of approximately 130 tree stems to low stumps along the north side of Route 169 – the Maple Valley Highway, opposite the Riviera Apartments. A constant and substantial amount of traffic control will be required, along with bucket trucks and chippers. One lane of westbound traffic will need to be closed during operations. A crane might need to be used to facilitate the removal of 2 tall cottonwood trees at the western-most end of the work zone. At 22” and 24” inches DBH respectively, these are the only trees currently logged in the inventory database. The bulk of the trees are Big Leaf Maples with a handful of Alders and smaller cottonwoods. These have not been measured, but range in diameter from a few inches to twenty inches. All debris will need to hauled or chipped. A sequence of photos is included below showing which trees are to be removed. The total number is approximate and reflects the number of stems as opposed to individual trees. On steeper banks the stumps may be left at 4-5’ feet if access is difficult. Chips can be dumped across the other side of the river next to the dog park. DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866 DocuSign Envelope ID: 70B299F7-3707-4FCD-A41D-E37AD1EFB866