Loading...
HomeMy WebLinkAboutMFP23002555.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23002555 IVR Number: 23002555 Permit Information Permit Name: N.898610 Address/Location:05/15/2023Application Date:3343301140Parcel Number: 1800 NE 44TH ST Permit Type:05/31/2023Issue Date:Franchise Permit Work Class:05/30/2024Expiration Date:Minor Utility Job Number: N.898610Franchise Type:Telephone Description: Lumen to remove 1 existing Ped, Place 1 new Ped and trench approx. 123' in soft surface. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Prime Electric Inc 3460 161ST Ave SE Bellevue, WA 98008 Applicant Stephen Neumann Fibe Solutions 604 W Meeker St., Suite 103 KENT, WA 98032 C: (425) 753-1916Applicant Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549ApplicantX Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Jesse Patjens CenturyLink / Lumen 23315 66th Ave S Kent, WA 98032 Contact Austin Sweeney Century Link 23315 66th Ave S Kent, WA 98032 C: (253) 766-7549Contact Michael Smith North Sky Communications 21320 84th Ave S Kent, WA 98032 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 23315 66th Ave S Kent, WA 98032 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Northsky Communications Tawnya Longfellow 22517 88th ave S Kent/WA 98031 1800 NE 44th St N.898610 6/15 7/15 425 615 7121 Lumen to remove 1 existing ped, place 1 new ped, and trench approx. 123' in soft surface. MFP23002555 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 5/31/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Austin Sweeney Austin Sweeney 5/15/2023 ADVANCE WARNING ARROW PANEL SHIFTING TAPER = 1/2 L SHOULDER TAPER = 1/3 L ≤ 40 MPH L=WS² 60 ≥ 45 MPH L=WSS = SPEED (MPH) L = TAPER LENGTH (FT.) W = WIDTH OF LATERAL SHIFT (FT.) BUFFER LENGTH GENERAL NOTES 1. PROJECTS WITH AN EXISTING SPEED LIMIT GREATER THAN 55 MPH MAY TEMPORARILY REDUCE BY 10 MPH OR TO 55 MPH, WHICHEVER IS LOWER, WITH THE CONCURRENCE FROM THE CHIEF TRAFFIC OPERATIONS ENGINEER. ANY TEMPORARY REDUCTIONS TO A SPEED LOWER THAN 55 MPH MAY BE REDUCED WITH CONCURRENCE FROM THE CHIEF TRAFFIC OPERATIONS ENGINEER AND A RECOMMENDATION FORWARDED BY TRAFFIC OPERATIONS TO THE DIRECTOR FOR APPROVAL. 2. THE W1-3 SIGNS SHALL BE USED WHEN THE RECOMMENDED SPEED ON A CURVE IS 30 MPH OR LESS, THE W1-4 SIGNS SHALL BE USED WHEN THE RECOMMENDED SPEED IS 35 MPH OR GREATER. 3. THE W6-3 AND R4-1 SIGNS SHALL BE INSTALLED ALTERNATELY AT 0.5 MILE INTERVALS WHEN THE LENGTHS OF CROSSOVERS EXCEED 0.5 MILE. 4. ALL REGULATORY SIGNS (R SERIES) SHALL BE BLACK ON RETRO REFLECTIVE WHITE. 5. ALL WARNING SIGNS (W SERIES) SHALL BE BLACK ON RETRO REFLECTIVE ORANGE. 6. WARNING SIGNS SHALL BE A MINIMUM OF 3'x3' FOR TOP SPEEDS OF 45 MPH OR LESS, R2-1 SHALL BE 4'x5'. 7. WARNING SIGNS SHALL BE A MINIMUM OF 4'x4' FOR SPEEDS OF 50 MPH OR GREATER, R2- SHALL BE 4'x5'. 8. ALL DEVICE SPACING SHALL BE DESIGNED BASED ON WORK ZONE SPEEDS SCOPE OF WORK THIS TRAFFIC CONTROL PLAN IS FOR THE FOLLOWING ROAD ENROACHMENTS IN CITY OF #### RIGHT OF WAY.WORK LOCATION: 1800 NE 44TH ST, RENTON, WA 98056, USA 208-916-8054 CITY OF RENTON AUSTIN SWEENEY MFP23002555 © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS 100'NTS22 0 ' B U F F E R S P A C E WORK AREA ROAD WORK AHEAD W20-1 LANECLOSED C30(CA) LANECLOSED C30(CA) 100' ROAD WORK AHEAD W20-1 NE 44TH ST 25 MPH NE 44TH ST 25 MPH NE 4 4 TH ST 2 5 MPHLAKE WASHINGTON BLVD NE 25 MPHLAKE WASHINGTON BLVD NE 25 MPH1. CONTRACTORS SHALL MAINTAIN ALL BUSINESS AND RESIDENTIAL ACCESS. 2. CONTRACTORS SHALL MAINTAIN ACCESS FOR ALL EMERGENCY VEHICLES. 3. "NO PARKING" SIGNS TO BE PLACED AS NEEDED 24 HOURS IN ADVANCE. 4. CONTRACTOR WILL GRADE AND MAINTAIN 12', DUST FREE TRAVEL LANES IN ALL DETOUR ROUTES UNLESS OTHERWISE NOTED. 5. ALL DEVICES WILL BE SETUP IN ACCORDANCE WITH THE MUTCD / N-DOT STANDARDS AND DEVICES WILL HAVE HIGH INTENSITY SHEETING. 6. CONTRACTOR WILL PLATE AND BACKFILL, PLACE BARRIER RAILS OR NON-CLIMB FENCE AROUND ANY OPEN EXCAVATION DURING NON-WORKING HOURS. 7. ALL EXCAVATIONS WITHIN 18' OF THE TRAVEL LANE DEEPER AND WIDER THAN 1' HAVING LESS THAN 4:1 SLOPE REQUIRE BARRIER RAIL. 8. UNPAVED DETOURS SHALL ONLY BE ALLOWED FOR 72 HOURS MAX. 9. CONTRACTORS SHALL MAINTAIN A SAFE PED. ROUTE 10. ALL TRAFFIC CONTROL MUST COMPLY WITH NRS-484. CONTRACTORS NOTES 28"(11cm)TRAFFIC CONES W/13"(5cm) REFLECTIVE SLEEVE FOR DAY/NIGHT USE OR DELINEATORS IF DAY USE ONLY TRAFFIC CONE WITH CLIP ON SIGN PROPOSED SIGN AND POST SIGNALIZED INTERSECTION FLASHING ARROWBOARD TYPE II BARRICADE W/O SIGN (3'H x 2'W) TYPE III BARRICADE W/SIGN (5'H x 4'W) HIGH LEVEL WARNING DEVICE WITH SIGN FLAGGER TOW AWAY NO STOPPING ANY TIME WORK ZONE LIMITS DIRECTION OF TRAFFIC TANSAT LEGEND S EXISTING DRIVEWAY SCALE AUSTIN SWEENEY MFP23002555 24+00 25+00 26+0 0 STA 24+65.5(NE)39.4'L REMOVE EX PEDESTAL **CAUTION EX GAS LINE** STA 25+60.4(NE)58.8'L EX PEDESTAL PROTECT IN PLACE 44TH ST TRENCH (1) 1.25" DUCT STA 24+75.1(NE)63.6'L EX WATER CROSSING CONTRACTOR TO POTHOLE DURING CONSTRUCTION STA 25+23.0(NE)58.3'L EX ELECTRIC CROSSING CONTRACTOR TO POTHOLE DURING CONSTRUCTION STA 24+69.7(NE)64.3'L PLACE BEND STA 24+69.5(NE)59.0'L PLACE NEW 1248 PEDESTAL TRENCH (1) 4" DUCT 13'B 110'A STA 24+57.8(NE)59.0'L INTERCEPT EX 4" DUCT & BSW STA 24+65.5(NE)59.0'L GAS CROSSING CONTRACTOR TO POTHOLE DURING CONSTRUCTION C.4N1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW EXISTING FINISHED GRADE. 2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS. Notes CenturyLink Conflict Resolution Plans CTL JOB: WC CLLI: N.898610 RNTNWA01 NEEDED: PERMITS Sheet R RAll methods, materials, content and form contained in this material are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed, or displayed without the express written permission of Terra Technologies LLC. The technology presented in this material is protected under various U.S. and international patents and pending patent applications, including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934. 44TH ST VET CLINIC PROJECT NO. XL5467 __________________WSDOT & C.O.R. CTL ENGINEER: PHONE: E-MAIL: JESSE PATJENS 425-429-5722 jesse.patjens@lumen.comUTILITY PLAN 0 4020 SCALE: 1" = 40' WSDOT R/W City of Renton R/W WSDOT R/W City of Renton R/W MFP23002555 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Property Line WSDOT Limited Access 1700 NE 44TH ST Parcel 3343301150 MFP23002555