Loading...
HomeMy WebLinkAboutMFP23002301.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23002301 IVR Number: 23002301 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:05/02/2023Application Date:1723059078Parcel Number: 601 WILLIAMS AVE S Permit Type:06/13/2023Issue Date:Franchise Permit Work Class:06/12/2024Expiration Date:Minor Utility Job Number: JB0001357590Franchise Type:Cable Description: Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Leah Ihlenfeldt Cablecom LLC 1316 Bonneville Avenue Snohomish, WA 98290 B: (360) 670-4291ApplicantX Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Contact CABLECOM LLC 20021 120th Ave NE, #101 BOTHELL, WA 98011 B: (360) 668-1300Contractor Business License Number: 52252Construction Contractor: CABLEL*971DP Jessamin Santos Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (206) 401-2188Emergency Contact MARKHAM JOY ANN 601 WILLIAMS AVE S RENTON , WA 98055 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Cablecom LLC Leah Ihlenfeldt 360-670-4291 1316 Bonneville Ave Snohomish, WA 98290 617 Williams Ave S Renton WA 98057 JB0001357590 Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. MFP23002301 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 6/8/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Jessamin Santos D/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WD/WBUS STOPBUS STOPCATVCATVCATVCATVOPOPOPROADWORKAHEADW20-1SHOULDERWORKW21-5ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RROADWORKAHEADW20-1ROADWORKAHEADW20-1RIGHTLANECLOSEDAHEADW20-5RW4-2RX XXXXX X X L/ 3RURAL ROADS & URBAN ARTERIALSURBAN STREETS25 MPH OR LESS100' +/- (2)200' +/- (2)35 / 40 MPH25 / 30 MPH350' +/- (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS.(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.SIGN SPACING = X (1)RURAL ROADS, URBAN ARTERIALS,RESIDENTIAL & BUSINESS DISTRICTSSPEED (MPH)25303540455055606570LENGTH (feet)250305360425495570645730155200TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = RHOST VEHICLE WEIGHT9,900 TO 22,000 OEV.HOST VEHICLE WEIGHT! 22,000 OEV.MPH50/7035/4525/30TAPERTANGENT403020806040CHANNELIZATION DEVICESPACING (feet)GENERAL NOTES:1.ALL "W" SERIES SIGNS SHALL BE 48" FLUORESCENT ORANGE, UNLESS OTHERWISE NOTED.2.NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS.3.PEDESTRIAN SPOTTERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TO MAINTAIN OPENSIDEWALKS AND ADA RAMPS.4.NOTIFY TRANSIT AUTHORITY FIVE DAYS PRIOR TO STARTING WORK.5.ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZINGDEVICES.SignTraffic Cone or DelineatorLEGENDWork VehicleW I L L I A M S A V E S 2 5 M P H LS GRADY WAY 35 MPH10550605660105125150205270165225295180245320540115-----7206607808402530354050551260116570LANEWIDTH(feet)50055060049545045Flashing Arrow Board11'11'12'13'11'18'21'21'617 Williams Ave S,Renton, WA 98057507 Williams Ave S,Renton, WA 98057900 S Grady Way,Renton, WA 98057TRAFFIC CONTROLTHIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIALAPPROVED:DRAWN BY:DESIGN:DESCRIPTIONREVDATEAPPROVED:APPROVED:PROJ#: CONSTRUCTION TYPE: SYSTEM: NODE: SHEET: OFCALL TOLL FREE48 HOURS BEFORE YOU DIGUNDERGROUND SERVICE ALERT1-800-227-2600IMPORTANT NOTICESection # 4216/4217 of the Government Code requires a Dig AlertIdentification Number to be issued before a "Permit to Excavate" will bevalid For your Dig Alert I.D.617 WILLIAMS AVE S, RENTON, WAJB1357590-MDUOVERLASH AND PROOF & PULLRENTON10ISSUE FOR PERMIT04/10/2023DOMTC-11SCALE: N.T.S.MFP23002301 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date COMCAST Jessamin Santos 206-401-2188 WAConstruction_JointUse@comcast.com 360-670-4291 CABLEL*971DP Cablecom LLC - Leah Ihlenfeldt 52252 COMCAST -JB0001357590 617 Williams Ave S Renton WA 98057 Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4".Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. 05/02/2023 MFP23002301 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (COAX/FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS AND FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. SHOW ENTIRE ROUTE FROM TIE IN TO CUSTOMER LOCATION Legend Provide Clear Construction Details *IMPORTANT CONSIDERATIONS FOR ROUTE OVERVIEW COMPLETION* New Ped New Vault Existing U/G Existing Aerial New U/G New Aerial Interior Path Exterior Building Path Footage Break FiberSplice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Power Suppy Hard Surface Cut Abandoned Cable 150' Text PS 1 C R V V R TIE IN LOCATION SP.WAKV.0072 POLE 1 POLE 2 POLE 3 VAULT 1 MFP23002301 1 1 Address: 1 1 New Aerial Coax:0 Overlash Coax:0 New UG Fiber:0 1 New Aerial Fiber:0 Overlash Fiber:320 Existing UG Fiber:175 1 Empty Conduit Only:0 New UG Coax:0 Existing UG Coax:0 1 MDUHFC 1 See Below 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (COAX/FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS AND FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. RIGHT OF WAY TAB IS OPTIONAL ON HYPERBUILD LATERAL JOB TYPES Legend Provide Clear Construction Details Are Additional Pages Needed:No NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS OVERVIEW Completed By:ANDREW LOMANS 617 Williams Ave S Renton WA 98057 Completion Date:2/28/2023 Right of Way Footages: Job Type:MDU Job Subtype:HFC Survey Scope:Post-Sale Project Manager:- P2 ID:JB0001357590 *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* New Ped New Vault Existing U/G ExistingAerial New U/G New Aerial Interior Path Exterior Building Path Footage Break Fiber Splice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Power Suppy Hard Surface Cut Abandoned Cable 150' Text PS 1 R V C R V TIE IN LOCATION SP.WAKV.0072 130' 150' 190' MFP23002301 1 1 Address: 1 1 New Aerial Coax:0 Overlash Coax:0 New UG Fiber:0 1 New Aerial Fiber:0 Overlash Fiber:0 Existing UG Fiber:0 1 Empty Conduit Only:0 New UG Coax:0 Existing UG Coax:0 1 MDUHFC 1 See Below 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Right of Way Completed By:ANDREW LOMANS 617 Williams Ave S Renton WA 98057 Completion Date:2/28/2023 Right of Way Footages: P2 ID:JB0001357590 Are Additional Pages Needed:No Job Type:MDU Job Subtype:HFC Survey Scope:Post-Sale Project Manager:- *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (COAX/FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS AND FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. RIGHT OF WAY TAB IS OPTIONAL ON HYPERBUILD LATERAL JOB TYPES Legend Provide Clear Construction Details Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. New Ped New Vault Existing U/G ExistingAerial New U/G New Aerial Interior Path Exterior Building Path Footage Break Fiber Splice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Power Suppy Hard Surface Cut Abandoned Cable 150' Text PS 1 R V C POLE 1 TIE IN LOCATION SP.WAKV.0072 POLE 2 TIE IN LOCATION SP.WAKV.0072 130' 190' MFP23002301 1 1 Address: 1 1 New Aerial Coax:0 Overlash Coax:0 New UG Fiber:0 1 New Aerial Fiber:0 Overlash Fiber:0 Existing UG Fiber:0 1 Empty Conduit Only:0 New UG Coax:0 Existing UG Coax:0 1 MDUHFC 1 See Below 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Right of Way Completed By:ANDREW LOMANS 617 Williams Ave S Renton WA 98057 Completion Date:2/28/2023 Right of Way Footages: P2 ID:JB0001357590 Are Additional Pages Needed:No Job Type:MDU Job Subtype:HFC Survey Scope:Post-Sale Project Manager:- *IMPORTANT CONSIDERATIONS FOR RIGHT OF WAY COMPLETION* NOTE ALL FUTURE PEDESTAL / VAULT LOCATIONS ENSURE YOU HAVE VERIFIED THE EXISTING COMCAST FACILITIES (COAX/FIBER / CASE LOCATIONS / SHEATHS PER CASE / SLACK LOCATIONS AND FOOTAGE / STRUCTURE) SHOWN ON THE FACILITY SEARCH MAP WITHIN THE CONSTRUCTION AREA. RIGHT OF WAY TAB IS OPTIONAL ON HYPERBUILD LATERAL JOB TYPES Legend Provide Clear Construction Details Tie in south of Pole 1. Proof and pull 150' from riser to Vault 1. Proof and pull 60' from Vault 1 up 4". Tie in through Pole 2 and 3, down riser through Vault and contunie working on private property. New Ped New Vault Existing U/G ExistingAerial New U/G New Aerial Interior Path Exterior Building Path Footage Break Fiber Splice Point Storage Loop Riser Pole Lock Box Footage Text Box Callout Arrow New Tap Phase Identifier Power Suppy Hard Surface Cut Abandoned Cable 150' Text PS 1 R V C R V POLE 3 VAULT 1 150' 60' 60' 25' 130' MFP23002301