Loading...
HomeMy WebLinkAboutAdden 1 CAG-15-224, Adden �1 -16 FORM: ADD-2015 (E1-2015) ADDENDUM NO. 1 ENGINEERING CONSULTANT AGREEMENT FOR PROFESSIONAL SERVICES for Cedar River 205 Project Levee Certification, CAG-15-224 This Addendum is made and entered into this ��� , day of 1'Y�L�. Zvi tv by and between the City of Renton, hereinafter called the "City", and Tetra Tech, Inc., whose address is, 1420 Fifth Ave, Suite 550,Seattle, WA 98101, hereinafter called the "Consultant". WITNESSETH THAT: WHEREAS, the City engaged the services of the consultant under Engineering Consultant Agreement CAG-15-224, dated December 7, 2015, to provide engineering services necessary for the Cedar River 205 Project Levee Certification; and WHEREAS, the City desires to complete the work associated with the Cedar River 205 Project Levee Certification, and the City does not have sufficient qualified engineering employees to perform the work within a reasonable time; and WHEREAS, the City and consultant have determined that additional services are required to complete the work items listed in Exhibit A Scope of Services under the original contract CAG-15-224, dated December 7, 2015; NOW,THEREFORE, in accordance with Section VIII Extra Work of the Master Agreement CAG-15-224, dated December 7, 2015, it is mutually agreed upon that Engineering Consultant Agreement CAG-15- 224, is amended to include the work and associated budget as follows: 1. The Scope of Work (Section I of the Master Agreement CAG-15-224) is modified to include the additional services on the attached Exhibit A. 2. The Payment (Section VI of the Master Agreement CAG-15-224) is modified to include payment for the additional work items defined in Exhibit A. The revised contract total payable for work on this contract addendum is increased from $98,908, to $106,541, making a difference of$7,633. The maximum amount payable for the additional work items defined in Exhibit A of this contract addendum is$7,633, without prior authorization from the City. All other provisions of Consultant Agreement CAG-15-224 dated December 7, 2015, shall apply to this addendum. H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3708 Cedar River Levee Recertification\1002 Phase 1 Scope and Contract\Addeddum 1\2014-12-17 ADDENDUM for E1-2015.doc\1Ltp Page 1 of 2 EXECUTION IN WITNESS WHEREOF, the parties have executed this Addendum No. 1 to ENGINEERING CONSULTANT AGREEMENT CAG-15-224 as of the day and year first above written. CONSULTANT CITY OF RENTON ��. �� Z c� � ���� - --�-�� Signature Date �Gregg i m rman Date Public s Administrator l,� �I 1 i �n�T� �� 1,\�e.�r--�-n,�. Type or Print Name ���rn�.��Qtit Title H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3708 Cedar River Levee Recertification\1002 Phase 1 Scope and Contract\Addeddum 1\2014-12-17 ADDENDUM for E1-2015.doc\JLtp Page 2 of 2 Exhibit A New Work—Task 9 Cedar River Gravel Removal Project, Special Provisions Specification Review Tetra Tech will provide review and comments of 90 percent status Contract Documents for the City of Renton Cedar River Gravel Removal project (Contract Documents). The project uses WSDOT Standard Specifications for or Road, Bridge, and Municipal Construction (Standard Specification). Tetra Tech's review objectives will be to cross check between contract drawings, contract specifications, and the contract bid schedule to check that work described in the plans and specifications is clearly defined, along with a corresponding pay item within the bid schedule, as applicable. An independent civil discipline review of design drawings will also be completed. The presentation and packaging of the Contract Documents will be reviewed for clarity and consistency of a project using the Standard Specification. Review and comment will be provided for the following components: • Contract Drawings • Bid Proposal Form and Bid Schedule(s) • Division 1 Special Provisions • Divisions 2-9 Special Provisions Review comments will be completed as red line markups of the drawings, track changes comments on Word documents, with a Technical Memorandum summarizing the other issues (general, packaging, and cross reference comments). Drawing comments will be scanned to electronically submit comments to the City for their review. After electronic submittal of the deliverables, Tetra Tech will meet with the City if requested to discuss the findings and questions that may arise. Assumptions • The project is to be constructed in accordance with Standard Specifications for Road, Bridge and Municipal Construction, 2014 edition, as issued by the Washington State Department of Transportation (WSDOT). • Technical discipline reviews of the Contract Documents design content, materials, and methods are understood to have been previously reviewed by others, so Tetra Tech's design review will focus on civil discipline and constructability issues. • Tetra Tech will review the drawing file "20151229 - Cedar River Gravel Removal_90percent_Submittal" and the bid item list "CRD_Bid Item List_01_07_2016_90percent_Draft" as received from the City, or as updated before the review process begins. • Tetra Tech will review the Bid Proposal Form and Bid Schedule(s) and Division 1 Special Provisions, to be provided by the City before the review process begins. • Tetra Tech will review the 02-18-16 file named "DIVISION 2-9_90%_Draft," as received from the City, or as updated before the review process begins. • One client meeting is included. Schedule • 02/29/16 — Notice to proceed by the City and Tetra Tech receipt of applicable Contract Documents, discussed above. • 03/07/16—Electronic submittal of deliverables to the City. • 03/14/16—Meeting with the City. H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3708 Cedar River Levee Recertification\1002 Phase 1 Scope and Contract\Addeddum 1 Deliverables • 90% Contract Document review will be submitted in electronic format, with scanned drawing comments, track changes specification comments, and Technical Memorandum summary of other issues. Budget = $7,633 (See Fee Estimate). H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3708 Cedar River Levee Recertification\1002 Phase 1 Scope and Contract\Addeddum 1 Fee Estimate:Tetra Tech with Subcontractor Roll-up FEMA Levee Certification-Cedar River 205 Levee,Phase 1,Modification 1 MoudyRates'� $93.34 � $82.09 � $72.12 � 552.17 � 558.57 � $75.61 � $34.41 � 561.98 � $34.36 � 54�.64 � $67.54 � $72.01 � $26.00 � $3179 � $31.85 � � Scoped Tasks Manager (OW�C H8H �ech Sr.Hyd.Eng. 5�.Crvil EnB� Sr.Shuc Eng.Sr.Mech.Eng. Sr.Ekc.Eng. MyE.Eng. Crv�l Eng. I Survey YLS SurveY 1 SuServicea�'ch GISICAD I Pro�ecf A¢at. Tohl ODCc I Total C�osIY,(Labor _ ,.< _ . r is , � . _:_ >..:$_ ,, ..., .�_- - ; ::�• i_, # '. t':;,. _ �F:-� �E'.: � ''� ':'�FTS� >�€ . .:.- � Project management 1 I I I I I I I I I I I I I 2 I 8 - I S 157 FEMA Coordinaeon I I I I I I I I I I I I I I I I E - I S - Clien[Meetings(1 meeUng) � � � � 4 � � � � � � � � � I �$ 20�S 234 Caordination Meetings(Internal 8 Ertemap 1 � � � � 1 � � � � � � � � � I I S - I$ 152 i I 1 I I I I 1 I I I I I 1 k: _ ::.... ... . .:..... _ '� � � �` .:y� �� ��:;.`,'=;.=�," , < . _ . _ . :�`.`t__.,__k',.. '�:,,::.�...:�, � ,_ , :"�3 --- � ,-- . . . r ._.. :. _ ;: _ .-=. Daw collec6on I I I I I I I 1 I I I$ - Reviewofinformaeon I I I I I I I I I I I 1 I I I IS - I I I I I I 1 I I I I I I ,��',v - �.�`�:: �`�_:: , �,•;. _.,. .:;.,V p ,.. _ �, ..._ :._ � . t`.. 3<_-.i �. �-:: a:;:_1;�,. <, _ - .. __e: x. ,_.,. ,. . _,.., . , _. ,. F�em s��eY i i i i i__.. . _:., , ,. s . ._. Data reducfion and mapp�ng � � � � � � � � � � � � . � I � �$ - I I I I I I I I I I I I I I I I .. � , , . ,.. . . �. . �,: ._.. '!�e#;.•;`�.! ,' ��e;:�".`�� �. , . �� __ �� - .._.,-..;...., _--.- .. . _...:..:-�� :�� 3 .. �I ._ .. � _ � .. i __. , � .. _. - ,..�;':.�'� .. . . ....,.. .... _ . .;.w... ._.... . ._. �-... :-.,., . _., _ . . ,:. . _ a... :- r.<,. _°.:_ Levee Inspec6on I� I 1 � I I I 1� I I 3 - S�te Recon Memo-Draft I I I I I I I I I I I I I I I I$ - Site Recon Memo-Final I I I I I I 1 I I I I I I I I I 3 - Embankment Protecuon Design Review � � � � � � � � � � � � � I � �$ - EmbankmentPro[ec4onMemo-Draft I I I I I I I I I I I I 1 I I I$ - EmbankmentProtechonMemo-Final � � � � � � � � � � � � � I � �$ - I � I I I I I I I I I I I I I _ , .. �:._ . � ,,_ _ f�a�€¢ '# As3�3i�,`c.w. . . . .- :,- : _:� '. :<_, s.. .: � , .i=." iz..-: _ f.;t' }__",".'; . , .. -.: -_. t= ;, ,. . .. Hyd�aulic assessment I I I �y�� I I I I I F $ - I I I I I I I I I I I I 1 I I I '�:�:; _. _.. : : . . ., _ "; ;..' '-'-'.' m;;>_�. .: ".`:� a .;,>-I' . %�� �"' _: �'`:- :.. :'_t:."' ..� _,_ . _�`: ��."; �:`'t �,�:"�> 'f`� 'a:,.. #�- =_;"��' GeotechmcaUSeuctural Evaluaeon I I I I I I I I I I I I I� $ - . . _ _ ...._ _.._. ... ,. . . �3�i'�:`-� . ...., ; _...�� .. :, . . ,r _. _,., ; .. �a.,_.�. .�i�:�,Y� . .... �:�'� •`��� . ..``�`�. .-�;_' .�.:'_atRR� �..;_��. ...'�'_�, ::':�: ,:'�' ....-. .: .... . . ,,a __-._ .s ���s,..�� ..,_��..- . ,... ,_._... . � � � ..,. _., .� ....�.....,... - - . ��:'�. . -�:;L`�, a- .. ,. . Needs Assessment Report DraB I I I 1 I$ - Needs Assessment Report-Final � � � � � � � � � � � � � � I � �$ - . ._.,. . . . ..�.,- r..: -._ .�::.:.. ...,,� . . _. a � I I I I 1 I I I I I I I I ��x::`'",�t . . ifaY�ar���:x`.._ ` , . -�, - <.� r, r� . ,�4 �. _,� - ,��' R_:_ _ ,. � <� ><, ,_ ,. _.,:: .�,�. a , ,., _ � :. < _ - �:.. r- �r . . Des�gn and Specs I I i � �$ - ff.�is�.�.'-� ._.. .. . ._ .. .. _.... ..... :. .:�.�� .�� �, �`;'.��. ':`.�.�....':.:.�-. '-'II� ..'.�-I" - .�.'F:`: �,.;,,,,,_.'#z��' �. .���`'. � .1";=;^. ...'�.':. .. . ,. ��;�"-,� . .. �'�:-,.a.:.,,::����� � -�.� . �,...: Contrect AdministraUon Review of 90%Contract Documents I � � � 34 � � � � � � � � � � $ `�10 �$ � 7 991� I I I I I I I I I I I I I 1 I I I �.�u,.r����,�v�a�r,ancn�oa..�a�e����..o�.�a����o���.�a�m��oraai�,���a�a���a�a�rv�Mr��„m,�e�.o��a�v�_„�o �TetraTeehLabor I$ 2.535 `Tech Services staff are at Labo�Muldplier of 14.82%-Tech Services staff hours are shaded as: � �Teha Tech ODGs �$ 30 Tetra Tech Overhead on labor-167.84% �$ 4,254 Tetra Tech Labor-Tech Services �$ - Teha Tech OH on Tech Services Labor-14.82% I$ - Tetn Tech Fee on Labor and OH-12% �$ 815 GeoEngineen Labor �$ - GeoEngineers ODCs I$ - GeoEngineen Overhead on Labor-213.19% I$ - GeoEngineers Fee an Lahor and OH-12% �$ - � Markup on subcontrectors 10% I S - � ,. ..��` `. -,� . , ..,:� . ,..._.,.._. .. .�_.�r� ..'�i�'. OCedarRiverGravelRemoval-FEE_Mod 1_02-25-t6.:ls: Total Cost RaI�uP 2/252016