Loading...
HomeMy WebLinkAboutAdden 1 CAG-15-221, Adden #1-16 �� Washington State '� Departmen#of Tfranspartation Suppiemen#al Agreement brganization and Address Number � DGK Inc, Original Agreement Number (D108 32nd Avenue W STE.D CAG-15-221 Everett,W A 9$204-f 302 Phnne: Project Number Execution Date CompEetion Date 11f20120t5 12/3it2017 Rroject T'�le New Maximum Amount Payable 1 l6th Avenue SE Sidewatk Fraject $16,176.56 Description of Work !t6th Avenue SE,classi6ed as a minor arterial,was annexed to the City of Rentoa in 200g.It generaily has two ianes for traffic with le8-turn lanes ae intersections in the current configuration. Sidewalks are intermittent. In order to enfianee vehicular,bicycle,and pedestrian safery along this eocridor,this praject will widen the roadway ta inciude bike Ianes,a two-way-teft-lane,new pavement,curt�s,gutters,sidewatks,street lights,traffic signa3s,stonn water drainage,striping and tandseaping,from Puget Drive SF,to the south City Limits. The Local Agency of�itv af Renton desires to supplement the agreement antered in to with DGK Inc• � „__. and executed on 1112o1zoj 5 and identified as Agreement Mo. CAG-i 5-221 , Af1 provisions in the basic agreement remain in effect excep#as expressly madified by this s�pplement. The changes to the agreement are described as fallows: 1 Section 1,SCOPE OF WORK, is hereby changed to read: This scope of work is amended to add support serviees for the ongaing environmental compliance reviews of the project during cons[ructian and provide weekly oversight to assure contractor comptiance with Washington State water quality standards and the King County permit. �� Section !V,TlME FOR BEGINNING AND COMPLETI4N, is amended to change the number of calendar days fOt"COtTIP�@�tOtl Of thB WOC�C t0�@ad: Th��fIlVIEFOR£-,XECtITION AND COMPLETION pf this proiect is amended to extend to 1?!3 i120}7 itl Section V, PAYMENT,shall be amended as follaws: 'Fhe ariginal agreement's maximurn amount payable oP$4,960.4U is inereased by this Sugplement by$11,216.16 for a new maximum amount payabte of$(6,176.56 in accordance with Exhibit B. , as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree ta the changes as stated above, ptease sign in the Appropriate spaces belaw and return to this a�ce far finai action. BY•DGK Inc.Jeanette C Widener Q,y; e Zimmerman Public Works Aciministrator � J � � nsu fant Signa ure r ature v ate DOT FomR 140-063 Revised 09t20Q5 I L Exhibit "A" Summary of Payments Basic Supplement#1 Total Agreement Direct Salary Cost 1,796.00 4,290.00 6,086.00 Overhead 1,975.60 4,719.00 6,694.60 (Including Payroll Additives) Direct Non-Salary Costs 650.00 920.16 1,570.16 Fixed Fee 538.80 1,287.00 1,825.80 Total 4,960.40 11,216.16 16,176.56 DOT Form 140-063 Revised 09/2005 Exhibit B Project Name 116th Ave SE Sidewalk Project CM CAG 15-221 Client City of Renton Public Works-Flora Lee Location City of Renton Date 11/28/2016 Project Senior Project Tasks Manager Biologist Biologist Total to com lete Hours Hours Hours DSC OH&Fee Total Construction Sup ort Erosion Control inspections (4 months and close out) 50 $3,200.00 8 $400.00 30 $690.00 $4,290.00 56,006.00 $10,296.00 Totalhours 50 8 30 Project Direct Rate Labor (DSC+OH Safe Harbor Rates Hours Rate +FEE) Labor Cost Pro'ect Cost Pro'ectMana er 50 $64.00 $153.60 $3;?00.00 $7,680.00 SeniorBiolo ist 8 $50.00 $120.00 $400.00 $960.00 Project Biolo ist 30 $23.00 $55.20 $690.00 $1,656.00 $4,290.00 a e ar or ver�ea ate /o �xe ze _ /o milea e 7l miles roundtri ) 1704 0.54 $ 920.16 TOTAL ESTIMATED COST $11,21616 This scope of work is amended to add support services for the ongoing environmental compliance reviews of the project during construction. The following tasks identify the work needed: Provide weekly oversight to assure contracror compliance with the State water quality standards and King County permit.