HomeMy WebLinkAboutAddendum - 7AMENDMENT NO. 7 TO AGREEMENT FOR THUNDER HILLS
SANITARY SEWER INTERCEPTOR REPLACEMENT PROJECT
THIS AMENDMENT, dated for reference purposes only as June 5, 2023, is by and between the
City of Renton (the “City”), a Washington municipal corporation, and Stantec Consulting Services,
Inc. (“Consultant”), a New York Corporation. The City and the Consultant are referred to
collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this
Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-16-108, dated
June 23, 2016, to provide necessary services for the Thunder Hills Sanitary Sewer Interceptor
Replacement Project (referred to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, change the
time for performance, and change the compensation in order to accommodate the construction
schedule, provide materials testing services and adjust project management fees to account for
current (2023) rates.
NOW THEREFORE, It is mutually agreed upon that CAG-16-108 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add and modify the Work as
specified in Exhibit A-7, which is attached and incorporated herein.
2.Time of Performance:Section V, Time of Beginning and Completion, is amended pursuant
to the schedule(s) set forth in Exhibit B-7. All Work shall be performed by no later than
February 28, 2024.
3. Compensation: Section VI , Payment, is amended so that the maximum amount of
compensation payable to Consultant is increased by $35,554.00 from $610,764.74 to
$646,318.74, plusany applicable state and local sales taxes. The additional compensation
shall be paid based upon Work actually performed according to the rate(s) or amounts
specified in Exhibit C-7 of the Agreement.
4.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
CAG-16-108, Adden #7-23
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Martin Pastucha
Public Works Administrator
Mike Van Doorn
Senior Principal
_____________________________
Date
_____________________________
Date
Approved as to Legal Form
By: __________________________
Shane Moloney
Renton City Attorney
Contract Template Updated 06/17/2021
Clb 6/8/23 (106)
Approved by Cheryl Beyer via 6/8/2023 email
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW ([KLELW$
$PHQGPHQW6FRSHRI6HUYLFHV3DJHRI
Exhibit A-7
SCOPE OF SERVICES
City of Renton
Thunder Hills Sanitary Sewer Interceptor Replacement Project
CAG-16-108 Amendment No. 7
Stantec Consulting Services Inc.
AMENDMENT DESCRIPTION AND PURPOSE
This amendment includes scope for material testing services during construction and
additional project management efforts due to the extended schedule.
The budget has also been adjusted to compensate for increases in the billing rates for
Stantec staff to reflect current (2023) rates as a result of the extended schedule.
6&23(2)6(59,&(6$1'7$6.6
The scope of services for this amendment consists of additional work required under the
following tasks:
Task 200 Project Management
The project was scheduled to be complete under Amendment 6(constructed) at the
end of 2022. The project is now scheduled for construction in 2023. The current project
management scope and budget are adequate to complete the project.
Task 201 Surveying
This task is complete.
Task 202 Design
This task is complete.
Task 203 Permitting
This task is complete.
Task 204 Bidding Services
This task is complete.
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW ([KLELW$
$PHQGPHQW6FRSHRI6HUYLFHV3DJHRI
7DVN &RQVWUXFWLRQ6XSSRUW6HUYLFHV
The budget was revised to account for the extended schedule and current (2023)
billing rates and for coordination of materials testing services.
Task 206 Materials Testing Services
The City has requested Stantec provide materials testing services during construction for
trench compaction and subgrade compaction for maintenance road repair. Stantec
will add Otto Rosenau as a subconsultant to the project to perform testing services
under this task. A 10% markup will be applied to all subconsultant billings. Stantec
coordination for this task will be provided under Task 205.
END OF EXHIBIT A-7
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW3URMHFW ([KLELW%
6FKHGXOH±'HVLJQ %LGGLQJ6HUYLFHV3DJHRI
9??DFWLYH??PDQDJHPHQW?DJUHHPHQW?DPHQGB?7KXQGHU+LOO%'HVLJQ6FKHGXOHB$PHQGPHQWB'UDIWBGRF[
(;+,%,7%
6&+('8/(
&LW\RI5HQWRQ
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW3URMHFW
'HVLJQDQG&RQVWUXFWLRQ6HUYLFHV
6WDQWHF&RQVXOWLQJ6HUYLFHV,QF
'XHWRWKHFKDQJHVLQWLPHWRFRPSOHWHGHVLJQDQGSHUPLWWLQJVHUYLFHVWKHSURMHFW
VFKHGXOHKDVEHHQPRGLILHGDVVKRZQEHORZ
6&+('8/(
• 1RWLFHWR3URFHHG±-XQH
• 6XUYH\(DVHPHQW([KLELWV±-XQHWR$XJXVW
• 'HVLJQ±-XO\WR)HEUXDU\
• 3HUPLWWLQJ±6HSWHPEHUWR'HFHPEHU
• 'HVLJQ5HYLVLRQV±0DUFKWR2FWREHU
• %LGGLQJ6HUYLFHV±0DUFKWR$SULO
• &RQVWUXFWLRQ6HUYLFHV±-XQHWR)HEUXDU\
$OOZRUNXQGHUWKLVFRQWUDFWWREHFRPSOHWHGE\)HEUXDU\
(1'2)(;+,%,7
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW3URMHFW ([KLELW&
&RPSHQVDWLRQIRU6HUYLFHV3DJHRI
9??DFWLYH??PDQDJHPHQW?DJUHHPHQW?DPHQGB?7KXQGHU+LOO&&RPSHQVDWLRQB$PHQGPHQWB'UDIWBGRF[
(;+,%,7&
&203(16$7,21)256(59,&(6
&LW\RI5HQWRQ
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW3URMHFW
'HVLJQDQG&RQVWUXFWLRQ6HUYLFHV
6WDQWHF&RQVXOWLQJ6HUYLFHV,QF
The additional scope of services will be accomplished by Stantec, with the current fee
amount of $610,764.74 (as modified pursuant to Amendment 6) increased to
$646,318.74 as summarized below.
7$6. '(6&5,37,21 &855(17
%8'*(7
$'',7,21$/%8'*(7 5(9,6('
%8'*(7
352-(&7
0$1$*(0(17
1$
6859(<,1*
($6(0(17(;+,%,76
1$
'(6,*1 1$
3(50,77,1* 1$
%,'',1*6(59,&(6 1$
&216758&7,21
68332576(59,&(6
0$7(5,$/7(67,1*
6(59,&(6
1$
727$/
7KXQGHU+LOOV6DQLWDU\6HZHU,QWHUFHSWRU5HSODFHPHQW3URMHFW ([KLELW$
&RPSHQVDWLRQIRU6HUYLFHV3DJHRI
9??DFWLYH??PDQDJHPHQW?DJUHHPHQW?DPHQGB?7KXQGHU+LOO&&RPSHQVDWLRQB$PHQGPHQWB'UDIWBGRF[
And the adjustment to the original fee estimate will be:
Revised Amendment 6 Fee Budget $610,764.74
Fee Budget (as modified by Amendment 7) $646,318.74
Net Increase in Fee Budget $35,554.00
The new “not-to-exceed” fee after execution of Amendment 7 is $646,318.