HomeMy WebLinkAboutAdden 1 CAG-14-068, Adden #1-15
Washington State
�AP Department of Transportation
Supplemental Agreement Organization and Address
Number 1 CivilTech Engineering,Inc.
400-112 Ave NE,Suite 120
Original Agreement Number Bellevue,WA 98004
CAG-14-068 Phone: (425)453-6488
Project Number Execution Date Completion Date
May 5,2014 December 31,2015
Project Title NE 31st St Culvert Repair Project, New Maximum Amount Payable
Replacement Alternative-Bridge $ 34,998.50
Description of Work
Perform Engineering Support Services during construction including completion of record drawings.
The Local Agency of City of Renton
desires to supplement the agreement entered into with CivilTech Engineering,Inc.
and executed on May 5,2014 and identified as Agreement No. CAG-14-068
All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
No changes.
II
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for
completion of the work to read: Change contract completion date from June 30,2015 to December 31,2015
III
Section V, PAYMENT, shall be amended as follows:
No changes.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces
below and return to this office for final action.
By: CivilTech Engineering, Inc. By. City of Renton
0
Consults ignature pr g Authority Signature
���1<
DOT Form 140-063 EF Date
Revised 9/2005