HomeMy WebLinkAboutAdden 4 ��► CAG-14-068 , Adden #4-17
Wasl�ngton State
�� t�epartmerrt of Tlrsansportation
Supplementai Agreement OrganizationandAddress
Number 4 CivilTech F,ngineering,Inc.
Original Agreement Number 400-I 12 Ave NE,Suite 120
Bellevuc,WA 98004
CAG-14-068
Phone: 425-453-6488
Project Number Execution Date Completion Date
TED403669 OS/OS/2014 12/31/2018
Project Title New Maximum Amount Payable
NE 31st St Culvert Repair Project,Replacement Alt.-Bridge $34,999.30
Descnption of Work _
Extend the contract completion date.
The Local Agency of Citv ofRencon
desires to supplement the agreement entered in to with C�vilTech En ineering,lnc.
and executed on o5/05/2014 and identified asAgreement No. CAG-�a-o68
All provisions in the basic agreement remain in effect except as expressly modified by this supplemenf.
The changes to the agreement are described as follows:
I
Section 1, SCOPE OF WORK, is hereby changed to read:
This Supplemental Agreement does not change the Scope of Work.
I I
Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days
f0�COmpl@t10t1 Of th�wO�k to fead: Chan�e contract completion date from December 31.2017 to December 31.2018
III
Section V, PAYMENT, shall be amended as follows:
This Supplemental Agreement does not change the maximum amount payable.
as set forth in the attached Exhibit A, and by this reference made a part of this supplement.
If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate
spaces below and return to this office for final action.
gy_ CivilTech En ineering,Inc. gy; Gre Zimmerman Public Works Administrator
� , ��
or�u�lta t ignature rovi uthority igna re
�rl�� i i 7
ae `
DOT Form 140-063
Revised 09/2005