Loading...
HomeMy WebLinkAboutAdden 4 ��► CAG-14-068 , Adden #4-17 Wasl�ngton State �� t�epartmerrt of Tlrsansportation Supplementai Agreement OrganizationandAddress Number 4 CivilTech F,ngineering,Inc. Original Agreement Number 400-I 12 Ave NE,Suite 120 Bellevuc,WA 98004 CAG-14-068 Phone: 425-453-6488 Project Number Execution Date Completion Date TED403669 OS/OS/2014 12/31/2018 Project Title New Maximum Amount Payable NE 31st St Culvert Repair Project,Replacement Alt.-Bridge $34,999.30 Descnption of Work _ Extend the contract completion date. The Local Agency of Citv ofRencon desires to supplement the agreement entered in to with C�vilTech En ineering,lnc. and executed on o5/05/2014 and identified asAgreement No. CAG-�a-o68 All provisions in the basic agreement remain in effect except as expressly modified by this supplemenf. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: This Supplemental Agreement does not change the Scope of Work. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days f0�COmpl@t10t1 Of th�wO�k to fead: Chan�e contract completion date from December 31.2017 to December 31.2018 III Section V, PAYMENT, shall be amended as follows: This Supplemental Agreement does not change the maximum amount payable. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. gy_ CivilTech En ineering,Inc. gy; Gre Zimmerman Public Works Administrator � , �� or�u�lta t ignature rovi uthority igna re �rl�� i i 7 ae ` DOT Form 140-063 Revised 09/2005